CN108154255A CN201711188935.7A CN201711188935A CN108154255A CN 108154255 A CN108154255 A CN 108154255A CN 201711188935 A CN201711188935 A CN 201711188935A CN 108154255 A CN108154255 A CN 108154255A
Authority
CN
China
Prior art keywords
access
capacity
main transformer
substation
open
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711188935.7A
Other languages
Chinese (zh)
Inventor
宋伟
吴�琳
韩韬
亢洁
宋英华
徐玮
于海平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nari Technology Co Ltd
NARI Nanjing Control System Co Ltd
Original Assignee
Nari Technology Co Ltd
NARI Nanjing Control System Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nari Technology Co Ltd, NARI Nanjing Control System Co Ltd filed Critical Nari Technology Co Ltd
Priority to CN201711188935.7A priority Critical patent/CN108154255A/en
Publication of CN108154255A publication Critical patent/CN108154255A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • G06Q10/047Optimisation of routes or paths, e.g. travelling salesman problem
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Public Health (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Water Supply & Treatment (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a kind of implementation methods of distribution network users access analysis system, according to the position of access customer point waiting and customer charge grade and application capacity, access customer point periphery waiting is analyzed to can access a little, and the characteristics of for electric power system model, utilize network topologies, calculate the most short supply path of power equipment and access customer waiting point at 2 points, radius of electricity supply, circuit to different access schemes can open capacity, substation can open capacity, main transformer and can open capacity and be compared, and obtain optimal case.The present invention automatically generates access customer waiting according to the network distribution of power network resources and can access the optimal power path of point, can effectively improve the routine work efficiency of new user's cut-in operation and the reasonability of generation scheme by intelligent analysis process.

Description

A kind of implementation method of distribution network users access analysis system
Technical field
The present invention relates to a kind of implementation methods of distribution network users access analysis system, belong to power distribution network administrative skill neck Domain.
Background technology
At present, power grid circuit itself, number of devices are huge, cut and change frequently, the selection power equipment in user's access procedure The problems such as complicated and not high there are real-time, correctness and reliability are seriously relatively low, is safeguarded and used to access point heavy workload.
Invention content
Purpose:In order to overcome the deficiencies in the prior art, the present invention provides a kind of distribution network users access analysis system The implementation method of system.
Technical solution:In order to solve the above technical problems, the technical solution adopted by the present invention is:
A kind of implementation method of distribution network users access analysis system, includes the following steps:
Step 1:It treats accessing user's point to be positioned, confirms the position of access customer point waiting;
Step 2:It according to the position of access customer point waiting, searches for and can access point, and calculate access point opens capacity;
Step 3:The capacity that opens for applying for capacity and access point according to user is screened, and capacity can be opened by, which filtering out, expires The power network resources of foot access customer requirement waiting are feasible access scheme;If there are many feasible access schemes, difference is connect Entering the circuit of scheme can open that capacity, main transformer can open capacity and substation can open capacity, radius of electricity supply is compared successively, Obtain optimal case.
Preferably, step 4 is further included:It is completed and manages, the management of being completed includes:
4.1:Apply for the modification of GIS circuits communication chart:After user accesses implementation completion, modification phase is sent out to state's net generalized information system Answer circuit communication chart application;
4.2:Submit the update of present situation electric network data:After the completion of state's net generalized information system sends out modification respective lines communication chart application, User's access scheme of completion is transferred to as present situation electric network data, the electric network data update of submission present situation.
Preferably, access customer point location waiting includes in the step 1:
1.1:Automatic positioning:According to the doorplate address of the user information obtained from power grid marketing system, by doorplate Address carries out parsing participle, and matched road name is found from allocation index library, access customer point position waiting is confirmed on map simultaneously Positioning;
1.2:Manual positioning:Using the roaming of map, amplification, basic operational functions are reduced, found on map to be accessed User's point accurate location;
1.3:Input positioning:Distribution network users access analysis system provides coordinate position and is manually entered channel, when geography is sat When marking known to information, the accurate location of access customer point waiting can be determined by manual input-mode.
Preferably, the step 2 includes:
2.1:Access point search:According to the position of access customer point waiting having determined, using access customer point waiting as origin, Using acquiescence or customized search range as search radius, the access point in search range;
2.2:Access point analysis:According to distribution transforming simultaneity factor, distribution transforming load factor, each access point opens in calculating search radius Capacity is put, can open capacity, main transformer including circuit and can open capacity and substation can open capacity, and show one by one with tabular form Show each access-in point information, and have Site Survey function;
Distribution transforming simultaneity factor refers to the load according to the distribution transforming peak load moment all under circuit, distribution transforming peak load, calculates Distribution transforming simultaneity factor, distribution transforming simultaneity factor calculation formula are as follows:
Distribution transforming load factor calculation formula is as follows:
Circuit can open capacity and refer to according to line component minimum current-carrying capacity, circuit maximum load current and distribution transforming simultaneously Rate, distribution transforming load factor calculating circuit can open capacity, and calculation formula is as follows:For the circuit of 10kV,
Main transformer can open capacity and refer to according to the affiliated transforming plant main transformer quantity of main transformer, main transformer load factor, main transformer capacity, distribution transforming Simultaneity factor, distribution transforming load factor, capacity can be opened by calculating main transformer, and it is as follows that main transformer can open calculation of capacity:
If there are two main transformers in place substation,:
If the sum of two varying load rates>130%, then main transformer can open capacity=0;
If the sum of two varying load rates<130%, then:
If separate unit main transformer load factor>80%, then main transformer can open capacity=0;
If separate unit main transformer load factor<80%, then
If there are three main transformers in place substation,:
If the sum of three varying load rates>195%, then main transformer can open capacity=0;
If the sum of three varying load rates<195%, then:
If separate unit main transformer load factor>80%, then main transformer can open capacity=0;
If separate unit main transformer load factor<80%, then:
Substation can open capacity and refer to according to main transformer quantity, main transformer load factor, main transformer capacity, substation in substation most Big load, capacity can be opened by calculating substation, and it is as follows that substation can open calculation of capacity:
If there are two main transformers in place substation,:
If the sum of two varying load rates>130%, then substation can open capacity=0;
If the sum of two varying load rates<130%, then:
If there are three main transformers in place substation,:
If the sum of three varying load rates>195%, then substation can open capacity=0;
If the sum of three varying load rates<195%, then:
Preferably, optimal case is obtained in the step 3, it is as follows including step:
3.1:If circuit can open capacity * 0.8 applies for capacity more than user, this circuit is selected;
3.2:If main transformer can open capacity * 0.8 can open capacity more than circuit, this main transformer is selected;
3.3:If substation can open capacity * 0.8 more than main transformer can development capacity, select this substation;
3.4:On the basis of above-mentioned condition is met, radius of electricity supply, that is, user and substation air line distance it is minimum then for most Excellent access scheme.
3.5:Access scheme result's management:User is established for each user's access events and accesses engineering, preserves feasible access Scheme achievement, geographic distribution and line section figure including different access schemes etc. realizes the unified management of user's access scheme, Convenient for later stage query calls;
3.6:Access scheme prints and export:Using the masterplate of typical design solution, user's access is obtained from marketing system The relevant information of flow using the method for unifying on tabular form to be inserted into Excel bookmarks in Guo Wang companies, realizes that export and auxiliary are beaten Print.
Preferably, step 5 is further included:Station track device statistics, the station track device statistics:By the circuit of substation Facility information Classifying Sum statistics and space orientation in information and circuit.
Preferably, step 6 is further included:Outage analysis, the outage analysis:Using Distributing Network GIS graph topology as base Plinth, simulation disconnects a circuit, the customer quantity that analysis power failure influences, and calculates power distribution network power supply reliability, for user's access point Analysis provides basic data support.
Advantageous effect:A kind of implementation method of distribution network users access analysis system provided by the invention, passes through intelligence point Algorithm is analysed, access customer waiting is automatically generated according to the network distribution of power network resources and can access the optimal power path of point, energy Enough effectively improve the routine work efficiency of new user's cut-in operation and the reasonability of generation scheme.
Description of the drawings
Fig. 1 is flow chart of the method for the present invention.
Specific embodiment
The present invention is further described below in conjunction with the accompanying drawings.
As shown in Figure 1, a kind of implementation method of distribution network users access analysis system, as follows including step:
Step l, it treats accessing user's point to be positioned, confirms the position of access customer point waiting:
Automatic positioning:According to the doorplate address of the user information obtained from marketing system, by being carried out to doorplate address Parsing participle finds matched road name from allocation index library, access customer point Position Approximate waiting is confirmed on map and is positioned.
Manual positioning:Cannot on map it is automatic accurate describe access customer point waiting position when, distribution network users connect Enter analysis system and manual positioning function is provided.User is using basic operational functions such as roaming, amplification, the diminutions of map, in map It is upper to find access customer point accurate location waiting.
Input positioning:Distribution network users access analysis system provides coordinate position and is manually entered channel, when geographical coordinate is believed The accurate location of access customer point waiting can be determined when known to breath by manual input-mode.
Step 2, the position according to access customer point waiting are searched for and can access point, and calculate access point opens capacity:
2-1) access point search:According to the position of access customer point waiting having determined, using access customer point waiting as origin, Using acquiescence or customized search range as search radius, the access point in search range;
2-2) access point analysis:According to distribution transforming simultaneity factor, distribution transforming load factor, each access point opens in calculating search radius Capacity is put, can open capacity, main transformer including circuit and can open capacity and substation can open capacity, and show one by one with tabular form Show each access-in point information, and have Site Survey function.
Distribution transforming simultaneity factor refers to the load according to the distribution transforming peak load moment all under circuit, distribution transforming peak load, calculates Distribution transforming simultaneity factor, distribution transforming simultaneity factor calculation formula are as follows:
Distribution transforming load factor calculation formula is as follows:
Circuit can open capacity and refer to according to line component minimum current-carrying capacity, circuit maximum load current and distribution transforming simultaneously Rate, distribution transforming load factor calculating circuit can open capacity, and calculation formula is as follows:For the circuit of 10kV,
Main transformer can open capacity and refer to according to the affiliated transforming plant main transformer quantity of main transformer, main transformer load factor, main transformer capacity, distribution transforming Simultaneity factor, distribution transforming load factor, capacity can be opened by calculating main transformer, and it is as follows that main transformer can open calculation of capacity:
If there are two main transformers in place substation,:
If the sum of two varying load rates>130%, then main transformer can open capacity=0;
If the sum of two varying load rates<130%, then:
If separate unit main transformer load factor>80%, then main transformer can open capacity=0;
If separate unit main transformer load factor<80%, then
If there are three main transformers in place substation,:
If the sum of three varying load rates>195%, then main transformer can open capacity=0;
If the sum of three varying load rates<195%, then:
If separate unit main transformer load factor>80%, then main transformer can open capacity=0;
If separate unit main transformer load factor<80%, then
Substation can open capacity and refer to according to main transformer quantity, main transformer load factor, main transformer capacity, substation in substation most Big load, capacity can be opened by calculating substation, and it is as follows that substation can open calculation of capacity:
If there are two main transformers in place substation,:
If the sum of two varying load rates>130%, then substation can open capacity=0;
If the sum of two varying load rates<130%, then:
If there are three main transformers in place substation,:
If the sum of three varying load rates>195%, then substation can open capacity=0;
If the sum of three varying load rates<195%, then:
Step 3 applies for that the capacity that opens of capacity and access point is screened according to user, and capacity can be opened by, which filtering out, expires The power network resources of foot access customer requirement waiting are feasible access scheme;If there are many feasible access schemes, difference is connect Enter the radius of electricity supply of scheme, circuit can open capacity, main transformer and can open capacity and substation and can open capacity and be compared, obtain Optimal case.It is final to obtain optimal case:
Access scheme comparative analysis:Apply for that capacity is screened with access-in point information according to user, filtering is unsatisfactory for condition Access point, filter out feasible program, it is connecing for the condition that meets that can open capacity to meet the power network resources of access customer requirement waiting Access point.If there are many feasible access scheme, each access scheme of comparative analysis mainly includes:Circuit can open capacity, main transformer Capacity can be opened, substation can open capacity, the aspect of radius of electricity supply four is compared analysis, finally obtain optimal case.
If circuit can open capacity * 0.8 applies for capacity more than user, this circuit is selected;
If main transformer can open capacity * 0.8 can open capacity more than circuit, this main transformer is selected;
If substation can open capacity * 0.8 more than main transformer can development capacity, select this substation;
On the basis of above-mentioned condition is met, radius of electricity supply, that is, user then connects with substation's air line distance minimum to be optimal Enter scheme.
The analysis of 10kV line powerings radius refers to selecting circuit, according to shortest path principle, counts the line main line and straight Line length, general radius of electricity supply should be less than being equal to 15km.
Access scheme result's management:User is established for each user's access events and accesses engineering, preserves feasible access scheme Achievement, geographic distribution and line section figure including different access schemes etc. is realized the unified management of user's access scheme, is convenient for Later stage query calls.
Access scheme prints and export:Using the masterplate of typical design solution, user's access process is obtained from marketing system Relevant information using the method for unifying on tabular form to be inserted into Excel bookmarks in Guo Wang companies, realizes export and auxiliary printing.
4, management of being completed includes the following steps:
4-1) application GIS circuits communication chart modification:After user accesses implementation completion, the corresponding line of modification is sent out to state net GIS Road communication chart application.
4-2) submit the update of present situation electric network data:After the completion of state net GIS sends out modification respective lines communication chart application, it will complete User's access scheme of work is transferred to as present situation electric network data, the electric network data update of submission present situation.
In addition, the access analysis system is also equipped with following functions:
Station track device statistics:Facility information Classifying Sum statistics and space on the line information and circuit of substation are determined Position etc..
Outage analysis:Based on Distributing Network GIS graph topology, using GIS as technological means, simulation disconnects a circuit, analysis Have a power failure the customer quantity influenced, including pressing customer quantity in 10kV.Customer quantity is pressed in 10kV for calculating the confession of 10kV power distribution networks Electric reliability accesses analysis for user and provides basic data support.
The above is only the preferred embodiment of the present invention, it should be pointed out that:For the ordinary skill people of the art For member, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications also should It is considered as protection scope of the present invention.

Claims (7)

1. a kind of implementation method of distribution network users access analysis system, it is characterised in that:Include the following steps:
Step 1:It treats accessing user's point to be positioned, confirms the position of access customer point waiting;
Step 2:It according to the position of access customer point waiting, searches for and can access point, and calculate access point opens capacity;
Step 3:The capacity that opens for applying for capacity and access point according to user is screened, and capacity satisfaction can be opened by, which filtering out, treats The power network resources of accessing user's requirement are feasible access scheme;If there are many feasible access scheme, to different access sides The circuit of case can open that capacity, main transformer can open capacity and substation can open capacity, radius of electricity supply is compared successively, obtain Optimal case.
2. a kind of implementation method of distribution network users access analysis system according to claim 1, it is characterised in that:Also wrap Include step 4:It is completed and manages, the management of being completed includes:
4.1:Apply for the modification of GIS circuits communication chart:After user accesses implementation completion, the corresponding line of modification is sent out to state's net generalized information system Road communication chart application;
4.2:Submit the update of present situation electric network data:After the completion of state's net generalized information system sends out modification respective lines communication chart application, it will complete User's access scheme of work is transferred to as present situation electric network data, the electric network data update of submission present situation.
3. a kind of implementation method of distribution network users access analysis system according to claim 1, it is characterised in that:It is described Access customer point location waiting includes in step 1:
1.1:Automatic positioning:According to the doorplate address of the user information obtained from power grid marketing system, by doorplate address Parsing participle is carried out, matched road name is found from allocation index library, access customer point position waiting is confirmed on map and is positioned;
1.2:Manual positioning:Using the roaming of map, amplification, basic operational functions are reduced, access customer waiting is found on map Point accurate location;
1.3:Input positioning:Distribution network users access analysis system provides coordinate position and is manually entered channel, when geographical coordinate is believed When known to breath, the accurate location of access customer point waiting can be determined by manual input-mode.
4. a kind of implementation method of distribution network users access analysis system according to claim 1, it is characterised in that:It is described Step 2 includes:
2.1:Access point search:According to the position of access customer point waiting having determined, using access customer point waiting as origin, with silent Recognize or customized search range is search radius, the access point in search range;
2.2:Access point analysis:According to distribution transforming simultaneity factor, distribution transforming load factor, each access point opens appearance in calculating search radius Amount, can open capacity, main transformer including circuit and can open capacity and substation can open capacity, and be shown one by one with tabular form each Access-in point information, and have Site Survey function;
Distribution transforming simultaneity factor refers to the load according to the distribution transforming peak load moment all under circuit, distribution transforming peak load, calculates distribution transforming Simultaneity factor, distribution transforming simultaneity factor calculation formula are as follows:
Distribution transforming load factor calculation formula is as follows:
Circuit can open capacity refer to according to line component minimum current-carrying capacity, circuit maximum load current and distribution transforming simultaneity factor, Distribution transforming load factor, which calculates circuit, can open capacity, and calculation formula is as follows:For the circuit of 10kV,
Main transformer can open capacity and refer to according to the affiliated transforming plant main transformer quantity of main transformer, main transformer load factor, main transformer capacity, distribution transforming simultaneously Rate, distribution transforming load factor, capacity can be opened by calculating main transformer, and it is as follows that main transformer can open calculation of capacity:
If there are two main transformers in place substation,:
If the sum of two varying load rates>130%, then main transformer can open capacity=0;
If the sum of two varying load rates<130%, then:
If separate unit main transformer load factor>80%, then main transformer can open capacity=0;
If separate unit main transformer load factor<80%, then
If there are three main transformers in place substation,:
If the sum of three varying load rates>195%, then main transformer can open capacity=0;
If the sum of three varying load rates<195%, then:
If separate unit main transformer load factor>80%, then main transformer can open capacity=0;
If separate unit main transformer load factor<80%, then:
Substation can open capacity and refer to be born according to main transformer quantity, main transformer load factor, main transformer capacity, substation's maximum in substation Lotus, capacity can be opened by calculating substation, and it is as follows that substation can open calculation of capacity:
If there are two main transformers in place substation,:
If the sum of two varying load rates>130%, then substation can open capacity=0;
If the sum of two varying load rates<130%, then:
If there are three main transformers in place substation,:
If the sum of three varying load rates>195%, then substation can open capacity=0;
If the sum of three varying load rates<195%, then:
5. a kind of implementation method of distribution network users access analysis system according to claim 1, it is characterised in that:It is described Optimal case is obtained in step 3, it is as follows including step:
3.1:If circuit can open capacity * 0.8 applies for capacity more than user, this circuit is selected;
3.2:If main transformer can open capacity * 0.8 can open capacity more than circuit, this main transformer is selected;
3.3:If substation can open capacity * 0.8 more than main transformer can development capacity, select this substation;
3.4:On the basis of above-mentioned condition is met, radius of electricity supply, that is, user then connects with substation's air line distance minimum to be optimal Enter scheme;
3.5:Access scheme result's management:User is established for each user's access events and accesses engineering, preserves feasible access scheme Achievement, geographic distribution and line section figure including different access schemes etc. is realized the unified management of user's access scheme, is convenient for Later stage query calls;
3.6:Access scheme prints and export:Using the masterplate of typical design solution, user's access process is obtained from marketing system Relevant information using the method for unifying on tabular form to be inserted into Excel bookmarks in Guo Wang companies, realizes export and auxiliary printing.
6. a kind of implementation method of distribution network users access analysis system according to claim 1, it is characterised in that:Also wrap Include step 5:Station track device statistics, the station track device statistics:By the facility information on the line information and circuit of substation point Class collect statistics and space orientation.
7. a kind of implementation method of distribution network users access analysis system according to claim 1, it is characterised in that:Also wrap Include step 6:Outage analysis, the outage analysis:Based on Distributing Network GIS graph topology, simulation disconnects a circuit, and analysis has a power failure The customer quantity of influence, and power distribution network power supply reliability is calculated, accessing analysis for user provides basic data support.
CN201711188935.7A 2017-11-23 2017-11-23 A kind of implementation method of distribution network users access analysis system Pending CN108154255A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711188935.7A CN108154255A (en) 2017-11-23 2017-11-23 A kind of implementation method of distribution network users access analysis system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711188935.7A CN108154255A (en) 2017-11-23 2017-11-23 A kind of implementation method of distribution network users access analysis system

Publications (1)

Publication Number Publication Date
CN108154255A true CN108154255A (en) 2018-06-12

Family

ID=62468156

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711188935.7A Pending CN108154255A (en) 2017-11-23 2017-11-23 A kind of implementation method of distribution network users access analysis system

Country Status (1)

Country Link
CN (1) CN108154255A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111126833A (en) * 2019-12-20 2020-05-08 新奥数能科技有限公司 Method and device for acquiring power access point
CN111339227A (en) * 2020-01-07 2020-06-26 国网安徽省电力有限公司合肥供电公司 Method for evaluating power supply scheme rationality based on GIS
CN112132701A (en) * 2020-08-17 2020-12-25 国电南瑞科技股份有限公司 Openable capacity calculation method based on one power grid diagram
CN112421644A (en) * 2020-11-12 2021-02-26 珠海许继芝电网自动化有限公司 Low-voltage load access method for distribution internet of things
CN112491046A (en) * 2020-11-25 2021-03-12 国网湖北省电力有限公司咸宁供电公司 Load access position decision method, device, equipment and storage medium
CN114065554A (en) * 2022-01-11 2022-02-18 国网北京市电力公司 Power distribution network online planning method, device, equipment and medium
CN114091885A (en) * 2021-11-16 2022-02-25 国网江苏省电力有限公司连云港供电分公司 Power protection method and system for important power consumption customer

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103870998A (en) * 2014-02-17 2014-06-18 国家电网公司 Method of determining power distribution network user access scheme
CN104239589A (en) * 2013-06-20 2014-12-24 国家电网公司 Method for implementing intelligent analysis system of distribution network business expansions
CN106651226A (en) * 2017-03-13 2017-05-10 国网江苏省电力公司徐州供电公司 Smart distribution grid user access scheme aided analysis method based on big data technology

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104239589A (en) * 2013-06-20 2014-12-24 国家电网公司 Method for implementing intelligent analysis system of distribution network business expansions
CN103870998A (en) * 2014-02-17 2014-06-18 国家电网公司 Method of determining power distribution network user access scheme
CN106651226A (en) * 2017-03-13 2017-05-10 国网江苏省电力公司徐州供电公司 Smart distribution grid user access scheme aided analysis method based on big data technology

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
吴波等: "供电企业业扩报装规范管理及自动化应用研究", 《科技资讯》 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111126833A (en) * 2019-12-20 2020-05-08 新奥数能科技有限公司 Method and device for acquiring power access point
CN111339227A (en) * 2020-01-07 2020-06-26 国网安徽省电力有限公司合肥供电公司 Method for evaluating power supply scheme rationality based on GIS
CN112132701A (en) * 2020-08-17 2020-12-25 国电南瑞科技股份有限公司 Openable capacity calculation method based on one power grid diagram
CN112132701B (en) * 2020-08-17 2022-09-30 国电南瑞科技股份有限公司 Openable capacity calculation method based on one power grid diagram
CN112421644A (en) * 2020-11-12 2021-02-26 珠海许继芝电网自动化有限公司 Low-voltage load access method for distribution internet of things
CN112421644B (en) * 2020-11-12 2023-06-16 珠海许继芝电网自动化有限公司 Low-voltage load access method for power distribution Internet of things
CN112491046A (en) * 2020-11-25 2021-03-12 国网湖北省电力有限公司咸宁供电公司 Load access position decision method, device, equipment and storage medium
CN114091885A (en) * 2021-11-16 2022-02-25 国网江苏省电力有限公司连云港供电分公司 Power protection method and system for important power consumption customer
CN114091885B (en) * 2021-11-16 2023-08-25 国网江苏省电力有限公司连云港供电分公司 Power protection method and system for important power utilization clients
CN114065554A (en) * 2022-01-11 2022-02-18 国网北京市电力公司 Power distribution network online planning method, device, equipment and medium
CN114065554B (en) * 2022-01-11 2022-04-08 国网北京市电力公司 Power distribution network online planning method, device, equipment and medium

Similar Documents

Publication Publication Date Title
CN108154255A (en) A kind of implementation method of distribution network users access analysis system
CN102567603B (en) Method for automatically generating BPA calculation file based on actual measurement topology and measured data
CN102722764B (en) Integration network optimization computer-aided decision support System
US11049195B2 (en) Modeling analysis method based on geographic targets
CN103337864B (en) Many direct currents concentrate the dynamic passive compensation mounting points optimization method of feed-in receiving end electrical network
CN107565562A (en) Power system topological hierarchy recognition methods based on isolated island search technique
CN109635127A (en) A kind of power equipment portrait knowledge mapping construction method based on big data technology
CN104992382A (en) Data fusion method facing current situation assessment of power distribution network
CN102970163B (en) Power communication backbone network node upgrade method and system
CN104239589A (en) Method for implementing intelligent analysis system of distribution network business expansions
CN107025524B (en) Equipment overload auxiliary decision-making method considering load power supply reliability requirement
CN103093391A (en) City power distribution network arranging method
CN109933634A (en) A kind of electric system drawing drawing method based on power supply radiation scope
CN106970999A (en) A kind of BPA Database Modelings and maintaining method
CN107085939A (en) A kind of highway VMS layout optimization methods divided based on road network grade
CN103488726A (en) Method for establishing unified grid data platform based on WEB-SERVICE
CN109871566B (en) Loop construction method based on power grid topology technology and storage medium
CN113902583A (en) Distribution network side operation and maintenance method and system using low-voltage network equipment data
CN108538185A (en) A kind of Electric Power Network Planning geographical information platform and preparation method thereof
CN105488337A (en) Service capability assessment method for electric vehicle battery charging and replacement network
CN112016174A (en) Multi-source distribution network grid diagram-based user variable relationship checking method
CN110310048A (en) A kind of distribution planning overall process appraisal procedure and device
CN106130019A (en) A kind of distribution line tidal current analysis method based on big data
CN110601240B (en) Intelligent management and control method for power grid charging pile access
CN114818632A (en) Method and device for compiling power limiting sequence table for over-planning power utilization

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180612