CN108150179A - High osmosis bad ground shield pressure chamber sediment improvement method - Google Patents

High osmosis bad ground shield pressure chamber sediment improvement method Download PDF

Info

Publication number
CN108150179A
CN108150179A CN201810027837.3A CN201810027837A CN108150179A CN 108150179 A CN108150179 A CN 108150179A CN 201810027837 A CN201810027837 A CN 201810027837A CN 108150179 A CN108150179 A CN 108150179A
Authority
CN
China
Prior art keywords
stratum
shield
bad ground
sediment improvement
grain
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810027837.3A
Other languages
Chinese (zh)
Other versions
CN108150179B (en
Inventor
陈荣泰
槐荣国
钟小春
王敏
朱超
陈旭泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Jinghui Engineering Consulting Co Ltd
Hohai University HHU
China Railway No 5 Engineering Group Co Ltd
Guangzhou Metro Group Co Ltd
Original Assignee
Nanjing Jinghui Engineering Consulting Co Ltd
Hohai University HHU
China Railway No 5 Engineering Group Co Ltd
Guangzhou Metro Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Jinghui Engineering Consulting Co Ltd, Hohai University HHU, China Railway No 5 Engineering Group Co Ltd, Guangzhou Metro Group Co Ltd filed Critical Nanjing Jinghui Engineering Consulting Co Ltd
Priority to CN201810027837.3A priority Critical patent/CN108150179B/en
Publication of CN108150179A publication Critical patent/CN108150179A/en
Application granted granted Critical
Publication of CN108150179B publication Critical patent/CN108150179B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining

Abstract

The present invention is a kind of high osmosis bad ground shield pressure chamber sediment improvement method, is included the following steps:(1) investigate thoroughly and collect the geological conditions on shield crossing stratum;(2) several representative bad ground operating modes, the ratio according to shared by stratum each under each operating mode in shield crossing section are selected;(3) the obtained grading curve of mixed particle size distribution curve and existing earth pressure balanced shield and ground adaptability is compared, preresearch estimates goes out in high osmosis bad ground improved, process the fine grained grain size and incorporation for needing to mix;(4) stratum of shield crossing is sampled at the scene, determines sediment improvement outer-penetrating agent type and incorporation.Advantage:It due to considering coarse granule stratum and fine grained stratum melange effect in bad ground, more tallies with the actual situation compared to only consideration coarse granule stratum sediment improvement, so as to advantageously reduce the cost of the universal sediment improvement for only considering least favorable coarse grain stratum at present.

Description

High osmosis bad ground shield pressure chamber sediment improvement method
Technical field
The present invention relates to a kind of high osmosis bad ground shield pressure chamber sediment improvement methods, belong to underground engineering construction Technical field.
Background technology
Earth pressure balanced shield encounters high permeability formation when tunneling and tends to occur gushing for spiral dumper soil-discharging port, i.e., Tu Shui occurs and detaches a large amount of underground water by pressure chamber and the discharge of spiral dumper, the pressure of pressure chamber is caused to drop suddenly, excavation face It caves in, the safety accidents such as surface subsidence take place frequently.Therefore, shield crossing high permeability formation causes shield engineering circles and academia Great attention.During shield driving, the opportunity for encountering single high osmosis coarse grain stratum is to be much smaller than to encounter Thief zone in fact The bad ground of property coarse grain stratum refinement grain soil layer.Under normal conditions, in order to ensure the safety of shield driving, from worst Angle, which is set out, to be generally selected the coarse grain stratum of high osmosis and is studied, and is carried out sediment improvement experiment, is routinely incorporated into a certain amount of Outer-penetrating agent, such as bubble, bentonite slurry or calcareous bentonite slurry(Contain a certain amount of fine grained soil), make up to Plastic Flow state meets the requirement of shield-tunneling construction, prevents the accident of gushing.Due to from worst operating mode, often Ignore true situation be shield digging get off be particulate soil layer and high osmosis coarse grain soil layer mixing slag soil, compared to Coarse-grained soil will have more fine graineds, there is better grading.This is beneficial to make full use of fine grained in this bad ground The hole that coarse granule is formed is filled, the permeability of dregs after mixing is advantageously reduced, so as to effectively reduce the improvement of coarse-grained soil Difficulty.
Invention content
The present invention provides a kind of high osmosis bad ground shield pressure chamber sediment improvement method, it is intended to solve earth pressure balance When formula shield crossing contains coarse-grained soil stratum and high osmosis bad ground containing fine grained soil stratum, how more efficiently, Economically improve dregs in shield pressure chamber.By considering that coarse-grained soil stratum and fine grained soil stratum are respectively on shield digging cross section Ratio is accounted for obtain, the grading curve of dregs after being mixed in shield pressure chamber when section driving is obtained by calculation, with shield The particle diameter distribution relation curve to match with stratum is compared, and primarily determines the incorporation for needing to mix fine grained soil.So as to It can be to avoid waste that the improvement of coarse-grained soil on the section is brought and uneconomical be only considered, because coarse-grained soil is improved to Plastic Flow shape State usually requires the excessive high molecular polymer more containing fine grain fine grained soil or incorporation of incorporation, not only material cost It is high, and increase pumping program and affect shield driving efficiency.
The technical solution of the present invention:High osmosis bad ground shield pressure chamber sediment improvement method, feature exist In:This method comprises the following steps:
(1) Main Geological Conditions on shield crossing stratum are investigated thoroughly and collect, such as shield section geology vertical and horizontal section, master stratum Permeability and particle size distribution, groundwater level depth, edpth of tunnel;
(2) several representative bad ground operating modes are selected, according to shared by stratum each under each operating mode in shield crossing section Ratio, it is assumed that have M stratum, each stratum that can be divided into n grain group in the range of shield digging section, calculate bad ground digging and break The mixed particle size distribution curve of face dregs;
(1)
(2)
……
In formula:
A1, A2..., An--- A soil layer grains group 1, grain group 2 ..., the grogs content of grain group n(%);
B1, B2..., Bn--- B soil layer grains group 1, grain group 2 ..., the grogs content of grain group n(%);
……
M1, M2..., Mn--- M soil layer grains group 1, grain group 2 ..., the grogs content of grain group n(%);
Z1、Z2..., Zn--- the mixed grain group 1 of complex random systems, grain group 2 ..., the grogs content of grain group n(%);
xA, xB..., xM--- A soil layers, B soil layers ..., M soil layers driving cross section shared by area ratio(%);
(3) by obtained mixed particle size distribution curve and the grain size of existing earth pressure balanced shield and ground adaptability Distribution curve is compared, and preresearch estimates goes out in high osmosis bad ground improved, process to need the fine grained mixed grain size and mixes Enter amount;
(4) stratum of shield crossing is sampled at the scene, sediment improvement experiment is carried out on the basis of step 3, is allowed to reach To Plastic Flow state, so as to accurately determine sediment improvement outer-penetrating agent type and incorporation.
Beneficial effects of the present invention:The present invention proposes the high osmosis complexity that shield crossing contains coarse-grained soil and fine grained soil Fine grained fills the hole that coarse granule is formed after the mixing of the two is considered as during stratum so that dregs particle diameter distribution grading more adduction Reason, is more favorable to improve dregs after mixing, can effectively reduce and usually only consider coarse-grained soil sediment improvement cost, reduces A large amount of bentonites and high molecular polymer incorporation, not only have higher economic benefit, but also be conducive to the raising of construction efficiency.It is logical The comparative analysis of multiple engineering practices is crossed, fine grained soil is made full use of to be very beneficial for the sediment improvement of this bad ground, energy Improvement cost is enough greatly lowered.
Description of the drawings
Fig. 1 is the grading curve schematic diagram of shield and soil layer adaptability.
Fig. 2 is right the 25th ring shield driving section clay distribution situation schematic diagram of line.
Fig. 3 is right the 301st ring shield driving section clay distribution situation schematic diagram of line.
Fig. 4 is right line the 25th, 301 ring dregs grading curve schematic diagrames.
Specific embodiment
High osmosis bad ground shield pressure chamber sediment improvement method, includes the following steps:
(1) Main Geological Conditions on shield crossing stratum are investigated thoroughly and collect, such as shield section geology vertical and horizontal section, master stratum Permeability and particle size distribution, groundwater level depth, edpth of tunnel;
(2) several representative bad ground operating modes are selected, according to shared by stratum each under each operating mode in shield crossing section Ratio, it is assumed that have M stratum, each stratum that can be divided into n grain group in the range of shield digging section, calculate bad ground digging and break The mixed particle size distribution curve of face dregs;
(1)
(2)
……
In formula:
A1, A2..., An--- A soil layer grains group 1, grain group 2 ..., the grogs content of grain group n(%);
B1, B2..., Bn--- B soil layer grains group 1, grain group 2 ..., the grogs content of grain group n(%);
……
M1, M2..., Mn--- M soil layer grains group 1, grain group 2 ..., the grogs content of grain group n(%);
Z1、Z2..., Zn--- the mixed grain group 1 of complex random systems, grain group 2 ..., the grogs content of grain group n(%);
xA, xB..., xM--- A soil layers, B soil layers ..., M soil layers driving cross section shared by area ratio(%);
(3) by obtained mixed particle size distribution curve and the grain size of existing earth pressure balanced shield and ground adaptability Distribution curve is compared, and preresearch estimates goes out in high osmosis bad ground improved, process to need the fine grained mixed grain size and mixes Enter amount;
(4) stratum of shield crossing is sampled at the scene, sediment improvement experiment is carried out on the basis of step 3, is allowed to reach To Plastic Flow state, so as to accurately determine sediment improvement outer-penetrating agent type and incorporation.
In the step (2), when selecting representative high osmosis bad ground operating mode, primarily directed in bad ground The unfavorable operating mode of coarse grain stratum accounting maximum and the cross section tunneled in shield of each stratum on be distributed more typical operating mode.
Mainly the slump test including dregs or jumping table fluidity are real for sediment improvement experiment in the step (4) It tests, the direct shear test of dregs and dregs pressureless penetration are tested or have pressure permeability test.
Plastic Flow state in the step (4) refers to relatively low permeability, relatively low intensity and higher flowing Property, i.e. permeability<10-4Cm/s, slump 150-200mm, common direct shear strength internal friction angle<20°.
Embodiment 1
No. 21 Xian Zhu villages of Guangzhou Underground are predominantly located to as ridge section on Guangzhou Zengcheng City Guang Shan highways, originate in Zhuan Shui villages east side Zhu Cunzhan, way of escape continuation advance eastwards along Guang Shan highways, through multiple planning crossings and closed conduit, approach Guangzhou University matsuda in way In being full of the envisioned ridge station in garden east side, wide Shan is generally the civil buildings such as local-style dwelling houses and retail shop, house comparatively dense, mostly two on both sides of the road for institute To six floor height buildings.Shield crossing location basal water is fine sand layer<3-1>, medium-sand seam<3-1>, gravel layer<3-3 >, gravel layer<3-4>And silty clay layer<4N-2>.Underground water preservation in the form of pore ground water is mended by Atmospheric precipitation and surface water It gives, watery is medium.
(1)Fine sand layer<3-1>In light gray, yellowish-brown etc., saturation, it is slightly close~in it is close, part is fluffy, predominantly Fine sand, flour sand, containing sticking grain, grading is poor.Its is in uneven thickness, and when sticky content is higher in layer of sand, and infiltration coefficient chooses 5.79 ×10-3Cm/s is medium pervious bed.
(2)Medium-sand seam<3-2>In lark, light gray etc., saturation, it is slightly close~in it is close, part is closely knit shape, mainly by Middle sand, coarse sand composition, secondary is fine sand, and containing sticking grain, part presss from both sides cobble, and grading is general.Infiltration coefficient chooses 1.15 × 10-2Cm/s, For highly permeable layer.
(3)Gravel layer<3-3>In isabelline, canescence etc., saturation, it is slightly close~in it is close, part is closely knit shape, mainly by gravel Sand form, it is secondary be in, coarse sand, containing sticking grain, be locally caught broken stone, grading is preferable.Infiltration coefficient chooses 2.31 × 10-2Cm/s is strong Pervious bed.
(4)Gravel layer<3-4>In isabelline, lark, saturation, in it is close, be mainly made of circle gravel, it is secondary for dust, in Asia Round shape, subangular, a small amount of angular, clearance filled sticking grain and sand, part press from both sides cobble, and grain size is generally 5~20mm, maximum Grain size reaches 40mm.Infiltration coefficient chooses 5.61 × 10-2Cm/s is highly permeable layer.
(5)Silty clay layer is in canescence, isabelline etc., plastic shape, saturation, in it is close, be mainly made of sticking grain, powder, Fine sand, middle sand, organic matter are contained in part, and soil property is more inhomogenous.Infiltration coefficient chooses 1.15 × 10-5Cm/s is aquiclude.
The soil layer that right the 25th ring of line driving encounters is silty clay layer<4N-2>, fine sand layer<3-1>And gravel layer<3-3> Complex random systems.According to geology exploration report, it is 2.67m in shield driving section silty clay layer thickness, it is total accounts for domain dregs The 40.6% of volume;Extra-fine sand thickness 2.49m accounts for the 47.4% of domain dregs total volume;Gravelly sand layer thickness 1.02m, accounts for domain slag The 12.0% of native total volume.Clay distribution situation is as shown in Figure 2.
The soil layer that right the 301st ring of line driving encounters is silty clay layer<4N-2>, medium-sand seam<3-1>And gravel layer<3-3>'s Complex random systems.It is 1.23m in shield driving section silty clay layer thickness according to geology exploration report, accounts for domain dregs totality Long-pending 12.2%;Medium coarse sand thickness 3.89m accounts for the 76.6% of domain dregs total volume;Gravel layer thickness 1.16m, accounts for domain dregs The 11.2% of total volume.Right the 301st ring clay distribution situation of line is as shown in Figure 3.
Each grain group grogs content of right the 25th ring of line and 301 rings is calculated respectively, draws grading curve.If individually consider multiple In miscellaneous soil layer if worst soil layer, the 25th ring is gravelly sand soil layer, and the 301st ring is circle gravel soil layer, gravelly sand soil layer and circle gravel soil Layer has been in the range that must carry out soil improvement, has sizable challenge using shield machine with soil pressure balance for construction.But Be under the immixture of other soil layers, whole dregs performance be improved significantly, 25 ring diggings as can see from Figure 4 mix It closes dregs grading curve and is substantially at the region that need not carry out sediment improvement, and then the 75mm contents organized are apparent for 301 rings Not enough, a certain amount of bentonite slurry is required supplementation with to be improved.It can also be seen that taking around supplement stratum matter from Fig. 4 The calcium bentonite of 4-5% is measured, according to swollen water than 1:3 carry out puffing, formation high concentration bentonite slurry, then every ring needs to mix 10-13m3Calcium bentonite mud(Section of jurisdiction ring width 1.5m, shield machine outer diameter 6.28m, per ring digging side, amount is 46.4m3).Shield During the driving of scene, it is typically incorporating bubble and carries out cutterhead and cutter anti-attrition, while improve the fluidity of dregs.The 25th ring of field monitoring The infiltration coefficient of dregs is 6.8 × 10-5Cm/s, slump 183mm, from the point of view of the situation that scene is slagged tap, spiral dumper goes out Slag is smooth, and dregs stream plasticity is preferable, and ideal statue flow regime has been reached under the premise of bentonite slurry is not mixed.It is digging During into 301 ring, since scene is not fully according to enough dense bentonite slurries of injection are required, dregs moisture content is higher, state Partially dilute fluidity is bigger than normal, and amount of slag is difficult to control or even occurs gushing for short time.The infiltration coefficient for testing the ring dregs is 1.5×10-3Cm/s, slump 210mm have exceeded the requirement of shield dregs Plastic Flow state.
This Engineering Projects, it was confirmed that sediment improvement method provided by the invention is feasible, is coincide with engineering practice result Preferably, it is only accounted in the larger subrange of entire excavated section in medium coarse sand and round gravel stratum and injects dense bentonite slurry progress slag Land reform is good, so as to which bentonitic dosage be greatly saved, saves project cost.

Claims (4)

1. high osmosis bad ground shield pressure chamber sediment improvement method, it is characterised in that:This method comprises the following steps:
(1) geological conditions on shield crossing stratum is investigated thoroughly and collects, such as the infiltration of shield section geology vertical and horizontal section, master stratum Property and particle size distribution, groundwater level depth, edpth of tunnel;
(2) several representative bad ground operating modes are selected, according to shared by stratum each under each operating mode in shield crossing section Ratio, it is assumed that have M stratum, each stratum that can be divided into n grain group in the range of shield digging section, calculate bad ground digging and break The mixed particle size distribution curve of face dregs;
(1)
(2)
……
In formula:
A1, A2..., An--- A soil layer grains group 1, grain group 2 ..., the grogs mass content of grain group n(%);
B1, B2..., Bn--- B soil layer grains group 1, grain group 2 ..., the grogs mass content of grain group n(%);
……
M1, M2..., Mn--- M soil layer grains group 1, grain group 2 ..., the grogs mass content of grain group n(%);
Z1、Z2..., Zn--- the mixed grain group 1 of complex random systems, grain group 2 ..., the grogs mass content of grain group n(%);
xA, xB..., xM--- A soil layers, B soil layers ..., M soil layers driving cross section shared by area ratio(%);
(3) by obtained mixed particle size distribution curve and the grain size of existing earth pressure balanced shield and ground adaptability Distribution curve is compared, and preresearch estimates goes out in high osmosis bad ground improved, process to need the fine grained mixed grain size and mixes Enter amount;
(4) stratum of shield crossing is sampled at the scene, sediment improvement experiment is carried out on the basis of step 3, is allowed to reach To Plastic Flow state, so as to accurately determine sediment improvement outer-penetrating agent type and incorporation.
2. high osmosis bad ground shield pressure chamber sediment improvement method as described in claim 1, it is characterised in that:It is described In step (2), when selecting representative high osmosis bad ground operating mode, accounted for primarily directed to the coarse grain stratum in bad ground More typical operating mode is distributed on the cross section tunneled than maximum unfavorable operating mode and each stratum in shield.
3. high osmosis bad ground shield pressure chamber sediment improvement method as described in claim 1, it is characterised in that:Step (4) the sediment improvement experiment in mainly includes the slump test of dregs or the experiment of jumping table fluidity, the direct shearing of dregs Experiment and the experiment of dregs pressureless penetration have pressure permeability test.
4. high osmosis bad ground shield pressure chamber sediment improvement method as described in claim 1, it is characterised in that:It is described Plastic Flow state in step (4) refers to relatively low permeability, relatively low intensity and higher mobility, i.e. permeability< 10-4Cm/s, slump 150-200mm, common direct shear strength internal friction angle<20°.
CN201810027837.3A 2018-01-11 2018-01-11 High osmosis bad ground shield pressure chamber sediment improvement method Expired - Fee Related CN108150179B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810027837.3A CN108150179B (en) 2018-01-11 2018-01-11 High osmosis bad ground shield pressure chamber sediment improvement method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810027837.3A CN108150179B (en) 2018-01-11 2018-01-11 High osmosis bad ground shield pressure chamber sediment improvement method

Publications (2)

Publication Number Publication Date
CN108150179A true CN108150179A (en) 2018-06-12
CN108150179B CN108150179B (en) 2019-08-20

Family

ID=62461347

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810027837.3A Expired - Fee Related CN108150179B (en) 2018-01-11 2018-01-11 High osmosis bad ground shield pressure chamber sediment improvement method

Country Status (1)

Country Link
CN (1) CN108150179B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109577993A (en) * 2018-12-06 2019-04-05 中交公局第三工程有限公司 The determination method of the dense mud sediment improvement economical formula of sand-pebble layer EPB shield tunneling
CN110566211A (en) * 2019-09-04 2019-12-13 中交一公局第三工程有限公司 Earth pressure shield muck flow plasticity improvement method suitable for sandy gravel stratum
CN110863833A (en) * 2019-11-22 2020-03-06 中铁隧道局集团有限公司 Tunneling parameter control process of tunnel shield tunneling starting end boulder area shield tunneling machine
WO2021180178A1 (en) * 2020-03-13 2021-09-16 广州轨道交通建设监理有限公司 Geological data processing method, system and apparatus, and storage medium
CN113775345A (en) * 2021-09-01 2021-12-10 浙江杭海城际铁路有限公司 Method for improving full-section muck in silt layer in construction of connecting channel pipe jacking machine
CN115455850A (en) * 2022-08-29 2022-12-09 北京交通大学 CFD-DEM coupling technology-based distribution calculation method for large-particle-size sandy gravel stratum slurry shield circulation system centrifugal pump

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104018843A (en) * 2014-06-23 2014-09-03 上海隧道工程股份有限公司 Improved construction method of composite stratum shield tunneling soil body
CN105041324A (en) * 2015-06-12 2015-11-11 北京城建设计发展集团股份有限公司 Method for improving residue soil for shield excavation of water-rich weathering uneven slate interaction formation
CN106032755A (en) * 2015-03-09 2016-10-19 北京市政路桥股份有限公司 A composite stratum earth pressure balance shield tunneling additive selection and proportioning method
CN106929023A (en) * 2017-02-17 2017-07-07 山东大学 The stable foam agent and preparation method and application of bad ground shield-tunneling construction
CN107327302A (en) * 2017-07-20 2017-11-07 西南交通大学 The sediment improvement method of high hydraulic pressure, Thief zone arenaceous stratum earth pressure balanced shield, EPBS

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104018843A (en) * 2014-06-23 2014-09-03 上海隧道工程股份有限公司 Improved construction method of composite stratum shield tunneling soil body
CN106032755A (en) * 2015-03-09 2016-10-19 北京市政路桥股份有限公司 A composite stratum earth pressure balance shield tunneling additive selection and proportioning method
CN105041324A (en) * 2015-06-12 2015-11-11 北京城建设计发展集团股份有限公司 Method for improving residue soil for shield excavation of water-rich weathering uneven slate interaction formation
CN106929023A (en) * 2017-02-17 2017-07-07 山东大学 The stable foam agent and preparation method and application of bad ground shield-tunneling construction
CN107327302A (en) * 2017-07-20 2017-11-07 西南交通大学 The sediment improvement method of high hydraulic pressure, Thief zone arenaceous stratum earth pressure balanced shield, EPBS

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109577993A (en) * 2018-12-06 2019-04-05 中交公局第三工程有限公司 The determination method of the dense mud sediment improvement economical formula of sand-pebble layer EPB shield tunneling
CN110566211A (en) * 2019-09-04 2019-12-13 中交一公局第三工程有限公司 Earth pressure shield muck flow plasticity improvement method suitable for sandy gravel stratum
CN110566211B (en) * 2019-09-04 2020-11-24 中交一公局第三工程有限公司 Earth pressure shield muck flow plasticity improvement method suitable for sandy gravel stratum
CN110863833A (en) * 2019-11-22 2020-03-06 中铁隧道局集团有限公司 Tunneling parameter control process of tunnel shield tunneling starting end boulder area shield tunneling machine
WO2021180178A1 (en) * 2020-03-13 2021-09-16 广州轨道交通建设监理有限公司 Geological data processing method, system and apparatus, and storage medium
CN113775345A (en) * 2021-09-01 2021-12-10 浙江杭海城际铁路有限公司 Method for improving full-section muck in silt layer in construction of connecting channel pipe jacking machine
CN115455850A (en) * 2022-08-29 2022-12-09 北京交通大学 CFD-DEM coupling technology-based distribution calculation method for large-particle-size sandy gravel stratum slurry shield circulation system centrifugal pump
CN115455850B (en) * 2022-08-29 2023-08-15 北京交通大学 Method for calculating distribution of centrifugal pumps of slurry shield circulation system of large-particle-size sandy pebble stratum

Also Published As

Publication number Publication date
CN108150179B (en) 2019-08-20

Similar Documents

Publication Publication Date Title
CN108150179B (en) High osmosis bad ground shield pressure chamber sediment improvement method
CN106836186B (en) A kind of construction technology of utilizing solidified earth from sludge
CN105780793B (en) A kind of high artesian stratum Foundation Pit Pouring emergency processing method
CN106437719B (en) The restorative procedure in mining subsidence basin
Zhou et al. Engineering issues on karst
Yang et al. Pre-grouting reinforcement of underwater karst area for shield tunneling passing through Xiangjiang River in Changsha, China
CN110924967B (en) Fine control construction method for shield proximity sensitive building in water-rich sandy gravel stratum
CN105484269B (en) Foundation pit enclosure structure seepage prevention and treatment construction method under blasting condition
CN101560764B (en) Method for calking exploratory hole by intermittent high-pressure rotary jet grouting
CN110512589A (en) A kind of shallow-layer ultra-soft foundation curing method of vacuum Yield rainfall relation co-oxidation magnesium carbonization
CN113699971A (en) Soft soil stratum in-situ curing agent preparation feeding equipment and curing process thereof
CN104033160A (en) Novel support method applicable to shallow-buried subsurface tunnel of soft soil stratum
CN101974898B (en) Roller compacted concrete cushion changing and filling method
CN105178285A (en) Method for widening grouting reinforcement and seepage and blockage prevention range of rock and soil
CN104353666A (en) In-situ stirring curing and repairing method for heavy metal polluted soil
CN105350489B (en) A kind of bank slope construction method of river lake ecological pollution
CN103696416A (en) Novel foundation treatment method
CN106381405A (en) Rare earth mine liquid collection system and method
CN110080232A (en) A kind of deep basal pit earth-filling method of underground high water level
CN101275393A (en) Method for controlling running sand in underground engineering and grouting system therefor
CN105041326A (en) Water-rich diabase and slate irregular mutual invasion rock shield residue soil improving method
CN110002717A (en) The resource utilization method of mud in discarded pit
Pellegrini et al. Sao Paulo Metro Project–Control of Settlements in variable soil conditions through EPB pressure and bicomponent backfill grout
CN113820383A (en) Waste resin powder piling point soil pollution risk control method based on covering and blocking technology
CN105603842B (en) The big thickness back-up sand construction technology of embankment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190820

Termination date: 20200111