CN108174387A - A kind of CE resource regulating methods and device - Google Patents

A kind of CE resource regulating methods and device Download PDF

Info

Publication number
CN108174387A
CN108174387A CN201711384578.1A CN201711384578A CN108174387A CN 108174387 A CN108174387 A CN 108174387A CN 201711384578 A CN201711384578 A CN 201711384578A CN 108174387 A CN108174387 A CN 108174387A
Authority
CN
China
Prior art keywords
base station
resource
days
average
preset
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711384578.1A
Other languages
Chinese (zh)
Other versions
CN108174387B (en
Inventor
贺晓伟
荆雷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China United Network Communications Group Co Ltd
Original Assignee
China United Network Communications Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China United Network Communications Group Co Ltd filed Critical China United Network Communications Group Co Ltd
Priority to CN201711384578.1A priority Critical patent/CN108174387B/en
Publication of CN108174387A publication Critical patent/CN108174387A/en
Application granted granted Critical
Publication of CN108174387B publication Critical patent/CN108174387B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W16/00Network planning, e.g. coverage or traffic planning tools; Network deployment, e.g. resource partitioning or cells structures
    • H04W16/02Resource partitioning among network components, e.g. reuse partitioning
    • H04W16/04Traffic adaptive resource partitioning
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W28/00Network traffic management; Network resource management
    • H04W28/16Central resource management; Negotiation of resources or communication parameters, e.g. negotiating bandwidth or QoS [Quality of Service]
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W28/00Network traffic management; Network resource management
    • H04W28/16Central resource management; Negotiation of resources or communication parameters, e.g. negotiating bandwidth or QoS [Quality of Service]
    • H04W28/24Negotiating SLA [Service Level Agreement]; Negotiating QoS [Quality of Service]
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W28/00Network traffic management; Network resource management
    • H04W28/02Traffic management, e.g. flow control or congestion control
    • H04W28/0289Congestion control

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Quality & Reliability (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The embodiment of the present application discloses a kind of CE resource regulating methods and device, it is related to field of communication technology, it solves due to only needing dilatation using the maximum CE resource utilizations of base station as base station or need to subtract the foundation matched causes judging result accuracy relatively low, and during by CE resource allocations to the base station for needing dilatation, the problem of accuracy of caused CE resource allocations is relatively low.Concrete scheme is:According to average CE resource utilization and CE resource congestion total degree of the base station each in pending area in the first preset time, determine at least one resource reclaim base station and at least one inadequate resource base station, and obtain the CE resources of the preset quantity of each base station at least one resource reclaim base station, it is recycled in resource pool, and the priority of each base station at least one inadequate resource base station at current time is calculated, and the CE resource priorities in resource pool are distributed into the larger inadequate resource base station of priority.The embodiment of the present application is used for during CE scheduling of resource.

Description

A kind of CE resource regulating methods and device
Technical field
The invention relates to field of communication technology more particularly to a kind of Channel Elements (channel elements, CE) resource regulating method and device.
Background technology
CE resources refer to the resource that processing 12.2 kilobytes (kilobyte, KB) business needs in base station occupy, and CE is provided Source is one of index for weighing base station processing capacity, and the CE number of resources of each base station configuration is characterized at the business of base station in itself Reason ability.But in the prior art, the CE resources in network usually will appear idle and busy utilizes unbalanced phenomenon, In order to improve the utilization ratio of CE resources, automatically configuring for CE resources can be carried out, is hurried with achieving the purpose that tear open not busy mend.
Specifically, can first calculation base station maximum CE utilization rates, and be more than in the maximum CE utilization rates for determining base station and expand When holding the number of days of threshold values more than or equal to setting value, determine that the base station needs dilatation CE resources, similarly, in the maximum CE for determining base station When the number of days that utilization rate is more than volume reduction threshold values is less than or equal to setting value, determine that the base station need to subtract with CE resources.Then, record needs The base station of dilatation and the information for the base station matched and corresponding CE performance datas need to be subtracted.It at this point, can be from need to subtract with CE resources Base station recycling CE resources, and assign them to the base station for needing dilatation.
At least there are following technical problems in the prior art:Due to when determining to need the base station of dilatation and the base station matched need to be subtracted Incomplete only using the maximum CE resource utilizations of base station as basis for estimation, cause in this way the accuracy of judging result compared with It is low.And due to when carrying out CE scheduling of resource, being arbitrarily by the CE resource allocations of recycling to the base station for needing dilatation, in this way meeting So that be badly in need of CE resources to need dilatation base station that may distribute inadequate less than CE resources or the CE resources being assigned to so that CE is provided The accuracy of source distribution is relatively low.
Invention content
The embodiment of the present application provides a kind of CE resource regulating methods and device, solves due to only providing the maximum CE of base station Source utilization rate as base station need dilatation or need to subtract the foundation matched cause judging result accuracy relatively low and by CE resource allocations extremely When needing the base station of dilatation, the problem of accuracy of caused CE resource allocations is relatively low.
In order to achieve the above objectives, the application adopts the following technical scheme that:
In a first aspect, the application provides a kind of CE resource regulating methods, this method can include:CE resource scheduling devices are first According to average CE resource utilization and CE resource congestion total degree of the base station each in pending area in the first preset time, Determine at least one of pending area resource reclaim base station and at least one inadequate resource base station, and it is at least one to obtain this In resource reclaim base station, the CE resources of the preset quantity of each base station, by the CE resources of the preset quantity of each base station of acquisition It is recycled to resource pool, and CE resource scheduling devices calculate the excellent of each base station at least one inadequate resource base station at current time First grade, and the CE resource priorities in resource pool are distributed into the larger inadequate resource base station of priority.
The CE resource regulating methods that the application provides, pass through the average CE utilizations of resources by base station in the first preset time Rate and CE resource congestion total degrees are combined, and as the foundation for judging resource reclaim base station and inadequate resource base station, are improved and are sentenced The accuracy of disconnected result, and the priority by calculating each inadequate resource base station, and the CE resource priorities in resource pool are divided The larger inadequate resource base station of dispensing priority, so that foot can be quickly assigned to by being badly in need of the inadequate resource base station of CE resources Enough CE resources, so as to improve the accuracy of CE resource allocations.
With reference to first aspect, in a kind of possible realization method, CE resource scheduling devices calculate current time at least one In a inadequate resource base station, the priority of each base station can specifically include:CE resource scheduling devices obtain first base station and exist CE resource congestion total degrees in the second preset time before current time obtain the average times of congestion N of the first base station, and CE consumed resource of the first base station in the second preset time before current time is obtained, obtains being averaged for the first base station Consumption E, and according to the average times of congestion N and average consumption E and the weight coefficient of the first base station of the first base station W, and using formula:Calculate the priority M of the first base station.Wherein, first base station at least one resource not Any one base station in sufficient base station.
With reference to first aspect with above-mentioned possible realization method, in alternatively possible realization method, in CE resource tune It, can be with before degree device determines at least one of pending area resource reclaim base station and at least one inadequate resource base station Including:First preset time is M days, and M is the integer more than 0.It is every daily in M days that CE resource scheduling devices acquire the second base station Hour flow, hour of daily middle maximum flow will be determined as busy, and did daily in M days according to second base station When flow, calculate second base station busy CE resource utilizations daily in M days, and calculate the flat of second base station M days Equal CE resource utilizations, CE resource scheduling devices obtain the CE resource congestion total degrees in second base station M days.Wherein, this Two base stations are any one base station in pending area.
With reference to first aspect with above-mentioned possible realization method, in alternatively possible realization method, CE scheduling of resource Device determines at least one of pending area resource reclaim base station, can specifically include:CE resource scheduling devices are true The fixed second base station average CE resource utilizations of M days are less than the first preset value, and the CE resources in determining second base station M days are gathered around When plug total degree is 0, it is resource reclaim base station to determine second base station.
With reference to first aspect with above-mentioned possible realization method, in alternatively possible realization method, CE scheduling of resource Device determines at least one of pending area inadequate resource base station, can specifically include:CE resource scheduling devices are true The fixed second base station average CE resource utilizations of M days are more than the second preset value, and the CE resources in determining second base station M days When congestion total degree is more than third preset value, it is inadequate resource base station to determine second base station.Wherein, the second preset value is more than the One preset value.
With reference to first aspect with above-mentioned possible realization method, in alternatively possible realization method, in CE resource tune It spends device to obtain at least one resource reclaim base station, the CE resources of the preset quantity of each base station, and by the pre- of each base station If after the CE resource reclaims to resource pool of quantity, can also include:CE resource scheduling devices are if it is determined that third base station M days Average CE resource utilizations are less than the 4th preset value, and the CE resource congestions total degree in third base station M days is less than the 5th and presets Value, it is determined that recycle the CE resources success of the third base station, if it is determined that the third base station average CE resource utilizations of M days are big In or equal to the 4th preset value, and the CE resource congestions total degree in third base station M days is greater than or equal to the 5th preset value, then The CE resources of the preset quantity of the third base station in resource pool are retracted and give the third base station.Wherein, third base station is at least one Any one base station in a resource reclaim base station, the 4th preset value are more than the first preset value.
Second aspect provides a kind of CE resource scheduling devices, which can include:Determination unit obtains Take unit, recovery unit, computing unit and allocation unit.Determination unit, for according to base station each in pending area Average channel unit CE resource utilizations and CE resource congestion total degrees in one preset time, determine in pending area extremely A few resource reclaim base station and at least one inadequate resource base station.Acquiring unit determines at least for obtaining determination unit In one resource reclaim base station, the CE resources of the preset quantity of each base station.Recovery unit, for by least one resource reclaim The CE resource reclaims of the preset quantity of each base station are to resource pool in base station.Computing unit, for calculating current time at least one In a inadequate resource base station, the priority of each base station.Allocation unit, for the CE moneys in the resource pool that recycles recovery unit Preferentially distribute to the larger inadequate resource base station of priority in source.
With reference to second aspect, in a kind of possible realization method, computing unit is specifically used for:First base station is obtained to exist CE resource congestion total degrees in the second preset time before current time obtain the average times of congestion N of first base station, this One base station is any one base station at least one inadequate resource base station;It is second pre- before current time to obtain first base station If the CE consumed resources in the time obtain the average consumption E of first base station;According to the average times of congestion N of first base station With the average consumption E and weight coefficient W of first base station, and using formula:Calculate the excellent of first base station First grade M.
With reference to second aspect and above-mentioned possible realization method, in alternatively possible realization method, first it is default when Between for M days, M is the integer more than 0, which can also include collecting unit.Collecting unit, for acquiring the Two base stations daily flow hourly in M days, the second base station are any one base station in pending area.Determination unit, Be additionally operable to will it is daily in hour of maximum flow be determined as busy.Computing unit was additionally operable to according to the second base station in M days The flow of daily busy, calculates the second base station busy CE resource utilizations daily in M days, and the second base station of calculating M days Average CE resource utilizations.Acquiring unit is additionally operable to obtain the CE resource congestion total degrees in the second base station M days.
With reference to second aspect and above-mentioned possible realization method, in alternatively possible realization method, determination unit has Body is used to determine that the second base station average CE resource utilizations of M days are less than the first preset value, and in determining second base station M days When CE resource congestions total degree is 0, it is resource reclaim base station to determine the second base station.
With reference to second aspect and above-mentioned possible realization method, in alternatively possible realization method, determination unit has Body is used to determine that the second base station average CE resource utilizations of M days are more than the second preset value, and in determining second base station M days When CE resource congestions total degree is more than third preset value, the second base station is determined as inadequate resource base station, and the second preset value is more than the One preset value.
With reference to second aspect and above-mentioned possible realization method, in alternatively possible realization method, the CE resource tune Degree device can also include:Rollback unit.Determination unit is additionally operable to if it is determined that the average CE utilizations of resources of M days of third base station Rate is less than the 4th preset value, and the CE resource congestions total degree in third base station M days is less than the 5th preset value, it is determined that recycles the Three base stations CE resources success, third base station be at least one resource reclaim base station in any one base station, the 4th preset value More than the first preset value.Rollback unit, for if it is determined that the third base station average CE resource utilizations of M days are greater than or equal to the Four preset values, and the CE resource congestions total degree in third base station M days is greater than or equal to the 5th preset value, then by resource pool the The CE resources of the preset quantity of three base stations, which retract, gives third base station.
The third aspect provides a kind of CE resource scheduling devices, which includes:At least one processor, Memory, communication interface and communication bus.Processor is connect with memory, communication interface by communication bus, and memory is used for Computer executed instructions are stored, when CE resource scheduling devices are run, the computer execution that processor performs memory storage refers to It enables, so that CE resource scheduling devices are performed such as the CE moneys of any one in the possible realization method of first aspect or first aspect Source dispatching method.
Fourth aspect provides a kind of computer storage media, is stored thereon with computer executed instructions, when computer performs When instruction is run on computers so that computer is performed as arbitrary in the possible realization method of first aspect or first aspect The CE resource regulating methods of one.
Description of the drawings
Fig. 1 is that a kind of simplifying for system architecture that can apply the embodiment of the present application provided by the embodiments of the present application is illustrated Figure;
Fig. 2 is a kind of composition schematic diagram of CE resource scheduling devices provided by the embodiments of the present application;
Fig. 3 is a kind of flow chart of CE resource regulating methods provided by the embodiments of the present application;
Fig. 4 is the composition schematic diagram of another kind CE resource scheduling devices provided by the embodiments of the present application;
Fig. 5 is the composition schematic diagram of another kind CE resource scheduling devices provided by the embodiments of the present application;
Fig. 6 is the composition schematic diagram of another kind CE resource scheduling devices provided by the embodiments of the present application.
Specific embodiment
The terms " system " and " network " are often used interchangeably herein.The terms "and/or", only It is a kind of incidence relation for describing affiliated partner, expression may have three kinds of relationships, for example, A and/or B, can represent:Individually There are A, exist simultaneously A and B, these three situations of individualism B.In addition, character "/" herein, typicallys represent forward-backward correlation pair Like a kind of relationship of "or".
Fig. 1 is that a kind of simplifying for system architecture that can apply the embodiment of the present application provided by the embodiments of the present application is illustrated Figure, as shown in Figure 1, the system architecture can include:At least one of CE resource scheduling devices 11 and pending area base station 12。
Wherein, each base station at least one of CE resource scheduling devices 11 and pending area base station 11 is led to Letter, for by the CE resource reclaims to resource pool of the preset quantity of the resource reclaim base station in pending area, and by resource CE resource allocations in pond are to the inadequate resource base station in the pending area.
Each base station at least one base station 12 is that one kind is deployed in wireless access network to provide wirelessly for terminal The device of communication function, major function have:Carry out management, the tissue of paging message and transmission, the broadcast message of radio resource Tissue and transmission, the measurement for the purpose of the mobility or scheduling and configuration of measurement report etc..
Fig. 2 is a kind of composition schematic diagram of CE resource scheduling devices provided by the embodiments of the present application, as shown in Fig. 2, the CE Resource scheduling device can include:At least one processor 21, memory 22, communication interface 23 and communication bus 24.
Wherein, processor 21 is the control centre of CE resource scheduling devices, can be a processor or multiple The general designation of processing element.For example, processor 21 is a central processing unit (central processing unit, CPU), It can be specific integrated circuit (application specific integrated circuit, ASIC) or be configured Into the one or more integrated circuits for implementing the embodiment of the present application, such as:One or more digital signal processor (digital Signal processor, DSP) or, one or more field programmable gate array (field programmable gate Array, FPGA).
In concrete implementation, as a kind of embodiment, processor 21 can include one or more CPU, such as in Fig. 2 Shown CPU0 and CPU1.And as a kind of embodiment, CE resource scheduling devices can include multiple processors, such as in Fig. 2 Shown processor 21 and processor 25.Each in these processors can be a single core processor (single- ) or a multi-core processor (multi-CPU) CPU.Here processor can refer to one or more equipment, circuit, And/or the process cores for handling data (such as computer program instructions).
Memory 22 can be read-only memory (read-only memory, ROM) or can store static information and instruction Other kinds of static storage device, random access memory (random access memory, RAM) or letter can be stored Breath and the other kinds of dynamic memory or Electrically Erasable Programmable Read-Only Memory (electrically of instruction Erasable programmable read-only memory, EEPROM), CD-ROM (compact disc read- Only memory, CD-ROM) or other optical disc storages, optical disc storage (including compression optical disc, laser disc, optical disc, digital universal Optical disc, Blu-ray Disc etc.), magnetic disk storage medium or other magnetic storage apparatus or can be used in carrying or store with referring to Enable or data structure form desired program code simultaneously can by any other medium of computer access, but not limited to this. Memory 22 can be individually present, and be connected by communication bus 24 with processor 21.Memory 22 can also and processor 21 integrate.
In concrete implementation, memory 22, for storing the data in the application and performing the software program of the application. Processor 21 can be stored in by running or performing the software program being stored in memory 22 and call in memory 22 Data, perform CE resource scheduling devices various functions.
Communication interface 23, using the device of any transceiver one kind, for other equipment or communication, such as base It stands, wireless access network (radio access network, RAN), WLAN (wireless loCal area Networks, WLAN) etc..Communication interface 23 can include receiving unit and realize that receive capabilities and transmitting element are realized and sent Function.
Communication bus 24 can be industry standard architecture (industry standard architecture, ISA) Bus, external equipment interconnection (peripheral component interconnect, PCI) bus or extension industrial standard body Architecture (extended industry standard architecture, EISA) bus etc..The bus can be divided into address Bus, data/address bus, controlling bus etc..For ease of representing, only represented in Fig. 2 with a thick line, it is not intended that only one Bus or a type of bus.
In order to improve the accuracy of judging result when judging resource reclaim base station and inadequate resource base station, and in order to incite somebody to action When CE resource allocations in resource pool are to inadequate resource base station, the accuracy of CE resource allocations is improved, the embodiment of the present application provides A kind of CE resource regulating methods, as shown in figure 3, this method can include:
301st, CE resource scheduling devices acquisition the second base station daily flow hourly in the first preset time, and will be every Hour of maximum flow is determined as busy in it, and the first preset time is M days.
Wherein, the second base station is any one base station in pending area, and M is the integer more than 0.When need carry out CE When automatically configuring of resource, CE resource scheduling devices can first acquire any one base station in pending area, such as the second base It stands the daily flow hourly in M days, and a hour of maximum flow daily in M days is determined as busy, at this point, To obtain the corresponding M busy in second base station.
302nd, CE resource scheduling devices calculate the second base station at M days according to the flow of the second base station daily busy in M days In daily busy CE resource utilizations, and calculate the second base station average CE resource utilizations of M days.
It wherein, can be according to the second base after CE resource scheduling devices busy daily in the second base station is determined M days The flow for daily busy of standing calculates corresponding busy CE resource utilizations, then further according to busy daily in the second base station M days CE resource utilizations calculate the second base station busy of M days and are averaged CE resource utilizations.
303rd, CE resource scheduling devices obtain the CE resource congestion total degrees in the second base station M days.
It should be noted that in the embodiment of the present application, CE resource scheduling devices are every in pending area is got After average CE resource utilizations and CE resource congestion total degrees of a base station in the first preset time, following step can be performed Rapid 304.
304th, CE resource scheduling devices determine at least one of pending area resource reclaim base station and at least one money Source deficiency base station.
Wherein, for any one base station in pending area, such as the second base station, if it is determined that the second base station M days Average CE resource utilizations are less than the first preset value, and determine that the CE resource congestions total degree in second base station M days is 0, then CE resource scheduling devices can determine second base station as resource reclaim base station, and resource reclaim base station refers to that CE resources existed The base station of surplus situation.If it is determined that the second base station average CE resource utilizations of M days are more than the second preset value, and determine the second base The CE resource congestions total degree stood in M days is more than third preset value, then CE resource scheduling devices can determine that second base station is Inadequate resource base station, the inadequate resource base station refer to that CE resources use nervous base station.In this way, CE resource scheduling devices pass through Average CE resource utilizations in base station each in pending area M days and CE resource congestions total degree and preset value are carried out pair Than that can know which base station is resource reclaim base station in pending area, which base station is inadequate resource base station.
It should be noted that in the embodiment of the present application, the second preset value is more than the first preset value.
305th, CE resource scheduling devices are obtained at least one resource reclaim base station, the CE moneys of the preset quantity of each base station Source.
Wherein it is possible to the CE resource quantities for obtaining each resource reclaim base station are pre-set in CE resource scheduling devices, In this way, CE resource scheduling devices are after at least one of pending area resource reclaim base station is determined, it can basis It pre-sets and obtains at least one resource reclaim base station, the CE resources of the preset quantity of each base station.
Illustratively, it is assumed that be previously provided in CE resource scheduling devices, obtain each all CE in resource reclaim base station The CE resources of/3rd of resource, in this way, CE resource scheduling devices can obtain all CE moneys in each resource reclaim base station The CE resources of/3rd of source.
306th, CE resource scheduling devices are by the CE resource reclaims of the preset quantity of each resource reclaim base station to resource pool.
307th, whether the CE resources of CE resource scheduling devices verification recycling each resource reclaim base station preset quantity are reasonable.
Wherein, CE resource scheduling devices are by the CE resource reclaims of the preset quantity of each resource reclaim base station to resource pool Later, any one base at least one resource reclaim base station can be obtained in a manner that elder generation is according to step 301- steps 303 It stands, such as the average CE resource utilizations and CE resource congestion total degrees in third base station M days, then according in third base station M days Average CE resource utilizations and CE resource congestion total degrees, the CE resources of verification recycling third base station preset quantity whether close Reason.Specifically:If it is determined that the third base station average CE resource utilizations of M days are less than the 4th preset value, and determine third base station M It CE resource congestions total degree is less than the 5th preset value, then the CE resources for showing to recycle the third base station preset quantity are reasonable , at this point, CE resource scheduling devices can determine the CE resources success of recycling third base station.If it is determined that third base station M days Average CE resource utilizations are greater than or equal to the 4th preset value, and determine that the third base station CE resource congestion total degrees of M days are more than Or equal to the 5th preset value, then it is unreasonable to show the CE resources for recycling the third base station preset quantity, at this point, CE resource tune Degree device, which can retract the CE resources of the preset quantity of third base station in resource pool, gives third base station.
It should be noted that in the embodiment of the present application, the 4th preset value is more than the first preset value.
308th, CE resource scheduling devices calculate current time at least one inadequate resource base station in, each base station it is preferential Grade.
Wherein, CE resource scheduling devices, can after at least one of pending area inadequate resource base station is determined To calculate in current time at least one inadequate resource base station, the priority of each inadequate resource base station.Specifically, at least Any one inadequate resource base station, such as first base station in one inadequate resource base station, CE base station schedulings device can be obtained first CE resource congestion total degree of the first base station in the second preset time before current time, and calculate being averaged for the first base station Then times of congestion N obtains CE consumed resource of the first base station in the second preset time before current time, and calculates and be somebody's turn to do The average consumption E of first base station, last CE resource scheduling devices can be according to the average times of congestion N peace of first base station The weight coefficient W of equal consumption E and preconfigured first base station, using formula:Calculate first base station Priority M, the priority M that first base station is calculated is bigger, shows that the first base station is more badly in need of CE resources.
Illustratively, it is assumed that the second preset time be 24 hours, current time T, then CE resource scheduling devices can With obtain first base station before the moment T CE resource congestion total degrees of 24 hours, and by the CE resource congestions total degree divided by 24, Obtain the average times of congestion N of first base station, and obtain first base station before the moment T CE consumed resources of 24 hours, and will The CE consumed resources divided by 24, obtain the average consumption E of first base station, and last CE resource scheduling devices can use public affairs Formula:Calculate the priority of first base station.
It should be noted that in the embodiment of the present application, the weight coefficient of each inadequate resource base station is fixed constant, can To be obtained according to the importance of base station covering scene in construction plan, and it is set in advance in CE resource scheduling devices.
In addition, in the embodiment of the present application, step 305- steps 307, the no precedence relationship of execution with step 308, i.e., After execution of step 304, step 305- steps 307 can be first carried out, then perform step 308 again, alternatively, can also be first Step 308 is performed, then performs step 305- steps 307 again, alternatively, step 305- steps 307 and step can also be performed simultaneously Rapid 308, the embodiment of the present application, to step 305- steps 307, is not particularly limited at this with the execution sequence of step 308.
309th, the CE resource priorities in resource pool are distributed to the larger inadequate resource base of priority by CE resource scheduling devices It stands.
It should be noted that in the embodiment of the present application, CE resource scheduling devices can periodically perform above-mentioned steps 301- steps 309 so as to update resource reclaim base station and the inadequate resource base station in pending area in real time, and recycle The CE resources of the preset quantity of resource reclaim base station, and the CE resource priorities of recycling are distributed into the larger inadequate resource of priority Base station is hurried so as to achieve the purpose that tear open not busy mend.
The CE resource regulating methods that the application provides, pass through the average CE utilizations of resources by base station in the first preset time Rate and CE resource congestion total degrees are combined, and as the foundation for judging resource reclaim base station and inadequate resource base station, are improved and are sentenced The accuracy of disconnected result, and the priority by calculating each inadequate resource base station, and the CE resource priorities in resource pool are divided The larger inadequate resource base station of dispensing priority, so that foot can be quickly assigned to by being badly in need of the inadequate resource base station of CE resources Enough CE resources, so as to improve the accuracy of CE resource allocations.
Also, CE resource scheduling devices are by the way that after CE resources have been recycled, it is pre- that each resource reclaim base station is recycled in verification It if whether the CE resources of quantity are reasonable, can proceed from reality in this way, avoid having recycled the CE resources of resource reclaim base station The problem of influencing the service feature of the resource reclaim base station later.
It is above-mentioned that mainly scheme provided by the embodiments of the present application is described from the angle of CE resource scheduling devices.It can be with Understand, CE resource scheduling devices in order to realize above-mentioned function, it comprises perform each corresponding hardware configuration of function and/ Or software module.Those skilled in the art should be readily appreciated that, respectively show with reference to what the embodiments described herein described The algorithm steps of example, the present invention can be realized with the combining form of hardware or hardware and computer software.Some function is actually It is performed in a manner of hardware or computer software driving hardware, depending on the specific application of technical solution and design constraint item Part.Professional technician can realize described function to each specific application using distinct methods, but this It realizes it is not considered that beyond the scope of this invention.
The embodiment of the present application can carry out CE resource scheduling devices according to the above method example division of function module, example Such as, each function can be corresponded to and divide each function module, two or more functions can also be integrated at one It manages in module.The form that hardware had both may be used in above-mentioned integrated module is realized, can also use the form of software function module It realizes.It should be noted that it is schematical to the division of module in the embodiment of the present application, only a kind of logic function is drawn Point, there can be other dividing mode in actual implementation.
In the case where dividing each function module using corresponding each function, Fig. 4 is shown involved in above-described embodiment CE resource scheduling devices alternatively possible composition schematic diagram, as shown in figure 4, the CE resource scheduling devices can include: Determination unit 41, acquiring unit 42, recovery unit 43, computing unit 44 and allocation unit 45.
Wherein it is determined that unit 41, for CE resource scheduling devices to be supported to perform in CE resource regulating methods shown in Fig. 3 Described in step 301 will it is daily in hour of maximum flow be determined as busy, step 304.
Acquiring unit 42, for CE resource scheduling devices to be supported to perform the step in CE resource regulating methods shown in Fig. 3 303rd, step 305.
Recovery unit 43, for CE resource scheduling devices to be supported to perform the step in CE resource regulating methods shown in Fig. 3 306。
Computing unit 44, for CE resource scheduling devices to be supported to perform the step in CE resource regulating methods shown in Fig. 3 302nd, step 308.
Allocation unit 45, for CE resource scheduling devices to be supported to perform the step in CE resource regulating methods shown in Fig. 3 309。
In the embodiment of the present application, further, as shown in figure 5, CE resource scheduling devices can also include:Collecting unit 46 and rollback unit 47.
Collecting unit 46, for CE resource scheduling devices to be supported to perform the step in CE resource regulating methods shown in Fig. 3 The second base station of acquisition described in 301 daily flow hourly in the first preset time.
Rollback unit 47, for support CE resource scheduling devices perform in CE resource regulating methods shown in Fig. 3 true The third base station average CE resource utilizations of M days are determined more than or equal to the 4th preset value, and the CE resources in third base station M days are gathered around When filling in total degree more than or equal to five preset values, the CE resources of the preset quantity of third base station in resource pool are retracted to third Base station.
It should be noted that all related contents for each step that above method embodiment is related to can quote correspondence The function description of function module, details are not described herein.
CE resource scheduling devices provided by the embodiments of the present application, for performing above-mentioned CE resource regulating methods, therefore can be with Achieve the effect that identical with above-mentioned CE resource regulating methods.
In the case of using integrated unit, Fig. 6 shows CE resource scheduling devices involved in above-described embodiment Alternatively possible composition schematic diagram.As shown in fig. 6, the CE resource scheduling devices include:Processing module 51 and communication module 52。
Processing module 51 to the action of CE resource scheduling devices for carrying out control management, for example, processing module 51 is used for Support CE resource scheduling devices perform step 301 in Fig. 3, step 302, step 303, step 304, step 305, step 306, Step 307, step 308, step 309 and/or other processes for techniques described herein.Communication module 52 is for branch CE resource scheduling devices and other network entities are held, such as the communication of base station.CE resource scheduling devices can also include memory module 53, for storing the program code of CE resource scheduling devices and data.
Wherein, processing module 51 can be the processor in Fig. 2.It can realize or perform with reference to the disclosure of invention Described various illustrative logic blocks, module and circuit.Processor can also be the combination for realizing computing function, such as It is combined comprising one or more microprocessors, combination of DSP and microprocessor etc..Communication module 52 can be logical in Fig. 2 Believe interface.Memory module 53 can be the memory in Fig. 2.
Through the above description of the embodiments, it is apparent to those skilled in the art that, for description It is convenienct and succinct, it, can as needed will be upper only with the division progress of above-mentioned each function module for example, in practical application It states function distribution to be completed by different function modules, i.e., the internal structure of device is divided into different function modules, to complete All or part of function described above.
In several embodiments provided herein, it should be understood that disclosed device and method can pass through it Its mode is realized.For example, the apparatus embodiments described above are merely exemplary, for example, the module or unit It divides, only a kind of division of logic function can have other dividing mode, such as multiple units or component in actual implementation It may be combined or can be integrated into another device or some features can be ignored or does not perform.Another point, it is shown or The mutual coupling, direct-coupling or communication connection discussed can be the indirect coupling by some interfaces, device or unit It closes or communicates to connect, can be electrical, machinery or other forms.
The unit illustrated as separating component may or may not be physically separate, be shown as unit The component shown can be a physical unit or multiple physical units, you can be located at a place or can also be distributed to Multiple and different places.Some or all of unit therein can be selected according to the actual needs to realize this embodiment scheme Purpose.
In addition, each functional unit in each embodiment of the present invention can be integrated in a processing unit, it can also That each unit is individually physically present, can also two or more units integrate in a unit.Above-mentioned integrated list The form that hardware had both may be used in member is realized, can also be realized in the form of SFU software functional unit.
If the integrated unit is realized in the form of SFU software functional unit and is independent product sale or uses When, it can be stored in a read/write memory medium.Based on such understanding, the technical solution of the embodiment of the present application is substantially The part to contribute in other words to the prior art or all or part of the technical solution can be in the form of software products It embodies, which is stored in a storage medium, is used including some instructions so that an equipment (can be single Piece machine, chip etc.) or processor (processor) execution all or part of the steps of the method according to each embodiment of the present invention. And aforementioned storage medium includes:USB flash disk, mobile hard disk, ROM, RAM, magnetic disc or CD etc. are various can to store program code Medium.
The above description is merely a specific embodiment, but protection scope of the present invention is not limited thereto, any Change or replacement in the technical scope disclosed by the present invention, should be covered by the protection scope of the present invention.Therefore, this hair Bright protection domain should be based on the protection scope of the described claims.

Claims (14)

1. a kind of CE resource regulating methods, which is characterized in that the method includes:
According to average channel unit CE resource utilization and CE money of the base station each in pending area in the first preset time Source congestion total degree determines at least one of described pending area resource reclaim base station and at least one inadequate resource base It stands;
It obtains at least one resource reclaim base station, the CE resources of the preset quantity of each base station, and by each base The CE resource reclaims for the preset quantity stood are to resource pool;
It calculates at least one inadequate resource base station described in current time, the priority of each base station;
CE resource priorities in the resource pool are distributed into the larger inadequate resource base station of priority.
2. according to the method described in claim 1, it is characterized in that, at least one inadequate resource described in the calculating current time In base station, the priority of each base station, including:
CE resource congestion total degree of the first base station in the second preset time before current time is obtained, obtains first base The average times of congestion N to stand, the first base station are any one base station at least one inadequate resource base station;
CE consumed resource of the first base station in second preset time before current time is obtained, obtains described The average consumption E of one base station;
According to the average times of congestion N and average consumption E of the first base station and the weight coefficient W of the first base station, And using formula:, calculate the priority M of the first base station.
3. method according to claim 1 or 2, which is characterized in that in the determining pending area at least Before one resource reclaim base station and at least one inadequate resource base station, further include:First preset time is M days, and M is big In 0 integer;
Acquire the second base station daily flow hourly in M days, will it is daily in hour of maximum flow be determined as busy, Second base station is any one base station in the pending area;
According to the flow of second base station daily busy in M days, second base station busy CE daily in M days is calculated Resource utilization, and calculate the second base station average CE resource utilizations of M days;
Obtain the CE resource congestion total degrees in second base station M days.
4. according to the method described in claim 3, it is characterized in that, described determine at least one of pending area money Base station is recycled in source, including:
The second base station average CE resource utilizations of M days are being determined less than the first preset value, and determine the second base station M When CE resource congestions total degree in it is 0, it is the resource reclaim base station to determine second base station.
5. according to the method described in claim 3, it is characterized in that, described determine at least one of pending area money Source deficiency base station, including:
The second base station average CE resource utilizations of M days are being determined more than the second preset value, and determine the second base station M When CE resource congestions total degree in it is more than third preset value, second base station is determined as inadequate resource base station, described the Two preset values are more than first preset value.
6. method according to any one of claims 1-5, which is characterized in that obtain at least one resource described It recycles in base station, the CE resources of the preset quantity of each base station, and by the CE resource reclaims of the preset quantity of each base station To resource pool, further include:
If it is determined that the third base station average CE resource utilizations of M days are less than the 4th preset value, and in third base station M days CE resource congestions total degree is less than the 5th preset value, it is determined that recycles the CE resources success of the third base station, the third base It stands as any one base station at least one resource reclaim base station, it is default that the 4th preset value is more than described first Value;
If it is determined that the third base station average CE resource utilizations of M days are greater than or equal to the 4th preset value, and described CE resource congestions total degree in third base station M days is greater than or equal to the 5th preset value, then will be described in the resource pool The CE resources of the preset quantity of third base station retract to the third base station.
7. a kind of CE resource scheduling devices, which is characterized in that the CE resource scheduling devices include:Determination unit, acquiring unit, Recovery unit, computing unit and allocation unit;
The determination unit, for the average channel unit CE according to base station each in pending area in the first preset time Resource utilization and CE resource congestion total degrees determine at least one of described pending area resource reclaim base station and at least One inadequate resource base station;
The acquiring unit, for obtaining at least one resource reclaim base station that the determination unit determines, Mei Geji The CE resources for the preset quantity stood;
The recovery unit, for the CE of the preset quantity of base station each described at least one resource reclaim base station to be provided Source is recycled to resource pool;
The computing unit, for calculating at least one inadequate resource base station that determination unit described in current time determines In, the priority of each base station;
The allocation unit distributes to priority for the CE resource priorities in the resource pool that recycles the recovery unit Larger inadequate resource base station.
8. CE resource scheduling devices according to claim 7, which is characterized in that the computing unit is specifically used for:
CE resource congestion total degree of the first base station in the second preset time before current time is obtained, obtains first base The average times of congestion N to stand, the first base station are any one base station at least one inadequate resource base station;
CE consumed resource of the first base station in second preset time before current time is obtained, obtains described The average consumption E of one base station;
According to the average times of congestion N and average consumption E of the first base station and the weight coefficient W of the first base station, And using formula:Calculate the priority M of the first base station.
9. CE resource scheduling devices according to claim 7 or 8, which is characterized in that first preset time is M days, M To be more than 0 integer, the CE resource scheduling devices further include:Collecting unit;
The collecting unit, for acquiring the second base station daily flow hourly in M days, second base station is treated to be described Any one base station in processing region;
The determination unit, be additionally operable to will it is daily in hour of maximum flow be determined as busy;
The computing unit is additionally operable to the flow according to second base station daily busy in M days, calculates second base station The daily busy CE resource utilizations in M days, and calculate the second base station average CE resource utilizations of M days;
The acquiring unit is additionally operable to obtain the CE resource congestion total degrees in second base station M days.
10. CE resource scheduling devices according to claim 9, which is characterized in that the determination unit is specifically used for:
The second base station average CE resource utilizations of M days are being determined less than the first preset value, and determine the second base station M When CE resource congestions total degree in it is 0, it is the resource reclaim base station to determine second base station.
11. CE resource scheduling devices according to claim 9, which is characterized in that the determination unit is specifically used for:
The second base station average CE resource utilizations of M days are being determined more than the second preset value, and determine the second base station M When CE resource congestions total degree in it is more than third preset value, second base station is determined as inadequate resource base station, described the Two preset values are more than first preset value.
12. the CE resource scheduling devices according to any one of claim 7-11, which is characterized in that the CE scheduling of resource Device further includes:Rollback unit;
The determination unit, be additionally operable to if it is determined that the third base station average CE resource utilizations of M days be less than the 4th preset value, and CE resource congestions total degree in third base station M days is less than the 5th preset value, it is determined that recycles the CE of the third base station Resource success, the third base station are any one base station at least one resource reclaim base station, and the described 4th is default Value is more than first preset value;
The rollback unit, for if it is determined that the third base station average CE resource utilizations of M days be greater than or equal to it is described 4th preset value, and the CE resource congestions total degree in third base station M days is greater than or equal to the 5th preset value, then will The CE resources of the preset quantity of third base station described in the resource pool retract to the third base station.
13. a kind of CE resource scheduling devices, which is characterized in that the CE resource scheduling devices include:At least one processor is deposited Reservoir, communication interface and communication bus;
The processor is connect with the memory, the communication interface by the communication bus, and the memory is used to deposit Computer executed instructions are stored up, when the CE resource scheduling devices are run, the processor performs the institute of the memory storage Computer executed instructions are stated, so that the CE resource scheduling devices perform the CE resources as described in any one of claim 1-6 Dispatching method.
14. a kind of computer storage media, which is characterized in that the computer storage media includes computer executed instructions, when When the computer executed instructions are run on computers so that the computer is performed such as any one of claim 1-6 institutes The CE resource regulating methods stated.
CN201711384578.1A 2017-12-20 2017-12-20 CE resource scheduling method and device Active CN108174387B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711384578.1A CN108174387B (en) 2017-12-20 2017-12-20 CE resource scheduling method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711384578.1A CN108174387B (en) 2017-12-20 2017-12-20 CE resource scheduling method and device

Publications (2)

Publication Number Publication Date
CN108174387A true CN108174387A (en) 2018-06-15
CN108174387B CN108174387B (en) 2020-03-13

Family

ID=62523073

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711384578.1A Active CN108174387B (en) 2017-12-20 2017-12-20 CE resource scheduling method and device

Country Status (1)

Country Link
CN (1) CN108174387B (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2339511A (en) * 1997-04-24 2000-01-26 Ericsson Telefon Ab L M System and method for allocating channel elements in a code division multiple access radio telecommunications network
CN1579067A (en) * 2002-07-30 2005-02-09 英特尔公司 Point coordinator delegation in a wireless network
CN103687016A (en) * 2012-09-24 2014-03-26 中国电信股份有限公司 Mobile communication base station channel element dynamic configuration method and system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2339511A (en) * 1997-04-24 2000-01-26 Ericsson Telefon Ab L M System and method for allocating channel elements in a code division multiple access radio telecommunications network
CN1579067A (en) * 2002-07-30 2005-02-09 英特尔公司 Point coordinator delegation in a wireless network
CN103687016A (en) * 2012-09-24 2014-03-26 中国电信股份有限公司 Mobile communication base station channel element dynamic configuration method and system

Also Published As

Publication number Publication date
CN108174387B (en) 2020-03-13

Similar Documents

Publication Publication Date Title
CN108234581B (en) Resource scheduling method and server
CN113377540A (en) Cluster resource scheduling method and device, electronic equipment and storage medium
CN110389816B (en) Method, apparatus and computer readable medium for resource scheduling
CN104142860A (en) Resource adjusting method and device of application service system
CN105791254B (en) Network request processing method and device and terminal
CN106502918B (en) A kind of scheduling memory method and device
CN109788489A (en) A kind of base station planning method and device
CN111176840B (en) Distribution optimization method and device for distributed tasks, storage medium and electronic device
CN106973377B (en) The control method and control device and management equipment and terminal of data communication
CN112631780A (en) Resource scheduling method and device, storage medium and electronic equipment
CN108920276A (en) Linux system memory allocation method, system and equipment and storage medium
CN109614223A (en) Hardware resource dispatching method, device and hardware resource controlling equipment
CN109228954B (en) Charging pile energy management method and system and charging pile group system
CN103516763B (en) Method for processing resource and system and device
CN106569898A (en) Resource distribution method and mobile terminal
CN107343023A (en) Resource allocation methods, device and electronic equipment in a kind of Mesos management cluster
CN112802359A (en) Parking lot management method and device and server
CN108228350A (en) A kind of resource allocation methods and device
CN109521970A (en) A kind of data processing method and relevant device
CN104123188A (en) Resource allocating method and related devices
CN103761192B (en) A kind of method and apparatus of Memory Allocation
CN109634888A (en) A kind of FC interface card exchange resource identification processing method and associated component
CN108174387A (en) A kind of CE resource regulating methods and device
CN110096352B (en) Process management method, device and computer readable storage medium
CN110837421A (en) Task allocation method and device

Legal Events

Date Code Title Description
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant