CN108118687A - Multi-functional construction of diaphragm wall device - Google Patents

Multi-functional construction of diaphragm wall device Download PDF

Info

Publication number
CN108118687A
CN108118687A CN201711479939.0A CN201711479939A CN108118687A CN 108118687 A CN108118687 A CN 108118687A CN 201711479939 A CN201711479939 A CN 201711479939A CN 108118687 A CN108118687 A CN 108118687A
Authority
CN
China
Prior art keywords
wall
strong
control system
ground
straightening
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711479939.0A
Other languages
Chinese (zh)
Inventor
吴洁妹
邹铭
张顺
尹宇杰
曹俊逸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Foundation Engineering Group Co Ltd
Original Assignee
Shanghai Foundation Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Foundation Engineering Group Co Ltd filed Critical Shanghai Foundation Engineering Group Co Ltd
Priority to CN201711479939.0A priority Critical patent/CN108118687A/en
Publication of CN108118687A publication Critical patent/CN108118687A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B1/00Cleaning by methods involving the use of tools
    • B08B1/10Cleaning by methods involving the use of tools characterised by the type of cleaning tool
    • B08B1/12Brushes

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The present invention relates to a kind of multi-functional construction of diaphragm wall devices, including pedestal and stent, lift control system, hydraulic control system, strong and weak electricity Transmission system, slurry delivery system, components mechanism, the pedestal and stent are fixed on by ground straightening and fixing device on ground wall chase section, and mobile, fixed, straightening is carried out by ground straightening and fixing device;Lift control system, through pulley assembly connection component mechanism, lift work is carried out for control assembly mechanism by steel wire rope;Components mechanism connection hydraulic control system, slurry delivery system, strong and weak electricity Transmission system, carry out the diaphram wall after grooving brush wall, clear base, the institutional operation for changing slurry and ultrasound examination.The present invention has the characteristics of maneuverability, handling strong, especially suitable for ultra-deep the use of wall construction period.Using the present invention, it can accomplish brush wall, clear base, change slurry, ultrasound examination integration operation.Engineering practice proves that it is easy to operate, can Reusability, one-machine-multi-function, economical and practical.

Description

Multi-functional construction of diaphragm wall device
Technical field
The present invention relates to a kind of construction of diaphragm wall devices, are specifically after one kind is suitable for construction of diaphragm wall grooving Brush wall, clear base, change slurry, the device of ultrasound examination integrated construction.
Background technology
With the continuous development of city size, town site resource is more rare, and Urban Underground Space Excavation utilizes It is expanded to " depth ", the diaphram wall application gone along with sb. to guard him as basement is also more and more, and the application depth of diaphram wall also has Breakthrough growth has broken through hundred meters using depth at present.Thereupon, the slurry trench stability after corresponding continuous wall trench underground Be construction of diaphragm wall success or failure it is crucial, original technique process very complicated, brush wall, clear base, to change slurry, ultrasound examination more Step process separate it is independent implement and utilize different construction equipments, not only largely effect in time construction efficiency and Cell wall safety also constantly influences slurry trench stability, the disturbance periphery soil body in machinery replaces step.Therefore by multi-step process and machinery It is necessary to carry out simplified integrated optimization.
The content of the invention
The present invention is to solve after grooving during existing construction of diaphragm wall the technical issues of slurry trench stability, and provide A kind of multi-functional construction of diaphragm wall device.
The present invention is achieved by the following technical solutions;
A kind of multi-functional construction of diaphragm wall device, including pedestal and stent, lift control system, hydraulic control system, strong Light current Transmission system, slurry delivery system, components mechanism, the pedestal and stent are fixed on by ground straightening and fixing device On ground wall chase section, mobile, fixed, straightening is carried out by ground straightening and fixing device;Lift control system is passed through by steel wire rope Pulley assembly connection component mechanism carries out lift work for control assembly mechanism;Components mechanism connection hydraulic control system, slurry Liquid transport system, strong and weak electricity Transmission system carry out the diaphram wall after grooving in brush wall, clear base, change slurry and ultrasound examination Institutional operation.
The components mechanism is by component skeleton, detachable brush wall device, scalable hydraulic support, filtering pulp absorbing hole, mud The circulatory system, scale extending apparatus, supersonic detector, hydraulic control circuit, strong and weak electricity system pipeline, slurries transfer pipeline group Into component skeleton both sides connect detachable brush wall device by scalable hydraulic support, and component skeleton lower end is stretched by scale Device connects supersonic detector and filtering pulp absorbing hole.
The scalable hydraulic support connects hydraulic control system by hydraulic control circuit, for passing through detachable brush wall Device carries out cell wall to clean operation with water.
It is described filtering pulp absorbing hole connect respectively by mud circulating system with strong and weak electricity system pipeline slurry delivery system with Strong and weak electricity Transmission system filters pulp absorbing hole slot bottom sediment is inhaled clearly for passing through.
The scale extending apparatus, supersonic detector connect strong and weak electricity Transmission system by strong and weak electricity system pipeline, use In by supersonic detector, wall chase section carries out controllable ultrasound examination over the ground.
The beneficial effects of the invention are as follows:The present invention has maneuverability compared with existing process equipment, and adaptive faculty is strong, effect The characteristics of rate is high after being applicable in construction of diaphragm wall grooving, transfers the technique between steel reinforcement cage.Using the present invention, can accomplish to brush Wall, clear base change slurry, ultrasound examination integrated construction.Engineering practice proves that the present invention it is easy to operate, can Reusability, one It is machine multipotency, economical and practical.
Description of the drawings
Fig. 1 is the multi-functional construction of diaphragm wall apparatus structure front view of the present invention;
Fig. 2 is the left view of Fig. 1;
Fig. 3 is components mechanism schematic diagram;
Fig. 4 is the top view of Fig. 3.
Specific embodiment
The use case of the present invention is explained below in conjunction with the accompanying drawings:Present case carries out in fact lower premised on the present invention It applies, gives detailed embodiment and specific operating process, but protection scope of the present invention is not limited to following cases.
As shown in Figures 1 to 4, multi-functional construction of diaphragm wall device of the invention, including pedestal and stent 1, lifting Control system 3, hydraulic control system 5, strong and weak electricity Transmission system 6, slurry delivery system 7, components mechanism 9 etc..
Pedestal and stent 1 are fixed on by ground straightening and fixing device 8 on ground wall chase section, by ground straightening and fixation Device carries out mobile, fixed, straightening;Lift control system 3, through 4 connection component mechanism 9 of pulley assembly, is used for by steel wire rope 2 Control assembly mechanism 9 carries out lift work;Components mechanism 9 connects hydraulic control system 5, slurry delivery system 7, strong and weak electrical transmission System 6 carries out the diaphram wall after grooving brush wall, clear base, the institutional operation for changing slurry and ultrasound examination.
Components mechanism 9 is by component skeleton 9-1, detachable brush wall device 9-2, scalable hydraulic support 9-3, filtering pulp absorbing hole 9-4, mud circulating system 9-5, scale extending apparatus 9-6, supersonic detector 9-7, hydraulic control circuit 9-8, strong and weak electricity system Road 9-9 under the overall leadership, slurries transfer pipeline 9-10 composition, component skeleton 9-1 both sides by scalable hydraulic support 9-3 connections detachably Brush wall device 9-2, component skeleton 9-1 lower ends pass through scale extending apparatus 9-6 connection supersonic detector 9-7 and filtering pulp absorbing hole 9-4。
The specific embodiment of the invention:
Mode 1:Pedestal and stent 1 carry out mobile, fixed, straightening by ground straightening and fixing device 8, using steel wire rope 2, rise Control system 3 drops, 4 control assembly mechanism 9 of pulley assembly carries out lift work;By hydraulic control system 5 to scalable hydraulic pressure Stent 9-3, detachable brush wall device 9-2 carry out control progress cell wall and clean operation with water.
Mode 2:Pedestal and stent 1 carry out mobile, fixed, straightening by ground straightening and fixing device 8, utilize steel wire rope 2nd, lift control system 3,4 control assembly mechanism 9 of pulley combination carry out lift work;It is cycled using slurry delivery system 7, mud System 9-5, strong and weak electricity Transmission system 6 carry out slot bottom sediment and inhale clearly.
Mode 3:Pedestal and stent 1 carry out mobile, fixed, straightening by ground straightening and fixing device 8, utilize steel wire rope 2nd, lift control system 3,4 control assembly mechanism 9 of pulley assembly carry out lift work;It is stretched using strong and weak electricity Transmission system 6, scale Wall chase section carries out controllable ultrasound examination over the ground by extending apparatus 9-6, supersonic detector 9-7.
Mode 4:Above-mentioned three kinds of embodiments synchronize, mix and match operation.
The process that operates with of the present invention is implemented in full as follows:
1)Pedestal and stent 1 are moved to required position using loop wheel machine, pass through ground straightening and fixing device;See Fig. 1
2)Control assembly mechanism 9 is connected using steel wire rope 2, lift control system 3, pulley assembly 4;It needs to connect hydraulic pressure by using Control system 5, slurry delivery system 7, strong and weak electricity Transmission system 6;See Fig. 2
3)It connects control assembly mechanism 9 using steel wire rope 2, lift control system 3, pulley assembly 4 and is transferred, pass through hydraulic pressure control System 5 processed carries out scalable hydraulic support 9-3, detachable brush wall device 9-2 control progress cell wall and cleans operation with water.
4)After decentralization to slot bottom, carried out using slurry delivery system 7, mud circulating system 9-5, strong and weak electricity Transmission system 6 Slot bottom sediment is inhaled clearly;
5)Mud circulating system 9-5 positions are moved to scalable hydraulic support 9-3 by hydraulic control system 5 and carry out different position Slot bottom sediment is inhaled clearly;
6)Using steel wire rope 2, lift control system 3, pulley assembly 4 connect control assembly mechanism 9 be promoted to needed for slot section Depth carries out taking out slurry operation, pedestal and stent using slurry delivery system 7, mud circulating system 9-5, strong and weak electricity Transmission system 6 1st, slurry delivery system 7 supplements fresh slurry on ground.
7)It connects control assembly mechanism 9 using steel wire rope 2, lift control system 3, pulley assembly 4 and is lifted, using strong Wall chase section carries out controllable ultrasound examination over the ground by light current Transmission system 6, scale extending apparatus 9-6, supersonic detector 9-7.

Claims (5)

1. a kind of multi-functional construction of diaphragm wall device, including pedestal and stent(1), lift control system(3), hydraulic control System(5), strong and weak electricity Transmission system(6), slurry delivery system(7), components mechanism(9), it is characterised in that:The pedestal and branch Frame(1)Pass through ground straightening and fixing device(8)It is fixed on ground wall chase section, is moved by ground straightening and fixing device Dynamic, fixed, straightening;Lift control system(3)Pass through steel wire rope(2)Through pulley assembly(4)Connection component mechanism(9), for controlling Components mechanism processed(9)Carry out lift work;Components mechanism(9)Connect hydraulic control system(5), slurry delivery system(7), it is strong and weak Electrical transmission system(6), brush wall, clear base, the institutional operation for changing slurry and ultrasound examination are carried out to the diaphram wall after grooving.
2. multi-functional construction of diaphragm wall device according to claim 1, it is characterised in that:The components mechanism(9) By component skeleton(9-1), detachable brush wall device(9-2), scalable hydraulic support(9-3), filtering pulp absorbing hole(9-4), mud The circulatory system(9-5), scale extending apparatus(9-6), supersonic detector(9-7), hydraulic control circuit(9-8), strong and weak electricity system Road under the overall leadership(9-9), slurries transfer pipeline(9-10)Composition, component skeleton(9-1)Both sides pass through scalable hydraulic support(9-3)Even Connect detachable brush wall device(9-2), component skeleton(9-1)Lower end passes through scale extending apparatus(9-6)Connect supersonic detector (9-7)And filtering pulp absorbing hole(9-4).
3. multi-functional construction of diaphragm wall device according to claim 2, it is characterised in that:The scalable hydraulic pressure branch Frame(9-3)Pass through hydraulic control circuit(9-8)Connect hydraulic control system(5), for passing through detachable brush wall device(9-2)It is right Cell wall carries out cleaning operation with water.
4. multi-functional construction of diaphragm wall device according to claim 2, it is characterised in that:The filtering pulp absorbing hole (9-4)Pass through mud circulating system respectively(9-5)With strong and weak electricity system pipeline(9-9)Connect slurry delivery system(7)And power Electrical transmission system(6), for passing through filtering pulp absorbing hole(9-4)Slot bottom sediment is inhaled clearly.
5. multi-functional construction of diaphragm wall device according to claim 2, it is characterised in that:The scale extending apparatus (9-6), supersonic detector(9-7)Pass through strong and weak electricity system pipeline(9-9)Connect strong and weak electricity Transmission system(6), for passing through Supersonic detector(9-7)Wall chase section carries out controllable ultrasound examination over the ground.
CN201711479939.0A 2017-12-29 2017-12-29 Multi-functional construction of diaphragm wall device Pending CN108118687A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711479939.0A CN108118687A (en) 2017-12-29 2017-12-29 Multi-functional construction of diaphragm wall device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711479939.0A CN108118687A (en) 2017-12-29 2017-12-29 Multi-functional construction of diaphragm wall device

Publications (1)

Publication Number Publication Date
CN108118687A true CN108118687A (en) 2018-06-05

Family

ID=62232408

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711479939.0A Pending CN108118687A (en) 2017-12-29 2017-12-29 Multi-functional construction of diaphragm wall device

Country Status (1)

Country Link
CN (1) CN108118687A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109339032A (en) * 2018-10-19 2019-02-15 岩土科技股份有限公司 The method for carrying out construction of diaphragm wall using twisting sucker head
CN114808981A (en) * 2022-05-07 2022-07-29 上海市基础工程集团有限公司 Rotary floor wall brush for underground continuous wall

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0960465A (en) * 1995-08-21 1997-03-04 Nippon Ikosu Kk Continuous underground wall forming excavator, cut face cleaning jig, continuous underground wall forming method with them
JPH10266207A (en) * 1997-03-27 1998-10-06 Kumagai Gumi Co Ltd Slime cleaning device
CN201447707U (en) * 2009-05-25 2010-05-05 毛杰 Automatic reciprocating drill pile driver
CN201660910U (en) * 2009-11-02 2010-12-01 中冶天工建设有限公司 Electric cleaning device of diaphragm wall joint
CN204000830U (en) * 2014-06-27 2014-12-10 中铁建港航局集团勘察设计院有限公司 Merogenesis take-over type sand drain machine
CN204959753U (en) * 2015-09-11 2016-01-13 中建八局第二建设有限公司 High -efficient piling equipment
CN106836191A (en) * 2017-01-20 2017-06-13 中国建筑第四工程局有限公司 The construction method of subway building enclosure ground-connecting-wall under a kind of low clearance

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0960465A (en) * 1995-08-21 1997-03-04 Nippon Ikosu Kk Continuous underground wall forming excavator, cut face cleaning jig, continuous underground wall forming method with them
JPH10266207A (en) * 1997-03-27 1998-10-06 Kumagai Gumi Co Ltd Slime cleaning device
CN201447707U (en) * 2009-05-25 2010-05-05 毛杰 Automatic reciprocating drill pile driver
CN201660910U (en) * 2009-11-02 2010-12-01 中冶天工建设有限公司 Electric cleaning device of diaphragm wall joint
CN204000830U (en) * 2014-06-27 2014-12-10 中铁建港航局集团勘察设计院有限公司 Merogenesis take-over type sand drain machine
CN204959753U (en) * 2015-09-11 2016-01-13 中建八局第二建设有限公司 High -efficient piling equipment
CN106836191A (en) * 2017-01-20 2017-06-13 中国建筑第四工程局有限公司 The construction method of subway building enclosure ground-connecting-wall under a kind of low clearance

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109339032A (en) * 2018-10-19 2019-02-15 岩土科技股份有限公司 The method for carrying out construction of diaphragm wall using twisting sucker head
CN114808981A (en) * 2022-05-07 2022-07-29 上海市基础工程集团有限公司 Rotary floor wall brush for underground continuous wall
CN114808981B (en) * 2022-05-07 2023-10-27 上海市基础工程集团有限公司 Rotary floor wall brush for underground diaphragm wall

Similar Documents

Publication Publication Date Title
CN103015523B (en) Treatment vehicle and treating method for sucking sludge in city pipe network
CN108118687A (en) Multi-functional construction of diaphragm wall device
CN204510316U (en) A kind of hydroelectric power plant desilting equipment
CN107012847A (en) A kind of algae processing unit and method
CN207211235U (en) A kind of combined type silt-cleaning vessel for river way
CN205128588U (en) On --spot soil repair equipment of plain type
CN106565057A (en) Lake water purification pipe network circulating system and construction method thereof
CN202766398U (en) Pull type sludge treatment equipment
CN204826029U (en) Mud device is inhaled to showy formula
CN204002651U (en) A kind of jumbolter
CN204767819U (en) Sewage treatment pond
CN102765865A (en) Pull-type sludge treatment equipment and method
CN202969568U (en) City pipe network sludge drawing treatment vehicle
CN203954758U (en) A kind of sedimentation basin dross removing device
CN213926191U (en) River course sewage floater is handled and is used clearance system
CN206108581U (en) Flood prevention hosepipe collection device
CN107489182A (en) A kind of combined type silt-cleaning vessel for river way
CN209339302U (en) A kind of dredging dredger for drainage pipeline inspection well
CN204097993U (en) A kind of river surface anti-pollution vessel
CN107382027A (en) A kind of fast dewatering curing for the alum sludge pool
CN106437574A (en) Vibration screen parallel-series connection type drilling fluid solid-phase removing device
CN207699407U (en) A kind of sewage filter device with automatic desilting function
CN106368305A (en) Pipeline dredging robot
CN207079026U (en) A kind of novel flotation tank
CN206980206U (en) A kind of running vehicle type scrapes slag suction dredge

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180605