CN108119717A - A kind of preparation method of bamboo winding composite three-way pipe fitting - Google Patents

A kind of preparation method of bamboo winding composite three-way pipe fitting Download PDF

Info

Publication number
CN108119717A
CN108119717A CN201710150198.5A CN201710150198A CN108119717A CN 108119717 A CN108119717 A CN 108119717A CN 201710150198 A CN201710150198 A CN 201710150198A CN 108119717 A CN108119717 A CN 108119717A
Authority
CN
China
Prior art keywords
main pipe
liner layer
bamboo
main
pasted
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710150198.5A
Other languages
Chinese (zh)
Other versions
CN108119717B (en
Inventor
叶柃
张淑娴
孙元平
李以静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Xinzhou Bamboo Based Composites Technology Co Ltd
Original Assignee
Zhejiang Xinzhou Bamboo Based Composites Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Xinzhou Bamboo Based Composites Technology Co Ltd filed Critical Zhejiang Xinzhou Bamboo Based Composites Technology Co Ltd
Publication of CN108119717A publication Critical patent/CN108119717A/en
Application granted granted Critical
Publication of CN108119717B publication Critical patent/CN108119717B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L41/00Branching pipes; Joining pipes to walls
    • F16L41/02Branch units, e.g. made in one piece, welded, riveted
    • F16L41/021T- or cross-pieces
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B27WORKING OR PRESERVING WOOD OR SIMILAR MATERIAL; NAILING OR STAPLING MACHINES IN GENERAL
    • B27JMECHANICAL WORKING OF CANE, CORK, OR SIMILAR MATERIALS
    • B27J1/00Mechanical working of cane or the like
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B27WORKING OR PRESERVING WOOD OR SIMILAR MATERIAL; NAILING OR STAPLING MACHINES IN GENERAL
    • B27MWORKING OF WOOD NOT PROVIDED FOR IN SUBCLASSES B27B - B27L; MANUFACTURE OF SPECIFIC WOODEN ARTICLES
    • B27M3/00Manufacture or reconditioning of specific semi-finished or finished articles

Abstract

The invention discloses a kind of preparation methods of bamboo winding composite three-way pipe fitting, and this method comprises the following steps:(1) winding prepares threeway main pipe, which is bamboo coiled composite tube, radially includes liner layer, structure sheaf and external protection coating successively from the inside to the outside, including main main pipe and branch main pipe;(2) rule and cut in the main main pipe and branch main pipe prepared in winding;(3) cut edge of the main main pipe and branch main pipe is polished into liner layer;(4) branch main pipe with the liner layer polished in main main pipe is docked, liner layer is pasted at docking, solidify afterwards;(5) after the liner layer that pastes cures, fiber-reinforced composite materials structures layer is pasted on the liner layer pasted, solidify afterwards, outside surface anticorrosion processing is carried out after curing, prepares required tee pipe fitting.The present invention is easy to operate, efficient, it is low that mold is required, and the threeway prepared has many advantages, such as that dimensional accuracy is high, strength character is good.

Description

A kind of preparation method of bamboo winding composite three-way pipe fitting
Technical field
The invention belongs to tee pipe fitting preparation field, more particularly, to a kind of preparation of bamboo winding composite three-way pipe fitting Method.
Background technology
Bamboo coiled composite tube is a kind of using bamboo wood as basis material, using thermosetting resin as adhesive, using winding process Manufactured novel pressure product, the multiple tube have compressive resistance height, good rigidity, insulation, corrosion resistant, current excellent performance, it is light-weight, The characteristics such as easy for installation, of low cost, service life length, can be widely applied to urban water supply and sewerage, water conservancy, field irrigation, oil The fields such as sewage disposal, industrial circulating water.
Tee pipe fitting is common a kind of connecting pipe part in Pipe installing, and can connect more by threeway is not at together The pipeline of one straight line.There are many moulding process of threeway at present, including direct Wrapping formed, hand pasting forming, extrusion forming or compacting Shaping etc..It is very high to equipment and winding method requirement due to being directly wound in tee pipe fitting with bamboo fibre, it is difficult to realize.Hand is pasted During shaping, due to manual operation, the poor dimensional precision and preparation efficiency of the three-way pipe prepared are low.Extruding or compression moulding one As be suitable for the threeway of metal material and prepare, and bamboo winding composite tee pipe shaping can not be suitable for, and in extrusion molding mistake Technological parameter is required in journey it is high, particularly with reduced tee, when hypertonia or it is too low when will cause cob webbing, lead Cause is reprocessed or scrapped;Secondly in reducer tee shaping, the shape and size for deforming can just reach requirement several times, process are passed through It is complicated;In addition inside/outside diameter size, circularity and Pingdu of side of the appearance profile of reducer tee including threeway etc. be directly and mould The shape of core is related, and shape of threeway supervisor and branch pipe intermediate location etc. is obtained by molding die, and mold is proposed High requirement.
To sum up, in order to realize the preparation of bamboo winding composite three-way pipe fitting, realize being reliably connected for bamboo coiled composite tube, need to grind Study carefully and design a kind of preparation process suitable for bamboo winding composite three-way pipe fitting, to prepare meet intensity and size requirement three Way pipe fitting.
The content of the invention
For the disadvantages described above or Improvement requirement of the prior art, the present invention provides a kind of bamboo winding composite three-way pipe fittings Preparation method uses first winding threeway main pipe, and liner layer is then polished after line cutting, then compound through pasted technique shaping Threeway has the advantages that easy to operate, efficient, low to mold requirement.
To achieve the above object, the present invention proposes a kind of preparation method of bamboo winding composite three-way pipe fitting, and feature exists In this method comprises the following steps:
(1) winding prepares threeway main pipe, which is bamboo coiled composite tube, radially includes liner successively from the inside to the outside Layer, structure sheaf and external protection coating, including main main pipe and branch main pipe;
(2) rule and cut in the main main pipe and branch main pipe prepared in winding;
(3) cut edge of the main main pipe and branch main pipe is polished into liner layer;
(4) branch main pipe with the liner layer polished in main main pipe is docked, liner layer is pasted at docking, solidify afterwards;
(5) after the liner layer pasted cures, fiber-reinforced composite materials structures layer is pasted on the liner layer pasted, it Solidify afterwards carry out outside surface anticorrosion processing, prepare required tee pipe fitting after curing.
As it is further preferred that the length of the liner layer polished is preferably 10-20mm.
As it is further preferred that the liner layer that pasted at docking is specially:With infiltration epoxy resin adhesive The liner layer at docking is made in the inner surface and the outer surface that fiberglass surfacing mat or glass fibre knitting felt are pasted at docking.
As it is further preferred that the fiber-reinforced composite materials structures layer is answered by high strength fiber peacekeeping Resin adhesive It closes, the high strength fibre is glass fibre, the one or more in carbon fiber, basalt fibre, aramid fiber.
As it is further preferred that liner enhancing is first pasted using bamboo fiber felt and glue as raw material at the liner layer pasted Layer, then pastes fiber-reinforced composite materials structures layer in the outside of liner enhancement layer.
In general, by the above technical scheme conceived by the present invention compared with prior art, mainly possess following Technological merit:
1. the present invention using the main main pipe of threeway and branch main pipe is first wound respectively, then polish liner layer after line cutting, Composite tee is molded through pasted technique again, breaches traditional preparation method of threeway, the preparation method is easy to operate, moulding process Simply, requirement efficient, to mold is low, and winding main pipe parameter need to be only set according to winding process, reduces the difficulty of winding, The threeway prepared has many advantages, such as that dimensional accuracy is high, strength character is good.
2. the present invention is using winding and pastes the means preparation threeway being combined, solving other shaping needs to deform several times Can be only achieved shape and size requirement problem, paste process and molding die be more not required, reduce complicated die design and Safeguard the manpower and materials expenditure of mold.
3. the tee pipe fitting to match with bamboo coiled composite tube prepared by the present invention, green in itself with bamboo coiled composite tube The advantages of environmental protection, energy-saving low-carbon, except can be connected with bamboo coiled composite tube, can also be attached with rigid elements such as pumps, The application range of threeway is further widened, and three-way pipe can reasonably select the connection with treating connecting pipe according to engineer application Mode, such as flanged joint or bell and spigot connection, convenient for actual installation.
Description of the drawings
Fig. 1-Fig. 3 is the preparation process of equal tee;
Fig. 4-Fig. 6 is the preparation process of reducer tee.
Specific embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, with reference to the accompanying drawings and embodiments, it is right The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.As long as in addition, technical characteristic involved in the various embodiments of the present invention described below Conflict is not formed each other to can be combined with each other.
An embodiment of the present invention provides a kind of preparation method of bamboo winding composite three-way pipe fitting, this method includes following step Suddenly:
(1) winding prepares threeway main pipe, which is bamboo coiled composite tube, and radial direction includes interior successively from the inside to the outside Lining, structure sheaf and external protection coating, including main main pipe and branch main pipe;
(2) cutting line is marked in expansion setting-out, the outer surface of the main main pipe prepared according to setting-out size in winding, and along cutting Line is cut, and to be cut into slot, one end of the branch main pipe then prepared in winding, which is rule, cuts, to be cut into and the slot pair The shape answered makes it just coincide with the slot in main main pipe;
(3) one end that the surrounding for the slot being cut into main main pipe and branch main pipe are cut into is polished to the liner of certain length Layer;
(4) and then by the liner layer that branch main pipe polish with the liner layer polished in main main pipe dock, and at docking Liner layer is pasted, is then cured;
(5) after the liner layer that pastes cures, fiber-reinforced composite materials structures layer is pasted at docking, solidify afterwards, Outside surface anticorrosion processing is carried out after curing, prepares required tee pipe fitting.
Further, the length of the liner layer polished is preferably 10-20mm, under the length, can effectively ensure that connection Intensity.Preferably, liner enhancement layer is first pasted as raw material using bamboo fiber felt and glue at the liner layer pasted, then increased in liner The outside of strong layer pastes fiber-reinforced composite materials structures layer, by the way that liner enhancement layer is set to can further improve the strong of bonding part Degree.
Specifically, the fiber-reinforced composite materials structures layer is combined by high strength fiber peacekeeping Resin adhesive, institute High strength fibre is stated as the one or more in glass fibre, carbon fiber, basalt fibre, aramid fiber.
Bamboo winding compound three according to the invention is more clearly illustrated below in conjunction with some specific embodiments Manufacturing process and its key process parameter design of siphunculus.
Embodiment 1
As shown in Figure 1-Figure 3, the present invention will be described by taking equal tee as an example for the embodiment, and flange can be used in both ends Or bell and spigot is attached with pipeline to be connected, and is below specific preparation process:
(1) winding prepare threeway main pipe (including preparing main main pipe and branch main pipe, main main pipe is identical with the caliber of branch main pipe, It is identical with the technique for preparing bamboo coiled composite tube)
(1.1) bamboo fibre pre-processes:Fresh bamboo wood is split into bamboo chip, by bamboo chip go after blue or green de-etiolation to cut into 1.5m long, 1mm is thick, the bamboo of 5mm wide is slightd, by thin bamboo strips used for weaving drying process, then by 10 thin bamboo strips used for weavings it is arranged in parallel be neatly a row, entire row thin bamboo strips used for weaving Back side lining grid cloth, is sutured with sewing machine, forms bamboo curtain splint, often arranges the docking end to end of bamboo curtain splint, and is sutured using sewing machine, A continual bamboo curtain splint band more than several meters even tens of rice is formed, it is for use that winding acquisition bamboo slights volume;
(1.2) liner layer is prepared:The polyester film of one layer of 0.03mm thickness, the mylar are coated on polished mold As release layer, thickness is made on the release layer of mold with adhesive, bamboo fiber nonwovens and glass fibre knitting felt and reached The liner layer of 1.5mm, the liner layer have the function of antiseepage, and inner wall smooth;Liner layer is along caliber to being followed successively by bamboo from the inside to the outside Fabric nonwoven cloth and glass fibre knitting felt, bamboo fiber nonwovens and glass fibre knitting felt are soaked with adhesive, the adhesive Including resin and curing agent, resin selects the excellent epoxy resin of antiseptic property in the present embodiment;
(1.3) preparation structure layer:After liner layer curing, it is entirely wrapped in mold by bamboo curtain splint band debatching On lining, bamboo curtain splint band need to infiltrate adhesive during winding, wind one or more layers bamboo curtain splint band, and it is thick to reach design Degree, canoe are first circumferential winding 14mm thickness, then axially winding 4.5mm thickness, last circumferential winding 3.5mm thickness;It twines After, 90 DEG C are heated to pipeline and is cured 110 minutes, obtains structure sheaf, wherein, adhesive includes resin and curing agent, Resin is specially amino resins;
(1.4) external protection coating is prepared:Outside bamboo fibre layer brush one layer of preferable vinyl ester resin of waterproof and anticorrosion with The external protection coating of thickness about 1.5mm is obtained, prepares main main pipe and branch main pipe respectively.
(2) expanded view is drawn according to tee pipe fitting size, line cutting is carried out in main main pipe and branch main pipe according to pattern, Obtained branch main pipe and the cut place of main main pipe is just chimeric, for example, marking cutting in the outer surface of the main main pipe of winding preparation Line is cut into annular groove along cutting line, and cut direction is vertical with the axis of main main pipe and exists with horizontal plane, the cutting line Circle is projected as on horizontal plane, one end of branch main pipe is cut into and the circle by the internal diameter of the circular a diameter of main pipe The corresponding shape of annular groove makes it that can just coincide with the annular groove in main main pipe;
(3) cut place of main main pipe is carried out polishing makes it expose the liner layer of 10mm, and in branch main pipe cut place Polish the liner layer that length is 10mm;
(4) will be docked by the branch main pipe of polishing with the cut place of main main pipe, i.e., in branch main pipe kind to main main pipe, then The inner surface and the outer surface at docking is pasted with fiberglass surfacing mat, the glass fibre knitting felt of infiltration epoxy resin adhesive The liner layer at docking is made, is heating and curing afterwards to liner layer;After liner layer curing, the inner surface and the outer surface at docking Fiber-reinforced composite materials structures layer is pasted, reinforcing fiber can select glass fibre, carbon fiber, basalt fibre, aramid fiber fine The high strength fibres such as dimension, infiltrate corresponding Resin adhesive and are combined;One layer is brushed after structure sheaf curing in its outer surface to prevent The preferable vinyl ester resin of water anti-corrosion prepares required straight tee, as shown in Figure 3 to carry out preservative treatment.
Embodiment 2
As Figure 4-Figure 6, the present invention will be described by taking reducer tee as an example for the embodiment, and flange can be used in both ends Or bell and spigot is attached with pipeline to be connected, and is below specific preparation process:
(1) (including preparing main main pipe and branch main pipe, the caliber of main main pipe is more than the pipe of branch main pipe to winding preparation threeway main pipe Footpath, identical with the technique for preparing bamboo coiled composite tube)
(1.1) bamboo fibre pre-processes:Fresh bamboo wood is split into bamboo chip, by bamboo chip go after blue or green de-etiolation to cut into 2m long, 1.2mm is thick, the bamboo of 4mm wide is slightd, then that 12 thin bamboo strips used for weavings are arranged in parallel neat for a row, entire row thin bamboo strips used for weaving by thin bamboo strips used for weaving drying process Back side lining grid cloth, sutured with sewing machine, formed bamboo curtain splint, often arrange bamboo curtain splint docking end to end, and using sewing machine stitch It closes, forms a continual bamboo curtain splint band being up to more than several meters or even tens of rice, winding obtains bamboo and slights volume for use.
(1.2) liner layer is prepared:On polished mold coat one layer of 0.02mm thickness polyester film, with adhesive, Bamboo fiber nonwovens and glass fibre knitting felt make the liner layer that thickness reaches 2.5mm on the release layer of mold;Liner layer edge Caliber to being followed successively by bamboo fiber nonwovens and glass fibre knitting felt, bamboo fiber nonwovens and glass fibre knitting felt from the inside to the outside Adhesive is soaked with, which includes resin and curing agent, and resin selects the excellent vinyl of antiseptic property in the present embodiment Ester resin.
(1.3) preparation structure layer:After liner layer curing, it is entirely wrapped in mold by bamboo curtain splint band debatching On lining, bamboo curtain splint band need to infiltrate adhesive during winding, wind one or more layers bamboo curtain splint band, and it is thick to reach design Degree, canoe are first circumferential winding 20mm thickness, then axially winding 8mm thickness, last circumferential winding 6mm thickness;It has wound Bi Hou is heated to pipeline 85 DEG C and cures 115 minutes, obtains bamboo fibre structure sheaf, wherein, adhesive includes resin and curing Agent, resin are specially epoxy resin.
(1.4) external protection coating is prepared:Outside bamboo fibre layer brush one layer of preferable vinyl ester resin of waterproof and anticorrosion with The external protection coating of thickness about 2mm is obtained, prepares main main pipe and branch main pipe respectively.
(2) expanded view is drawn according to tee pipe fitting size, line cutting is carried out in main main pipe and branch main pipe according to pattern, Obtained branch main pipe and the cut place of main main pipe is just chimeric;
(3) cut place of main main pipe is carried out polishing makes it expose the liner layer of 20mm, and in branch main pipe cut place Polish the liner layer that length is 20mm;
(4) it will dock with the liner layer of the cut place of main main pipe by the branch main pipe of polishing, sticked with infiltration epoxide-resin glue The liner at docking is made in the inner surface and the outer surface that fiberglass surfacing mat, the glass fibre knitting felt of agent are pasted at docking Layer, is afterwards heating and curing to liner layer;After liner layer curing, pasted outside the liner layer pasted using bamboo fiber felt and glue as raw material Liner enhancement layer processed, is then heating and curing;After the curing of liner enhancement layer, paste fiber reinforcement in the outside of liner enhancement layer and answer Condensation material structure sheaf, reinforcing fiber can select the high strength fibres such as glass fibre, carbon fiber, basalt fibre, aramid fiber, Corresponding Resin adhesive is infiltrated to be combined;After structure sheaf curing one layer of preferable ethylene of waterproof and anticorrosion is brushed in its outer surface Base ester resin prepares required reduced tee, as shown in Figure 6 to carry out preservative treatment.
As it will be easily appreciated by one skilled in the art that the foregoing is merely illustrative of the preferred embodiments of the present invention, not to The limitation present invention, all any modification, equivalent and improvement made within the spirit and principles of the invention etc., should all include Within protection scope of the present invention.

Claims (5)

1. a kind of preparation method of bamboo winding composite three-way pipe fitting, which is characterized in that this method comprises the following steps:
(1) winding prepare threeway main pipe, the threeway main pipe be bamboo coiled composite tube, radially from the inside to the outside successively include liner layer, Structure sheaf and external protection coating, including main main pipe and branch main pipe;
(2) rule and cut in the main main pipe and branch main pipe prepared in winding;
(3) cut edge of the main main pipe and branch main pipe is polished into liner layer;
(4) branch main pipe with the liner layer polished in main main pipe is docked, liner layer is pasted at docking, solidify afterwards;
(5) after the liner layer pasted cures, fiber-reinforced composite materials structures layer, Zhi Hougu are pasted on the liner layer pasted Change, outside surface anticorrosion processing is carried out after curing, prepares required tee pipe fitting.
2. the preparation method of bamboo as described in claim 1 winding composite three-way pipe fitting, which is characterized in that it is described polish it is interior The length of lining is preferably 10-20mm.
3. the preparation method of bamboo winding composite three-way pipe fitting as claimed in claim 2, which is characterized in that described to be pasted at docking Liner layer processed is specially:It is pasted with the fiberglass surfacing mat or glass fibre knitting felt of infiltration epoxy resin adhesive at docking The inner surface and the outer surface liner layer at docking is made.
4. the preparation method of bamboo winding composite three-way pipe fitting as claimed in claim 3, which is characterized in that the fiber reinforcement is answered Condensation material structure sheaf is combined by high strength fiber peacekeeping Resin adhesive, the high strength fibre for glass fibre, carbon fiber, One or more in basalt fibre, aramid fiber.
5. the preparation method of bamboo winding composite three-way pipe fitting as claimed in claim 4, which is characterized in that in the liner layer pasted It sentences bamboo fiber felt and glue and first pastes liner enhancement layer for raw material, then paste fiber-reinforced composite in the outside of liner enhancement layer Material structure layer.
CN201710150198.5A 2016-11-30 2017-03-14 A kind of preparation method of bamboo winding composite three-way pipe fitting Active CN108119717B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201611081709 2016-11-30
CN2016110817094 2016-11-30

Publications (2)

Publication Number Publication Date
CN108119717A true CN108119717A (en) 2018-06-05
CN108119717B CN108119717B (en) 2019-12-03

Family

ID=62228053

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710150198.5A Active CN108119717B (en) 2016-11-30 2017-03-14 A kind of preparation method of bamboo winding composite three-way pipe fitting

Country Status (1)

Country Link
CN (1) CN108119717B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120031616A1 (en) * 2010-08-03 2012-02-09 Hall David R Cylindrical Truss Structure Reinforced Pipe
CN103032649A (en) * 2012-12-20 2013-04-10 江西科得玻璃钢有限公司 Glass fiber reinforced plastic trousers leg three-way pipe and manufacturing method thereof
CN103032648A (en) * 2012-12-20 2013-04-10 江西科得玻璃钢有限公司 Glass reinforced plastic (GRP) trouser leg three-way pipe and manufacturing method thereof
CN105508809A (en) * 2015-12-11 2016-04-20 浙江鑫宙竹基复合材料科技有限公司 Lining layer of bamboo-wound composite pipe and preparation method thereof
CN205315879U (en) * 2015-12-24 2016-06-15 浙江鑫宙竹基复合材料科技有限公司 A pipe fitting that is used for bamboo winding complex to manage

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120031616A1 (en) * 2010-08-03 2012-02-09 Hall David R Cylindrical Truss Structure Reinforced Pipe
CN103032649A (en) * 2012-12-20 2013-04-10 江西科得玻璃钢有限公司 Glass fiber reinforced plastic trousers leg three-way pipe and manufacturing method thereof
CN103032648A (en) * 2012-12-20 2013-04-10 江西科得玻璃钢有限公司 Glass reinforced plastic (GRP) trouser leg three-way pipe and manufacturing method thereof
CN105508809A (en) * 2015-12-11 2016-04-20 浙江鑫宙竹基复合材料科技有限公司 Lining layer of bamboo-wound composite pipe and preparation method thereof
CN205315879U (en) * 2015-12-24 2016-06-15 浙江鑫宙竹基复合材料科技有限公司 A pipe fitting that is used for bamboo winding complex to manage

Also Published As

Publication number Publication date
CN108119717B (en) 2019-12-03

Similar Documents

Publication Publication Date Title
CN108521016B (en) Shipborne radar antenna housing and manufacturing method thereof
CN105546230B (en) A kind of stalk bamboo coiled composite tube and preparation method thereof
US10190705B2 (en) Thermosetting bamboo-wood composite pipe
CN201651576U (en) Straight bamboo reinforced bamboo compound tube
CN101776187B (en) Prestressed concrete glass fiber reinforced plastic compound tubing structure and manufacture process thereof
CN104089105A (en) Method for manufacturing bamboo-plastic winding composite pipe
CN102218837A (en) Glass reinforced plastic ribbed sand-included tube and manufacture method thereof
US10215312B2 (en) Hemp-winding composite pipe
CN105508809A (en) Lining layer of bamboo-wound composite pipe and preparation method thereof
CN205350604U (en) Compound pipe of straw bamboo winding
CN105690789B (en) The disposable winding, molding method of glass fiber reinforced plastic tank cylinder
CN104266017A (en) Preparation of pipe bundle joint for connecting bamboo composite pipes, mounting method thereof and pipe bundle joint
CN104006229A (en) Stainless steel belt composite pipe and manufacturing method thereof
CN108119719A (en) A kind of preparation method of bamboo winding composite elbow
CN108119717B (en) A kind of preparation method of bamboo winding composite three-way pipe fitting
CN104385616A (en) Method for preparing coalbed gas pipeline by adopting double-angle alternating winding technology
CN108119705B (en) Reducing bamboo winding pipe structure and preparation method thereof
CN204663110U (en) Bamboo is wound around composite electric support member
CN108638271B (en) Preparation method of bamboo-wound reducer pipe and reducer pipe prepared by using same
CN210007284U (en) Cable protection pipe for power made of composite materials
CN203892740U (en) Stainless steel belt composite pipe
CN111300843A (en) Forming equipment and forming process for GFRP (glass fiber reinforced Polymer) tube layer of composite electric pole
CN211315384U (en) Bamboo-hemp winding composite pressure pipe
CN108561637B (en) Preparation method of bamboo winding reducer pipe and reducer pipe prepared by using same
CN210661828U (en) Compound tub of connection structure of bamboo

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 311251 No.1, Dongfan Middle Road, Linpu Town, Xiaoshan District, Hangzhou City, Zhejiang Province

Applicant after: Zhejiang Xinzhou Bamboo Base Composite Materials Technology Co., Ltd.

Applicant after: Ye Ling

Address before: Hangzhou City, Zhejiang province 311115 Fengdu Pingyao town Yuhang District village show along the road No. 6

Applicant before: Zhejiang Xinzhou Bamboo Base Composite Materials Technology Co., Ltd.

Applicant before: Ye Ling

GR01 Patent grant