CN108152546A - Take control intelligent electric energy meter production technology - Google Patents
Take control intelligent electric energy meter production technology Download PDFInfo
- Publication number
- CN108152546A CN108152546A CN201810024358.6A CN201810024358A CN108152546A CN 108152546 A CN108152546 A CN 108152546A CN 201810024358 A CN201810024358 A CN 201810024358A CN 108152546 A CN108152546 A CN 108152546A
- Authority
- CN
- China
- Prior art keywords
- production technology
- electric energy
- soldering
- energy meter
- wave
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R3/00—Apparatus or processes specially adapted for the manufacture or maintenance of measuring instruments, e.g. of probe tips
Abstract
The invention discloses control intelligent electric energy meter production technology is taken, include the following steps:First, mainboard silk-screen;2nd, patch;3rd, Reflow Soldering;4th, plug-in unit;5th, wave-soldering;6th, it cleans;7th, repair welding;8th, it checks.The environment temperature of entire production technology is 23 DEG C ± 3 DEG C, and humidity is 50%RH ± 10%RH, and operating personnel are required to wear antistatic wrist strap.It is first produced in entire production technology using more jigsaw, then carries out scoreboard after mainboard silk-screen, wave-soldering respectively.The beneficial effects of the invention are as follows:The component of different model is subjected to grafting in different station respectively, leakage is avoided to greatest extent and inserts, misplugs, and the design of pure pipeline system production, it ensure that the high efficiency of production, production technology multiple step format operation is convenient for production, production process is checked at any time, it is therefore prevented that batch is bad.In addition, first being produced in production technology using more jigsaw, scoreboard is then carried out after mainboard silk-screen, wave-soldering respectively, improves production efficiency.
Description
Technical field
The present invention relates to a kind of electric energy meter production technologies, specially take control intelligent electric energy meter production technology, belong to ammeter life
Produce technical field.
Background technology
Ammeter, the abbreviation of electric energy meter is the instrument for measuring electric energy, also known as kilowatt-hour meter, energy meter, electric energy meter, kilowatt small
When table, refer to the instrument for measuring various electrical quantities.Ammeter is divided into ammeter, voltmeter, electric energy meter, and ammeter is electric in measuring circuit
The tool of size is flowed, voltmeter is a kind of instrument for measuring voltage, and electric energy meter is the instrument for measuring electric energy.Earliest electric energy
Table (also referred to as ammeter) be 1881 according to made of electrolysis principle, it is very stupid although this electric energy meter every weighs tens kilograms
Weight, and the guarantee without precision, still, were still valued by people and were praised by an invention of great significance as scientific and technological circle at that time
It raises, and soon employs it in engineering, with the development of science and technology, 1888, the discovery and application of alternating current, and to
The development of electric energy meter proposes new requirement.By the effort of scientist, induction type electric energy meter is born.Due to inductive power
Table has the series of advantages such as simple in structure, safe operation, inexpensive, durable and easy to repair and batch production, so development is very
Soon.The function that intelligent electric meter has has been embodied on original Semi-intelligent Modular formula electric energy meter, is national grid nothing but
The function of network communication and photoelectric communication is mixed to ammeter again, the general service life of table that generated electricity in the form of professional standard is 6 years,
Once to be examined, looked after and guided according to the every 6 years ammeters of national regulation, replaced and etc., to ensure Electrical Safety.In ammeter
In production, take control intelligence there is presently no a kind of suitable flow line production dedicated for single-phase charge-controlled intelligent electric meter production
Electric energy meter production technology.
Invention content
The purpose of the present invention be that provide to solve the above-mentioned problems a kind of suitable flow line production dedicated for
Single-phase charge-controlled intelligent electric meter production takes control intelligent electric energy meter production technology.
The present invention is achieved through the following technical solutions above-mentioned purpose:
Take control intelligent electric energy meter production technology, include the following steps:First, mainboard silk-screen, it is right using full-automatic vision printing equipment
Wiring board selection steel mesh is answered to be printed;2nd, patch is hindered piece using chip mounter, piece holds, chip pastes circuit after screen printing
On plate, the track width of chip mounter is adjusted, snap-gauge, board falling phenomenon is avoided using FAA first article assurance, after patch, should examine in time
It looks into, avoids few part, more than one piece, wrong part, upright, anti-part, edge-on bad phenomenon, while check the direction of polarized component, member
The degrees of offset of device prevents defective products from flowing into subsequent processing;3rd, Reflow Soldering carries out Reflow Soldering using hot-air through nonwoven, rises
To after set temperature, track width is adjusted, using thermocouple, test temperature curve is compared with the temperature curve of tin cream, rises
2-3 DEG C of warm area slope/S, cooling zone are produced when being less than 5 DEG C/S, in production process, are detected at any time using visual inspection, core
Do not conform to lattice point to what machine tested out, it is labelled at underproof position, to the unqualified place of discovery, carry out repair welding;4th,
Wiring board after Reflow Soldering is mounted on fixture by plug-in unit, is then inserted into crystal oscillator, discharge tube, electrolysis electricity respectively in different station
Appearance, thermistor, varistor, transformer;5th, wave-soldering, using dual waves welding machine to complete previous step wiring board into
Row wave-soldering, it is 130 DEG C that wave-soldering temperature region, which preheats 1 area's temperature, and 2 area's temperature of preheating are 140 DEG C, and 3 area's temperature of preheating are 150
DEG C, speed chain 1500mm/min;6th, it cleans, polylith workpiece is put into rinse bath, carried out using supersonic wave cleaning machine clear
It washes, is dried after the completion of cleaning;7th, repair welding, the wiring board after detection cleaning check emphatically rosin joint, even solder skip, weldering, pin
It is excessively high(More than 2mm), it is found that rosin joint, solder skip are modified in time using repair welding, then with constant temperature electric iron different station according to
It is secondary that crystal oscillator, switch, battery, key of uncapping, 12 foot sockets, backlight, 4 foot sockets are respectively welded, liquid crystal display is then fixed on finger
Positioning is put, then drags weldering liquid crystal display pin, LED light, then cuts foot, labelling;8th, it checks, first checks the welding of pcb board component
Position, polarity, dialysance, re-inspection component whether there is damaged, missing, crooked, and whether reexamine each solder joint bright and clean, full,
Rosin joint, solder skip are whether there is, after confirming qualification, the dispensing at crystal oscillator, you can be packaged into finished product.The environment temperature of entire production technology
It it is 23 DEG C ± 3 DEG C, humidity is 50%RH ± 10%RH.The operating personnel of entire production technology are required to wear antistatic wrist strap.It is whole
It is first produced in a production technology using more jigsaw, then carries out scoreboard after mainboard silk-screen, wave-soldering respectively.The plug-in unit step
In, the different model of same electronic device is inserted into different station.In the plug-in unit step, it should ensure that component pin is not curved
In the case of song, component need to be inserted into bottom, and electrolytic capacitor needs to pay attention to polarity, and the hypographous part of pcb board silk-screen corresponds to electrolysis
The cathode of capacitance, thermistor will be kept upright, ontology it is small be partially toward transformer, varistor is kept upright, and not fallen
To transformer, thermistor, the pin of transformer is corresponding with the position in hole on PCB.In the wave-soldering, scaling powder selection dimension
Special idol GW9810A-5 types.In the wave-soldering, according to the determining spray velocity of the width+50 of jig, jig width -10 determines spray
Mist width.In the cleaning step, according to Wei Te idols GW804:Wei Te idols GW9810A-5=3:Cleaning agent is poured into rinse bath by 1.
The beneficial effects of the invention are as follows:The component of different model is subjected to grafting in different station respectively, to greatest extent
It avoids leakage to insert, misplug, and the design of pure pipeline system production, ensure that the high efficiency of production, the production technology multiple step format
Operation, convenient for production, production process is checked at any time, it is therefore prevented that batch is bad.In addition, more jigsaw are first used in production technology
Production, scoreboard is then carried out after mainboard silk-screen, wave-soldering, improves production efficiency respectively.
Specific embodiment
Technical scheme of the present invention is clearly and completely described below in conjunction with specific embodiment, it is clear that described
Embodiment be only part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, ability
Domain those of ordinary skill all other embodiments obtained without making creative work, belong to guarantor of the present invention
The range of shield.
Take control intelligent electric energy meter production technology, include the following steps:First, mainboard silk-screen is set using full-automatic vision printing
Standby, corresponding line plate selection steel mesh is printed;2nd, patch is hindered piece using chip mounter, piece holds, chip is attached to silk-screen printing
On rear board, adjust the track width of chip mounter, snap-gauge, board falling phenomenon avoided using FAA first article assurance, after patch, should and
When check, avoid few part, more than one piece, wrong part, upright, anti-part, edge-on bad phenomenon, while check the side of polarized component
To the degrees of offset of component prevents defective products from flowing into subsequent processing;3rd, Reflow Soldering is flowed back using hot-air through nonwoven
Weldering after being raised to set temperature, adjusts track width, using thermocouple, test temperature curve is compared with the temperature curve of tin cream
Right, 2-3 DEG C of heating zone slope/S, cooling zone is produced when being less than 5 DEG C/S, in production process, is examined at any time using visual inspection
It surveys, what verification machine tested out does not conform to lattice point, labelled at underproof position, to the unqualified place of discovery, is mended
Weldering;4th, plug-in unit, by the wiring board after Reflow Soldering be mounted on fixture on, then different station be inserted into respectively crystal oscillator, discharge tube,
Electrolytic capacitor, thermistor, varistor, transformer;5th, wave-soldering, using dual waves welding machine to the line of completion previous step
Road plate carries out wave-soldering, and it is 130 DEG C that wave-soldering temperature region, which preheats 1 area's temperature, and 2 area's temperature of preheating are 140 DEG C, preheat 3 area's temperature
It is 150 DEG C to spend, speed chain 1500mm/min;6th, it cleans, polylith workpiece is put into rinse bath, utilizes supersonic wave cleaning machine
It is cleaned, is dried after the completion of cleaning;7th, repair welding, the wiring board after detection cleaning, checks emphatically rosin joint, solder skip, company
Weldering, pin are excessively high(More than 2mm), it is found that rosin joint, solder skip are modified in time using repair welding, then with constant temperature electric iron in difference
Crystal oscillator, switch, battery, key of uncapping, 12 foot sockets, backlight, 4 foot sockets are respectively welded in station successively, then consolidate liquid crystal display
Designated position is scheduled on, then drags weldering liquid crystal display pin, LED light, then cuts foot, labelling;8th, it checks, first checks pcb board component
The position of welding, polarity, dialysance, re-inspection component whether there is damaged, missing, crooked, reexamine each solder joint it is whether bright and clean,
It is full, rosin joint, solder skip are whether there is, after confirming qualification, the dispensing at crystal oscillator, you can be packaged into finished product.
The beneficial effects of the invention are as follows:The component of different model is subjected to grafting in different station respectively, to greatest extent
It avoids leakage to insert, misplug, and the design of pure pipeline system production, ensure that the high efficiency of production, the production technology multiple step format
Operation, convenient for production, production process is checked at any time, it is therefore prevented that batch is bad.In addition, more jigsaw are first used in production technology
Production, scoreboard is then carried out after mainboard silk-screen, wave-soldering, improves production efficiency respectively.
It is obvious to a person skilled in the art that the present invention is not limited to the details of above-mentioned exemplary embodiment, Er Qie
In the case of without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter
From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power
Profit requirement rather than above description limit, it is intended that all by what is fallen within the meaning and scope of the equivalent requirements of the claims
Variation is included within the present invention.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped
Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should
It considers the specification as a whole, the technical solutions in each embodiment can also be properly combined, forms those skilled in the art
The other embodiment being appreciated that.
Claims (9)
1. taking control intelligent electric energy meter production technology, include the following steps:First, mainboard silk-screen, using full-automatic vision printing equipment,
Corresponding line plate selection steel mesh is printed;2nd, patch is hindered piece using chip mounter, piece holds, chip pastes line after screen printing
On the plate of road, the track width of chip mounter is adjusted, snap-gauge, board falling phenomenon is avoided using FAA first article assurance, after patch, should examine in time
It looks into, avoids few part, more than one piece, wrong part, upright, anti-part, edge-on bad phenomenon, while check the direction of polarized component, member
The degrees of offset of device prevents defective products from flowing into subsequent processing;3rd, Reflow Soldering carries out Reflow Soldering using hot-air through nonwoven, rises
To after set temperature, track width is adjusted, using thermocouple, test temperature curve is compared with the temperature curve of tin cream, rises
2-3 DEG C of warm area slope/S, cooling zone are produced when being less than 5 DEG C/S, in production process, are detected at any time using visual inspection, core
Do not conform to lattice point to what machine tested out, it is labelled at underproof position, to the unqualified place of discovery, carry out repair welding;4th,
Wiring board after Reflow Soldering is mounted on fixture by plug-in unit, is then inserted into crystal oscillator, discharge tube, electrolysis electricity respectively in different station
Appearance, thermistor, varistor, transformer;5th, wave-soldering, using dual waves welding machine to complete previous step wiring board into
Row wave-soldering, it is 130 DEG C that wave-soldering temperature region, which preheats 1 area's temperature, and 2 area's temperature of preheating are 140 DEG C, and 3 area's temperature of preheating are 150
DEG C, speed chain 1500mm/min;6th, it cleans, polylith workpiece is put into rinse bath, carried out using supersonic wave cleaning machine clear
It washes, is dried after the completion of cleaning;7th, repair welding, the wiring board after detection cleaning check emphatically rosin joint, even solder skip, weldering, pin
It is excessively high(More than 2mm), it is found that rosin joint, solder skip are modified in time using repair welding, then with constant temperature electric iron different station according to
It is secondary that crystal oscillator, switch, battery, key of uncapping, 12 foot sockets, backlight, 4 foot sockets are respectively welded, liquid crystal display is then fixed on finger
Positioning is put, then drags weldering liquid crystal display pin, LED light, then cuts foot, labelling;8th, it checks, first checks the welding of pcb board component
Position, polarity, dialysance, re-inspection component whether there is damaged, missing, crooked, and whether reexamine each solder joint bright and clean, full,
Rosin joint, solder skip are whether there is, after confirming qualification, the dispensing at crystal oscillator, you can be packaged into finished product.
2. according to claim 1 take control intelligent electric energy meter production technology, it is characterised in that the environment of entire production technology
Temperature is 23 DEG C ± 3 DEG C, and humidity is 50%RH ± 10%RH.
3. according to claim 1 take control intelligent electric energy meter production technology, it is characterised in that the operation of entire production technology
Personnel are required to wear antistatic wrist strap.
4. according to claim 1 take control intelligent electric energy meter production technology, it is characterised in that is first adopted in entire production technology
It is produced with more jigsaw, then carries out scoreboard after mainboard silk-screen, wave-soldering respectively.
5. according to claim 1 take control intelligent electric energy meter production technology, it is characterised in that same in the plug-in unit step
The different model of kind electronic device is inserted into different station.
6. according to claim 1 take control intelligent electric energy meter production technology, it is characterised in that in the plug-in unit step, Ying Bao
In the case of card component pin is unbent, component need to be inserted into bottom, and electrolytic capacitor needs to pay attention to polarity, and pcb board silk-screen has the moon
The part of shadow corresponds to the cathode of electrolytic capacitor, and thermistor will be kept upright, ontology it is small be partially toward transformer, varistor
It is kept upright, not swing to transformer, thermistor, the pin of transformer is corresponding with the position in hole on PCB.
7. according to claim 1 take control intelligent electric energy meter production technology, it is characterised in that in the wave-soldering, scaling powder
Select Wei Te idol GW9810A-5 types.
8. according to claim 1 take control intelligent electric energy meter production technology, it is characterised in that in the wave-soldering, according to controlling
The determining spray velocity of width+50 of tool, -10 determining spray width of jig width.
9. according to claim 1 take control intelligent electric energy meter production technology, it is characterised in that in the cleaning step, according to
Wei Te idols GW804:Wei Te idols GW9810A-5=3:Cleaning agent is poured into rinse bath by 1.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810024358.6A CN108152546A (en) | 2018-01-10 | 2018-01-10 | Take control intelligent electric energy meter production technology |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810024358.6A CN108152546A (en) | 2018-01-10 | 2018-01-10 | Take control intelligent electric energy meter production technology |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108152546A true CN108152546A (en) | 2018-06-12 |
Family
ID=62461251
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810024358.6A Pending CN108152546A (en) | 2018-01-10 | 2018-01-10 | Take control intelligent electric energy meter production technology |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108152546A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH02296154A (en) * | 1989-05-11 | 1990-12-06 | Toshiba Corp | Electronic watthour meter |
US6389690B1 (en) * | 1997-12-11 | 2002-05-21 | American Meter Company | Method of coating printed circuit board |
CN201854507U (en) * | 2010-11-23 | 2011-06-01 | 南京熊猫电子制造有限公司 | Synthetic production line for machining of PCB (printed circuit board) manual inserting piece and mounting sheet |
CN202330491U (en) * | 2011-12-08 | 2012-07-11 | 威胜集团有限公司 | Three-phase kilowatt-hour meter without manual welding |
CN105791725A (en) * | 2016-03-14 | 2016-07-20 | 东莞康佳电子有限公司 | Ultra-high-definition man-machine interaction television production line process |
CN105873377A (en) * | 2016-05-19 | 2016-08-17 | 东莞市冠佳电子设备有限公司 | Automatic production process of chargers |
-
2018
- 2018-01-10 CN CN201810024358.6A patent/CN108152546A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH02296154A (en) * | 1989-05-11 | 1990-12-06 | Toshiba Corp | Electronic watthour meter |
US6389690B1 (en) * | 1997-12-11 | 2002-05-21 | American Meter Company | Method of coating printed circuit board |
CN201854507U (en) * | 2010-11-23 | 2011-06-01 | 南京熊猫电子制造有限公司 | Synthetic production line for machining of PCB (printed circuit board) manual inserting piece and mounting sheet |
CN202330491U (en) * | 2011-12-08 | 2012-07-11 | 威胜集团有限公司 | Three-phase kilowatt-hour meter without manual welding |
CN105791725A (en) * | 2016-03-14 | 2016-07-20 | 东莞康佳电子有限公司 | Ultra-high-definition man-machine interaction television production line process |
CN105873377A (en) * | 2016-05-19 | 2016-08-17 | 东莞市冠佳电子设备有限公司 | Automatic production process of chargers |
Non-Patent Citations (3)
Title |
---|
WANGYE4: ""电能表基础及生产工艺介绍"", 《豆丁网》 * |
李宏新等: ""单相智能电表生产工艺流程"", 《科技展望》 * |
樊会灵等: "《电子产品工艺》", 30 September 2002 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105873377B (en) | A kind of charger automatic production process | |
CN101867225B (en) | Debugging method for integrated automation of transformer substation and integration of relaying protection system | |
CN211296072U (en) | Junction box for realizing seamless measurement of electric energy meter replacement | |
CN105979719A (en) | Welding method for printed circuit board | |
CN111044828B (en) | Three-phase transformer winding parameter online monitoring method based on positive and negative sequence equations | |
CN108152546A (en) | Take control intelligent electric energy meter production technology | |
CN205374562U (en) | Change electric energy meter electric quantity compensation arrangement on line | |
CN112269157A (en) | Intelligent ammeter production process | |
CN212965196U (en) | Test device with primary through flow and secondary pressurization | |
CN111879991A (en) | Test device for primary through-flow secondary pressurization and excitation small current | |
CN203572912U (en) | Wiring testing device for massive quantity power supply electric energy measurement | |
CN105307409A (en) | Open-circuit line repairing method in circuit board | |
CN206004998U (en) | Circuit board | |
CN205982611U (en) | Intelligent ammeter's electric fast transient burst influence quantity experimental apparatus | |
CN204882850U (en) | A 0. 02 grade of miniature standard electric energy meter that is used for single -phase intelligent ammeter verification system repeatability experimental | |
CN209462730U (en) | A kind of PCB rotating plate | |
CN107741551A (en) | 110kV polarity testing device of current transformer | |
CN202330491U (en) | Three-phase kilowatt-hour meter without manual welding | |
CN207603558U (en) | Exchange header box with smoke alarm unit | |
CN207380171U (en) | A kind of connector body test device | |
CN206863074U (en) | Fixture and experimental rig | |
CN207743852U (en) | The wiring of current transformer High-current output and mutual inductor, installation, fixing device | |
Tsenev | Exploration of the Possibilities of Low Temperature Soldering Alloy LMPA at Selective Wave Soldering (SWS) | |
CN104965107B (en) | A kind of PCBA board measurement jig | |
CN204731402U (en) | For 0.02 grade of miniature standard electric energy meter of verifying during single-phase intelligent electric energy meter verification system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20180612 |
|
WD01 | Invention patent application deemed withdrawn after publication |