CN108149558A - Construction of the highway removes vehicle with graticule - Google Patents

Construction of the highway removes vehicle with graticule Download PDF

Info

Publication number
CN108149558A
CN108149558A CN201711404549.7A CN201711404549A CN108149558A CN 108149558 A CN108149558 A CN 108149558A CN 201711404549 A CN201711404549 A CN 201711404549A CN 108149558 A CN108149558 A CN 108149558A
Authority
CN
China
Prior art keywords
oil cylinder
water tank
rubber
waste water
installing plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201711404549.7A
Other languages
Chinese (zh)
Inventor
赵红丽
朱远哲
王昕垚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Well Road Special Vehicle Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201711404549.7A priority Critical patent/CN108149558A/en
Publication of CN108149558A publication Critical patent/CN108149558A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/06Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road
    • E01C23/08Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for roughening or patterning; for removing the surface down to a predetermined depth high spots or material bonded to the surface, e.g. markings; for maintaining earth roads, clay courts or like surfaces by means of surface working tools, e.g. scarifiers, levelling blades
    • E01C23/085Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for roughening or patterning; for removing the surface down to a predetermined depth high spots or material bonded to the surface, e.g. markings; for maintaining earth roads, clay courts or like surfaces by means of surface working tools, e.g. scarifiers, levelling blades using power-driven tools, e.g. vibratory tools
    • E01C23/088Rotary tools, e.g. milling drums
    • E01C23/0885Rotary tools, e.g. milling drums with vertical or steeply inclined rotary axis
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01HSTREET CLEANING; CLEANING OF PERMANENT WAYS; CLEANING BEACHES; DISPERSING OR PREVENTING FOG IN GENERAL CLEANING STREET OR RAILWAY FURNITURE OR TUNNEL WALLS
    • E01H1/00Removing undesirable matter from roads or like surfaces, with or without moistening of the surface
    • E01H1/10Hydraulically loosening or dislodging undesirable matter; Raking or scraping apparatus ; Removing liquids or semi-liquids e.g., absorbing water, sliding-off mud
    • E01H1/108Removing liquids or semi- liquids, e.g. absorbing rain water, sucking-off mud

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Processing Of Solid Wastes (AREA)

Abstract

Construction of the highway removes vehicle with graticule, including flat bed transport vehicle, the front lower portion of flat bed transport vehicle is provided with double plate high pressure water by preceding swing lifting mechanism and removes trolley, braced frame is provided on the chassis of flat bed transport vehicle and the pulp water on rear side of braced frame receives arranging device, filtered water tank is provided in braced frame, the chassis of flat bed transport vehicle is arranged with hydraulic system, engine is provided in braced frame, diesel fuel tanks, generator, accumulator, charging pump, high-pressure hydraulic pump, vacuum pump, by-pass filtration system and secondary filtration system, the pulp water import that pulp water receives arranging device is connect by the formula slag absorbing tube assembly that is flexible coupling with the slag absorbing mouth of a river of double plate high pressure water removing trolley.The present invention is easy to operation, and easy to use, elimination effect is very good, can effectively improve construction efficiency and construction effect.The present invention improves high pressure water and removes the degree of automation simultaneously, alleviates the labor intensity of worker, so as to push popularization and application of the high pressure water in terms of automation, industrialization.

Description

Construction of the highway removes vehicle with graticule
Technical field
The invention belongs to roadmarking clearance technique fields, and in particular to a kind of construction of the highway removes vehicle with graticule.
Background technology
The development that domestic high-pressure water jet is removed starts from the beginning of the eighties at the end of the seventies, and actually high pressure water clearance technique exists Application in industry cleaning and the beginning of the nineties at the end of the eighties is extended to, high pressure water, which is removed, in this stage just starts mass, quotient Product metaplasia is produced, and undeniably, domestic high pressure water clearance technique development removes skill due to starting evening, weak foundation and external high pressure water Art also has certain gap.
There is use in many places to high pressure water clearance technique at home, such as harbour, harbour, railway and industrial derust Machine is removed in the graticule on removing road Deng, conventional high-tension water jet, mainly passes through hand-held spray guns or hand propelled Trolley is purged graticule, and not only labor intensity is big, but also elimination efficiency is low for such reset mode, and the degree of automation is low, The effect for removing graticule is poor, therefore limits further genralrlization and application that high pressure water removes machine.
Invention content
The present invention provides small a kind of labor intensity, high degree of automation, clear to solve shortcoming of the prior art Except construction of the highway efficient, that elimination effect is good graticule removes vehicle.
In order to solve the above technical problems, the present invention adopts the following technical scheme that:Construction of the highway removes vehicle with graticule, including flat Plate transport vehicle, the front lower portion of flat bed transport vehicle are provided with double plate high pressure water by preceding swing lifting mechanism and remove trolley, put down Braced frame is provided on the chassis of plate transport vehicle and the pulp water on rear side of braced frame receives arranging device, is set in braced frame There is filtered water tank, the chassis of flat bed transport vehicle is arranged with hydraulic system, engine, diesel fuel tanks, power generation are provided in braced frame Machine, accumulator, charging pump, high-pressure hydraulic pump, vacuum pump, by-pass filtration system and secondary filtration system, the power output of engine End is driven by transfer case with the power intake of hydraulic system, charging pump, high-pressure hydraulic pump, generator and vacuum pump respectively to be connected It connects, generator is storage battery power supply, and charging pump passes through high-pressure water inlet to be pumped into clear water, the water inlet of high-pressure hydraulic pump inside filtered water tank Pipe is connect with filtered water tank bottom, and the water outlet of high-pressure hydraulic pump removes the water inlet of trolley by high-pressure outlet and double plate high pressure water Mouth connection, by-pass filtration system and secondary filtration system are connected on high-pressure outlet, and the bleeding point of vacuum pump is by vacuumizing It manages and is connect with the forward upper of pulp water receipts arranging device, the pulp water import that pulp water receives arranging device passes through the formula slag absorbing tube assembly that is flexible coupling The slag absorbing mouth of a river that trolley is removed with double plate high pressure water is connect;
Pulp water receives arranging device and includes space framework and the waste water tank being arranged in space framework, and being provided with grain slag at the top of waste water tank enters Mouth, dust suction air entry and service ports, waste water tank top are provided with the case for covering grain slag entrance, dust suction air entry and service ports Lid, grain slag entrance are connect with the outlet for the formula slag absorbing tube assembly that is flexible coupling, and the bleeding point connection of dust suction air entry and vacuum-pumping tube is inhaled Dirt air entry is connected with steam trap, and waste water tank lower rearward side offers grain slag outlet, and setting is useful on rear side of space framework In the chamber door for blocking grain slag outlet, chamber door upper edge edge is hinged on by first axle on space framework, on rear side of space framework Lower part is provided with the set lever that chamber door is compressed to sealing grain slag outlet, chamber door front side surface and grain slag outlet outer edge it Between spring seal strip is set;Chamber door is provided on rear side of space framework and opens and closes oil cylinder, chamber door opens and closes cylinder upper end and passes through the second hinge Chain is hinged on rear side of space framework, and chamber door opens and closes oil cylinder lower end and is hinged on chamber door trailing flank by third hinge;
The formula that is flexible coupling slag absorbing tube assembly includes fixed dreg inhaling pipe, rubber fittings and movable dreg inhaling pipe, the front end of fixed dreg inhaling pipe The slag absorbing mouth of a river that trolley is removed in import with double plate high pressure water is connect, and the back outlet of movable dreg inhaling pipe is connect with grain slag entrance, The center line of the rear end of fixed dreg inhaling pipe, the front end of fixed dreg inhaling pipe and rubber fittings overlaps and the center line is before and after Direction is horizontally disposed with, and the rear end of fixed dreg inhaling pipe is coaxial to be welded with forward flange disk, forward flange disk trailing flank and fixed dreg inhaling pipe Rear end face flushes, and rubber fittings front end face is contacted with forward flange disk trailing flank, and excircle is integrally fixed on front side of rubber fittings Be connected with has the rear stub in gap between forward flange disk, is connected between rear stub and forward flange disk by fastening bolt It connects, movable dreg inhaling pipe front end is arranged rubber sleeve, and rubber sleeve front end is coaxial to be provided with and end in contact before fixed dreg inhaling pipe Seal head, the internal diameter for fixing dreg inhaling pipe, rubber fittings, movable dreg inhaling pipe and seal head is equal, the front end face of seal head and rubber The endoporus rear end of rubber hose coupling is in the endoporus of rear thick preceding the first thin conical structure, rubber sleeve front end face and rubber fittings Rear end crimps and seals cooperation;
Double plate high pressure water removes trolley and includes horizontally disposed rectangular frame, is provided on rear side of rectangular frame and is hinged on preceding swing The body cradle of elevating mechanism front end, it is front and rear on rectangular frame to be equipped with two groups of water clear disk components, the left and right two of rectangular frame side by side Side is both provided with support wheel;
Every group of water clear disk component includes rotatory sealing attachment device, and rotatory sealing attachment device is arranged on rectangular frame top Portion, rectangular frame top are equipped with hydraulic motor, vertically disposed transition hollow shaft, hydraulic motor are rotatably connected on rectangular frame It is connect by tape handler with transition Hollow Shaft Transmission, rectangular frame bottom is equipped with the splash-proof shield of bottom opening, transition Hollow shaft upper end and the coaxial connection in rotatory sealing attachment device lower end, transition hollow shaft lower end is connected with positioned at splash-proof shield Interior is in criss-cross nozzle carrier, is hollow cavity inside nozzle carrier, is fixed with connecting tube at the upper surface center of nozzle carrier, connects Pipe is connected with hollow cavity, and the lower end of transition hollow shaft extend into connecting tube and is threadedly coupled with connecting tube, under nozzle carrier Surface is equipped with several mounting holes, and mounting hole is connected with hollow cavity, and the high pressure nozzle sprayed downward is equipped in mounting hole.
Preceding swing lifting mechanism includes Chinese herbaceous peony beam link, horizontal hunting beam, swings up and down beam, intermediate link, first Oscillating oil cylinder, the second oscillating oil cylinder and third oscillating oil cylinder, Chinese herbaceous peony beam link are fixedly mounted under the front end of flat bed transport vehicle Portion, the length of horizontal hunting beam are more than the center line edge of the length for swinging up and down beam, the first oscillating oil cylinder and the second oscillating oil cylinder Vertical direction is set, and the center line of third oscillating oil cylinder is arranged in vertical, fixed on rear side of the cylinder body of the first oscillating oil cylinder to connect It being connected on front side of Chinese herbaceous peony beam link, one end of horizontal hunting beam is fixedly connected with the output revolving shaft both ends of the first oscillating oil cylinder, the The output revolving shaft both ends of two oscillating oil cylinders are fixedly connected on the other end of horizontal hunting beam, on front side of the cylinder body of the second oscillating oil cylinder with It is fixedly connected on rear side of intermediate link, is fixedly connected on rear side of the front side of intermediate link and the cylinder body of third oscillating oil cylinder, the The output revolving shaft both ends of three oscillating oil cylinders are fixedly connected with swinging up and down the rear end of beam.
Horizontal hunting beam includes the first upper mounting plate and the first lower installation board, and the first upper mounting plate both ends are put respectively with first The output revolving shaft upper end of dynamic oil cylinder is fixedly connected with the output revolving shaft upper end of the second oscillating oil cylinder, the first lower installation board both ends difference It is fixedly connected with the output revolving shaft lower end of the second oscillating oil cylinder and the output revolving shaft lower end of the second oscillating oil cylinder, the first upper mounting plate Front mounting plate is fixedly installed between on front side of front side and the first lower installation board, on rear side of the first upper mounting plate and after the first lower installation board Rear installing plate is fixedly installed between side, is opened up on the first upper mounting plate, the first lower installation board, front mounting plate and rear installing plate There is the first lightening hole, the first upper mounting plate, the first lower installation board, the inside of front mounting plate and rear installing plate are uniform along its length It is provided with several pieces of the first reinforcing plates.
It swings up and down beam and includes left installing plate and right installing plate, left installing plate rear end and the output revolving shaft of third oscillating oil cylinder Left end be fixedly connected, right installing plate rear end is fixedly connected with the right end of the output revolving shaft of third oscillating oil cylinder, on left installing plate Upper mounting plate is fixedly installed between on the upside of side and right installing plate, is fixedly installed between right installing plate downside on the downside of left installing plate There is lower installation board, the second lightening hole offered on the second upper mounting plate, the second lower installation board, left installing plate and right installing plate, Second upper mounting plate, the second lower installation board, left installing plate and right installing plate inside be provided with along its length one piece second plus Strong plate;The body cradle that lower installation board front end removes trolley upper back with double plate high pressure water is hinged.
The lower front of space framework and waste water tank gradually narrows backward, and space framework lower part is below waste water tank A fixing axle is fixedly installed along left and right horizontal direction, waste water tank bottom is provided with supporting rack, and supporting rack is rotated by axle sleeve It is connected in fixing axle, actuating arm is fixedly installed on front side of supporting rack, space framework lower front is provided with waste water tank overturning oil Cylinder, the front end of waste water tank overturning oil cylinder are hinged on by the 4th hinge on space framework, and waste water tank overturning oil cylinder rear end passes through Five hinges are hinged with actuating arm front end;The left or right side of waste water tank is provided with the liquid level for monitoring liquid level in waste water tank Count component.
The outer circle of rubber sleeve is along the circumferential direction offered in rear thin preceding the second thick conical structure, activity slag absorbing pipe outer wall One delineation position seal groove, rubber sleeve inner wall are provided with the locating sealing ring with location sealing slot corresponding matching;Rubber fittings External peripheral surface structure spherical in shape, rubber fittings rear end are provided with a circle reinforcing ring in the outer ring of the first conical structure.
Splash-proof shield is columnar structured, and the bottom periphery of splash-proof shield is fixed with the resistance to of annular by ring-shaped clip Rubber is ground, wear-resisting rubber lower edge is less than the lower edge of splash-proof shield, is parched if being offered on the circumferencial direction of wear-resisting rubber Air drain;The side of splash-proof shield is fixedly connected with air scoop, the air scoop company of offering corresponding with the junction of splash-proof shield Port is provided with pulp water recycling pipe fitting at the top of air scoop.
Nozzle carrier is made of four swingles, and one end of four swingles is fixedly connected and surrounds across, every rotation The permeable hole of perforation is offered in bull stick along its length, the center line weight for the permeable hole of two swingles being oppositely arranged Close, the hollow cavity inside nozzle carrier by being in integrally cross and interconnected permeable hole is composed, every swingle Outer end offers threaded hole along its length, the center line of threaded hole overlapped with the center line of permeable hole in the swingle and The radius of the threaded hole is more than the radius of permeable hole, is equipped with the sealing steel ball for blocking permeable hole in threaded hole, in threaded hole Sealing bolt is threaded with, inner end and the sealing steel ball top pressure of sealing bolt coordinate.
Negative pressure filter cylinder is provided on vacuum-pumping tube;High-pressure hydraulic pump and charging pump are connected respectively by clutch and transfer case transmission It connects, automatic operating-controlling mechanism is provided on clutch;Pressure regulator valve, pressure gauge are provided on high-pressure hydraulic pump.
Using above-mentioned technical proposal, operation principle of the invention is:Driver manipulates flat bed transport vehicle movement on roads, drives The dynamic double plate high pressure water positioned at flat bed transport vehicle front end removes trolley movement on roads, and double plate high pressure water removes trolley edge Graticule to be cleaned is advanced.Clear water in filtered water tank is extracted into by-pass filtration system by the work of engine driving high-pressure hydraulic pump(Filtering 10 μ of precision), secondary filtration system is then arrived again(1 μ of filtering accuracy), the water after double-filtration avoids through high-pressure outlet Impurity in water blocks nozzle, and high-pressure outlet removes trolley for double plate high pressure water and supplies water, and high pressure water passes through high-pressure outlet Into rotatory sealing attachment device, using hollow shaft is crossed into criss-cross nozzle carrier, finally by the height of nozzle carrier lower surface Pressure nozzle sprays downwards high pressure water, and at the same time, hydraulic motor drives transition hollow shaft to rotate by tape handler, and transition is empty The nozzle carrier of mandrel lower end also with high speed rotation, in rotary course by the high pressure water of high pressure nozzle injection to roadmarking into Row cutting, realizes the removing of roadmarking.When encountering the larger graticule of area, preceding swing lifting mechanism drives double plate high pressure Water removes trolley and swings back and forth, and improves the efficiency for removing graticule.
The grain slag that graticule generates after being eliminated can be recovered simultaneously, in order to avoid pollution road surface.Specifically removal process is:Vacuum Pump passes through the formula dreg inhaling pipe group that is flexible coupling by the air in negative pressure filter cylinder draw waste water case, the interior negative pressure generated of closed waste water tank Part and air scoop make to generate negative pressure inside two splash-proof shields, so as to remove graticule mistake by the formula slag absorbing tube assembly that is flexible coupling The waste water and residue generated in journey is drawn into waste water tank and keeps in.Several ventilating grooves are offered on the circumferencial direction of wear-resisting rubber to rise To permeation functions, wear-resisting rubber lower end annular surface is contacted with road surface, and wear-resisting rubber can prevent the residue in splash-proof shield from flying It splashes out, improves the clean degree of recycling waste water and residue.Due to vacuum pump pump orifice connect steam trap, vacuum pump can again by Gas-vapor mix in waste water tank enters by dust suction air entry in steam trap, and steam trap detaches water, vapour, separation Vapour be exhausted directly in air by muffler, reduce noise during vacuum pump operation, the water of separation returned in waste water tank.
Wear-resisting rubber is fixed on by the fixed mode of clip outside splash-proof shield 77, when wear-resisting rubber uses for a long time Wear-resisting rubber can be replaced during abrasion more conveniently;When the permeable hole plug in nozzle carrier, four swingles can be opened On sealing bolt, and back out high pressure nozzle, then take out the sealing steel ball in threaded hole, using dredging rod piece(It is such as needle, thin Straight-bar)It is inserted into permeable hole to be dredged, tamper is discharged, while also to height by mounting hole or by opposite threaded hole Pressure nozzle is cleared up, and ressembles sealing steel ball and sealing bolt on nozzle carrier after dredging.
When the waste water and residue storage in waste water tank is more, flat bed transport vehicle is driven to the discharge areas specified, by waste water Case is opened, and the waste water and residue in waste water tank is poured out.It is specific topple over waste water and residue process be:Unscrew set lever, starting box Door opens and closes oil cylinder, and chamber door opens and closes hydraulic oil cylinder driving chamber door and is flipped up automatically opening, and waste water and residue are automatically drained out;Then restart Waste water tank overturning oil cylinder, waste water tank overturning oil cylinder drive supporting rack line centered on fixing axle to rotate backward by actuating arm, give up Water tank upper rotates backward, and since grain slag entrance is connect with the outlet for the formula slag absorbing tube assembly that is flexible coupling, is fixedly connected on waste water tank For the movable dreg inhaling pipe at top also with rotating backward, seal head is detached from rubber fittings, and remaining residue is from grain slag in waste water tank Outlet Automatic-dumping comes out, and realizes waste water, residue Automatic-dumping.After toppling over, then reverse starting waste water tank overturning oil cylinder, Waste water tank rotates forward reset, and seal head front end is contacted with rubber fittings top pressure, realizes sealing connection, and reverse starting chamber door opens Oil cylinder is closed, chamber door is automatically closed, and tightens case set lever, chamber door locking.Personnel enter waste water tank from service ports when something goes wrong Repair, the sealing of service ports fitted seal lid is tight when waste water tank works.
By turning fastening bolt, the gap between forward flange disk and rear stub is reduced, rubber fittings front end can be made Face is in close contact with rear stub leading flank.
Rubber sleeve, the setting of rubber sleeve front end and the seal head of rubber sleeve integral structure are arranged in movable dreg inhaling pipe front end, it is close End socket is tightly connected with rubber fittings front end by part pyramid like configuration, this can not only improve sealing area, but also convenient for activity It is detached after dreg inhaling pipe rotation with rubber fittings.Seal head and rubber fittings are that rubber material is made, and are inhaled in this way in activity After slag pipe rotate in place, between seal head and rubber fittings have certain pressure, it is this be flexible coupling play good sealing Effect, and the service life of each component can be extended.
The outer circle of rubber sleeve in thick the second conical structure before rear thin, can make in this way rubber sleeve front end seal head it is outer Diameter bigger makes the first conical structure of seal head front end face have the sealing area of bigger.
Since rubber fittings are made of rubber, in order to enhance the intensity of rubber fittings, specially rubber tube is set to connect The middle part shape of head is spherical structure, in order to avoid the intensity and sealing reliability of rubber fittings rear end, specially in rubber tube Connector rear end is provided with a circle reinforcing ring in the outer ring of the first conical structure.
The pulp water of the present invention receives arranging device and passes through the formula dreg inhaling pipe that is flexible coupling during automatic recycling, Automatic-dumping pulp water Component automatic butt, automatic-sealed, the formula that is flexible coupling slag absorbing tube assembly have the features such as elasticity is good, and volume is light, convenient to install and maintain, There is fabulous effect to compensation piping displacement, it can not only compensate the generated transverse direction in installation process, longitudinal direction, angular position Move, and work when can reduce structure-borne noise, vibration absorption ability is strong, can bear higher operating pressure, at the same have it is heat-resisting, The performances such as oil resistant, corrosion resistant, acidproof, ageing-resistant.
The specific work process of preceding swing lifting mechanism in the present invention is:After removing operation starts, the first oscillating oil cylinder It by crawl, is rotated around XX axis, the double plate high pressure water being connected with horizontal hunting beam is driven to remove trolley and is moved horizontally to tablet Left side, center in front of transport vehicle, right positions;Meanwhile by the second oscillating oil cylinder of fixed speed control or so reciprocally swinging, make double Disc type high pressure water removes trolley around YY axis reciprocating rotaries, and region is removed so as to form arc;It is equipped with flat bed transport vehicle constant speed forward (Or backward)Movement forms the removing band that a width is more than body width;Third oscillating oil cylinder controls double plate by crawl High pressure water is removed trolley and is rotated around ZZ axis, it is made to complete pitching motion, and then wear-resisting rubber bottom surface is made to be bonded with being eliminated ground. After removing operation, withdrawn by the action Shi Ge mechanisms of each oscillating oil cylinder.The control for swinging by driver's cabin of each oscillating cylinder Platform processed manipulates, by being that driver is operated, so as to fulfill it is intuitive, conveniently, efficiently remove operation.
Preceding swing lifting mechanism can remove double plate high pressure water according to the position of graticule the tune that trolley is purged range It is whole, it is effective to improve construction efficiency and construction effect.
The whole process that pulp water receives arranging device realizes high pressure water and removes vehicle during remove graticule to waste water, residue Automatic recycling, Automatic-dumping, make removing scene without dust, without residue, without sewage, low noise, effectively reduce artificial input, carry High working efficiency, water-saving, energy-saving and environmental protection are time saving and energy saving.
In conclusion the present invention is easy to operation, easy to use, elimination effect is very good, and can recycle waste water and residue, has The raising construction efficiency and construction effect of effect.The present invention improves high pressure water and removes the degree of automation simultaneously, alleviates worker's Labor intensity, so as to push popularization and application of the high pressure water in terms of automation, industrialization.
Description of the drawings
Fig. 1 is the dimensional structure diagram at a visual angle of the invention;
Fig. 2 is the dimensional structure diagram at another visual angle of the invention;
Fig. 3 is the section plan that pulp water receives arranging device in Fig. 1 and Fig. 2;
Fig. 4 is the left view of Fig. 3;
Fig. 5 is the right view of Fig. 3;
Fig. 6 is the dimensional structure diagram that pulp water receives arranging device;
Fig. 7 is the structure diagram of formula slag absorbing tube assembly of being flexible coupling;
Fig. 8 is the dimensional structure diagram at preceding one visual angle of swing lifting mechanism in Fig. 2;
Fig. 9 is the dimensional structure diagram at preceding another visual angle of swing lifting mechanism in Fig. 2;
Figure 10 is the structure diagram of a water clear disk component in Fig. 8 and Fig. 9.
Specific embodiment
As shown in Fig. 1-Figure 10, construction of the highway of the invention removes vehicle with graticule, including flat bed transport vehicle 1, flat bed delivery The front lower portion of vehicle 1 is provided with double plate high pressure water by preceding swing lifting mechanism 2 and removes trolley 3, the chassis of flat bed transport vehicle 1 On be provided with braced frame 89 and the pulp water positioned at the rear side of braced frame 89 receives arranging device 5, be provided with clear water in braced frame 89 Case 4, the chassis of flat bed transport vehicle 1 are arranged with hydraulic system, and engine 6, diesel fuel tanks 7, power generation are provided in braced frame 89 Machine, accumulator, charging pump, high-pressure hydraulic pump 11, vacuum pump 12, by-pass filtration system 13 and secondary filtration system 14, engine 6 Power output end is defeated with the power of hydraulic system, charging pump, high-pressure hydraulic pump 11, generator and vacuum pump 12 respectively by transfer case Enter end to be sequentially connected, generator is storage battery power supply, and charging pump is pumped into clear water, the water inlet of high-pressure hydraulic pump 11 for 4 inside of filtered water tank Mouth is connect by high-pressure intake pipe 15 with 4 bottom of filtered water tank, and the water outlet of high-pressure hydraulic pump 11 passes through high-pressure outlet 16 and double plate Formula high pressure water removes the water inlet connection of trolley 3, and by-pass filtration system 13 and secondary filtration system 14 are connected to high-pressure outlet On 16, the bleeding point of vacuum pump 12 is connect by vacuum-pumping tube 17 with the forward upper of pulp water receipts arranging device 5, and pulp water receives row's dress It puts 5 pulp water import the slag absorbing mouth of a river of trolley 3 is removed by being flexible coupling formula slag absorbing tube assembly 18 with double plate high pressure water and connect;
Pulp water receives arranging device 5 and includes space framework 19 and the waste water tank 20 being arranged in space framework 19, and 20 top of waste water tank is set Grain slag entrance 21, dust suction air entry 22 and service ports 23 are equipped with, 20 top of waste water tank is provided with grain slag entrance 21, dust suction air-breathing The case lid 24 that mouth 22 and service ports 23 cover, grain slag entrance 21 are connect with the outlet for the formula slag absorbing tube assembly 18 that is flexible coupling, and dust suction is inhaled Gas port 22 is connect with the bleeding point of vacuum-pumping tube 17, and dust suction air entry 22 is connected with steam trap(Do not illustrate in figure), waste water 20 lower rearward side of case offers grain slag outlet 25, and 19 rear side of space framework is provided with the chamber door for blocking grain slag outlet 25 26,26 upper edge of chamber door along being hinged on space framework 19 by first axle 27,19 back lower of space framework be provided with by Chamber door 26 compresses the set lever 28 of sealing grain slag outlet 25, between 25 outer edge of 26 front side surface of chamber door and grain slag outlet Spring seal strip 29 is set;19 rear side of space framework is provided with chamber door and opens and closes oil cylinder 30, and chamber door opens and closes 30 upper end of oil cylinder and passes through Second hinge 31 is hinged on 19 rear side of space framework, after 30 lower end of chamber door keying oil cylinder is hinged on chamber door 26 by third hinge 32 On side.
The formula that is flexible coupling slag absorbing tube assembly 18 includes fixed dreg inhaling pipe 90, rubber fittings 91 and movable dreg inhaling pipe 92, fixed The slag absorbing mouth of a river that the leading inlet of dreg inhaling pipe 90 removes trolley 3 with double plate high pressure water is connect, and is brought out after movable dreg inhaling pipe 92 Mouth is connect with grain slag entrance 21, fixes the rear end of dreg inhaling pipe 90, the front end of fixed dreg inhaling pipe 90 and rubber fittings 91 Center line overlaps and the center line is horizontally disposed with along the longitudinal direction, and the rear end of fixed dreg inhaling pipe 90 is coaxial to be welded with forward flange disk 93,93 trailing flank of forward flange disk and fixed dreg inhaling pipe end face after 90s, 91 front end face of rubber fittings with after forward flange disk 93 Side contacts, and 91 front side excircle of rubber fittings is integrally fixedly connected with the rear flange between forward flange disk 93 with gap Disk 94 is connected between rear stub 94 and forward flange disk 93 by fastening bolt 95, and movable 92 front end of dreg inhaling pipe is arranged with rubber Gum cover 96, the coaxial seal head 97 being provided with end in contact before fixed dreg inhaling pipe 90 in 96 front end of rubber sleeve, fixed dreg inhaling pipe 90, Rubber fittings 91, movable dreg inhaling pipe 92 are equal with the internal diameter of seal head 97, the front end face of seal head 97 and rubber fittings 91 Endoporus rear end in thin the first conical structure 98 before rear thick, 96 front end face of rubber sleeve with after the endoporus of rubber fittings 91 Side pressure connects and seals cooperation.
The outer circle of rubber sleeve 96 is in rear thin preceding the second thick conical structure 99, and movable 92 outer wall of dreg inhaling pipe is along the circumferential direction A delineation position seal groove is offered, 96 inner wall of rubber sleeve is provided with the locating sealing ring 100 with location sealing slot corresponding matching;Rubber The external peripheral surface structure spherical in shape of rubber hose coupling 91,91 rear end of rubber fittings are set in the outer ring of the first conical structure 98 There is a circle reinforcing ring 101.
Double plate high pressure water removes trolley 3 and includes horizontally disposed rectangular frame 70, and 70 rear side setting of rectangular frame is hinged The body cradle 71 of 2 front end of swing lifting mechanism before being connected on, it is front and rear on rectangular frame 70 to be equipped with two groups of water clear disk components 72 side by side, The left and right sides of rectangular frame 70 is both provided with support wheel 73;
Every group of water clear disk component 72 includes rotatory sealing attachment device 74(Specific and structure is in entitled roadmarking Hand propelled high pressure water removes vehicle, and application No. is being had disclosed in 201610302969.3 patent, details are not described herein), rotation Turn sealing and connecting device 74 and be arranged on 70 top of rectangular frame, upper end and the high-pressure outlet 16 of rotatory sealing attachment device 74 Water outlet connects, and 70 top of rectangular frame is equipped with hydraulic motor 75, and vertically disposed transition is rotatably connected on rectangular frame 70 Hollow shaft 76, hydraulic motor 75 are sequentially connected by tape handler and transition hollow shaft 76, and 70 bottom of rectangular frame is equipped with bottom The splash-proof shield 77 of portion's opening, 76 upper end of transition hollow shaft and the coaxial connection in 74 lower end of rotatory sealing attachment device, transition 76 lower end of hollow shaft is connected in splash-proof shield 77 in criss-cross nozzle carrier, and nozzle carrier inside is hollow cavity, is sprayed Connecting tube 78 is fixed at the upper surface center of mouth seat, connecting tube 78 is connected with hollow cavity, the lower end of transition hollow shaft 76 Extend into connecting tube 78 and be threadedly coupled with connecting tube 78, nozzle carrier lower surface is equipped with several mounting holes, mounting hole with it is hollow Cavity connects, and the high pressure nozzle 79 sprayed downward is equipped in mounting hole.
The present invention improves jet area, and set in each 76 lower end of transition hollow shaft using two splash-proof shields 77 Criss-cross nozzle carrier, therefore referred to as double plate.
Preceding swing lifting mechanism 2 include Chinese herbaceous peony beam link 33, horizontal hunting beam, swing up and down beam, intermediate link 34, First oscillating oil cylinder 35, the second oscillating oil cylinder 36 and third oscillating oil cylinder 37, Chinese herbaceous peony beam link 33 are fixedly mounted on tablet fortune The front lower portion of defeated vehicle 1, the length of horizontal hunting beam are more than the length for swinging up and down beam, and the first oscillating oil cylinder 35 and second is swung The center line of oil cylinder 36 is arranged in vertical, and the center line of third oscillating oil cylinder 37 is arranged in vertical, and first swings oil 33 front side of Chinese herbaceous peony beam link, one end of horizontal hunting beam and the first oscillating oil cylinder 35 are fixedly connected on rear side of the cylinder body of cylinder 35 Output revolving shaft both ends are fixedly connected, and the output revolving shaft both ends of the second oscillating oil cylinder 36 are fixedly connected on the another of horizontal hunting beam End is fixedly connected with the rear side of intermediate link 34 on front side of the cylinder body of the second oscillating oil cylinder 36, the front side of intermediate link 34 and It is fixedly connected on rear side of the cylinder body of third oscillating oil cylinder 37, output revolving shaft both ends of third oscillating oil cylinder 37 and after swinging up and down beam End is fixedly connected.
Horizontal hunting beam include the first upper mounting plate 38 and the first lower installation board 39,38 both ends of the first upper mounting plate respectively with The output revolving shaft upper end of first oscillating oil cylinder 35 is fixedly connected with the output revolving shaft upper end of the second oscillating oil cylinder 36, first time installation Output revolving shaft lower end of 39 both ends of plate respectively with the output revolving shaft lower end of the second oscillating oil cylinder 36 and the second oscillating oil cylinder 36 is fixed Connection, 38 front side of the first upper mounting plate and the first lower installation board are fixedly installed front mounting plate 40 between 39 front side, pacify on first Rear installing plate 41 is fixedly installed between the rear side of loading board 38 and 39 rear side of the first lower installation board, under the first upper mounting plate 38, first The first lightening hole 42, the first upper mounting plate 38, first time peace are offered on installing plate 39, front mounting plate 40 and rear installing plate 41 The inside of loading board 39, front mounting plate 40 and rear installing plate 41 is evenly arranged with several pieces of the first reinforcing plates 43 along its length.
It swings up and down beam and includes left installing plate 44 and right installing plate 45, left 44 rear end of installing plate and third oscillating oil cylinder 37 The left end of output revolving shaft is fixedly connected, and the right end of right 45 rear end of installing plate and the output revolving shaft of third oscillating oil cylinder 37, which is fixed, to be connected It connects, upper mounting plate 46, left 44 downside of installing plate and the right side is fixedly installed between 45 upside of left 44 upside of installing plate and right installing plate Installing plate is fixedly installed lower installation board 47, the second upper mounting plate 46, the second lower installation board 47, left installing plate 44 between 45 downside With the second lightening hole 48, the second upper mounting plate 46, the second lower installation board 47,44 and of left installing plate are offered on right installing plate 45 The inside of right installing plate 45 is provided with one piece of second reinforcing plate 49 along its length;47 front end of lower installation board and double plate high pressure water The body cradle 71 for removing 3 upper back of trolley is hinged.
The lower front of space framework 19 and waste water tank 20 gradually narrows backward, and 19 lower part of space framework is positioned at waste water 20 lower section of case is fixedly installed a fixing axle 50 along left and right horizontal direction, and 20 bottom of waste water tank is provided with supporting rack 51, support Frame 51 is rotatably connected on by axle sleeve 52 in fixing axle 50, and 51 front side of supporting rack is fixedly installed actuating arm 53, space framework 19 Lower front is provided with waste water tank overturning oil cylinder 54, and the front end of waste water tank overturning oil cylinder 54 is hinged on solid by the 4th hinge 55 On frame 19,54 rear end of waste water tank overturning oil cylinder is hinged by the 5th hinge 56 and 53 front end of actuating arm;The left side of waste water tank 20 Or right side is provided with the liquid level gauge component 57 for monitoring liquid level in waste water tank 20.
Negative pressure filter cylinder is provided on vacuum-pumping tube 17;High-pressure hydraulic pump 11 and charging pump are passed respectively by clutch and transfer case It is dynamic to connect, it is provided with automatic operating-controlling mechanism on clutch;Pressure regulator valve, pressure gauge are provided on high-pressure hydraulic pump 11.
Splash-proof shield 77 is columnar structured, and the bottom periphery of splash-proof shield 77 is fixed with ring by ring-shaped clip 80 The wear-resisting rubber 81 of shape, wear-resisting 81 lower edge of rubber are less than the lower edge of splash-proof shield 77, the circumferencial direction of wear-resisting rubber 81 On offer several ventilating grooves 82.The side of splash-proof shield 77 is fixedly connected with air scoop 87, and air scoop 87 is protected with splash-proof The junction of cover 77, which corresponds to, offers communication port, and the top of air scoop 87 is provided with the slag with the outlet connection of fixed dreg inhaling pipe 90 Water recycles pipe fitting 88.
Nozzle carrier is made of four swingles 83, and one end of four swingles 83 is fixedly connected and surrounds across, often The permeable hole 84 of perforation is offered in root swingle 83 along its length, the permeable hole 84 for two swingles 83 being oppositely arranged Center line overlap, the hollow cavity inside nozzle carrier by being in integrally cross and interconnected permeable hole 84 is composed, The outer end of every swingle 83 offers threaded hole along its length, the center line of threaded hole with it is permeable in the swingle 83 The center line in hole 84 overlaps and the radius of the threaded hole is more than the radius of permeable hole 84, is equipped with to block permeable hole in threaded hole 84 sealing steel ball 85, threaded hole internal thread are connected with sealing bolt 86, inner end and sealing 85 top pressure of steel ball of sealing bolt 86 Cooperation.
The present invention operation principle be:Driver manipulates 1 movement on roads of flat bed transport vehicle, and driving is located at flat bed transport vehicle The double plate high pressure water of 1 front end removes 3 movement on roads of trolley, and double plate high pressure water removes trolley 3 along graticule to be cleaned It advances.Engine 6 drives high-pressure hydraulic pump 11 to work and the clear water in filtered water tank 4 is extracted into by-pass filtration system 13(Filtering accuracy 10 μ), secondary filtration system 14 is then arrived again(1 μ of filtering accuracy), the water after double-filtration avoids water through high-pressure outlet 16 In impurity block nozzle, high-pressure outlet 16 for double plate high pressure water remove trolley 3 supply water, high pressure water passes through high-pressure outlet 16 enter rotatory sealing attachment device 74, enter criss-cross nozzle carrier using hollow shaft 76 is crossed, finally by nozzle carrier following table The high pressure nozzle 79 in face sprays downwards high pressure water, and at the same time, hydraulic motor 75 drives transition hollow shaft by tape handler 76 rotations, the nozzle carrier of 76 lower end of transition hollow shaft are sprayed also with high speed rotation in rotary course by high pressure nozzle 79 High pressure water cuts roadmarking, realizes the removing of roadmarking.When encountering the larger graticule of area, preceding oscillating lifting Mechanism 2 drives double plate high pressure water to remove trolley 3 and swings back and forth, and improves the efficiency for removing graticule.
The grain slag that graticule generates after being eliminated can be recovered simultaneously, in order to avoid pollution road surface.Specifically removal process is:Vacuum Pump 12 is passed through the formula that is flexible coupling and is inhaled by the air in negative pressure filter cylinder draw waste water case 20, the interior negative pressure generated of closed waste water tank 20 Slag tube assembly 18 and air scoop 87 make two 77 inside of splash-proof shield generate negative pressure, so as to pass through the formula slag absorbing tube assembly that is flexible coupling 18 will remove graticule during generate waste water and residue be drawn into waste water tank 20 keep in.On the circumferencial direction of wear-resisting rubber 81 It offers several ventilating grooves 82 and plays permeation functions, wear-resisting 81 lower end annular surface of rubber is contacted with road surface, and wear-resisting rubber 81 can be with It prevents the residue in splash-proof shield 77 from sputtering, improves the clean degree of recycling waste water and residue.Due to the suction of vacuum pump 12 Gas-vapor mix in waste water tank 20 can be entered steam by mouth connection steam trap, vacuum pump 12 by dust suction air entry 22 again In separator, steam trap detaches water, vapour, and the vapour of separation is exhausted directly to by muffler in air, reduces vacuum pump 12 Noise during operation, the water of separation are returned in waste water tank 20.
Wear-resisting rubber 81 is fixed on by 80 fixed mode of clip outside splash-proof shield 77, when wear-resisting rubber 81 is long Between using abrasion when can replace wear-resisting rubber 81 more conveniently;When the permeable hole 84 in nozzle carrier blocks, can open Sealing bolt 86 on four swingles 83, and high pressure nozzle 79 is backed out, the sealing steel ball 85 in threaded hole is then taken out, is utilized Dredge rod piece(Such as needle, slice straight-bar)It is inserted into permeable hole 84 to be dredged, by mounting hole or passes through opposite threaded hole Tamper is discharged, while also high pressure nozzle 79 is cleared up, fills sealing steel ball 85 and sealing bolt 86 again after dredging It fits on nozzle carrier.
When the waste water and residue storage in waste water tank 20 is more, flat bed transport vehicle 1 is driven to the discharge areas specified, it will be useless Water tank 20 is opened, and the waste water and residue in waste water tank 20 is poured out.It is specific topple over waste water and residue process be:Unscrew set lever 28, start chamber door and open and close oil cylinder 30, chamber door opens and closes oil cylinder 30 and chamber door 26 is driven to be flipped up automatically opening, and waste water and residue are automatic Discharge;Then restart waste water tank overturning oil cylinder 54, waste water tank overturning oil cylinder 54 drives supporting rack 51 to consolidate by actuating arm 53 Line rotates backward centered on dead axle 50, and 20 top of waste water tank rotates backward, due to grain slag entrance and the formula slag absorbing tube assembly that is flexible coupling 18 outlet connection is fixedly connected on the movable dreg inhaling pipe 92 at 20 top of waste water tank also with rotating backward, and seal head 97 is detached from Rubber fittings 91, remaining residue comes out from 25 Automatic-dumping of grain slag outlet in waste water tank 20, realizes that waste water, residue are automatic Topple over.After toppling over, then reverse starting waste water tank overturning oil cylinder 54, waste water tank 20 resets, 97 front end of seal head and rubber tube 91 top pressure of connector contacts, and realizes sealing connection, and reverse starting chamber door opens and closes oil cylinder 30, and chamber door 26 is automatically closed, and tightens case locking Handle 28, chamber door 26 are locked.Personnel enter repair to waste water tank 20 from service ports 23 when something goes wrong, and waste water tank 20 repairs when working Mouth 23 fitted seal lids sealing is tight.
By turning fastening bolt 95, the gap between forward flange disk 93 and rear stub 94 is reduced, rubber tube can be connect First 91 front end face is in close contact with 94 leading flank of rear stub.
Rubber sleeve 96 is arranged in movable 92 front end of dreg inhaling pipe, 96 front end of rubber sleeve sets close with 96 integral structure of rubber sleeve End socket 97, seal head 97 are tightly connected with 91 front end of rubber fittings by part pyramid like configuration, this can not only improve sealing area, And it is detached after being rotated convenient for movable dreg inhaling pipe 92 with rubber fittings 91.Seal head 97 and rubber fittings 91 are rubber material Matter is made, and in this way after movable dreg inhaling pipe 92 rotate in place, has certain pressure between seal head 97 and rubber fittings 91, It is this be flexible coupling play good sealing function, and the service life of each component can be extended.
The outer circle of rubber sleeve 96 can make the sealing of 96 front end of rubber sleeve in this way in rear thin preceding the second thick conical structure 99 First 97 outer diameter bigger makes the first conical structure 98 of 97 front end face of seal head have the sealing area of bigger.
Since rubber fittings 91 are made of rubber, in order to enhance the intensity of rubber fittings 91, rubber is specially set The middle part shape of pipe fitting 91 is spherical structure, in order to avoid the intensity and sealing reliability of 91 rear end of rubber fittings, specially The outer ring of the first conical structure 98 is provided with a circle reinforcing ring 101 in 91 rear end of rubber fittings.
The specific work process of preceding swing lifting mechanism 2 in the present invention is:After removing operation starts, the first oscillating oil cylinder 35, by crawl, rotate around XX axis, the double plate high pressure water being connected with horizontal hunting beam removing trolley are driven to be moved horizontally to flat The left side in 1 front of plate transport vehicle, center, right positions;Meanwhile pass through the past physical pendulum of the second oscillating oil cylinder of fixed speed control 36 or so It is dynamic, double plate high pressure water is made to remove trolley around YY axis reciprocating rotaries, region is removed so as to form arc;It is equipped with flat bed transport vehicle 1 Constant speed is forward(Or backward)Movement forms the removing band that a width is more than body width;Third oscillating oil cylinder 37 by crawl, Double plate high pressure water is controlled to remove trolley to rotate around ZZ axis, it is made to complete pitching motion, and then it is small to remove double plate high pressure water The clear disk bottom surface of vehicle is bonded with being eliminated ground.After removing operation, received by the action Shi Ge mechanisms of each oscillating oil cylinder It returns.Each oscillating cylinder swing by driver's cabin console manipulate, by being that driver is operated, so as to fulfill it is intuitive, conveniently, It is efficient to remove operation.
The present embodiment is every according to this hair not to the limitation of works in any form such as shape, material, the structures of the present invention Any simple modification, equivalent change and modification that bright technical spirit makees above example, belongs to the technology of the present invention side The protection domain of case.

Claims (9)

1. construction of the highway removes vehicle with graticule, it is characterised in that:Including flat bed transport vehicle, the front lower portion of flat bed transport vehicle passes through Preceding swing lifting mechanism is provided with double plate high pressure water and removes trolley, and braced frame and position are provided on the chassis of flat bed transport vehicle Pulp water on rear side of braced frame receives arranging device, is provided with filtered water tank in braced frame, the chassis of flat bed transport vehicle is arranged with Hydraulic system, be provided in braced frame engine, diesel fuel tanks, generator, accumulator, charging pump, high-pressure hydraulic pump, vacuum pump, By-pass filtration system and secondary filtration system, the power output end of engine by transfer case respectively with hydraulic system, charging pump, The power intake of high-pressure hydraulic pump, generator and vacuum pump is sequentially connected, and generator is storage battery power supply, and charging pump is filtered water tank Inside is pumped into clear water, and the water inlet of high-pressure hydraulic pump is connect by high-pressure intake pipe with filtered water tank bottom, the water outlet of high-pressure hydraulic pump The water inlet for removing trolley with double plate high pressure water by high-pressure outlet is connect, and by-pass filtration system and secondary filtration system connect It is connected on high-pressure outlet, the bleeding point of vacuum pump is connect by vacuum-pumping tube with the forward upper of pulp water receipts arranging device, pulp water The pulp water import for receiving arranging device is connect by the formula slag absorbing tube assembly that is flexible coupling with the slag absorbing mouth of a river of double plate high pressure water removing trolley;
Pulp water receives arranging device and includes space framework and the waste water tank being arranged in space framework, and being provided with grain slag at the top of waste water tank enters Mouth, dust suction air entry and service ports, waste water tank top are provided with the case for covering grain slag entrance, dust suction air entry and service ports Lid, grain slag entrance are connect with the outlet for the formula slag absorbing tube assembly that is flexible coupling, and the bleeding point connection of dust suction air entry and vacuum-pumping tube is inhaled Dirt air entry is connected with steam trap, and waste water tank lower rearward side offers grain slag outlet, and setting is useful on rear side of space framework In the chamber door for blocking grain slag outlet, chamber door upper edge edge is hinged on by first axle on space framework, on rear side of space framework Lower part is provided with the set lever that chamber door is compressed to sealing grain slag outlet, chamber door front side surface and grain slag outlet outer edge it Between spring seal strip is set;Chamber door is provided on rear side of space framework and opens and closes oil cylinder, chamber door opens and closes cylinder upper end and passes through the second hinge Chain is hinged on rear side of space framework, and chamber door opens and closes oil cylinder lower end and is hinged on chamber door trailing flank by third hinge;
The formula that is flexible coupling slag absorbing tube assembly includes fixed dreg inhaling pipe, rubber fittings and movable dreg inhaling pipe, the front end of fixed dreg inhaling pipe The slag absorbing mouth of a river that trolley is removed in import with double plate high pressure water is connect, and the back outlet of movable dreg inhaling pipe is connect with grain slag entrance, The center line of the rear end of fixed dreg inhaling pipe, the front end of fixed dreg inhaling pipe and rubber fittings overlaps and the center line is before and after Direction is horizontally disposed with, and the rear end of fixed dreg inhaling pipe is coaxial to be welded with forward flange disk, forward flange disk trailing flank and fixed dreg inhaling pipe Rear end face flushes, and rubber fittings front end face is contacted with forward flange disk trailing flank, and excircle is integrally fixed on front side of rubber fittings Be connected with has the rear stub in gap between forward flange disk, is connected between rear stub and forward flange disk by fastening bolt It connects, movable dreg inhaling pipe front end is arranged rubber sleeve, and rubber sleeve front end is coaxial to be provided with and end in contact before fixed dreg inhaling pipe Seal head, the internal diameter for fixing dreg inhaling pipe, rubber fittings, movable dreg inhaling pipe and seal head is equal, the front end face of seal head and rubber The endoporus rear end of rubber hose coupling is in the endoporus of rear thick preceding the first thin conical structure, rubber sleeve front end face and rubber fittings Rear end crimps and seals cooperation;
Double plate high pressure water removes trolley and includes horizontally disposed rectangular frame, is provided on rear side of rectangular frame and is hinged on preceding swing The body cradle of elevating mechanism front end, it is front and rear on rectangular frame to be equipped with two groups of water clear disk components, the left and right two of rectangular frame side by side Side is both provided with support wheel;
Every group of water clear disk component includes rotatory sealing attachment device, and rotatory sealing attachment device is arranged on rectangular frame top Portion, rectangular frame top are equipped with hydraulic motor, vertically disposed transition hollow shaft, hydraulic motor are rotatably connected on rectangular frame It is connect by tape handler with transition Hollow Shaft Transmission, rectangular frame bottom is equipped with the splash-proof shield of bottom opening, transition Hollow shaft upper end and the coaxial connection in rotatory sealing attachment device lower end, transition hollow shaft lower end is connected with positioned at splash-proof shield Interior is in criss-cross nozzle carrier, is hollow cavity inside nozzle carrier, is fixed with connecting tube at the upper surface center of nozzle carrier, connects Pipe is connected with hollow cavity, and the lower end of transition hollow shaft extend into connecting tube and is threadedly coupled with connecting tube, under nozzle carrier Surface is equipped with several mounting holes, and mounting hole is connected with hollow cavity, and the high pressure nozzle sprayed downward is equipped in mounting hole.
2. construction of the highway according to claim 1 removes vehicle with graticule, it is characterised in that:Preceding swing lifting mechanism includes vehicle Front-axle beam link, horizontal hunting beam swing up and down beam, intermediate link, the first oscillating oil cylinder, the second oscillating oil cylinder and third pendulum Dynamic oil cylinder, Chinese herbaceous peony beam link are fixedly mounted on the front lower portion of flat bed transport vehicle, and the length of horizontal hunting beam is more than the upper bottom The center line of the length of dynamic beam, the first oscillating oil cylinder and the second oscillating oil cylinder is arranged in vertical, in third oscillating oil cylinder Heart line is arranged in vertical, and is fixedly connected on rear side of the cylinder body of the first oscillating oil cylinder on front side of Chinese herbaceous peony beam link, horizontal hunting One end of beam is fixedly connected with the output revolving shaft both ends of the first oscillating oil cylinder, and the output revolving shaft both ends of the second oscillating oil cylinder, which are fixed, to be connected The other end of horizontal hunting beam is connected on, is fixedly connected on rear side of the cylinder body front side of the second oscillating oil cylinder and intermediate link, it is intermediate Be fixedly connected on rear side of the cylinder body of the front side of link and third oscillating oil cylinder, the output revolving shaft both ends of third oscillating oil cylinder with up and down The rear end of walking beam is fixedly connected.
3. construction of the highway according to claim 2 removes vehicle with graticule, it is characterised in that:Horizontal hunting beam is included on first Installing plate and the first lower installation board, the first upper mounting plate both ends are put respectively with the output revolving shaft upper end of the first oscillating oil cylinder and second The output revolving shaft upper end of dynamic oil cylinder is fixedly connected, the first lower installation board both ends respectively with the output revolving shaft lower end of the second oscillating oil cylinder It is fixedly connected with the output revolving shaft lower end of the second oscillating oil cylinder, it is solid between the first lower installation board front side on front side of the first upper mounting plate Surely front mounting plate is provided with, rear installing plate is fixedly installed between the first lower installation board rear side on rear side of the first upper mounting plate, the Offer the first lightening hole on one upper mounting plate, the first lower installation board, front mounting plate and rear installing plate, the first upper mounting plate, The inside of first lower installation board, front mounting plate and rear installing plate is evenly arranged with several pieces of the first reinforcing plates along its length.
4. construction of the highway according to claim 3 removes vehicle with graticule, it is characterised in that:It swings up and down beam and includes left installation Plate and right installing plate, left installing plate rear end are fixedly connected with the left end of the output revolving shaft of third oscillating oil cylinder, right installing plate rear end It is fixedly connected with the right end of the output revolving shaft of third oscillating oil cylinder, is fixedly installed between right installing plate upside on the upside of left installing plate There is upper mounting plate, lower installation board, the second upper mounting plate, second are fixedly installed between right installing plate downside on the downside of left installing plate The second lightening hole, the second upper mounting plate, the second lower installation board, a left side are offered on lower installation board, left installing plate and right installing plate The inside of installing plate and right installing plate is provided with one piece of second reinforcing plate along its length;Lower installation board front end and double plate high pressure The body cradle that water removes trolley upper back is hinged.
5. construction of the highway according to claim 1 removes vehicle with graticule, it is characterised in that:Before space framework and waste water tank Side lower part gradually narrows backward, and space framework lower part is being fixedly installed one below waste water tank along left and right horizontal direction Fixing axle, waste water tank bottom are provided with supporting rack, and supporting rack is rotatably connected on by axle sleeve in fixing axle, fixed on front side of supporting rack Actuating arm is provided with, space framework lower front is provided with waste water tank overturning oil cylinder, and the front end of waste water tank overturning oil cylinder passes through Four hinges are hinged on space framework, and waste water tank overturning oil cylinder rear end is hinged by the 5th hinge with actuating arm front end;Waste water tank Left or right side be provided with liquid level gauge component for monitoring liquid level in waste water tank.
6. construction of the highway according to claim 1 removes vehicle with graticule, it is characterised in that:The outer circle of rubber sleeve is in before rear thin The second thick conical structure, activity slag absorbing pipe outer wall along the circumferential direction offer a delineation position seal groove, and rubber sleeve inner wall is set It is equipped with the locating sealing ring with location sealing slot corresponding matching;The external peripheral surface structure spherical in shape of rubber fittings, rubber tube Connector rear end is provided with a circle reinforcing ring in the outer ring of the first conical structure.
7. construction of the highway according to claim 1 removes vehicle with graticule, it is characterised in that:Splash-proof shield is cylindrical shape knot Structure, the bottom periphery of splash-proof shield are fixed with the wear-resisting rubber of annular by ring-shaped clip, and wear-resisting rubber lower edge is less than anti- Splash the lower edge of shield, offers several ventilating grooves on the circumferencial direction of wear-resisting rubber;The side of splash-proof shield, which is fixed, to be connected Air scoop is connected to, air scoop is corresponding with the junction of splash-proof shield to offer communication port, and pulp water is provided at the top of air scoop Recycle pipe fitting.
8. construction of the highway according to claim 1 removes vehicle with graticule, it is characterised in that:Nozzle carrier is by four swingle groups Into one end of four swingles is fixedly connected and surrounds across, offers perforation in every swingle along its length Permeable hole, the center line of the permeable hole of two swingles being oppositely arranged overlaps, and the hollow cavity inside nozzle carrier is by entirety It is composed in cross and interconnected permeable hole, the outer end of every swingle offers screw thread along its length Hole, the center line of threaded hole is overlapped with the center line of permeable hole in the swingle and the radius of the threaded hole is more than the half of permeable hole Diameter, the interior sealing steel ball being equipped with for blocking permeable hole of threaded hole, threaded hole internal thread are connected with sealing bolt, sealing bolt Inner end coordinates with sealing steel ball top pressure.
9. construction of the highway according to claim 7 removes vehicle with graticule, it is characterised in that:Negative pressure is provided on vacuum-pumping tube Filter cylinder;High-pressure hydraulic pump and charging pump are sequentially connected respectively by clutch and transfer case, and automatic manipulation machine is provided on clutch Structure;Pressure regulator valve, pressure gauge are provided on high-pressure hydraulic pump.
CN201711404549.7A 2017-12-22 2017-12-22 Construction of the highway removes vehicle with graticule Withdrawn CN108149558A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711404549.7A CN108149558A (en) 2017-12-22 2017-12-22 Construction of the highway removes vehicle with graticule

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711404549.7A CN108149558A (en) 2017-12-22 2017-12-22 Construction of the highway removes vehicle with graticule

Publications (1)

Publication Number Publication Date
CN108149558A true CN108149558A (en) 2018-06-12

Family

ID=62464250

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711404549.7A Withdrawn CN108149558A (en) 2017-12-22 2017-12-22 Construction of the highway removes vehicle with graticule

Country Status (1)

Country Link
CN (1) CN108149558A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109606325A (en) * 2019-01-17 2019-04-12 常州信息职业技术学院 A kind of offroad racing cleaning device and its application method
CN110499733A (en) * 2019-09-06 2019-11-26 海宁市映通汽车用品有限公司 A kind of roadmarking cleaning trailer
CN112095424A (en) * 2020-07-31 2020-12-18 盐城工学院 Municipal administration road zebra crossing clearing device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109606325A (en) * 2019-01-17 2019-04-12 常州信息职业技术学院 A kind of offroad racing cleaning device and its application method
CN110499733A (en) * 2019-09-06 2019-11-26 海宁市映通汽车用品有限公司 A kind of roadmarking cleaning trailer
CN110499733B (en) * 2019-09-06 2021-04-30 泰州左岸信息科技有限公司 Road marking washs trailer
CN112095424A (en) * 2020-07-31 2020-12-18 盐城工学院 Municipal administration road zebra crossing clearing device

Similar Documents

Publication Publication Date Title
CN106836093B (en) Multipurpose road sweeper
CN108149558A (en) Construction of the highway removes vehicle with graticule
CN111710456B (en) Bottom mud withdrawing method and system for radioactive waste liquid storage tank
CN105862639A (en) Pavement construction vacuum sweeper
CN212389373U (en) Dust collecting device for coal mine excavation
CN115069761A (en) Soil remediation system and remediation method
CN108130880A (en) Road construction combined type graticule removes engineering truck
CN107988966A (en) Road sweeper
CN206591476U (en) A kind of high-pressure jet cleaning device and roadway pollution remove car
CN108086228A (en) Equipment is removed for the high pressure water that roadmarking is removed
CN208806075U (en) A kind of broken extraction element of the mud for radioactivity place
EP0318074A1 (en) Device for cleaning runways
CN108149557A (en) For the telescopic moving formula high-pressure jet graticule cleaning machine of road construction
CN203737643U (en) Automatic cleaning device for tamping device
CN106049334B (en) A kind of environmental protection cleaning cart
CN107829356A (en) Pulp water recovery type water under high pressure removes graticule automobile
CN209039936U (en) Heavy construction vehicle and hand push combined road graticule remove equipment
CN108118600A (en) Highway and bridge graticule removing combination motor vehicle
CN207760699U (en) Pulp water recovery type high pressure water removes graticule automobile
CN208088197U (en) Road sweeper
CN108086111A (en) Heavy construction vehicle removes equipment with hand push combined road graticule
CN210459075U (en) Deicing fluid recovery vehicle
CN215962755U (en) Wisdom building site dust removal cleaning device
CN108342964A (en) Flat bed transport vehicle and multiplying drives combined road graticule high pressure water and removes equipment
CN205934815U (en) Environment -protection sweeping vehicle

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20181008

Address after: 226399 the intersection of Donghai Road and Chun Jiang Road, Nantong, Jiangsu Province, Tongzhou District

Applicant after: NANTONG WELL-ROAD SPECIAL VEHICLE CO.,LTD.

Address before: 450000 24 Building 5, Tianming Road, Jinshui District, Zhengzhou, Henan, China, 16

Applicant before: Zhao Hongli

WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20180612