CN108121148A - A kind of image department is developed a film device - Google Patents

A kind of image department is developed a film device Download PDF

Info

Publication number
CN108121148A
CN108121148A CN201711497141.9A CN201711497141A CN108121148A CN 108121148 A CN108121148 A CN 108121148A CN 201711497141 A CN201711497141 A CN 201711497141A CN 108121148 A CN108121148 A CN 108121148A
Authority
CN
China
Prior art keywords
film
developing
room
piece
main body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711497141.9A
Other languages
Chinese (zh)
Other versions
CN108121148B (en
Inventor
付华东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201711497141.9A priority Critical patent/CN108121148B/en
Publication of CN108121148A publication Critical patent/CN108121148A/en
Application granted granted Critical
Publication of CN108121148B publication Critical patent/CN108121148B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G03PHOTOGRAPHY; CINEMATOGRAPHY; ANALOGOUS TECHNIQUES USING WAVES OTHER THAN OPTICAL WAVES; ELECTROGRAPHY; HOLOGRAPHY
    • G03DAPPARATUS FOR PROCESSING EXPOSED PHOTOGRAPHIC MATERIALS; ACCESSORIES THEREFOR
    • G03D3/00Liquid processing apparatus involving immersion; Washing apparatus involving immersion
    • G03D3/08Liquid processing apparatus involving immersion; Washing apparatus involving immersion having progressive mechanical movement of exposed material

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Photographic Processing Devices Using Wet Methods (AREA)
  • Photographic Developing Apparatuses (AREA)

Abstract

It develops a film device the invention discloses a kind of image department, belong to medical instruments field, including developing machine main body and arranged on its internal developing room, fixing room, developing room, drying chamber and storage chamber, the film mobile cavity being additionally provided in developing machine main body above each running room, the load carrier of four running rooms before corresponding to respectively is equipped in film mobile cavity successively, load carrier includes loading plate and drives its hydraulic cylinder, per being equipped with drive roller sets between adjacent two load carrier, hydraulic cylinder difference connection timer and relay in each load carrier;Developing machine body side is connected into piece case, into piece case in slidably connect supporting plate, supporting plate can slide up and down, into piece case one side CD feeding port where height be equipped with baffle, supporting plate and the inner top surface into piece case are respectively equipped with the permanent magnetic iron block and electromagnet being adapted.The present invention can realize for the regulation and control respectively the time required to different steps of developing a film and realize the continuous work for step respective operations mechanism of respectively developing a film, and application value is higher.

Description

A kind of image department is developed a film device
Technical field
The present invention relates to medical instruments field, it is specifically related to a kind of image department and develops a film device.
Background technology
Developing machine refers to the instrument for rinsing the medical films such as X-ray film, CT, MPI.The process of developing a film of developing machine is mainly by showing Four shadow, fixing, flushing and drying steps compositions, blank lacquer first impregnate certain time in the liquid that develops, then in fixer Certain time is impregnated in liquid, is then rinsed with clear water, is finally dried to get to film finished product.Traditional image department is developed a film Machine can not send piece, it is necessary to send piece manually automatically, easily disposably be sent into multiple films, cause card, film waste, and device is forced to stop It only runs, influences efficiency of developing a film.During traditional X-ray film developing machine running, film process of entirely developing a film (is normally defined Dry-in dry-out process) generally more than 90 seconds, the speed developed a film is too slow.
A kind of image department is disclosed in the patent for being 204086805 U of CN in Granted publication to develop a film device, includes developing Slot, fixing bath, rinse bath, drying baker, can and running part, the running part connect circular support plate.In use, It holds blank lacquer in support plate, successively by each groove body, stays for some time in each groove body, operated accordingly; Multiple films are clamped on the supporting plate, multiple films can be carried out at the same time different steps of developing a film, but it can only be based on step of respectively developing a film It could smoothly be carried out under conditions of rapid required time consistency, and in fact, in most cases, respectively developing a film needed for step Time is different.It follows that the device carries out the purpose of time-controllable to realization respectively for different steps of developing a film, It can only then treat that a film could carry out the operation of developing a film of next after developing a film, develop a film less efficient;It is continuous to realize Develop a film, cannot but regulate and control different step required different times in fact of developing a film, so obtained film final product quality very likely without Method reaches requirement.
The content of the invention
1. technical problems to be solved
The technical problem to be solved in the present invention is to provide a kind of image department and develops a film device, can realize and be washed for difference Regulation and control respectively the time required to piece step, and can realize the continuous work for step respective operations mechanism of respectively developing a film, it ensure that device Working effect, improve the work efficiency of device, application value is higher.
2. technical solution
To solve the above problems, the present invention adopts the following technical scheme that:
A kind of image department is developed a film device, including developing machine main body and in vivo continuous successively arranged on developing machine master and set side by side The developing room put, fixing room, developing room, drying chamber and storage chamber are additionally provided in the developing machine main body positioned at developing room, fixing Film mobile cavity above room, developing room, drying chamber and storage chamber, developing machine body side where the developing room are connected into piece Case,
It is described into horizontally disposed supporting plate is equipped in piece case, the supporting plate both sides are connected with sliding block by connecting rod, institute The inner wall stated into piece case corresponding side is equipped with the strip sliding slot slided up and down for sliding block, described to connect developing machine main body into piece case Side wall be equipped with square CD feeding port, on the CD feeding port along while and it is lower along while on be respectively equipped with and turn to opposite upper propulsion Roller and lower propulsion roller, it is described it is upper promote roller and it is lower promote roller between gap can just be passed through for a blank lacquer, it is described on Height where promoting roller is fixed on into the baffle on piece chamber interior wall into being equipped in piece case, and the baffle lower surface is uniformly provided with more A idler wheel, the bottom surface of the supporting plate are fixedly arranged in the middle of permanent magnetic iron block, and the inner top surface middle part into piece case is equipped with and permanent magnetic iron block Magnetic opposite electromagnet, it is described to be equipped with film releasing switching door into piece case front;
The side plate connected in the developing machine main body of the developing room side into piece case be equipped with corresponding CD feeding port and with CD feeding port adaptation enters piece mouth, it is described enter piece mouth connection film mobile cavity, the developing room, fixing room, developing room, drying chamber and The upper port of storage chamber connects film mobile cavity, is respectively provided with developer solution in the developing room, fixing room and developing room, is fixed Liquid and cleaning solution, the drying chamber is interior to be equipped with drier, is equipped with successively in the film mobile cavity and corresponds to developing room respectively, is fixed The consistent load carrier of four structures of room, developing room and drying chamber, the load carrier include loading plate, and the loading plate hangs down The piston rod free end by Driven by Hydraulic Cylinder directly is each attached in the both ends of film moving direction, the loading plate is backwards into piece case One end be equipped with infrared detector;Under original state, the loading plate of the corresponding load carrier of the developing room is located at into piece mouth one The lower section of side, the loading plate of each load carrier keep concordant, the position of loading plate are corresponded between every adjacent two load carrier Be equipped with the drive roller sets being fixedly mounted in developing machine main body inner wall, the structure of the drive roller sets and upper propulsion roller and under push away Combining structure into roller is consistent;The corresponding load carrier of the drying chamber also is provided with a set of driven roller close to the one side of storage chamber Group, the position that storage chamber is corresponded on the developing machine main body front are equipped with and take piece switching door;
The developing machine body side is additionally provided with control cabinet, and control processor and and control process are equipped in the control cabinet 4 timers and 5 relays of device connection, wherein 4 relays and 4 timers are respectively coupled development Room, fixing room, developing room and drying chamber correspond to the starting switch of the hydraulic cylinder in load carrier, also have 1 relay connection electricity The power-on switch of magnet, it is described it is upper promote roller, it is lower promote roller, each drive roller sets and drier driving part with the control Processor connects;The control cabinet surface is equipped with control panel, be equipped in the control panel power-on button, start button, Power supply indicator and work light.
As the improvement to said program, the splint upper surface is by corresponding to the laterally opposed one side in CD feeding port place gradually Height, the baffle lower surface are parallel with splint upper surface.So set, when blank lacquer is raised, top layer's blank lacquer In inclined state, and it is located just at close to one end of CD feeding port at CD feeding port port, may advantageously facilitate the blank lacquer Enter CD feeding port under the action of upper propulsion roller and lower propulsion roller.
As the improvement to said program, the power-on switch of the electromagnet is also connected with counter, the counter and control Processor connection processed, the control panel are equipped with the display screen being connected with control processor.Electromagnet often leads to once electricity and (starts As soon as once just push a blank lacquer), counter counts a number, and is shown in real time by display screen, people easy to operation Member understands the quantity developed a film in real time, grasps process of developing a film.
Further, the film releasing switching door is equipped with transparent observation window.Whether personal observations easy to operation are all Blank lacquer is all developed a film and is finished, in order to carry out the operation of developing a film of second batch blank lacquer in time.
Specifically, the infrared detector include be individually fixed in loading plate backwards into piece case one end infrared transmitter and Positioned at infrared remote receiver directly over infrared transmitter, the infrared remote receiver is fixed in developing machine main body inner wall.Infrared receiver Device receives the infrared ray that sends of infrared transmitter, when film falls to loading plate completely, film can block infrared transmitter and Infrared transmission between infrared remote receiver, at this point, infrared remote receiver does not receive infrared signal, you can triggering enabling signal is given Control processor, control corresponding hydraulic cylinder opens operation.It is reasonable in design easy.
Further, the sidewall upper of connection drying chamber is fixed with the slide plate tilted down in the storage chamber.Convenient for for Film finished product is oriented to, and then is conducive to facilitate the orderly stacking of film finished product, convenient for taking for film finished product;It can also reduce to glue Piece finished product scratches.
Further, on the film releasing switching door and take and be equipped with handle on piece switching door.On film releasing switching door and to take The opening and closing of piece switching door provide facility.
3. advantageous effect
(1) present invention is equipped in developing machine main body on developing room, fixing room, developing room, drying chamber and storage chamber The film mobile cavity of side is equipped with four for correspond to developing room respectively, being fixed room, developing room and drying chamber in film mobile cavity successively The consistent load carrier of structure, load carrier include loading plate and drive loading plate hydraulic cylinder, to carry film enter or Exit corresponding operating room;Per be equipped with drive roller sets between adjacent two load carrier, it can be achieved that film every adjacent two step it Between transition;4 relays and 4 timers in control cabinet are respectively coupled developing room, fixing room, developing room And drying chamber corresponds to the starting switch of the hydraulic cylinder in load carrier so that the time span of each step of developing a film can be adjusted respectively Control can better meet the demand for step of respectively developing a film, and to reach optimal treatment effect, advantageously ensure that the work effect of developing machine Fruit.
(2) present invention is additionally provided with into piece case, into piece case in be equipped with and be used for holding the supporting plate of film, supporting plate can slide up and down, CD feeding port into piece case one side, which is equipped with, promotes roller group (above promoting roller and lower propulsion roller), promotes the gap between roller group can just Passed through for a blank lacquer, height where CD feeding port into baffle is equipped in piece case, the bottom surface of supporting plate is fixedly arranged in the middle of permanent magnetism Iron block, into the inner top surface of piece case in the middle part of be equipped with and the magnetic opposite electromagnet of permanent magnetic iron block.In application, electromagnet is powered, and open The dynamic driving part for promoting roller group, permanent magnetic iron block are subject to the magnetic attraction of electromagnet, supporting plate are promoted to move up, until top layer's blank Film contact baffle, because upper promote roller and the lower spacing limitation for promoting roller, under the action of upper propulsion roller and lower propulsion roller, only There is top layer one to open blank lacquer and enter CD feeding port;After a film is walked in push, electromagnet is powered and promotes the driving of roller group Component is shut off, after being again started up, can by the push of next film into CD feeding port, and so on, can realize between film Formula of having a rest is transmitted in succession.Based on this, as shown in the above, step of respectively developing a film independent control has then carried out one in a film After step, the step for next film can proceed by, i.e., the corresponding operating mechanism continuous work of step of respectively developing a film, no Terminate the operation of developing a film for just proceeding by next film that rises with a film is waited to develop a film completely, associated mechanisms are greatly reduced Stand-by period, it can be achieved that continuously developing a film for multiple films, improves the work efficiency of device.
To sum up, the present invention can be realized respectively develops a film for the regulation and control respectively the time required to different steps of developing a film and realization The continuous work of step respective operations mechanism, ensure that the working effect of device, improve the work efficiency of device, application value It is higher.
Description of the drawings
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is the structure enlargement diagram of a-quadrant in Fig. 1;
Fig. 3 is the structure enlargement diagram of B area in Fig. 1;
Fig. 4 30 internal structure schematic diagrams of case in order to control.
Reference numeral:1- developing rooms, 2- are fixed room, 3- developing rooms, 4- drying chambers, 5- storage chambers, 6- film mobile cavities, 7- Supporting plate, 8- connecting rods, 9- sliding blocks, 10- developing machine main bodys, 11- sliding slots, 12- CD feeding ports promote roller on 13-, roller are promoted under 14-, 15- baffles, 16- idler wheels, 17- permanent magnetic iron blocks, 18- electromagnet, 19- film releasing switching doors, for 20- into piece case, 21- enters piece mouth, and 22- is done Dry device, 23- loading plates, 24- hydraulic cylinders, 25- infrared detectors, 26- drive roller sets, 27- take piece switching door, 28- control process Device, 29- timers, 30- control cabinets, 31- relays, 32- control panels, 33- power-on buttons, 34- start buttons, 35- power supplys Indicator light, 36- work lights, 37- counters, 38- display screens, 39- observation windows, 41- infrared transmitters, 42- infrared receivers Device, 43- slide plates, 44- handles.
Specific embodiment
The present invention is described in further detail with reference to the accompanying drawings and examples.
Embodiment
A kind of image department as shown in Figure 1, Figure 2 and Figure 3 is developed a film device, including developing machine main body 10 and arranged on the owner that develops a film Continuous successively in body 10 and developing room 1, fixing room 2, developing room 3, drying chamber 4 and the storage chamber 5 being arranged side by side, it is described to develop a film The film mobile cavity being additionally provided in owner's body 10 above developing room 1, fixing room 2, developing room 3, drying chamber 4 and storage chamber 5 6,1 place developing machine main body of developing room, 10 one side is connected into piece case 20,
Described to be equipped with horizontally disposed supporting plate 7 into piece case 20 is interior, 7 both sides of supporting plate are connected with cunning by connecting rod 8 Block 9, the inner wall into 20 corresponding side of piece case is equipped with the strip sliding slot 11 slided up and down for sliding block 9, described into piece case 20 The side wall for connecting developing machine main body 10 is equipped with square CD feeding port 12, on the CD feeding port 12 along while and it is lower along while on respectively Equipped with opposite upper propulsion roller 13 and lower propulsion roller 14 is turned to, the upper gap promoted between roller 13 and lower propulsion roller 14 is just It can be passed through for a blank lacquer, the upper propulsion 13 place height of roller is fixed on into interior be equipped with of piece case 20 into 20 inner wall of piece case On baffle 15,15 lower surface of baffle is uniformly provided with multiple idler wheels 16, and the bottom surface of the supporting plate 7 is fixedly arranged in the middle of permanent magnet Block 17, the inner top surface middle part into piece case 20 is equipped with the electromagnet 18 opposite with 17 magnetism of permanent magnetic iron block, described into piece case 20 Front is equipped with film releasing switching door 19;
The side plate connected in the developing machine main body 10 of 1 side of developing room into piece case 20 is equipped with corresponding CD feeding port 12 and what is be adapted to CD feeding port 12 enter piece mouth 21, it is described enter piece mouth 21 connect film mobile cavity 6, the developing room 1, fixing room 2, The upper port of developing room 3, drying chamber 4 and storage chamber 5 connects film mobile cavity 6, the developing room 1, fixing room 2 and developing room It is respectively provided with developer solution, fixing solution and cleaning solution in 3, is equipped with drier 22 in the drying chamber 4, in the film mobile cavity 6 It is equipped with successively and corresponds to the consistent load carrier of developing room 1, four structures of fixing room 2, developing room 3 and drying chamber 4 respectively, it is described Load carrier includes loading plate 23, and the loading plate 23 is each attached to perpendicular to the both ends of film moving direction to be driven by hydraulic cylinder 24 Dynamic piston rod free end, the loading plate 23 are equipped with infrared detector 25 backwards into one end of piece case 20;Under original state, institute The loading plate 23 for stating 1 corresponding load carrier of developing room is located at the lower section into 21 one side of piece mouth, the carrying of each load carrier Plate 23 keeps concordant, is equipped with per the position that loading plate 23 is corresponded between adjacent two load carrier and is fixedly mounted on developing machine main body Drive roller sets 26 on 10 inner walls, the structure of the drive roller sets 26 and upper propulsion roller 13 and the lower combining structure one for promoting roller 14 It causes;The 4 corresponding load carrier of drying chamber also is provided with a set of drive roller sets 26, the developing machine close to the one side of storage chamber 5 Corresponded on 10 front of main body storage chamber 5 position be equipped with take piece switching door 27;
10 one side of developing machine main body is additionally provided with control cabinet 30, as shown in figure 4, being equipped in the control cabinet 30 at control Device 28 and 4 timers 29 being connected with control processor 28 are managed (including timer a, timer b, timer c and timer d) And 5 31 (including relay a, relay b, relay c, relay d and relay e), wherein 4 relays 31 (after Electric appliance a, relay b, relay c and relay d) and 4 timers 29 are respectively coupled developing room 1, fixing room 2, punching Chamber wash 3 and drying chamber 4 correspond to the starting switch of the hydraulic cylinder 24 in load carrier, also have 1 (relay e) connection of relay 31 The power-on switch of electromagnet 18, the upper driving part for promoting roller 13, lower propulsion roller 14, each drive roller sets 26 and drier 22 It is connected with the control processor 28;30 surface of control cabinet is equipped with control panel 32, is set in the control panel 32 There are power-on button 33, start button 34, power supply indicator 35 and work light 36.
In the present embodiment, 7 upper surface of supporting plate is gradually high by corresponding to the laterally opposed one side in 12 place of CD feeding port, described 15 lower surface of baffle is parallel with 7 upper surface of supporting plate.So set, when blank lacquer is raised, top layer's blank lacquer is in Inclined state, and it is located just at close to one end of CD feeding port 12 at 12 port of CD feeding port, may advantageously facilitate the blank lacquer Enter CD feeding port 12 under the action of upper propulsion roller 13 and lower propulsion roller 14.
In the present embodiment, the power-on switch of the electromagnet 18 is also connected with counter 37, the counter 37 and control Processor 28 connects, and the control panel 32 is equipped with the display screen 38 being connected with control processor 28.Electromagnet 18 often leads to one Secondary electricity (once just pushing a blank lacquer as soon as starting), counter 37 counts a number, and is shown in real time by display screen 38 Come, personnel easy to operation understand the quantity developed a film in real time, grasp process of developing a film.
In the present embodiment, the film releasing switching door 19 is equipped with transparent observation window 39.Personal observations easy to operation are No all blank lacquers, which are all developed a film, to be finished, in order to carry out the operation of developing a film of second batch blank lacquer in time.
In the present embodiment, the infrared detector 25 includes being individually fixed in loading plate 23 backwards into 20 one end of piece case Infrared transmitter 41 and positioned at 41 surface infrared remote receiver 42 of infrared transmitter, the infrared remote receiver 42 is fixed on developing machine On 10 inner wall of main body.Infrared remote receiver 42 receives the infrared ray that infrared transmitter 41 is sent, when film falls to loading plate completely When 23, film can block the infrared transmission between infrared transmitter 41 and infrared remote receiver 42, at this point, infrared remote receiver 42 connects It can not receive infrared signal, you can for triggering enabling signal to control processor 28, control corresponding hydraulic cylinder 24 opens operation.Structure is set Meter is rationally easy.
In the present embodiment, the sidewall upper of connection drying chamber 4 is fixed with the slide plate tilted down in the storage chamber 5 43.Convenient for being oriented to for film finished product, and then be conducive to facilitate the orderly stacking of film finished product, convenient for taking for film finished product;Also It can reduce and film finished product is scratched.
In the present embodiment, on the film releasing switching door 19 and take handle 44 is equipped on piece switching door 27.It is opened for film releasing Close on door 19 and take the opening and closing of piece switching door 27 to provide facility.
The develop a film application process of device of above-mentioned image department is:
(1) feed:It presses after power-on button 33 powers on, power supply indicator 35 is bright, opens film releasing switching door 19, will be more Blank lacquer heap to be developed a film, which stackeds, to be placed on supporting plate 7, shuts film releasing switching door 19;Press start button 34, work instruction Lamp 36 is bright, and relay e is powered to electromagnet 18, and roller 13 and the lower driving part for promoting roller 14, permanent magnetic iron block are promoted in startup 17 are subject to the magnetic attraction of electromagnet 18, supporting plate 7 are promoted to move up (sliding block 9 is moved up along sliding slot 11), until top layer's blank 16 bottom of film contact idler wheel, because upper promote roller 13 and the lower spacing limitation for promoting roller 14, in upper propulsion roller 13 and lower propulsion Under the action of roller 14, only top layer one opens blank lacquer and enters CD feeding port 12, and the rolling of the idler wheel 16 of 15 lower surface of baffle has Beneficial to the push of the promotion film, and advantageously reduce and film is scratched;
(2) develop:Film initially enters 1 corresponding load carrier of developing room from piece mouth 21 is entered into film mobile cavity 6 In, (at this point, closing relay e and upper promoting roller 13 and lower promote roller 14 when film is entirely fallen on respective carrier plate 23 Driving part), infrared detector 25 is triggered, and control processor 28 starts timer a and relay a, corresponding hydraulic cylinder 24 open Dynamic positive running, which is transferred in developing room 1, and film is submerged in developer solution (at this point, closing relay a, phase Hydraulic cylinder 24 is answered to close), at the end of timer a timing, relay a is connected, hydraulic cylinder 24 starts reversed running, by loading plate 23 above propose reset;Then, the drive roller sets 26 between developing room 1 and fixing room 2 are started, it is corresponding to push film to fixing room 2 Load carrier completes the development operation of the film;
(3) it is fixed:When film is entirely fallen on respective carrier plate 23, infrared detector 25 is triggered, control processor 28 startup timer b and relay b, corresponding hydraulic cylinder 24 start positive running, which is transferred in fixing room 2, Film is immersed in fixing solution (at this point, closing relay b, corresponding hydraulic cylinder 24 is closed), at the end of timer b timing, even Logical relay b, hydraulic cylinder 24 start reversed running, loading plate 23 are above carried reset;Then, start fixing room 2 and developing room 3 it Between drive roller sets 26, push film to developing room 3 corresponding load carrier, that is, complete the fixing operation of the film;
(4) rinse:When film is entirely fallen on respective carrier plate 23, infrared detector 25 is triggered, control processor 28 startup timer c and relay c, corresponding hydraulic cylinder 24 start positive running, which is transferred in developing room 3, Film is immersed in close cleaning solution (at this point, closing relay c, corresponding hydraulic cylinder 24 is closed), at the end of timer c timing, Relay c is connected, hydraulic cylinder 24 starts reversed running, loading plate 23 is above carried reset;Then, developing room 3 and drying chamber 4 are started Between drive roller sets 26, push film to drying chamber 4 corresponding load carrier, that is, complete the flushing operation of the film;
(5) dry:When film is entirely fallen on respective carrier plate 23, infrared detector 25 is triggered, control processor 28 startup timer d and relay d, corresponding hydraulic cylinder 24 start positive running, which is transferred in drying chamber 4, Meanwhile starting the driving part of drier 22, drier 22 dries film (at this point, closing relay d, corresponding hydraulic pressure Cylinder 24 is closed), at the end of timer d timing, relay d is connected, hydraulic cylinder 24 starts reversed running, loading plate 23 is above carried It resets;Then, start the drive roller sets 26 between drying chamber 4 and storage chamber 5, push film to storage chamber 5, that is, complete the film Drying operation;
(6) store:Under the promotion of drive roller sets 26 between drying chamber 4 and storage chamber 5, film is fallen into storage chamber 5, Obtain film finished product;It is opened when taking and takes piece switching door 27.
The above process is the overall process that a film is developed a film, in application, after first film has carried out step 2 Can be again turned on closing relay e and it is upper promote roller 13 and the lower driving part for promoting roller 14, that is, carry out second film Send piece and development operation;The fixing operation of second film can be proceeded by after first film has carried out step 3;When First film has carried out step 4 can proceed by the flushing operation of second film afterwards;When first film has carried out The drying operation of second film can be proceeded by after step 5, and so on, you can realize that the continuous of film is developed a film, respectively The stand-by period of associated mechanisms is greatly reduced in the corresponding operating mechanism continuous work of step of developing a film.
It can be seen from the above, the present invention can realize the regulation and control respectively and realization the time required to step of developing a film for difference The continuous work of step of respectively developing a film respective operations mechanism, ensure that the working effect of device, improve the work efficiency of device, should It is higher with being worth.
Those of ordinary skill in the art it should be appreciated that more than embodiment be intended merely to illustrate the present invention, And be not used as limitation of the invention, as long as in the spirit of the present invention, the change to embodiment described above Change, modification will all fall in scope of the presently claimed invention.

Claims (7)

  1. The device 1. a kind of image department is developed a film, which is characterized in that including developing machine main body (10) and in developing machine main body (10) Continuous successively and the developing room (1), fixing room (2), developing room (3), drying chamber (4) and the storage chamber (5) that are arranged side by side, it is described It is additionally provided in developing machine main body (10) positioned at developing room (1), fixing room (2), developing room (3), drying chamber (4) and storage chamber (5) The film mobile cavity (6) of top, developing machine main body (10) one side where the developing room (1) are connected into piece case (20),
    Described to be equipped with horizontally disposed supporting plate (7) into piece case (20) is interior, supporting plate (7) both sides pass through connecting rod (8) and connect There is sliding block (9), the inner wall into piece case (20) corresponding side is equipped with the strip sliding slot (11) slided up and down for sliding block (9), The side wall into piece case (20) connection developing machine main body (10) is equipped with square CD feeding port (12), the CD feeding port (12) On along while and it is lower along while on be respectively equipped with and turn to opposite upper propulsion roller (13) and lower propulsion roller (14), it is described upper to promote roller (13) Gap between lower propulsion roller (14) can just be passed through for a blank lacquer, it is described it is upper promote roller (13) where height into It is equipped with and is fixed on into the baffle (15) on piece case (20) inner wall in piece case (20), baffle (15) lower surface is uniformly provided with multiple Idler wheel (16), the bottom surface of the supporting plate (7) are fixedly arranged in the middle of permanent magnetic iron block (17), and the inner top surface middle part into piece case (20) is set There is the electromagnet (18) opposite with permanent magnetic iron block (17) magnetism, it is described to be equipped with film releasing switching door (19) into piece case (20) front;
    The side plate connected in the developing machine main body (10) of developing room (1) side into piece case (20) is equipped with corresponding into piece Mouthful (12) and what is be adapted to CD feeding port (12) enter piece mouth (21), it is described enter piece mouth (21) connect film mobile cavity (6), the development Room (1), fixing room (2), developing room (3), the upper port of drying chamber (4) and storage chamber (5) connect film mobile cavity (6), institute It states developing room (1), be respectively provided with developer solution, fixing solution and cleaning solution, the drying chamber (4) in fixing room (2) and developing room (3) It is interior to be equipped with drier (22), it is equipped with successively in the film mobile cavity (6) and corresponds to developing room (1), fixing room (2), flushing respectively The consistent load carrier of four structures of room (3) and drying chamber (4), the load carrier include loading plate (23), the carrying Plate (23) is each attached to the piston rod free end driven by hydraulic cylinder (24), the carrying perpendicular to the both ends of film moving direction Plate (23) is equipped with infrared detector (25) backwards into one end of piece case (20);Under original state, the developing room (1) is corresponding to hold The loading plate (23) of mounted mechanism is located at the lower section into piece mouth (21) one side, and the loading plate (23) of each load carrier keeps flat Together, it is equipped with per the position that loading plate (23) is corresponded between adjacent two load carrier and is fixedly mounted on developing machine main body (10) inner wall On drive roller sets (26), the structure of the drive roller sets (26) with it is upper propulsion roller (13) and it is lower propulsion roller (14) combining structure Unanimously;The corresponding load carrier of the drying chamber (4) also is provided with a set of drive roller sets (26), institute close to the one side of storage chamber (5) State corresponded on developing machine main body (10) front storage chamber (5) position be equipped with take piece switching door (27);
    Developing machine main body (10) one side is additionally provided with control cabinet (30), and control processor (28) is equipped in the control cabinet (30) And 4 timers (29) being connected with control processor (28) and 5 relays (31), wherein 4 relays (31) and 4 A timer (29) is respectively coupled developing room (1), fixing room (2), developing room (3) and the corresponding carrying machine of drying chamber (4) The starting switch of hydraulic cylinder (24) in structure also has the power-on switch of 1 relay (31) connection electromagnet (18), described above to push away Into roller (13), it is lower promote roller (14), each drive roller sets (26) and drier (22) driving part with the control processor (28) connect;Control cabinet (30) surface is equipped with control panel (32), and power-on button is equipped in the control panel (32) (33), start button (34), power supply indicator (35) and work light (36).
  2. The device 2. a kind of image department according to claim 1 is developed a film, which is characterized in that supporting plate (7) upper surface is by right The one side for answering CD feeding port (12) place laterally opposed is gradually high, and baffle (15) lower surface is parallel with supporting plate (7) upper surface.
  3. The device 3. a kind of image department according to claim 1 is developed a film, which is characterized in that the energization of the electromagnet (18) is opened Pass is also connected with counter (37), and the counter (37) is connected with control processor (28), and the control panel (32) is equipped with The display screen (38) being connected with control processor (28).
  4. The device 4. a kind of image department according to claim 1 is developed a film, which is characterized in that set on the film releasing switching door (19) There is transparent observation window (39).
  5. The device 5. a kind of image department according to claim 1 is developed a film, which is characterized in that the infrared detector (25) includes Be individually fixed in loading plate (23) backwards into the infrared transmitter (41) of piece case (20) one end and positioned at infrared transmitter (41) just Top infrared remote receiver (42), the infrared remote receiver (42) are fixed on developing machine main body (10) inner wall.
  6. The device 6. a kind of image department according to claim 1 is developed a film, which is characterized in that connection is dried in the storage chamber (5) The sidewall upper of dry chamber (4) is fixed with the slide plate (43) tilted down.
  7. It 7. is developed a film device according to a kind of image department of claim 1~6 any one of them, which is characterized in that the film releasing folding On door (19) and take handle (44) is equipped on piece switching door (27).
CN201711497141.9A 2017-12-31 2017-12-31 Image department film developing device Expired - Fee Related CN108121148B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711497141.9A CN108121148B (en) 2017-12-31 2017-12-31 Image department film developing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711497141.9A CN108121148B (en) 2017-12-31 2017-12-31 Image department film developing device

Publications (2)

Publication Number Publication Date
CN108121148A true CN108121148A (en) 2018-06-05
CN108121148B CN108121148B (en) 2020-09-29

Family

ID=62233787

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711497141.9A Expired - Fee Related CN108121148B (en) 2017-12-31 2017-12-31 Image department film developing device

Country Status (1)

Country Link
CN (1) CN108121148B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20010048819A1 (en) * 2000-02-03 2001-12-06 Systel International S.P.A. Processing of photographs in a photographic laboratory by operators
CN206224134U (en) * 2016-12-05 2017-06-06 南通大学附属医院 A kind of image department automatic film developer
CN107193181A (en) * 2017-06-19 2017-09-22 房立洲 Image department developing machine
CN107479321A (en) * 2017-09-30 2017-12-15 练陈敏 A kind of image department is developed a film device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20010048819A1 (en) * 2000-02-03 2001-12-06 Systel International S.P.A. Processing of photographs in a photographic laboratory by operators
CN206224134U (en) * 2016-12-05 2017-06-06 南通大学附属医院 A kind of image department automatic film developer
CN107193181A (en) * 2017-06-19 2017-09-22 房立洲 Image department developing machine
CN107479321A (en) * 2017-09-30 2017-12-15 练陈敏 A kind of image department is developed a film device

Also Published As

Publication number Publication date
CN108121148B (en) 2020-09-29

Similar Documents

Publication Publication Date Title
CN108121148A (en) A kind of image department is developed a film device
CN110303010A (en) A kind of automatic flushing device and operating method of medicine needle
CN113509001A (en) Vertical house high-capacity shoe cabinet
CN106732917B (en) A kind of discarded wallboard high-volume high-efficient treatment device
CN210747991U (en) Opening mechanism and old article transaction device thereof
CN208007804U (en) A kind of office decoration engineering rubbish retracting device easy to use
CN204086805U (en) A kind of image department is developed a film device
CN209574500U (en) A kind of intelligent bathroom cabinet
CN112760954B (en) Clothes drying system based on smart home and use method thereof
CN213642426U (en) Severe medical science branch of academic or vocational study is with quick drainage device
JP7429769B2 (en) Clothing processing machine and its control method
CN204217649U (en) For the manipulator that animal automatic bathing is dried
CN209366199U (en) A kind of ferrous waste turnover device
CN211272545U (en) Intelligent cleaning tool
CN210842791U (en) A wash platform limit angle mirror cabinet for bathroom
CN217695163U (en) Microwave sterilizer for food processing
CN214694664U (en) Textile fabric desizing device
CN208146602U (en) A kind of medical test tubes cleaning device
CN216135430U (en) Vertical house high-capacity shoe cabinet
CN220878963U (en) Multifunctional experiment table
CN211747911U (en) Thing networking wardrobe with disinfection function
CN215423499U (en) Intelligent clothes washing cabinet
CN217117192U (en) Animal doctor is with piglet insulation can with push-out function
CN218858952U (en) Essence liquid level membrane storage device
CN217470534U (en) PLC control cabinet for sewage treatment system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200929

Termination date: 20211231

CF01 Termination of patent right due to non-payment of annual fee