CN108120534A - 大型滑道模块受力状态监测方法 - Google Patents
大型滑道模块受力状态监测方法 Download PDFInfo
- Publication number
- CN108120534A CN108120534A CN201711080322.1A CN201711080322A CN108120534A CN 108120534 A CN108120534 A CN 108120534A CN 201711080322 A CN201711080322 A CN 201711080322A CN 108120534 A CN108120534 A CN 108120534A
- Authority
- CN
- China
- Prior art keywords
- module
- slideway
- scale
- transportational process
- stress
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01L—MEASURING FORCE, STRESS, TORQUE, WORK, MECHANICAL POWER, MECHANICAL EFFICIENCY, OR FLUID PRESSURE
- G01L5/00—Apparatus for, or methods of, measuring force, work, mechanical power, or torque, specially adapted for specific purposes
- G01L5/0061—Force sensors associated with industrial machines or actuators
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01M—TESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
- G01M13/00—Testing of machine parts
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Chemical & Material Sciences (AREA)
- Analytical Chemistry (AREA)
- Force Measurement Appropriate To Specific Purposes (AREA)
Abstract
本发明公开了大型滑道模块受力状态监测方法,包括以下步骤:步骤一、对运输过程中模块通过大型滑道各个受力监测点的时间数据进行采集,并将这些信息通过时间数据信息采集平台存入本地access数据库;步骤二、根据模块通过大型滑道受力监测段的时间信息以及受力监测段的长度计算出模块通过相应受力监测段时的平均速度;步骤三、由模块通过大型滑道相应受力状态监测段时的平均速度拟合出模块在大型滑道运输过程中的速度曲线,计算出模块在大型滑道运输过程中的加速度曲线以及模块在大型滑道运输过程中的受力状态曲线,并判断模块在大型滑道运输过程中受力状态是否正常。采用本发明方法提高了运输过程的安全性。
Description
技术领域
本发明涉及监测方法,尤其大型滑道模块受力状态监测方法。
背景技术
工业发展使得机械装备不断朝着大型化、机械化和自动化的方向发展,大型滑道运输是装备模块运输过程中经常使用的方法,具有搭设灵活,通用性强,经济适应等优点。随着滑道运输技术的不断发展,人们对滑道运输过程中的安全性要求越来越高,大型模块的受力状态尤其重要,在大型滑道运输过程中如何监测运输模块的受力状态是亟待解决的问题,具有十分重要的工业意义。
发明内容
本发明的目的在于克服已有技术的不足,提供一种实时反映大型滑道运输过程中模块受力状态的监测方法。
为了达到上述目的,本发明采用的技术方案是:
大型滑道模块受力状态监测方法,包括以下步骤:
步骤一、对运输过程中模块通过大型滑道各个受力监测点的时间数据进行采集,并将这些信息通过时间数据信息采集平台存入本地access数据库;
步骤二、根据模块通过大型滑道受力监测段的时间信息以及受力监测段的长度计算出模块通过相应受力监测段时的平均速度;
步骤三、由模块通过大型滑道相应受力状态监测段时的平均速度拟合出模块在大型滑道运输过程中的速度曲线,计算出模块在大型滑道运输过程中的加速度曲线以及模块在大型滑道运输过程中的受力状态曲线,并判断模块在大型滑道运输过程中受力状态是否正常。
与现有技术相比,本发明具有以下有益效果:
本发明通过使用时间数据信息采集以及Visual Basic语言完成对大型滑道模块受力状态的监测,取代原有的无模块受力状态监测的方式。原有大型滑道模块运输方式安全系数较低,运输大型模块往往不能达到模块受力状态的监测。而采用本方法实现了大型滑道运输过程中模块受力状态的监测,提高了运输过程的安全性。
附图说明
图1是本发明的大型滑道模块受力状态监测方法的流程图。
具体实施方式
下面结合具体实施例对本发明进行详细描述。
如图1所示的本发明的大型滑道模块受力状态监测方法,包括以下步骤:步骤一、对运输过程中模块通过大型滑道各个受力监测点的时间数据进行采集,并将这些信息通过时间数据信息采集平台存入本地access数据库;作为本发明的一种实施方式,对模块通过大型滑道的时间数据进行采集的过程为:(1)根据滑道整体长度以及工程精度要求在大型滑道上等间距安装若干光电传感器,然后将光电传感器终端与计算机相连;(2)采用光电传感器记录滑块通过相应受力监测段所需的时间,然后将时间信号输出给计算机并进行存储。
所述的时间数据信息采集平台可以采用Visual Basic建立,时间数据信息采集平台用于将光电传感器信息通过计算机存储到本地access数据库。当然时间数据信息采集平台也可以采用C语言等其他语言建立。
步骤二、根据模块通过大型滑道受力监测段的时间信息以及受力监测段的长度计算出模块通过相应受力监测段时的平均速度;
步骤三、由模块通过大型滑道相应受力状态监测段时的平均速度拟合出模块在大型滑道运输过程中的速度曲线,计算出模块在大型滑道运输过程中的加速度曲线以及模块在大型滑道运输过程中的受力状态曲线,并判断模块在大型滑道运输过程中受力状态是否正常。
作为本发明的一种实施方式,判断模块在大型滑道运输过程中受力状态是否正常的过程如下:(a)根据模块在大型滑道运输过程中的受力状态曲线,再结合模块质量以及模块与滑道之间的摩擦系数等已知信息,计算出模块在大型滑道运输过程中所受的牵引力状态曲线;(b)根据工程精度要求及设备载荷要求设定理论上模块在牵引过程中允许所受牵引力的最大值;(c)将模块在大型滑道运输过程中所受的牵引力状态曲线的最大值与理论设定中的最大值进行比较,如果实际牵引力最大值大于理论设定中的最大值,则发出警报。
Claims (3)
1.大型滑道模块受力状态监测方法,其特征在于包括以下步骤:
步骤一、对运输过程中模块通过大型滑道各个受力监测点的时间数据进行采集,并将这些信息通过时间数据信息采集平台存入本地access数据库;
步骤二、根据模块通过大型滑道受力监测段的时间信息以及受力监测段的长度计算出模块通过相应受力监测段时的平均速度;
步骤三、由模块通过大型滑道相应受力状态监测段时的平均速度拟合出模块在大型滑道运输过程中的速度曲线,计算出模块在大型滑道运输过程中的加速度曲线以及模块在大型滑道运输过程中的受力状态曲线,并判断模块在大型滑道运输过程中受力状态是否正常。
2.根据权利要求1所述的大型滑道模块受力状态监测方法,其特征在于:对模块通过大型滑道的时间数据进行采集的过程为:(1)根据滑道整体长度以及工程精度要求在大型滑道上等间距安装若干光电传感器,然后将光电传感器终端与计算机相连;(2)采用光电传感器记录滑块通过相应受力监测段所需的时间,然后将时间信号输出给计算机并进行存储。
3.根据权利要求1或者2所述的大型滑道模块受力状态监测方法,其特征在于:判断模块在大型滑道运输过程中受力状态是否正常的过程如下:(a)根据模块在大型滑道运输过程中的受力状态曲线,再结合模块质量以及模块与滑道之间的摩擦系数等已知信息,计算出模块在大型滑道运输过程中所受的牵引力状态曲线;(b)根据工程精度要求及设备载荷要求设定理论上模块在牵引过程中允许所受牵引力的最大值;(c)将模块在大型滑道运输过程中所受的牵引力状态曲线的最大值与理论设定中的最大值进行比较,如果实际牵引力最大值大于理论设定中的最大值,则发出警报。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711080322.1A CN108120534A (zh) | 2017-11-06 | 2017-11-06 | 大型滑道模块受力状态监测方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711080322.1A CN108120534A (zh) | 2017-11-06 | 2017-11-06 | 大型滑道模块受力状态监测方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108120534A true CN108120534A (zh) | 2018-06-05 |
Family
ID=62228418
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711080322.1A Pending CN108120534A (zh) | 2017-11-06 | 2017-11-06 | 大型滑道模块受力状态监测方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108120534A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109883598A (zh) * | 2019-04-15 | 2019-06-14 | 中车株洲电力机车有限公司 | 一种轨道机车牵引力的检测方法 |
CN113532270A (zh) * | 2021-05-31 | 2021-10-22 | 天津博迈科海洋工程有限公司 | 一种fpso火炬塔安装过程的姿态检测方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101832869A (zh) * | 2010-04-30 | 2010-09-15 | 中国铁道科学研究院机车车辆研究所 | 一种检测粘着系数的方法、装置和系统 |
CN202339277U (zh) * | 2011-11-30 | 2012-07-18 | 上海工程技术大学 | 一种大型轨道检测车模拟装置 |
CN202864459U (zh) * | 2012-09-12 | 2013-04-10 | 郑海宏 | 一种流体输送物质的载体及输送物质的系统 |
US20160047724A1 (en) * | 2014-08-18 | 2016-02-18 | Korea Institute Of Geoscience And Mineral Resource | Test apparatus for early landslide detection fully-connected with pore water pressure, surface displacement and shear surface |
-
2017
- 2017-11-06 CN CN201711080322.1A patent/CN108120534A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101832869A (zh) * | 2010-04-30 | 2010-09-15 | 中国铁道科学研究院机车车辆研究所 | 一种检测粘着系数的方法、装置和系统 |
CN202339277U (zh) * | 2011-11-30 | 2012-07-18 | 上海工程技术大学 | 一种大型轨道检测车模拟装置 |
CN202864459U (zh) * | 2012-09-12 | 2013-04-10 | 郑海宏 | 一种流体输送物质的载体及输送物质的系统 |
US20160047724A1 (en) * | 2014-08-18 | 2016-02-18 | Korea Institute Of Geoscience And Mineral Resource | Test apparatus for early landslide detection fully-connected with pore water pressure, surface displacement and shear surface |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109883598A (zh) * | 2019-04-15 | 2019-06-14 | 中车株洲电力机车有限公司 | 一种轨道机车牵引力的检测方法 |
CN109883598B (zh) * | 2019-04-15 | 2021-06-04 | 中车株洲电力机车有限公司 | 一种轨道机车牵引力的检测方法 |
CN113532270A (zh) * | 2021-05-31 | 2021-10-22 | 天津博迈科海洋工程有限公司 | 一种fpso火炬塔安装过程的姿态检测方法 |
CN113532270B (zh) * | 2021-05-31 | 2022-07-08 | 天津博迈科海洋工程有限公司 | 一种fpso火炬塔安装过程的姿态检测方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110472370B (zh) | 一种智能船舶船体系统 | |
CN107600110B (zh) | 一种车载列车组故障预测与健康管理系统 | |
CN110132352B (zh) | 基于人工智能和多传感器的监测装置 | |
CN108120534A (zh) | 大型滑道模块受力状态监测方法 | |
US20130268157A1 (en) | Method for reducing detection data of a monitoring device in a vehicle, and method for monitoring a vehicle defect in near real time using same | |
CN104020727A (zh) | 监视装置以及控制系统 | |
CN103639385B (zh) | 基于最小二乘的漏钢预报方法及系统 | |
CN104006869A (zh) | 一种用于皮带输送的激光称量系统及其称量方法 | |
CN205486358U (zh) | 一种人群密度及流向的监测系统 | |
CN104361088A (zh) | Scada系统基于实时权重分析的拥塞数据处理方法 | |
CN110166972B (zh) | 一种带有区块链模块的智能传感系统 | |
CN105501884A (zh) | 一种矿山产能远程监测与服务系统 | |
CN106679627A (zh) | 一种基于物联网的通信铁塔垂直度问题判断方法及系统 | |
CN204549871U (zh) | 起重设备安全监控管理系统 | |
CN106682579B (zh) | 用于检测输电线路覆冰的无人机双目视觉图像处理系统 | |
CN118505165A (zh) | 一种基于云计算的工程项目管理系统及方法 | |
CN203163699U (zh) | 一种汽车鼓式制动器摩擦片检测系统 | |
CN102495305A (zh) | 基于灰色理论的轨道交通运营机电设备故障趋势分析方法 | |
CN107144332A (zh) | 一种基于仪表远程自动清零的汽车衡称重系统及方法 | |
CN117058855B (zh) | 一种物联网云边通信方法 | |
CN112950125A (zh) | 一种配送资源安全状态数据的获得方法、装置、电子设备 | |
CN108535033A (zh) | 虚拟传感器及其健康监测智能决策系统 | |
CN111780809A (zh) | 轨道车辆零部件温度和振动监测预警方法及其系统 | |
CN109773586A (zh) | 双边剪曲轴温度检测方法、装置、干油润滑方法及装置 | |
RU2725342C1 (ru) | Интеллектуальная система помощи принятия диспетчерских решений для точного определения участка и места разрыва магистрального газопровода в режиме реального времени |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180605 |
|
RJ01 | Rejection of invention patent application after publication |