CN108168320A - A kind of symmetrical double furnace chambers scrap steel preheating melting appartus and steel scrap melt method - Google Patents

A kind of symmetrical double furnace chambers scrap steel preheating melting appartus and steel scrap melt method Download PDF

Info

Publication number
CN108168320A
CN108168320A CN201810081923.2A CN201810081923A CN108168320A CN 108168320 A CN108168320 A CN 108168320A CN 201810081923 A CN201810081923 A CN 201810081923A CN 108168320 A CN108168320 A CN 108168320A
Authority
CN
China
Prior art keywords
scrap
chamber
steel
steel scrap
closed chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810081923.2A
Other languages
Chinese (zh)
Inventor
顾军
杜刚
季中林
朱建军
李占才
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Great Huan Group Co Ltd
Original Assignee
Great Huan Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Great Huan Group Co Ltd filed Critical Great Huan Group Co Ltd
Priority to CN201810081923.2A priority Critical patent/CN108168320A/en
Publication of CN108168320A publication Critical patent/CN108168320A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D13/00Apparatus for preheating charges; Arrangements for preheating charges
    • F27D13/002Preheating scrap

Abstract

The invention discloses a kind of symmetrical double furnace chambers scrap steel preheating melting appartus and steel scrap to melt method, the device includes two steel scrap closed chambers, steel scrap closed chamber is equipped with burner, outlet flue, smoke outlet, tapping hole, outlet flue connects high-temperature flue, two steel scrap closed chamber high-temperature flues are connected by combustion chamber, and smoke outlet is connected by smoke discharging pipe with deduster, and smoke discharging pipe is equipped with flue gas stop valve, deduster is connected by air-introduced machine with smoke evacuation chimney, and tapping hole is equipped with the hired car that taps a blast furnace;This method is to use two steel scrap closed chambers alternately as scrap melting chamber, make scrap melting by providing heat in burner thereto a steel scrap closed chamber, the hot wind exhaust gas that scrap melting generates is passed through combustion chamber and is heated into high-temperature flue gas, high-temperature flue gas is passed through in another steel scrap closed chamber again, steel scrap is preheated, high-temperature flue gas is converted into low-temperature flue gas and passes through smoke discharging pipe.The present invention overcomes existing steel scrap processing mode power consumption it is big the problem of, neither electricity consumption can reduce smelting iron and steel cost again.

Description

A kind of symmetrical double furnace chambers scrap steel preheating melting appartus and steel scrap melt method
Technical field
The present invention relates to the preheating melt processed of steel scrap and steel scrap cycling and reutilization technical field, especially a kind of symmetric doubles Furnace chamber scrap steel preheating melting appartus and steel scrap melt method.
Background technology
Steel scrap enters the production procedure of existing smelting iron and steel as resource, realizes that self-loopa utilizes, and not only mitigates steel life Environmental protection pressure in production flow effectively promotes prouctiveness, and reduces the production cost of smelting iron and steel.Steel scrap is valuable source, Steel scrap circulating technology is a very important subject, and major part steel scrap is melted and recycled by electric furnace at present;Also there is one It is allocated as recycling to realize in cooling material addition converter.
Preheating scrap and by steel scrap on-line heating fusing be blended into ladle (tank), add in converter with blast-melted It is to realize the most effective economical route that steel scrap recycles.Electric energy is high-grade energy and is easy to use, but studies carefully its power generation, passes For defeated and conversion, gross efficiency is not high.
Invention content
Goal of the invention:The purpose of the present invention is being directed to the problem of existing steel scrap processing mode power consumption is big, invention is a kind of both Not electricity consumption can reduce the symmetrical double furnace chambers scrap steel preheating melting appartus of smelting iron and steel cost again and steel scrap melts method.
To achieve these goals, present invention employs following technical solutions:
A kind of symmetrical double furnace chambers scrap steel preheating melting appartus, including steel scrap closed chamber one and steel scrap closed chamber two, steel scrap is close Closed chamber one be equipped with burner one, outlet flue one, smoke outlet one, tapping hole one, steel scrap closed chamber two be equipped with burner two, outlet flue two, Smoke outlet two, tapping hole two;
Outlet flue one connects high-temperature flue one, and outlet flue two connects high-temperature flue two, high-temperature flue one and high-temperature flue two It is connected by combustion chamber, smoke outlet one is connected by smoke discharging pipe one with deduster, and smoke discharging pipe one is equipped with flue gas stop valve one, Smoke outlet two is connected by smoke discharging pipe two with deduster, and smoke discharging pipe two is equipped with flue gas stop valve two, and deduster passes through air inducing Machine is connected with smoke evacuation chimney, and tapping hole one and tapping hole two are respectively equipped with the hired car that taps a blast furnace.
Further, the combustion chamber includes combustion chamber one and combustion chamber two, and combustion chamber one and combustion chamber two are in cylinder Shape, one top of combustion chamber and combustion chamber are equipped with connection flue between two tops, and combustor side face is equipped with igniter burner one and even The smoke inlet of high-temperature flue one is connect, one smoke inlet of combustion chamber is set along one inner wall tangential direction of combustion chamber, two side of combustion chamber Face is equipped with igniter burner two and connects the smoke inlet of high-temperature flue two, and two smoke inlet of combustion chamber is along two inner wall tangent line of combustion chamber Direction is set, and one bottom of combustion chamber and one bottom of combustion chamber are equipped with ash output valve.
Further, the burner one is located on the closed chamber movement lid one at one top of steel scrap closed chamber, smoke outlet one Positioned at steel scrap closed chamber one side top, outlet flue one is located at steel scrap closed chamber one side lower part, and it is close that tapping hole one is located at steel scrap One bottom of closed chamber;The burner two is located on the closed chamber movable cover plate two at two top of steel scrap closed chamber, and smoke outlet two is located at useless Steel closed chamber two side faces top, outlet flue two are located at steel scrap closed chamber two side faces lower part, and tapping hole two is located at steel scrap closed chamber two Bottom.
Further, the smoke discharging pipe one is additionally provided with wind mixed chamber one, wind mixed chamber one by adjusting valve one and atmosphere, Smoke discharging pipe two is additionally provided with wind mixed chamber two, and wind mixed chamber's two-way crosses adjusting valve two and atmosphere.
A kind of scrap melting method based on above-mentioned symmetrical double furnace chambers scrap steel preheating melting appartus, this method include:
Steel scrap closed chamber one and steel scrap closed chamber two are used alternately as scrap melting chamber;
When steel scrap closed chamber one is used as scrap melting chamber in use, being used steel scrap closed chamber two as scrap steel preheating chamber, Adjusting valve one and flue gas stop valve one are closed, opens adjusting valve two and flue gas stop valve two, by burner one to steel scrap closed chamber Heat in one is provided, makes the scrap melting in steel scrap closed chamber one, by what is generated during scrap melting in steel scrap closed chamber one Hot wind exhaust gas is passed through burning heating indoor by high-temperature flue one, forms high-temperature flue gas, high-temperature flue gas is passed through high-temperature flue two It is passed through in steel scrap closed chamber two and steel scrap is preheated, high-temperature flue gas is converted into low-temperature flue gas and passes through smoke discharging pipe two and discharges;
When steel scrap closed chamber two is used as scrap melting chamber in use, being used steel scrap closed chamber one as scrap steel preheating chamber, Adjusting valve two and flue gas stop valve two are closed, opens adjusting valve one and flue gas stop valve one, by burner two to steel scrap closed chamber Heat in two is provided, makes the scrap melting in steel scrap closed chamber two, by what is generated during scrap melting in steel scrap closed chamber two Hot wind exhaust gas is passed through in combustion chamber by high-temperature flue two and heated, and forms high-temperature flue gas, high-temperature flue gas is passed through high-temperature flue one It is passed through in steel scrap closed chamber one and steel scrap is preheated, high-temperature flue gas is converted into low-temperature flue gas and passes through smoke discharging pipe one and discharges.
Further, it when low-temperature flue gas is discharged by smoke discharging pipe two, is introduced by adjusting valve two to wind mixed chamber two cold Wind;When low-temperature flue gas is discharged by smoke discharging pipe one, cold wind is introduced to wind mixed chamber one by adjusting valve one.
Advantageous effect:
(1) scrap melting preheating device of the present invention sets two steel scrap closed chambers, and a steel scrap closed chamber melting waste steel melts The hot wind exhaust gas for changing steel scrap discharge is passed through another steel scrap closed chamber preheating scrap, fusing and warm in two furnace chambers according to Secondary rotation, heat are fully used, and high temperature gas flow can fully discharge final cigarette with steel scrap heat exchange with relatively low temperature Gas;
(2) the usable carbon oxygen burner of the present invention, under the conditions of pure oxygen or Fuyang from steel scrap closed chamber top center to The Pulverized Coal burning of lower injection generates 2600 DEG C or more of high temperature, and rapid melting steel scrap is at low cost efficient;
(3) combustion chamber is set between two steel scrap closed chambers, and both having realized can in the hot wind exhaust gas of melting waste steel generation The burning and exhausting of combustion property residue, and realize the recycling of the high-temperature flue gas after hot wind secondary exhaust gas combustion;
(4) by controlling combustion chamber ignition burner combustion intensity and high-temperature flue air force, adjusting control scrap steel preheating Temperature realizes better pre-heat effect.
Description of the drawings
Fig. 1 is the structure diagram of the symmetrical double furnace chambers scrap steel preheating melting appartus of the present invention;
Fig. 2 be steel scrap closed chamber one, steel scrap closed chamber two, combustion chamber one, combustion chamber two sectional view.
In figure:1- steel scraps closed chamber one;2- steel scraps closed chamber two;3- burners one;4- burners two;5- closed chamber movable cover plates One;6- closed chambers movable cover plate two;7- outlet flues one;8- outlet flues two;9- high-temperature flues one;10- high-temperature flues two;11- fires Burn room one;12- combustion chambers two;13- couples flue;14- ash output valves;15- smoke outlets one;16- smoke outlets two;17- smoke discharging pipes One;18- smoke discharging pipes two;19- tapping holes one;20- tapping holes two;21- taps a blast furnace hired car;22- wind mixed chamber one;23- wind mixed chamber two; 24- adjusting valves one;25- adjusting valves two;26- flue gases stop valve one;27- flue gases stop valve two;28- dedusters;29- air-introduced machines; 30- smoke evacuation chimneys;31- igniter burners one;32- igniter burners two.
Specific embodiment:
Further explanation is done to the present invention below in conjunction with the accompanying drawings.
As shown in Figure 1, a kind of symmetrical double furnace chambers scrap steel preheating melting appartus of the present invention, including one 1 He of steel scrap closed chamber Steel scrap closed chamber 22.Steel scrap closed chamber 1 is equipped with burner 1, outlet flue 1, smoke outlet 1, tapping hole 1, and steel scrap is close Closed chamber 22 is equipped with burner 24, outlet flue 28, smoke outlet 2 16, tapping hole 2 20.
Burner 1 is located on the closed chamber movement lid 1 at one 1 top of steel scrap closed chamber, and smoke outlet 1 is located at steel scrap One 1 side surface upper part of closed chamber, outlet flue 1 are located at one 1 side lower of steel scrap closed chamber, and tapping hole 1 is located at steel scrap closed chamber One 1 bottoms.Burner 24 is located on the closed chamber movable cover plate 26 at 22 top of steel scrap closed chamber, and smoke outlet 2 16 is located at steel scrap 22 side surface upper part of closed chamber, outlet flue 28 are located at 22 side lower of steel scrap closed chamber, and tapping hole 2 20 is located at steel scrap closed chamber 22 bottoms.
Outlet flue 1 connects high-temperature flue 1, and outlet flue 28 connects high-temperature flue 2 10, high-temperature flue 1 and high temperature Flue 2 10 is connected by combustion chamber.Smoke outlet 1 is connected by smoke discharging pipe 1 with deduster 28, smoke discharging pipe 1 Equipped with flue gas stop valve 1, wind mixed chamber 1, wind mixed chamber 1 passes through adjusting valve 1 and atmosphere.Smoke outlet 2 16 is logical It crosses smoke discharging pipe 2 18 with deduster 28 to be connected, smoke discharging pipe 2 18 is equipped with flue gas stop valve 2 27, wind mixed chamber 2 23, wind mixed chamber 2 23 pass through adjusting valve 2 25 and atmosphere.Deduster 28 is connected by air-introduced machine 29 with smoke evacuation chimney 30.One 19 He of tapping hole Tapping hole 2 20 is respectively equipped with the hired car 21 that taps a blast furnace.
As shown in Fig. 2, combustion chamber includes combustion chamber 1 and combustion chamber 2 12, combustion chamber 1 and combustion chamber 2 12 are in Cylindrical shape, one 11 top of combustion chamber and combustion chamber are equipped with connection flue 13 between 2 12 top, and one 11 side of combustion chamber is equipped with point It burns mouth 1 and connects the smoke inlet of high-temperature flue 1, one 11 smoke inlet of combustion chamber is along one 11 inner wall tangent line of combustion chamber Direction is set, and 2 12 side of combustion chamber is equipped with igniter burner 2 32 and connects the smoke inlet of high-temperature flue 2 10, combustion chamber two 12 smoke inlets are set along 2 12 inner wall tangential direction of combustion chamber, and one 11 bottom of combustion chamber and one 12 bottom of combustion chamber are equipped with out Grey valve 14.As shown in Fig. 2, in the present invention, smoke inlet is set along two Inner Wall of Combustion Chamber tangential directions, in this way, On the one hand it is conducive to the sedimentation of dust and comburant, hot wind exhaust gas on the other hand can be made to obtain fully heating, with the height of uniform temperature Medium-temperature smoke pre-heating steel scrap.
The scrap melting method based on above-mentioned symmetrical double furnace chambers scrap steel preheating melting appartus of the present invention, this method include:
Steel scrap closed chamber 1 and steel scrap closed chamber 22 are used alternately as scrap melting chamber;
When steel scrap closed chamber 1 as scrap melting chamber in use, making steel scrap closed chamber 22 as scrap steel preheating chamber With closing adjusting valve 1 and flue gas stop valve 1 open adjusting valve 2 25 and flue gas stop valve 2 27, pass through burner 1 Heat is provided into steel scrap closed chamber 1, makes the scrap melting in steel scrap closed chamber 1, steel scrap in steel scrap closed chamber 1 is melted Change the hot wind exhaust gas generated in the process and burning heating indoor is passed through by high-temperature flue 1, high-temperature flue gas is formed, by high-temperature flue gas It is passed through in steel scrap closed chamber 22 by high-temperature flue 2 10 and steel scrap is preheated, high-temperature flue gas is converted into low-temperature flue gas and leads to The discharge of smoke discharging pipe 2 18 is crossed, when low-temperature flue gas is discharged by smoke discharging pipe 2 18, by adjusting valve 2 25 to wind mixed chamber two 23 introduce cold wind, and the ratio for participating in cooling air quantity is adjusted by adjusting valve 2 25, and control enters the flue-gas temperature of deduster 28;
When steel scrap closed chamber 22 as scrap melting chamber in use, making steel scrap closed chamber 1 as scrap steel preheating chamber With closing adjusting valve 2 25 and flue gas stop valve 2 27 open adjusting valve 1 and flue gas stop valve 1, pass through burner 24 Heat is provided into steel scrap closed chamber 22, makes the scrap melting in steel scrap closed chamber 22, steel scrap in steel scrap closed chamber 22 is melted Change the hot wind exhaust gas generated in the process and burning heating indoor is passed through by high-temperature flue 2 10, high-temperature flue gas is formed, by high temperature cigarette Gas is passed through in steel scrap closed chamber 1 by high-temperature flue 1 and steel scrap is preheated, and high-temperature flue gas is converted into low-temperature flue gas and leads to The discharge of smoke discharging pipe 1 is crossed, when low-temperature flue gas is discharged by smoke discharging pipe 1, by adjusting valve 1 to wind mixed chamber one 22 introduce cold wind, and the ratio for participating in cooling air quantity is adjusted by adjusting valve 1, and control enters the flue-gas temperature of deduster 28.
The present invention uses two steel scrap closed chambers respectively as scrap melting chamber and scrap steel preheating chamber, by pure oxygen or richness The Pulverized Coal burning being blown downwards by steel scrap closed chamber cavity volume top center under the conditions of sun generates 2600 DEG C or more of height Temperature carrys out melting waste steel, and the molten steel being fused by the slow downlink of gravity and falls into the hired car that taps a blast furnace, steel scrap by going out tapping hole The hot wind exhaust gas generated fully burning again in a combustion chamber is melted, by the CO contained in hot wind exhaust gas and other combustible after-flames Afterwards, the high-temperature flue gas that hot wind exhaust gas generates after burning again is entered back into after scrap steel preheating chamber exchanges heat with steel scrap and is discharged.By being located at two The open and close control flue gas direction of the flue gas cutting-off valve of a smoke discharging pipe realizes fusing burner hearth and preheats the conversion of burner hearth.
The above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications also should It is considered as protection scope of the present invention.

Claims (6)

1. a kind of symmetrical double furnace chambers scrap steel preheating melting appartus, it is characterised in that:It is closed including steel scrap closed chamber one (1) and steel scrap Chamber two (2), steel scrap closed chamber one (1) are given up equipped with burner one (3), outlet flue one (7), smoke outlet one (15), tapping hole one (19) Steel closed chamber two (2) is equipped with burner two (4), outlet flue two (8), smoke outlet two (16), tapping hole two (20);
Outlet flue one (7) connection high-temperature flue one (9), outlet flue two (8) connection high-temperature flue two (10), high-temperature flue one (9) It is connected with high-temperature flue two (10) by combustion chamber, smoke outlet one (15) passes through smoke discharging pipe one (17) and deduster (28) phase Even, smoke discharging pipe one (17) passes through smoke discharging pipe two (18) and deduster equipped with flue gas stop valve one (26), smoke outlet two (16) (28) it is connected, smoke discharging pipe two (18) passes through air-introduced machine (29) and smoke evacuation chimney equipped with flue gas stop valve two (27), deduster (28) (30) it is connected, tapping hole one (19) and tapping hole two (20) are respectively equipped with the hired car (21) that taps a blast furnace.
2. a kind of symmetrical double furnace chambers scrap steel preheating melting appartus according to claim 1, it is characterised in that:The combustion chamber Including combustion chamber one (11) and combustion chamber two (12), combustion chamber one (11) and combustion chamber two (12) are cylindrical, combustion chamber one (11) connection flue (13) is equipped between top and combustion chamber two (12) top, combustion chamber one (11) side is equipped with igniter burner one (31) and the smoke inlet of connection high-temperature flue one (9), combustion chamber one (11) smoke inlet is along combustion chamber one (11) inner wall tangent line Direction is set, and combustion chamber two (12) side is equipped with igniter burner two (32) and connects the smoke inlet of high-temperature flue two (10), combustion It burns room two (12) smoke inlet to set along combustion chamber two (12) inner wall tangential direction, combustion chamber one (11) bottom and combustion chamber one (12) bottom is equipped with ash output valve (14).
3. a kind of symmetrical double furnace chambers scrap steel preheating melting appartus according to claim 1 or 2, it is characterised in that:The burning For mouth one (3) on the closed chamber movement lid one (5) at the top of steel scrap closed chamber one (1), smoke outlet one (15) is close positioned at steel scrap Closed chamber one (1) side surface upper part, outlet flue one (7) is positioned at steel scrap closed chamber one (1) side lower, and tapping hole one (19) is positioned at steel scrap Closed chamber one (1) bottom;The burner two (4) on the closed chamber movable cover plate two (6) at the top of steel scrap closed chamber two (2), Smoke outlet two (16) is positioned at steel scrap closed chamber two (2) side surface upper part, and outlet flue two (8) is under steel scrap closed chamber two (2) side Portion, tapping hole two (20) is positioned at steel scrap closed chamber two (2) bottom.
4. a kind of symmetrical double furnace chambers scrap steel preheating melting appartus according to claim 3, it is characterised in that:The smoke exhaust pipe Road one (17) is additionally provided with wind mixed chamber one (22), and wind mixed chamber one (22) passes through adjusting valve one (24) and atmosphere, smoke discharging pipe two (18) wind mixed chamber two (23) is additionally provided with, wind mixed chamber two (23) passes through adjusting valve two (25) and atmosphere.
5. a kind of scrap melting method based on double furnace chambers scrap steel preheating melting appartus symmetrical described in claim 4, feature exist In this method includes:
Steel scrap closed chamber one (1) and steel scrap closed chamber two (2) are used alternately as scrap melting chamber;
When steel scrap closed chamber one (1) as scrap melting chamber in use, making steel scrap closed chamber two (2) as scrap steel preheating chamber With closing adjusting valve one (24) and flue gas stop valve one (26) are opened adjusting valve two (25) and flue gas stop valve two (27), passed through Burner one (3) provides heat into steel scrap closed chamber one (1), makes the scrap melting in steel scrap closed chamber one (1), and steel scrap is closed The hot wind exhaust gas generated during the interior scrap melting of chamber one (1) is passed through burning heating indoor by high-temperature flue one (9), is formed high High-temperature flue gas is passed through by high-temperature flue two (10) in steel scrap closed chamber two (2) and steel scrap is preheated by warm flue gas, high temperature cigarette Gas is converted into low-temperature flue gas and passes through smoke discharging pipe two (18) discharge;
When steel scrap closed chamber two (2) as scrap melting chamber in use, making steel scrap closed chamber one (1) as scrap steel preheating chamber With closing adjusting valve two (25) and flue gas stop valve two (27) are opened adjusting valve one (24) and flue gas stop valve one (26), passed through Burner two (4) provides heat into steel scrap closed chamber two (2), makes the scrap melting in steel scrap closed chamber two (2), and steel scrap is closed The hot wind exhaust gas generated during the interior scrap melting of chamber two (2) is passed through burning heating indoor by high-temperature flue two (10), is formed High-temperature flue gas is passed through by high-temperature flue one (9) in steel scrap closed chamber one (1) and steel scrap is preheated by high-temperature flue gas, high temperature Flue gas is converted into low-temperature flue gas and passes through smoke discharging pipe one (17) discharge.
6. scrap melting method according to claim 5, it is characterised in that:When low-temperature flue gas passes through smoke discharging pipe two (18) During discharge, cold wind is introduced to wind mixed chamber two (23) by adjusting valve two (25);When low-temperature flue gas is arranged by smoke discharging pipe one (17) When going out, cold wind is introduced to wind mixed chamber one (22) by adjusting valve one (24).
CN201810081923.2A 2018-01-29 2018-01-29 A kind of symmetrical double furnace chambers scrap steel preheating melting appartus and steel scrap melt method Pending CN108168320A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810081923.2A CN108168320A (en) 2018-01-29 2018-01-29 A kind of symmetrical double furnace chambers scrap steel preheating melting appartus and steel scrap melt method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810081923.2A CN108168320A (en) 2018-01-29 2018-01-29 A kind of symmetrical double furnace chambers scrap steel preheating melting appartus and steel scrap melt method

Publications (1)

Publication Number Publication Date
CN108168320A true CN108168320A (en) 2018-06-15

Family

ID=62515679

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810081923.2A Pending CN108168320A (en) 2018-01-29 2018-01-29 A kind of symmetrical double furnace chambers scrap steel preheating melting appartus and steel scrap melt method

Country Status (1)

Country Link
CN (1) CN108168320A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110423860A (en) * 2019-09-03 2019-11-08 苏州正益诚新能源科技有限公司 A kind of scrap steel preheating furnace
CN110849161A (en) * 2019-11-22 2020-02-28 湖南辰州矿业有限责任公司 Flue gas temperature regulating device of dry smelting furnace
CN111218539A (en) * 2020-03-09 2020-06-02 重庆燃控科技有限公司 Pure oxygen combustion scrap steel preheating device with flue gas self-circulation function
CN111235339A (en) * 2020-02-14 2020-06-05 中冶赛迪工程技术股份有限公司 Process capable of adjusting furnace burden collocation of converter

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB895534A (en) * 1960-02-06 1962-05-02 Meredith Woodridge Thring Improvements in electric-arc steel furnaces
CN87201878U (en) * 1987-02-11 1988-01-13 东北轻合金加工厂 Double bed alternate aluminium-smelting furnace
CN1091777A (en) * 1993-01-25 1994-09-07 曼内斯曼股份公司 The method and apparatus of control twin furnace equipment operation
JPH06323733A (en) * 1993-05-10 1994-11-25 Daido Steel Co Ltd Scrap preheating method for twin type electric furnace
CN1350629A (en) * 1999-06-25 2002-05-22 洛马金·弗拉德米尔·马克斯莫维奇 Multichambered stellmaking apparatus and method of steelmaking using this apparatus
CN204085215U (en) * 2014-09-28 2015-01-07 西安广大电炉有限公司 A kind of electrical arc furnace flue gas waste heat utilization device
CN207850090U (en) * 2018-01-29 2018-09-11 大峘集团有限公司 A kind of symmetrical double furnace chambers scrap steel preheating melting appartus

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB895534A (en) * 1960-02-06 1962-05-02 Meredith Woodridge Thring Improvements in electric-arc steel furnaces
CN87201878U (en) * 1987-02-11 1988-01-13 东北轻合金加工厂 Double bed alternate aluminium-smelting furnace
CN1091777A (en) * 1993-01-25 1994-09-07 曼内斯曼股份公司 The method and apparatus of control twin furnace equipment operation
JPH06323733A (en) * 1993-05-10 1994-11-25 Daido Steel Co Ltd Scrap preheating method for twin type electric furnace
CN1350629A (en) * 1999-06-25 2002-05-22 洛马金·弗拉德米尔·马克斯莫维奇 Multichambered stellmaking apparatus and method of steelmaking using this apparatus
CN204085215U (en) * 2014-09-28 2015-01-07 西安广大电炉有限公司 A kind of electrical arc furnace flue gas waste heat utilization device
CN207850090U (en) * 2018-01-29 2018-09-11 大峘集团有限公司 A kind of symmetrical double furnace chambers scrap steel preheating melting appartus

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
周传典: "高炉炼铁生产技术手册", 31 August 2002, 冶金工业出版社, pages: 511 - 512 *
张殿有: "高炉冶炼操作技术", 31 March 2006, 冶金工业出版社, pages: 287 - 290 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110423860A (en) * 2019-09-03 2019-11-08 苏州正益诚新能源科技有限公司 A kind of scrap steel preheating furnace
CN110423860B (en) * 2019-09-03 2024-01-05 苏州正益诚新能源科技有限公司 Scrap steel preheating furnace
CN110849161A (en) * 2019-11-22 2020-02-28 湖南辰州矿业有限责任公司 Flue gas temperature regulating device of dry smelting furnace
CN111235339A (en) * 2020-02-14 2020-06-05 中冶赛迪工程技术股份有限公司 Process capable of adjusting furnace burden collocation of converter
CN111218539A (en) * 2020-03-09 2020-06-02 重庆燃控科技有限公司 Pure oxygen combustion scrap steel preheating device with flue gas self-circulation function

Similar Documents

Publication Publication Date Title
CN108168320A (en) A kind of symmetrical double furnace chambers scrap steel preheating melting appartus and steel scrap melt method
CN101726187B (en) Single preheating, sintering, igniting and heat insulating furnace
CN104566339B (en) Biomass gasification burner
CN105039738B (en) Crude copper fire refining furnace and process
CN101294770A (en) Crucible furnace for alloy melting and heat preservation
ES2289500T3 (en) PROCESS OF COMBUSTION OF MATERIALS IN TROZOS WITH POOR GAS.
CN207850090U (en) A kind of symmetrical double furnace chambers scrap steel preheating melting appartus
CN101726175A (en) Heat accumulating type external heat blast cupola furnace
CN111250510B (en) Flying ash melting treatment device and flying ash melting treatment method operating in sections
CN105271841A (en) Rotary kiln device and method for constant temperature indirect calcination of limestone
CN102012029B (en) Heat-storing combustion apparatus and biomass gas heating system
CN112344729A (en) Double-chamber furnace
CN101643807B (en) Melting and iron-smelting device of heat storage type electric arc furnace
CN201053820Y (en) Highly effective crucible furnace
CN105858649A (en) Graphite high-temperature expanding furnace
CN202175560U (en) Gas electric arc double heat type thermal storage waste heat waste gas backdraft environment protection energy conservation efficient silicon refining furnace
JPS63503006A (en) Method and device for preheating waste metal for furnaces
US2574740A (en) Heated blast cupola
CN201589526U (en) Single preheating sintering ignition heat-preserving furnace
CN201327293Y (en) Melting furnace
CN207635351U (en) A kind of multistage gasification flash burning stove
CN201522185U (en) Gas-fired cupola
CN206695603U (en) Built-in accumulation of heat iron-bits melting furnace
CN101775455B (en) Iron reduction device
CN206269581U (en) A kind of high temperature oxygen deprivation multicell heat accumulation founding furnace system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination