CN108149705A - Universal power equipment mounting platform - Google Patents

Universal power equipment mounting platform Download PDF

Info

Publication number
CN108149705A
CN108149705A CN201711476167.5A CN201711476167A CN108149705A CN 108149705 A CN108149705 A CN 108149705A CN 201711476167 A CN201711476167 A CN 201711476167A CN 108149705 A CN108149705 A CN 108149705A
Authority
CN
China
Prior art keywords
plate
screw thread
steel plate
installing plate
thread hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711476167.5A
Other languages
Chinese (zh)
Inventor
陈冲
许伟
姚峰
姚一峰
徐明翼
钱皓雍
姚成
郑君
薛冠军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nissin Electric Wuxi Co Ltd
Original Assignee
Nissin Electric Wuxi Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nissin Electric Wuxi Co Ltd filed Critical Nissin Electric Wuxi Co Ltd
Priority to CN201711476167.5A priority Critical patent/CN108149705A/en
Publication of CN108149705A publication Critical patent/CN108149705A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/44Foundations for machines, engines or ordnance

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Foundations (AREA)

Abstract

The present invention provides a kind of universal power equipment mounting platform, including:Double-deck slotted hole installing plate, screw thread hole matrix steel plate, bottom installation foundation;The screw thread hole matrix steel plate is mounted on the installation foundation of bottom, and one or more bilayer slotted hole installing plates are mounted on screw thread hole matrix steel plate;Double-deck slotted hole installing plate includes top installing plate and lower mounting plate;Top installing plate is provided with several slotted holes thereon for the assembling with equipment;Top installing plate is connected on lower mounting plate;Lower mounting plate is used to fill with screw thread hole matrix steel plate group, is provided with several slotted holes thereon;The slotted hole of top installing plate and the slotted hole of lower mounting plate are vertically arranged.The installation dimension for meeting different power equipments that can be easy of the invention, reduces the cost repeatedly assembled.

Description

Universal power equipment mounting platform
Technical field
The present invention relates to power equipment manufacturing field, especially a kind of power equipment mounting platform.
Background technology
In substation, experiment institute, factory, in order to carry out the reasons such as power equipment experiment, trial operation, trial assembly, need Power equipment dismounting is carried out on one piece of place, is more changed jobs.Since the installation dimension of these power equipments is different, to the ruler on basis The requirement of very little and basic built-in fitting also differs.Power equipment generally all adds pre-embedded anchoring bolts using concreting at present (Or built-in fitting)Mode, will need to remake basis during replacement, increase workload and working hour, labor intensive object Power.
Invention content
For the deficiencies in the prior art, the present invention provides a kind of universal power equipment mounting platform, can be easy The installation dimension for meeting different power equipments, reduce the cost repeatedly assembled.The technical solution adopted by the present invention is:
A kind of universal power equipment mounting platform, including:Double-deck slotted hole installing plate, screw thread hole matrix steel plate, bottom installation Basis;
The screw thread hole matrix steel plate is mounted on the installation foundation of bottom, and one or more bilayer slotted hole installing plates are mounted on spiral shell On pit matrix steel plate;
Double-deck slotted hole installing plate includes top installing plate and lower mounting plate;
Top installing plate is provided with several slotted holes thereon for the assembling with equipment;Top installing plate is connected to lower mounting plate On;
Lower mounting plate is used to fill with screw thread hole matrix steel plate group, is provided with several slotted holes thereon;The slotted hole of top installing plate It is vertically arranged with the slotted hole of lower mounting plate.
Further, screw thread hole matrix steel plate is made of one or more steel plate splicing;Threaded hole is uniformly drilled on steel plate, To form screw thread hole matrix;
Screw thread hole matrix steel plate top and the lower mounting plate of double-deck slotted hole installing plate are assembled by bolt, and lower part is pacified with bottom The assembling of dress basis.
Further, bottom installation foundation adds pre-embedded anchoring bolts component and channel steel base including concreting;Channel steel Pedestal is fixed on multiple concretings and adds on pre-embedded anchoring bolts component;Channel steel base connection screw thread hole matrix steel plate.
The advantage of the invention is that:Double-deck slotted hole installing plate can be fixed on screw thread hole matrix steel plate any position, and On double-deck slotted hole installing plate, the slotted hole of top installing plate and the slotted hole of lower mounting plate are vertically arranged so that equipment Installation site is flexible, disclosure satisfy that the installation dimension of different power equipments.It is simple and reasonable, reduce multiple group of power equipment The cost of dress.
Description of the drawings
Fig. 1 is the structure composition schematic diagram of the present invention.
Fig. 2 is the double-deck slotted hole installing plate schematic diagram of the present invention.
The concreting that Fig. 3 is the present invention adds pre-embedded anchoring bolts component schematic diagram.
Fig. 4 is the bottom installation foundation schematic diagram of the present invention.
Specific embodiment
With reference to specific drawings and examples, the invention will be further described.
As shown in Figure 1, a kind of universal power equipment mounting platform provided by the invention, including:Double-deck slotted hole installation Plate 1, screw thread hole matrix steel plate 2, bottom installation foundation 3;
The screw thread hole matrix steel plate 2 is mounted on bottom installation foundation 3, and one or more bilayer slotted hole installing plates 1 are installed On screw thread hole matrix steel plate 2;
(One)As shown in Fig. 2, double-deck slotted hole installing plate 1 includes top installing plate 101 and lower mounting plate 102;It installs on top Plate 101 is provided with several slotted holes thereon for the assembling with equipment;Top installing plate 101 is connected on lower mounting plate 102;
Lower mounting plate 102 is provided with several slotted holes thereon for being assembled with screw thread hole matrix steel plate 2;Top installing plate 101 The slotted hole of slotted hole and lower mounting plate 102 is vertically arranged so that top installing plate can be in the installation on lower mounting plate Position is adjusted in a certain range around in the horizontal direction, meets the installation needs of distinct device;
(Two)Screw thread hole matrix steel plate 2 is made of the steel plate of 4 block length 6.996m wide 2.496m thickness 40mm, is uniformly drilled on steel plate Spacing is the threaded hole of the M24 of 250*250mm, to form screw thread hole matrix 201;Overall dimensions reach 14 meters long after assembling, wide by 5 Rice;Screw thread hole matrix steel plate 2 as needed can also be only made of one block of steel plate;
2 top of screw thread hole matrix steel plate and the lower mounting plate 102 of double-deck slotted hole installing plate 1 are assembled by M24 bolts, lower part It is assembled with bottom installation foundation 3;
(Three)As shown in Figure 3 and Figure 4, bottom installation foundation 3 adds pre-embedded anchoring bolts component 301 and channel steel including concreting Pedestal 302;
Concreting adds pre-embedded anchoring bolts component 301 as shown in figure 3, channel steel base 302 is fixed on multiple concretings Add on pre-embedded anchoring bolts component 301;
Concreting adds the structure after pre-embedded anchoring bolts component 301 plus the combination of channel steel base 302 as shown in Figure 4.Channel steel bottom 302 connection screw thread hole matrix steel plates 2 of seat.
It should be noted last that more than specific embodiment is merely illustrative of the technical solution of the present invention and unrestricted, Although the present invention is described in detail with reference to example, it will be understood by those of ordinary skill in the art that, it can be to the present invention Technical solution be modified or replaced equivalently, without departing from the spirit and scope of technical solution of the present invention, should all cover In scope of the presently claimed invention.

Claims (3)

1. a kind of universal power equipment mounting platform, which is characterized in that including:Double-deck slotted hole installing plate (1), threaded hole square Battle array steel plate (2), bottom installation foundation (3);
The screw thread hole matrix steel plate (2) is on bottom installation foundation (3), one or more bilayer slotted hole installing plates (1) on screw thread hole matrix steel plate (2);
Double-deck slotted hole installing plate (1) includes top installing plate (101) and lower mounting plate (102);
Top installing plate (101) is provided with several slotted holes thereon for the assembling with equipment;Top installing plate (101) is connected to On lower mounting plate (102);
Lower mounting plate (102) is provided with several slotted holes thereon for being assembled with screw thread hole matrix steel plate (2);Top installing plate (101) slotted hole and the slotted hole of lower mounting plate (102) are vertically arranged.
2. universal power equipment mounting platform as described in claim 1, which is characterized in that
Screw thread hole matrix steel plate (2) is made of one or more steel plate splicing;Threaded hole is uniformly drilled on steel plate, to form screw thread Hole matrix (201);
Screw thread hole matrix steel plate (2) top and the lower mounting plate (102) of double-deck slotted hole installing plate (1) are assembled by bolt, Lower part is assembled with bottom installation foundation (3).
3. universal power equipment mounting platform as described in claim 1, which is characterized in that
Bottom installation foundation (3) adds pre-embedded anchoring bolts component (301) and channel steel base (302) including concreting;Channel steel Pedestal (302) is fixed on multiple concretings and adds on pre-embedded anchoring bolts component (301);Channel steel base (302) connection screw thread Hole matrix steel plate (2).
CN201711476167.5A 2017-12-29 2017-12-29 Universal power equipment mounting platform Pending CN108149705A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711476167.5A CN108149705A (en) 2017-12-29 2017-12-29 Universal power equipment mounting platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711476167.5A CN108149705A (en) 2017-12-29 2017-12-29 Universal power equipment mounting platform

Publications (1)

Publication Number Publication Date
CN108149705A true CN108149705A (en) 2018-06-12

Family

ID=62463786

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711476167.5A Pending CN108149705A (en) 2017-12-29 2017-12-29 Universal power equipment mounting platform

Country Status (1)

Country Link
CN (1) CN108149705A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4687165A (en) * 1986-05-02 1987-08-18 The United States Of America As Represented By The United States Department Of Energy Adapter plate assembly for adjustable mounting of objects
JPH1181343A (en) * 1997-09-01 1999-03-26 Toshiba Eng Co Ltd Embedded footing
JPH11229409A (en) * 1998-02-18 1999-08-24 Toshiba Plant Kensetsu Co Ltd Installation of machinery base
JP2000345567A (en) * 1999-06-08 2000-12-12 Okabe Co Ltd Anchor-bolt fixing device
CN103669390A (en) * 2013-11-27 2014-03-26 中国十七冶集团有限公司 Embedding technique of large-diameter foundation bolts
CN207919593U (en) * 2017-12-29 2018-09-28 日新电机(无锡)有限公司 Universal power equipment mounting platform

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4687165A (en) * 1986-05-02 1987-08-18 The United States Of America As Represented By The United States Department Of Energy Adapter plate assembly for adjustable mounting of objects
JPH1181343A (en) * 1997-09-01 1999-03-26 Toshiba Eng Co Ltd Embedded footing
JPH11229409A (en) * 1998-02-18 1999-08-24 Toshiba Plant Kensetsu Co Ltd Installation of machinery base
JP2000345567A (en) * 1999-06-08 2000-12-12 Okabe Co Ltd Anchor-bolt fixing device
CN103669390A (en) * 2013-11-27 2014-03-26 中国十七冶集团有限公司 Embedding technique of large-diameter foundation bolts
CN207919593U (en) * 2017-12-29 2018-09-28 日新电机(无锡)有限公司 Universal power equipment mounting platform

Similar Documents

Publication Publication Date Title
WO2014139262A1 (en) Adaptive mounting component of communications cabinet base
CN105098679B (en) A kind of combination column for cable testing bridge
CN207919593U (en) Universal power equipment mounting platform
CN204780972U (en) Bayonet column base mounting adjustment device of steel column rim of a cup
CN108149705A (en) Universal power equipment mounting platform
CN201496662U (en) Cable bridge vertical arranging structure
CN105080976A (en) Installation method and device for backing plates of vertical rolling mill
CN208088807U (en) A kind of distribution wire steel tower operating platform
CN203839817U (en) Power transmission line foundation finished product protection cover
CN207624892U (en) A kind of GPS antenna mounting structure for outdoor cabinet
CN102518593A (en) Improved large-size centrifugal fan device and mounting and constructing method thereof
CN201649400U (en) Hoisting device used for ceiling hoisting machine
CN205447177U (en) Equipment for power transmission and distribution rack
CN104282414A (en) Mounting box for transformer
CN203453716U (en) Standardized steel frame foundation for communication device outdoor base station
CN212967329U (en) Be used for power engineering transformer fixing device
CN215928217U (en) Vibration isolation module suspension mounting structure
CN213390693U (en) Prefabricated factory building wallboard structure
KR20190072361A (en) A method of fixing a ceiling structure including a fixed fastener
CN203654768U (en) Shaft-mounted combined distributing device
CN213871780U (en) Camera support
CN103407869A (en) Counterbalancing weight
CN201229246Y (en) General-purpose bending test device
CN220184277U (en) Combined type iron tower foundation bolt positioning embedded part
CN210465727U (en) Tower meteorological monitoring device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination