CN108176844B CN201810034512.8A CN201810034512A CN108176844B CN 108176844 B CN108176844 B CN 108176844B CN 201810034512 A CN201810034512 A CN 201810034512A CN 108176844 B CN108176844 B CN 108176844B
Authority
CN
China
Prior art keywords
upper nozzle
dross
steel bar
round steel
bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810034512.8A
Other languages
Chinese (zh)
Other versions
CN108176844A (en
Inventor
刘洪银
孙建卫
刘曌娲
路峰
王孝科
郝帅
王利
袁鹏举
亓伟伟
王奉县
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Laiwu Steel Group Yinshan Section Steel Co Ltd
Original Assignee
Shandong Iron and Steel Group Co Ltd SISG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Iron and Steel Group Co Ltd SISG filed Critical Shandong Iron and Steel Group Co Ltd SISG
Priority to CN201810034512.8A priority Critical patent/CN108176844B/en
Publication of CN108176844A publication Critical patent/CN108176844A/en
Application granted granted Critical
Publication of CN108176844B publication Critical patent/CN108176844B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D41/00Casting melt-holding vessels, e.g. ladles, tundishes, cups or the like
    • B22D41/50Pouring-nozzles
    • B22D41/52Manufacturing or repairing thereof
    • B22D41/54Manufacturing or repairing thereof characterised by the materials used therefor

Abstract

The invention belongs to technical field of ferrous metallurgy, in particular it relates to a kind of device and method for clearing up tundish upper nozzle dross object.In continuous casting process, when there is tundish upper nozzle dross phenomenon, turn the opening degree of stopper down, pulling rate is reduced to the 20%~30% of normal pulling rate, then the round steel bar of one section of calcic core is inserted into from hollow stopper to tundish upper nozzle, molten steel melts away the steel shell at concave point or concave, occurs pothole or gap on the circumferential surface of round steel bar, calcium core inside round steel bar is heated and becomes gaseous state, and gaseous calcium is ejected to the Al in tundish upper nozzle from pothole or gap2O3At dross object, Ca and Al2O3Dross object reacts.Clear up Al2O3The time of dross object is only 1~5 minute, pours the secondary time much smaller than replacement continuous casting, is conducive to the promotion of continuous casting yield;Caused by production loss much smaller than replacement tundish caused by loss.Stopper will not be corroded, the service life of stopper will not be reduced.

Description

A kind of device and method for clearing up tundish upper nozzle dross object
Technical field
The invention belongs to technical field of ferrous metallurgy, in particular it relates to a kind of cleaning tundish upper nozzle knot The device and method of effluent.
Background technique
Continuous casting is important procedure in metallurgical production process, important fire proofed wood of the mouth of a river as connection tundish and crystallizer Material, referred to as " neck " of continuous casting, have the function of forming a connecting link, are to ensure that the important link of continuous casting stable operation.Steel plant In continuous casting process, often there is dross and cause nozzle blocking in middle water containing opening and submersed nozzle, influence continuous casting casting and Slab quality.With the improvement of continuous casting process and the exploitation of refractory material, the service life at the mouth of a river is obviously improved, still, A1 can occur in casting process2O3And the other element dross phenomenons in part, especially blocked when casting Al killed steel, steel containing Al Phenomenon is very serious, annoyings continuous casting working procedure always.Nozzle clogging or blocking not only reduce the production efficiency of conticaster, influence whole A continuous casting process, and be one of the main reason for causing steel products defect.
Nippon installs core plate additional in the submersed nozzle ontology made of insulating materials, and before casting, core plate is led to Electric heating improves mouth of a river inner wall temperature, to avoid Al caused by sharply declining because of steel contacts mouth of a river inner wall temperature2O3Adherency. Sumitomo Metal Industries develop the technology for making molten steel generate vortex using tundish protrusion, and the steady flowing of molten steel effectively presses down The aggregation of nozzle blocking object is made.Japanese kobe steel is developed a kind of with air-cooled and electromagnetic mixing apparatus novel immersion The mouth of a river is machined with the ring-shaped groove of 10mm depth on the outer wall of the mouth of a river to increase cooling surface product, overall process low overheat may be implemented Casting, avoids nozzle blocking.Weirton steel plant, the U.S. have carried out mass production experiment and have mitigated Submerged Nozzle Clogging Course, take The measures such as molding casting can reduce the generation of field trash, to improve Cleanliness of Molten Steel.
For the needs for meeting high pulling rate sheet blank continuous casting, Tian Naiyuan etc. ([University of Science & Technology, Beijing's journal] 2002,24 (03): 262~265 " New Subermerged Entry Nozzle in Thin Slab Caster ") a kind of four side opening mouths of a river for being referred to as dissipative type are developed, it reduces The impact depth of molten steel and field trash, is conducive to the floating of field trash, can play to a certain extent prevents nozzle blocking Effect.Zhao Guangrong etc. ([this steel technology] 1997 (5): 49~53 " New Subermerged Entry Nozzle in Thin Slab Caster ") thinks rationally to set Meter mouth of a river inner-cavity structure is conducive to improve the blocking of mouth of a river inner cavity, traditional straight cavate mouth of a river inner-cavity structure steel in drainage process Water and mouth of a river inner wall direct contact area are big, A12O3Equal field trashes sticking probability is also big, is modified to stepped annular formula inner cavity The mouth of a river and bicyclic step type water gap, alleviate A12O3Equal field trashes adherency.([Yunnan metallurgy] 1997,26 (3): 39 such as Chen Chongfeng ~42 " preventing tundish from blocking new technology ") it studies and thinks when surface roughness is more than 0.3mm, the viscous portion in molten steel boundary layer Divide failure, the protective effect of viscous layer disappears, the Al in steel2O3Equal field trashes are easy to be enriched with, therefore mouth of a river working face should be as far as possible It is smooth.Su Long etc. ([Jiangsu metallurgy] 2003,31 (4): 14~15 " discussions that submersed nozzle shape influences slab quality ") Study and think from material, put forth effort to develop the nonmetal oxides material such as ZrB2, BN, ZrO-CaO-C material, low carbon materials (carbon < 5%), without silicon Al2O3The mouth of a river of the materials such as C-material and C and Si free materials, investment practice have certain anti-clogging effect.
What current various methods were mainly studied is how to improve gate structure, how to prevent and mitigate nozzle clogging, and right The dross mouth of a river considers considerably less, does not solve the problems, such as that nozzle clogging blocks fundamentally.
Aluminum killed steel nozzle clogging substance can be roughly divided into 4 classes: alumina type, calcium aluminate type, calcium sulfide type and spinelle Type.But it is substantially primarily due to dystectic aluminium oxide and a small amount of salic large polymer is gathered in mouth of a river surface Caused, Al in molten steel2O3Field trash constantly deposits on mouth of a river surface, and by initial dotted and graininess, gradually aggregation is tied It closes, is finally sintered slabbing, while is increasingly finer and close inside dross object, MOLTEN STEEL FLOW is more and more difficult, when stopper bar position is to most When high level is not still able to satisfy steel -passing amount requirement, it is necessary to replace the mouth of a river, but since tundish upper nozzle is to be embedded in tundish packet In lining, be installed in tundish building process in, tundish upper nozzle can not be replaced in continuous casting process online, so If due to Al2O3Field trash is deposited on that nozzle clogging caused by tundish upper nozzle then needs to stop pouring or heat changes tundish, stops It opens to pour again again after pouring and about needs 1~2 hour, be unfavorable for the efficient operation of continuous casting, the expense for replacing 1 tundish is about 2~3 Wan Yuan will cause the rising of production cost.
Calcium treatment is dystectic Al2O3Field trash is transformed into the 12CaO7Al of low melting point2O3Field trash, 12CaO (s)+ 7Al2O3(s)=12CaO7Al2O3(l), after Calcium treatment, inclusion content in melting steel will be controlled in suitable fusing point.Calcium treatment is not Foot, inclusion melting point is excessively high, easily causes nozzle blocking, and Calcium treatment is excessive, and inclusion melting point is low, liquefaction and nodularization, but stopper, The mouth of a river is easily corroded, and calcium corrodes mouth of a river matrix in steel, mouth of a river inner wall coarse, and high-melting-point field trash is easy precipitating and is adhered in the mouth of a river On wall, dross is caused.
After refining procedure carries out Calcium treatment to molten steel, in subsequent continuous casting process, influenced by secondary oxidation, in molten steel Calcium content can gradually decrease, and calcium treatment effect weakens, and even if w (Ca)/w (Al after Calcium treatments) and w (Ca)/w (Alin) Value control within zone of reasonableness, but if field trash absolute magnitude is big, pourability of molten steel is still poor, easily causes mouth of a river knot Tumor problem.The casting sequence of steel mill, country production Ultra-low carbon aluminum killed steel (C≤0.005%) is respectively less than 10 furnaces at present.
So although Calcium treatment can alleviate nozzle clogging phenomenon, field trash absolute magnitude is big or Calcium treatment misoperation In the case where or can cause nozzle clogging phenomenon.
Summary of the invention
In order to solve the above problem, the present invention is for the tundish upper nozzle of dross, provide it is a kind of from hollow stopper to The method that middle water containing opening is inserted into the rod iron of calcic core to solve the problems, such as tundish upper nozzle dross.
In continuous casting process, when there is tundish upper nozzle dross phenomenon, the opening degree of stopper is turned down, reduce pulling rate to just Then the 20%~30% of normal pulling rate is inserted into the round steel bar of one section of calcic core from hollow stopper to tundish upper nozzle, described to contain Ca containing simple substance inside the round steel bar of calcium core, outside are one layer of steel round tube, and the bottom and top of steel round tube seal, steel round tube Circumferential surface gather concave point or concave.Molten steel melts away the steel shell at concave point or concave, occurs on the circumferential surface of round steel bar Pothole or gap, calcium core inside round steel bar is heated to become gaseous state (boiling point of calcium is 1484 DEG C, is lower than liquid steel temperature), gaseous calcium The Al being ejected to from pothole or gap in tundish upper nozzle2O3At dross object, Ca and Al2O3Following reaction occurs for dross object:
12Ca(g)+11Al2O3(s)=8Al (l)+12CaO7Al2O3(l),
Ca and Al2O3Reaction generates the 12CaO7Al of low melting point2O3, 12CaO7Al2O3Fusing point be about 1400 DEG C, It is liquid under molten steel temperature, is flowed into crystallizer with steel stream, the 12CaO7Al of generation2O3Field trash has slab quality larger It influences, gets rid of base processing, the slab that crystallizer in this period for clearing up tundish upper nozzle dross object is produced is cut off.
The present invention provides a kind of device of Al2O3 dross object at cleaning tundish upper nozzle, round steel bar including calcic core, Fire proofed wood charge bar, hollow stopper, horizontal clamper and vertical lift frame;Vertical lift frame is connected with horizontal clamper, by hanging down Straight crane can control the vertical displacement movement of horizontal clamper, and horizontal clamper is connected with the upper end of fire proofed wood charge bar, passes through Horizontal clamper can fix fire proofed wood charge bar, and fire proofed wood charge bar is driven to do vertical up-or-down movement, the outer diameter of fire proofed wood charge bar with The outer diameter of the round steel bar of calcic core is identical, and the lower end of fire proofed wood charge bar is connected with the round steel bar of calcic core, fire proofed wood charge bar and calcium The axis of the round steel bar of core is identical, and the oscilaltion campaign by being vertically moved up or down frame can be by the round steel of fire proofed wood charge bar and calcic core Stick is inserted into hollow stopper or extracts out of hollow stopper.
Preferably, the length of the round steel bar of calcic core and the length of tundish upper nozzle are identical, and 50 are contained inside round steel bar ~300g calcium, outside are one layer of steel round tube, and the wall thickness of steel round tube is 5~20mm, and the bottom and top of steel round tube seal, The depth of the densely covered concave point of the circumferential surface of steel round tube or concave, concave point or concave is 4~19mm.
Preferably, the hollow stopper is elongated cylindrical structure, and the inside of hollow stopper is equipped with cooperation round steel bar insertion Hollow tube, hollow stopper upper end is fixed with horizontal clamper.
Preferably, the horizontal clamper is made of the horizontal clamper of stopper and the horizontal clamper of fire proofed wood charge bar, plug The horizontal clamper one end of stick is connected with vertical lift frame, and the other end is folded with hollow stopper and held;The horizontal clamper of fire proofed wood charge bar, One end is connected with vertical lift frame, and the other end is folded with fire proofed wood charge bar and held.
Preferably, the vertical lift frame is made of lifting pipe and fixed plate, and lifting pipe is connected with horizontal clamper, Gu Fixed board is fixed on tundish side wall, and the height of clamper is adjusted by vertical lift frame.
The present invention also provides Al at a kind of processing tundish upper nozzle2O3The method of dross object, including the following steps:
A) judge that dross phenomenon occurs for tundish upper nozzle:
In the case where pulling speed of continuous casting significantly reduces and can not also improve pulling rate after replacement crystallizer invasive nozzle, this When be judged as have occurred tundish upper nozzle occur dross phenomenon,
It B) will be in the round steel bar insertion tundish upper nozzle of calcic core:
Pulling rate is reduced at this time is inserted into tundish upper nozzle to the 20%~30% of normal pulling rate, and by the round steel bar of calcic core Interior, the upper end of the round steel bar of calcic core is connect with fire proofed wood charge bar, and the upper end of fire proofed wood charge bar is fixed on horizontal clamper, is adjusted Section vertical lift frame, is in the round steel bar of calcium core in tundish upper nozzle;
C) Ca steam clears up Al2O3Dross object:
The round steel bar of calcic core is in high-temperature molten steel environment after about 5~15 seconds, and molten steel can burn round steel bar circumference table There is pothole or gap on the circumference of round steel bar in steel shell at face densely covered concave point or concave, and the calcium core inside round steel bar is heated Become gaseous state, gaseous calcium is ejected to the Al in tundish upper nozzle from pothole or gap2O3At dross object, Ca and Al2O3Dross Object, which reacts, generates 12CaO7Al2O3, by Al2O3Dross object cleans up.
D) fire proofed wood charge bar is extracted:
The round steel bar of calcic core can all be melted after being inserted into molten steel 50~200 seconds by molten steel, promote vertical lift frame at this time, Fire proofed wood charge bar is extracted from molten steel.
E pulling rate) is promoted:
By the Al in tundish upper nozzle2O3After dross object dross object is cleaned out, slowly improves pulling speed of continuous casting and drawn to normal Speed.
F unqualified slab) is cut off:
At slab scale position, by the casting produced of crystallizer in this period for clearing up tundish upper nozzle dross object The method of base gas flame cuttiug is cut off.
Ca and Al2O3Reaction generates the 12CaO7Al of low melting point2O3, 12CaO7Al2O3, fusing point be about 1400 DEG C, It is liquid, the 12CaO7Al of generation under molten steel temperature2O3Field trash with steel stream flow into crystallizer in, to slab quality have compared with It is big to influence, base processing is got rid of, at slab scale position, by crystallizer in this period for clearing up tundish upper nozzle dross object The method for the slab gas flame cuttiug produced is cut off.
Advantages of the present invention
1) present invention proposes a kind of Al cleared up in the tundish upper nozzle of dross2O3The method of dross object, cleaning knot Al after beam2O3Dross object becomes liquid 12CaO7Al2O3It is mingled with and flows into crystallizer, pulling speed of continuous casting can be promoted to normal pulling rate Range, tundish can continue to be poured.Clear up Al2O3The time of dross object is only 1~5 minute, much smaller than replacement continuous casting pour time when Between, be conducive to the promotion of continuous casting yield;Clear up Al2O3The weight of the unqualified slab generated in the dross object time is only 0.5~ 2.5 tons, caused by production loss much smaller than replacement tundish caused by loss.
2) molten steel stream in the case where the 20%~30% of reduction Casting speed to normal pulling rate, at tundish upper nozzle Dynamic speed is still very fast, and speed reaches 0.1~0.3 meter per second, and under the drive of the molten steel quickly flowed, unreacted Ca is with steel Stream enters in crystallizer, and Ca will not corrode stopper, will not reduce the service life of stopper.
Detailed description of the invention
Fig. 1, a kind of device usage state diagram for solving the problems, such as tundish upper nozzle dross.
The round steel bar configuration state figure of Fig. 2, calcic core.
The round steel bar sectional view of Fig. 3, calcic core.
Wherein: 1 is molten steel;2 be crystallizer;3 be invasive nozzle;4 be the round steel bar of calcic core;5 be water on tundish Mouthful;6 be fire proofed wood charge bar;7 be tundish;8 be hollow stopper;9 be first level clamper;10 be the second horizontal clamper; 11 be lifting pipe;12 be fixed plate;41 be concave point or concave;42 be steel round tube;43 be calcium core.
Specific embodiment:
The following examples are further illustrations of the invention, but the present invention is not limited thereto.
The dross of tundish upper nozzle is solved the problems, such as using equipment as shown in Figure 1, Figure 2, Figure 3 shows, is cleared up on tundish The device of Al2O3 dross object is mainly by the round steel bar 4 of calcic core, fire proofed wood charge bar 6, hollow stopper 8, horizontal clamper at the mouth of a river With vertical lift frame composition.Vertical lift frame is connected with horizontal clamper, can control horizontal clamper by being vertically moved up or down frame Vertical displacement movement, horizontal clamper are connected with the upper end of fire proofed wood charge bar, can fix fire proofed wood charge bar by horizontal clamper, And fire proofed wood charge bar is driven to do vertical up-or-down movement, the outer diameter of fire proofed wood charge bar is identical as the outer diameter of the round steel bar of calcic core, resistance to The lower end of fiery material bar is connected with the round steel bar of calcic core, and fire proofed wood charge bar is identical with the axis of the round steel bar of calcium core, by hanging down The oscilaltion campaign of straight crane can will be in the hollow stopper of the round steel bar of fire proofed wood charge bar and calcic core insertion or from hollow plug It is extracted in stick.
A: the length of the round steel bar 4 of calcic core is identical as the length of tundish upper nozzle 5, is containing weight inside round steel bar 50~300g calcium core 43, outside are one layer of steel round tube 42, and the wall thickness of steel round tube 42 is 5~20mm, the bottom of steel round tube 42 The depth of portion and top sealing, the densely covered concave point of the circumferential surface of steel round tube 42 or concave 41, concave point or concave is 4~19mm.
B: fire proofed wood charge bar 6 is inserted into hollow stopper 8, and the outer diameter of fire proofed wood charge bar 6 is identical as the outer diameter of round steel bar 4, resistance to The upper end of fiery material bar 6 and first level clamper 9 are fixed, and lower end is connected with the round steel bar 4 of calcic core.
C. the hollow stopper 8 is elongated cylindrical structure, and the inside of hollow stopper 8 is equipped with what cooperation round steel bar 4 was inserted into Hollow tube, hollow 8 upper end of stopper and the second horizontal clamper 10 are fixed;
D. the vertical lift frame is made of lifting pipe 11 and fixed plate 12, lifting pipe 11 and first level clamper 9, Second horizontal clamper 10 is connected, and fixed plate 12 is fixed on the side wall of tundish 7, adjusts first level by vertical lift frame The height of clamper 9 and the second horizontal clamper 10.
In the case where pulling speed of continuous casting significantly reduces and can not also improve pulling rate after replacement crystallizer invasive nozzle, this When be judged as that tundish upper nozzle, which has occurred, occurs dross phenomenon, taken in following operating procedure cleaning tundish upper nozzle at this time Dross object:
The round steel bar 4 of calcic core is inserted into tundish upper nozzle by A: the 20% of reduction pulling speed of continuous casting to normal pulling rate~ 30%, and the round steel bar of calcic core 4 is inserted into tundish upper nozzle 5, the upper end of the round steel bar 4 of calcic core and fire proofed wood charge bar 6 connections, the upper end of fire proofed wood charge bar 6 are fixed on first level clamper 9, and adjusting vertical lifting frame makes the round steel bar 4 of calcium core In tundish upper nozzle 5
B.Ca steam clears up Al2O3Dross object: the round steel bar 4 of calcic core is in the hot environment of molten steel 1 about 10 seconds Afterwards, molten steel 1 can burn the steel shell at 4 circumferential surface of round steel bar densely covered concave point or concave 41, occur on the circumference of round steel bar recessed Hole or gap, calcium core 43 inside round steel bar 4 is heated to become gaseous state, and gaseous calcium is ejected to water on tundish from pothole or gap Al in mouth 52O3At dross object, Ca and Al2O3Dross object, which reacts, generates 12CaO7Al2O3, by Al2O3The cleaning of dross object Fall.
C. fire proofed wood charge bar 6 is extracted: the round steel bar 4 of calcic core was inserted into molten steel 1 after 50~200 seconds can be complete by molten steel 1 Portion's fusing promotes vertical lift frame at this time, fire proofed wood charge bar 6 is extracted from molten steel 1.
D: pulling rate is promoted: by the Al in tundish upper nozzle 52O3After dross object dross object is cleaned out, continuous casting is slowly improved Pulling rate is to normal pulling rate.
E: unqualified slab: Ca and Al is cut off2O3Reaction generates the 12CaO7Al of low melting point2O3, 12CaO7Al2O3, Fusing point be about 1400 DEG C, under molten steel temperature be liquid, the 12CaO7Al of generation2O3Field trash flows into crystallizer 2 with steel stream It is interior, there is larger impact to slab quality, get rid of base processing, at the position of slab scale, 5 dross of tundish upper nozzle will be cleared up The method for the slab gas flame cuttiug that crystallizer is produced in this period of object is cut off.
Embodiment 1:
Below citing and a kind of 1,2,3 pair of the adapting device schematic diagram method for solving the problems, such as tundish upper nozzle dross do into One step explanation.
The big inclusion quantity of continuous casting are as follows: 50 tons, continuous casting installation for casting are as follows: rectangle blank continuous caster, three machines three stream, casting blank specification 180mm ×220mm。
Clear up tundish upper nozzle at Al2O3 dross object device mainly by the round steel bar 4 of calcic core, fire proofed wood charge bar 6, Hollow stopper 8, horizontal clamper and vertical lift frame composition.Vertical lift frame is connected with horizontal clamper, passes through vertical lift Frame can control the vertical displacement movement of horizontal clamper, and horizontal clamper is connected with the upper end of fire proofed wood charge bar, be pressed from both sides by level Holder can fix fire proofed wood charge bar, and fire proofed wood charge bar is driven to do vertical up-or-down movement, the outer diameter and calcic core of fire proofed wood charge bar Round steel bar outer diameter it is identical, the lower end of fire proofed wood charge bar is connected with the round steel bar of calcic core, the circle of fire proofed wood charge bar and calcium core The axis of rod iron is identical, and the round steel bar of fire proofed wood charge bar and calcic core can be inserted by the oscilaltion campaign by being vertically moved up or down frame It is extracted in hollow stopper or out of hollow stopper.
A: the length of the round steel bar 4 of calcic core is identical as the length of tundish upper nozzle 5, is containing weight inside round steel bar 50g calcium core 43, outside are one layer of steel round tube 42, and the wall thickness of steel round tube 42 is 5mm, and the bottom and top of steel round tube 42 are close The depth of envelope, the densely covered concave point of the circumferential surface of steel round tube 42 or concave 41, concave point or concave is 4mm.
B: fire proofed wood charge bar 6 is inserted into hollow stopper 8, and the outer diameter of fire proofed wood charge bar 6 is identical as the outer diameter of round steel bar 4, resistance to The upper end of fiery material bar 6 and first level clamper 9 are fixed, and lower end is connected with the round steel bar 4 of calcic core.
C. the hollow stopper 8 is elongated cylindrical structure, and the inside of hollow stopper 8 is equipped with what cooperation round steel bar 4 was inserted into Hollow tube, hollow 8 upper end of stopper and the second horizontal clamper 10 are fixed;
D. the vertical lift frame is made of lifting pipe 11 and fixed plate 12, lifting pipe 11 and first level clamper 9, Second horizontal clamper 10 is connected, and fixed plate 12 is fixed on the side wall of tundish 7, adjusts first level by vertical lift frame The height of clamper 9 and the second horizontal clamper 10.
In the case where pulling speed of continuous casting significantly reduces and can not also improve pulling rate after replacement crystallizer invasive nozzle, this When be judged as that tundish upper nozzle, which has occurred, occurs dross phenomenon, taken in following operating procedure cleaning tundish upper nozzle at this time Dross object:
The round steel bar 4 of calcic core is inserted into tundish upper nozzle by A: reduction pulling speed of continuous casting to the 20% of normal pulling rate, and The round steel bar 4 of calcic core to be inserted into tundish upper nozzle 5, the upper end of the round steel bar 4 of calcic core is connect with fire proofed wood charge bar 6, The upper end of fire proofed wood charge bar 6 is fixed on first level clamper 9, adjusting vertical lifting frame, is made during the round steel bar 4 of calcium core is in Between wrap in the mouth of a river 5
B.Ca steam clears up Al2O3Dross object: the round steel bar 4 of calcic core is in the hot environment of molten steel 1 about 10 seconds Afterwards, molten steel 1 can burn the steel shell at 4 circumferential surface of round steel bar densely covered concave point or concave 41, occur on the circumference of round steel bar recessed Hole or gap, calcium core 43 inside round steel bar 4 is heated to become gaseous state, and gaseous calcium is ejected to water on tundish from pothole or gap Al in mouth 52O3At dross object, Ca and Al2O3Dross object, which reacts, generates 12CaO7Al2O3, by Al2O3The cleaning of dross object Fall.
C. fire proofed wood charge bar 6 is extracted: the round steel bar 4 of calcic core was inserted into molten steel 1 after 50 seconds can be all molten by molten steel 1 Change, promotes vertical lift frame at this time, fire proofed wood charge bar 6 is extracted from molten steel 1.
D: pulling rate is promoted: by the Al in tundish upper nozzle 52O3After dross object dross object is cleaned out, continuous casting is slowly improved Pulling rate is to normal pulling rate.
E: unqualified slab: Ca and Al is cut off2O3Reaction generates the 12CaO7Al of low melting point2O3, 12CaO7Al2O3, Fusing point be about 1400 DEG C, under molten steel temperature be liquid, the 12CaO7Al of generation2O3Field trash flows into crystallizer 2 with steel stream It is interior, there is larger impact to slab quality, get rid of base processing, at the position of slab scale, 5 dross of tundish upper nozzle will be cleared up The method for the slab gas flame cuttiug that crystallizer is produced in this period of object is cut off.
Clear up Al2O3The time of dross object is only 1 minute, pours the secondary time much smaller than replacement continuous casting, is conducive to continuous casting yield Promotion;Clear up Al2O3The weight of the unqualified slab generated in the dross object time is only 0.5 ton, caused by production loss it is far small In replacing loss caused by tundish.
Molten steel flow speed in the case where the 20% of reduction Casting speed to normal pulling rate, at tundish upper nozzle 5 Still very fast, speed reaches 0.1~0.3 meter per second, and under the drive of the molten steel quickly flowed, unreacted Ca enters with steel stream In crystallizer 2, Ca will not corrode stopper, will not reduce the service life of stopper.
Embodiment 2
Below citing and a kind of 1,2,3 pair of the adapting device schematic diagram method for solving the problems, such as tundish upper nozzle dross do into One step explanation.
The big inclusion quantity of continuous casting are as follows: 120 tons, continuous casting installation for casting are as follows: heavy slab billet continuous casting machine, a machine are first-class, casting blank specification is 250mm×2200mm。
Clear up tundish upper nozzle at Al2O3 dross object device mainly by the round steel bar 4 of calcic core, fire proofed wood charge bar 6, Hollow stopper 8, horizontal clamper and vertical lift frame composition.Vertical lift frame is connected with horizontal clamper, passes through vertical lift Frame can control the vertical displacement movement of horizontal clamper, and horizontal clamper is connected with the upper end of fire proofed wood charge bar, be pressed from both sides by level Holder can fix fire proofed wood charge bar, and fire proofed wood charge bar is driven to do vertical up-or-down movement, the outer diameter and calcic core of fire proofed wood charge bar Round steel bar outer diameter it is identical, the lower end of fire proofed wood charge bar is connected with the round steel bar of calcic core, the circle of fire proofed wood charge bar and calcium core The axis of rod iron is identical, and the round steel bar of fire proofed wood charge bar and calcic core can be inserted by the oscilaltion campaign by being vertically moved up or down frame It is extracted in hollow stopper or out of hollow stopper.
A: the length of the round steel bar 4 of calcic core is identical as the length of tundish upper nozzle 5, contains weight inside round steel bar 4 For 300g calcium core 43, outside is one layer of steel round tube 42, and the wall thickness of steel round tube 42 is 20mm, the bottom and top of steel round tube 42 The depth of portion's sealing, the densely covered concave point of the circumferential surface of steel round tube 42 or concave 41, concave point or concave is 19mm.
B: fire proofed wood charge bar 6 is inserted into hollow stopper 8, and the outer diameter of fire proofed wood charge bar 6 is identical as the outer diameter of round steel bar 4, resistance to The upper end of fiery material bar 6 and first level clamper 9 are fixed, and lower end is connected with the round steel bar 4 of calcic core.
C. the hollow stopper 8 is elongated cylindrical structure, and the inside of hollow stopper 8 is equipped with what cooperation round steel bar 4 was inserted into Hollow tube, hollow 8 upper end of stopper and the second horizontal clamper 10 are fixed;
D. the vertical lift frame is made of lifting pipe 11 and fixed plate 12, lifting pipe 11 and first level clamper 9, Second horizontal clamper 10 is connected, and fixed plate 12 is fixed on the side wall of tundish 7, adjusts first level by vertical lift frame The height of clamper 9 and the second horizontal clamper 10.
In the case where pulling speed of continuous casting significantly reduces and can not also improve pulling rate after replacement crystallizer invasive nozzle, this When be judged as that tundish upper nozzle, which has occurred, occurs dross phenomenon, taken in following operating procedure cleaning tundish upper nozzle at this time Dross object:
The round steel bar 4 of calcic core is inserted into tundish upper nozzle by A: reduction pulling speed of continuous casting to the 30% of normal pulling rate, and The round steel bar 4 of calcic core to be inserted into tundish upper nozzle 5, the upper end of the round steel bar 4 of calcic core is connect with fire proofed wood charge bar 6, The upper end of fire proofed wood charge bar 6 is fixed on first level clamper 9, adjusting vertical lifting frame, is made during the round steel bar 4 of calcium core is in Between wrap in the mouth of a river 5
B.Ca steam clears up Al2O3Dross object: the round steel bar 4 of calcic core is in the hot environment of molten steel 1 about 10 seconds Afterwards, molten steel 1 can burn the steel shell at 4 circumferential surface of round steel bar densely covered concave point or concave 41, occur on the circumference of round steel bar recessed Hole or gap, calcium core 43 inside round steel bar 4 is heated to become gaseous state, and gaseous calcium is ejected to water on tundish from pothole or gap Al in mouth 52O3At dross object, Ca and Al2O3Dross object, which reacts, generates 12CaO7Al2O3, by Al2O3The cleaning of dross object Fall.
C. fire proofed wood charge bar 6 is extracted: the round steel bar 4 of calcic core was inserted into molten steel 1 after 200 seconds can be all molten by molten steel 1 Change, promotes vertical lift frame at this time, fire proofed wood charge bar 6 is extracted from molten steel 1.
D: pulling rate is promoted: by the Al in tundish upper nozzle 52O3After dross object dross object is cleaned out, continuous casting is slowly improved Pulling rate is to normal pulling rate.
E: unqualified slab: Ca and Al is cut off2O3Reaction generates the 12CaO7Al of low melting point2O3, 12CaO7Al2O3, Fusing point be about 1400 DEG C, under molten steel temperature be liquid, the 12CaO7Al of generation2O3Field trash flows into crystallizer 2 with steel stream It is interior, there is larger impact to slab quality, get rid of base processing, at the position of slab scale, 5 dross of tundish upper nozzle will be cleared up The method for the slab gas flame cuttiug that crystallizer is produced in this period of object is cut off.
Clear up Al2O3The time of dross object is only 5 minutes, pours the secondary time much smaller than replacement continuous casting, is conducive to continuous casting yield Promotion;Clear up Al2O3The weight of the unqualified slab generated in the dross object time is only 2.5 tons, caused by production loss it is far small In replacing loss caused by tundish.
Molten steel flow speed in the case where the 20% of reduction Casting speed to normal pulling rate, at tundish upper nozzle 5 Still very fast, speed reaches 0.1~0.3 meter per second, and under the drive of the molten steel quickly flowed, unreacted Ca enters with steel stream In crystallizer 2, Ca will not corrode stopper, will not reduce the service life of stopper.

Claims (2)

1. Al at a kind of processing tundish upper nozzle2O3The method of dross object, including the following steps:
A) judge that dross phenomenon occurs for tundish upper nozzle:
In the case where pulling speed of continuous casting significantly reduces and can not also improve pulling rate after replacement crystallizer invasive nozzle, sentence at this time Break and dross phenomenon occur for tundish upper nozzle,
It B) will be in the round steel bar insertion tundish upper nozzle of calcic core:
Pulling rate is reduced at this time to be inserted into tundish upper nozzle to the 20%~30% of normal pulling rate, and by the round steel bar of calcic core, The upper end of the round steel bar of calcic core is connect with fire proofed wood charge bar, and the upper end of fire proofed wood charge bar is fixed on horizontal clamper, is adjusted It is vertically moved up or down frame, is in the round steel bar of calcic core in tundish upper nozzle;
C) Ca steam clears up Al2O3Dross object:
The round steel bar of calcic core is in high-temperature molten steel environment after 5~15 seconds, and molten steel can burn round steel bar circumferential surface and gather Concave point or concave at steel shell, there is pothole or gap on the circumference of round steel bar, the calcium core inside round steel bar is heated to become gas State, gaseous calcium are ejected to the Al in tundish upper nozzle from pothole or gap2O3At dross object, Ca and Al2O3Dross object occurs Reaction generates 12CaO7Al2O3, by Al2O3Dross object cleans up;
D) fire proofed wood charge bar is extracted:
The round steel bar of calcic core can all be melted after being inserted into molten steel 50~200 seconds by molten steel, promote vertical lift frame at this time, will be resistance to Fiery material bar is extracted from molten steel;
E pulling rate) is promoted:
By the Al in tundish upper nozzle2O3After dross object is cleaned out, pulling speed of continuous casting is slowly improved to normal pulling rate;
F unqualified slab) is cut off:
At slab scale position, the slab that crystallizer in this period for clearing up tundish upper nozzle dross object is produced is used The method of gas flame cuttiug is cut off.
2. Al at processing tundish upper nozzle as described in claim 12O3The method of dross object, which is characterized in that the calcic The length of the round steel bar of core and the length of tundish upper nozzle are identical, and 50~300g calcium is contained inside round steel bar, and outside is one layer Steel round tube, the wall thickness of steel round tube are 5~20mm, and the bottom and top of steel round tube seal, the circumferential surface of steel round tube Gather concave point or concave, and the depth of concave point or concave is 4~19mm.
CN201810034512.8A 2018-01-15 2018-01-15 A kind of device and method for clearing up tundish upper nozzle dross object Active CN108176844B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810034512.8A CN108176844B (en) 2018-01-15 2018-01-15 A kind of device and method for clearing up tundish upper nozzle dross object

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810034512.8A CN108176844B (en) 2018-01-15 2018-01-15 A kind of device and method for clearing up tundish upper nozzle dross object

Publications (2)

Publication Number Publication Date
CN108176844A CN108176844A (en) 2018-06-19
CN108176844B true CN108176844B (en) 2019-07-05

Family

ID=62550571

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810034512.8A Active CN108176844B (en) 2018-01-15 2018-01-15 A kind of device and method for clearing up tundish upper nozzle dross object

Country Status (1)

Country Link
CN (1) CN108176844B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109226732A (en) * 2018-09-07 2019-01-18 宁国市宏达电炉有限公司 Rising pouring intermediate frequency holding furnace with automatic cleaning sprue gate function
CN109226731B (en) * 2018-09-07 2021-03-02 宁国市宏达电炉有限公司 Bottom pouring intermediate frequency holding furnace with automatic sprue gate cleaning function
CN109277558B (en) * 2018-10-24 2020-08-07 芜湖新兴铸管有限责任公司 Anti-caking submerged nozzle and anti-caking construction method
CN109158583B (en) * 2018-11-05 2024-03-08 安徽宏达电炉科技有限公司 Pouring device of high-efficiency bottom pouring medium-frequency heat preservation furnace
CN110280751B (en) * 2019-07-31 2021-06-15 广东韶钢松山股份有限公司 Long mouth of a river bowl cleaning device
CN110385411B (en) * 2019-08-19 2021-02-26 中天钢铁集团有限公司 Method for preventing high-aluminum cold heading steel continuous casting nodulation
CN113134587B (en) * 2020-01-17 2022-11-18 宝山钢铁股份有限公司 Method for judging water gap blockage and dissolution loss through stopper rod opening degree variation trend
CN114346232B (en) * 2022-01-07 2024-01-02 康硕(山西)智能制造有限公司 Pouring system for large-scale easily-oxidized metal castings
CN116604009B (en) * 2023-07-17 2023-10-20 联峰钢铁(张家港)有限公司 Device and method for rapidly opening flow after flow blocking of tundish

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0044183A1 (en) * 1980-07-09 1982-01-20 Foseco International Limited Metallurgical treatment agents
US4708897A (en) * 1983-03-03 1987-11-24 Vallourec Composite product having a tubular metal casing with a welt-type seam, and a core in powder form, which can be rolled up
CN2414077Y (en) * 1999-11-26 2001-01-10 包钢天骄企业股份有限公司 Silicon-calcium mixed rareearth filement core thread
CN1548257A (en) * 2003-05-09 2004-11-24 宝钢集团上海第一钢铁有限公司 Method and apparatus of adding alloy into liquid metal
CN1694772A (en) * 2002-08-20 2005-11-09 黑崎播磨株式会社 Method for manufacturing immersion nozzle less susceptible to deposition of alumina for use in continuous casting
CN101104197A (en) * 2007-08-03 2008-01-16 钢铁研究总院 Method for dispersion implanting fine heterogeneous particles during metal freezing course and added raw material
CN202047087U (en) * 2011-04-12 2011-11-23 沈阳午飞炉料有限公司 Seamless steel pipe jacket core-spun yarn
CN102527962A (en) * 2010-12-15 2012-07-04 鞍钢股份有限公司 Adding device and adding method for metal calcium in continuous casting process
CN102527965A (en) * 2010-12-11 2012-07-04 鞍钢股份有限公司 Method for desulfurizing in continuous casting process and pouring box wire feeding device thereof
CN103008636A (en) * 2013-01-21 2013-04-03 河北联合大学 Gun insertion type stopper rod device and method using same for absorbing inclusions at gate
CN105682827A (en) * 2013-09-27 2016-06-15 日新制钢株式会社 Continuous casting method

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0044183A1 (en) * 1980-07-09 1982-01-20 Foseco International Limited Metallurgical treatment agents
US4708897A (en) * 1983-03-03 1987-11-24 Vallourec Composite product having a tubular metal casing with a welt-type seam, and a core in powder form, which can be rolled up
CN2414077Y (en) * 1999-11-26 2001-01-10 包钢天骄企业股份有限公司 Silicon-calcium mixed rareearth filement core thread
CN1694772A (en) * 2002-08-20 2005-11-09 黑崎播磨株式会社 Method for manufacturing immersion nozzle less susceptible to deposition of alumina for use in continuous casting
CN1548257A (en) * 2003-05-09 2004-11-24 宝钢集团上海第一钢铁有限公司 Method and apparatus of adding alloy into liquid metal
CN101104197A (en) * 2007-08-03 2008-01-16 钢铁研究总院 Method for dispersion implanting fine heterogeneous particles during metal freezing course and added raw material
CN102527965A (en) * 2010-12-11 2012-07-04 鞍钢股份有限公司 Method for desulfurizing in continuous casting process and pouring box wire feeding device thereof
CN102527962A (en) * 2010-12-15 2012-07-04 鞍钢股份有限公司 Adding device and adding method for metal calcium in continuous casting process
CN202047087U (en) * 2011-04-12 2011-11-23 沈阳午飞炉料有限公司 Seamless steel pipe jacket core-spun yarn
CN103008636A (en) * 2013-01-21 2013-04-03 河北联合大学 Gun insertion type stopper rod device and method using same for absorbing inclusions at gate
CN105682827A (en) * 2013-09-27 2016-06-15 日新制钢株式会社 Continuous casting method

Also Published As

Publication number Publication date
CN108176844A (en) 2018-06-19

Similar Documents

Publication Publication Date Title
CN108176844B (en) A kind of device and method for clearing up tundish upper nozzle dross object
CN206622605U (en) A kind of three machines three stream slab CC tundish
CN109249013A (en) A kind of stuffing sand interstitital texture and plus sand technique for refining ladle
CN109332625A (en) A kind of casting method improving stopper rod flow control Al dexidized steel nozzle blocking
CN105983684A (en) Low-carbon inner hole body-contained submersed nozzle
CN212682432U (en) Water atomization alloy powder tundish
CN104249149B (en) A kind of channel-type sensing heating tundish and its casting method
CN201455253U (en) Novel molten steel ladle nozzle pocket block
CN112828270A (en) Casting steel launder device of vacuum induction smelting furnace
CN102179491B (en) Argon-blowing prefabricated member for continuous casting tundish cover
KR101242575B1 (en) The melting furnace which comprises a cooling equipment for slag discharging hole
CN101524750B (en) Preformed piece for plate blank tundish and preparation method thereof
CN106111970A (en) A kind of device and method being reduced ladle top slag oxidisability by excessive slag method
CN203695934U (en) Molten iron jar slag stopper with molten iron flowing opening
CN210789232U (en) Tundish capable of preheating and improving metal powder cleanliness
CN103736984A (en) Hot-metal bottle slag stopper with hot metal flowing port and manufacturing method thereof
CN208772448U (en) A kind of magnesium tundish flow straightener
CN207787694U (en) The device of molten steel casting surplus is reduced in a kind of casting process
CN203390191U (en) Continuous casting steel ladle fire retarding coating
CN109628704A (en) A kind of RH vacuum refining furnace and its building method
CN100596309C (en) Secondary refining method of 10 to 30 tons bottom breakout ladle
CN214349590U (en) Immersion type water gap
RU209252U1 (en) DOUBLE FUNNEL FOR POURING METALS
CN212864821U (en) Hot stove iron notch mud cover device in ore deposit
CN217727128U (en) Improve ladle bottom masonry structure of molten steel yield

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210623

Address after: 271104 Shuangquan Road, Gangcheng District, Jinan City, Shandong Province

Patentee after: LAIGANG GROUP YINSHAN SHAPED STEEL Co.,Ltd.

Address before: 271104 No.99, Fuqian street, Gangcheng District, Laiwu City, Shandong Province

Patentee before: SHANDONG IRON AND STEEL Co.,Ltd.