CN108117255A - Quartz fibre bushing loading and unloading bracket - Google Patents

Quartz fibre bushing loading and unloading bracket Download PDF

Info

Publication number
CN108117255A
CN108117255A CN201711470626.9A CN201711470626A CN108117255A CN 108117255 A CN108117255 A CN 108117255A CN 201711470626 A CN201711470626 A CN 201711470626A CN 108117255 A CN108117255 A CN 108117255A
Authority
CN
China
Prior art keywords
supporting plate
chuck
fixed
bushing
collet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711470626.9A
Other languages
Chinese (zh)
Inventor
邵敏强
缪黎燕
裴强
缪黎丽
吴旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Zhongyi Hi Tech Co Ltd
Original Assignee
Jiangsu Zhongyi Hi Tech Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Zhongyi Hi Tech Co Ltd filed Critical Jiangsu Zhongyi Hi Tech Co Ltd
Priority to CN201711470626.9A priority Critical patent/CN108117255A/en
Publication of CN108117255A publication Critical patent/CN108117255A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C03GLASS; MINERAL OR SLAG WOOL
    • C03BMANUFACTURE, SHAPING, OR SUPPLEMENTARY PROCESSES
    • C03B37/00Manufacture or treatment of flakes, fibres, or filaments from softened glass, minerals, or slags
    • C03B37/08Bushings, e.g. construction, bushing reinforcement means; Spinnerettes; Nozzles; Nozzle plates
    • C03B37/083Nozzles; Bushing nozzle plates

Abstract

The present invention relates to a kind of quartz fibre wire-drawing equipments, more particularly to quartz fibre bushing loading and unloading bracket, including supporting plate and at least a pair of of handle, the handle is mounted on the lower surface of supporting plate, it is and vertical with supporting plate lower surface, the splint upper surface is provided at least a pair of of collet, collet described in a pair is respectively fixed chuck and active chuck, fixed chuck be fixedly mounted in a side of supporting plate, another side of the supporting plate offers sliding slot, the active chuck bottom is provided with sliding block, and the sliding block is mounted in the sliding slot;The active chuck is slided along sliding slot, close to or away from the fixed chuck;Fixing device is additionally provided on the active chuck, for the position of active chuck to be fixed.Quartz fibre bushing loading and unloading bracket provided by the invention, can quickly and easily load and unload bushing, and clamp stabilization, protect the safety of bushing, also ensure operating personnel's safety.

Description

Quartz fibre bushing loading and unloading bracket
Technical field
The present invention relates to a kind of quartz fibre wire-drawing equipments, and in particular to quartz fibre bushing loading and unloading bracket.
Background technology
Quartz fibre is manufactured into using quartz pushrod as raw material through techniques such as high temperature melting, wire drawing, doff, woven fabrics, tool There is the features such as intensity is high, chemical stability is good, resistant to chemical etching, production cost is low, the reinforcing material being commonly used in composite material, The national economy every field such as electrically insulating material and heat-insulating material, circuit substrate.The filament diameter that glass marble pulls out is several A micron is equivalent to the 1/20-1/5 of a hairline to twenties microns, per bundle fiber precursor all by hundreds of even on Thousand monofilament compositions, to obtain so fine glass fiber single filament, bushing plays in glass fiber wire-drawing production process Very important effect.
In quartz fibre production process, bushing is an exposure in air, and heat exchange can occur with air, however The temperature of bushing use state is to be maintained at the constant condition of high temperature, so bushing is often needed by repeatedly Heating and temperature-fall period, this results in the dimensional accuracy of bushing to be finally difficult to ensure that using rear in heating and cooling repeatedly.And it draws Silk bushing often just finds that dimensional accuracy is unsatisfactory for engineering requirements in use, this allows for operator and has to Bushing is replaced in the condition of high temperature, is easy to scald operator, bushing handling instrument is all fairly simple clip at present, right Bushing fixation is not sufficiently stable, and bushing price is very expensive, and is easier to break after unloading in the case of a high temperature.
The content of the invention
For the present invention for disadvantages mentioned above, providing a kind of can clamp stable quartz fibre bushing loading and unloading bracket.
The technical solution of the present invention:
Quartz fibre bushing loading and unloading bracket is mounted on at least a pair of of handle, the handle under supporting plate including supporting plate Surface, and it is vertical with supporting plate lower surface, and the splint upper surface is provided at least a pair of of collet, the collet difference described in a pair For fixed chuck and active chuck, fixed chuck be fixedly mounted in a side of supporting plate, another side of the supporting plate Sliding slot is offered, the active chuck bottom is provided with sliding block, and the sliding block is mounted in the sliding slot;The work Dynamic collet is slided along sliding slot, close to or away from the fixed chuck;Fixed dress is additionally provided on the active chuck It puts, for the position of active chuck to be fixed.
Further, the collet one side is equipped with step, and the step of a pair of of collet is oppositely arranged, and step leaks for placing The bottom of plate.
Preferably, the fixing device includes the fixed block being fixed on supporting plate, further includes screw rod, the screw stem water Safety fills, and one end is movably connected on fixed block, horizontal through hole is offered on the active chuck, is had in the through hole Internal thread, the screw rod have external screw thread, and screw rod is connected through a screw thread with active chuck.
The fixed block is mounted on sliding slot close to the end of fixed chuck.
Quartz fibre bushing loading and unloading bracket provided by the invention can quickly and easily load and unload bushing, and Clamping is stablized, and protects the safety of bushing, also ensures operating personnel's safety.
Description of the drawings
Fig. 1 is the cross-sectional view of the present invention.
Specific embodiment
The present invention is described in further detail with reference to the accompanying drawings and detailed description.
As shown in Figure 1, quartz fibre bushing loading and unloading bracket, including supporting plate 2 and at least a pair of of handle 1, the hand Handle 1 is mounted on the lower surface of supporting plate 2, and vertical with 2 lower surface of supporting plate, and supporting plate 2 is made of heat-barrier material, is arrived to prevent heat transfer On handle 1.2 upper surface of supporting plate is provided at least a pair of of collet, and the collet described in a pair is respectively fixed chuck 3 and lives Dynamic collet 5, fixed chuck 3 be fixedly mounted in a side of supporting plate 2,2 another side of supporting plate offers sliding slot 4,5 bottom of active chuck is provided with sliding block, and the sliding block is mounted in the sliding slot 4;The active chuck 5 It is slided along sliding slot 4, close to or away from the fixed chuck 3;Fixing device is additionally provided on the active chuck 5, For the position of active chuck 5 to be fixed.
Collet can have multipair, be sequentially arranged on supporting plate 2.It is used suitable for longer bushing.Similary corresponding handle 1 It can be multipair.
Before use, first moving 5 outward side of active chuck, supporting plate 2 is then moved to bushing bottom, by a pair of of collet The both sides of bushing plug are clipped in, mobile active chuck 5 clamps bushing plug, and fixes active chuck 5 with fixing device.Then may be used To unclamp the fixed plate of bushing, bushing is removed.
The collet one side is equipped with step, and the step of a pair of of collet is oppositely arranged, and step is used to place the bottom of bushing. Step lifts the plug bottom of bushing, and certain distance is kept between supporting plate 2, to prevent the discharge spout for plug bottom of colliding with.
The fixing device includes the fixed block 7 being fixed on supporting plate 2, further includes screw rod 6, and the screw rod 6 is horizontal Installation, one end are movably connected on fixed block 7, and screw rod 6 be free to rotate, and end rotates unfettered in fixed block 7. Horizontal through hole is offered on the active chuck 5, there is internal thread in the through hole, the screw rod 6 has external screw thread, spiral shell Bar 6 is connected through a screw thread with active chuck 5.The fixed block 7 is mounted on sliding slot 4 close to the end of fixed chuck 3.Rotate spiral shell Bar 6 can drive active chuck 5 to be slided along sliding slot 4, unclamp or clamp bushing.
The foregoing is merely the embodiment of the present invention, are not intended to limit the scope of the invention, every to utilize this hair The equivalent structure or equivalent flow shift that bright specification and accompanying drawing content are made directly or indirectly is used in other relevant skills Art field, is included within the scope of the present invention.

Claims (4)

1. quartz fibre bushing loading and unloading bracket, which is characterized in that including supporting plate(2)At least a pair of of handle(1), it is described Handle(1)Mounted on supporting plate(2)Lower surface, and and supporting plate(2)Lower surface is vertical, the supporting plate(2)Upper surface is provided with At least a pair of of collet, the collet described in a pair is respectively fixed chuck(3)And active chuck(5), fixed chuck(3)It is fixed Mounted on supporting plate(2)A side on, the supporting plate(2)Another side offers sliding slot(4), the active chuck(5) Bottom is provided with sliding block, and the sliding block is mounted on the sliding slot(4)It is interior;The active chuck(5)Along sliding slot(4)It is sliding It is dynamic, close to or away from the fixed chuck(3);The active chuck(5)On be additionally provided with fixing device, for that will live Dynamic collet(5)Position fix.
2. quartz fibre bushing loading and unloading bracket according to claim 1, it is characterised in that:The collet one side is set There is step, the step of a pair of of collet is oppositely arranged, and step is used to place the bottom of bushing.
3. quartz fibre bushing loading and unloading bracket according to claim 1 or 2, it is characterised in that:The fixed dress It puts including being fixed on supporting plate(2)On fixed block(7), further include screw rod(6), the screw rod(6)It is horizontally mounted, one end activity It is connected to fixed block(7)On, the active chuck(5)On offer horizontal through hole, have internal thread, institute in the through hole The screw rod stated(6)There are external screw thread, screw rod(6)With active chuck(5)It is connected through a screw thread.
4. quartz fibre bushing loading and unloading bracket according to claim 3, it is characterised in that:The fixed block(7) Mounted on sliding slot(4)Close to fixed chuck(3)End.
CN201711470626.9A 2017-12-29 2017-12-29 Quartz fibre bushing loading and unloading bracket Pending CN108117255A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711470626.9A CN108117255A (en) 2017-12-29 2017-12-29 Quartz fibre bushing loading and unloading bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711470626.9A CN108117255A (en) 2017-12-29 2017-12-29 Quartz fibre bushing loading and unloading bracket

Publications (1)

Publication Number Publication Date
CN108117255A true CN108117255A (en) 2018-06-05

Family

ID=62232484

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711470626.9A Pending CN108117255A (en) 2017-12-29 2017-12-29 Quartz fibre bushing loading and unloading bracket

Country Status (1)

Country Link
CN (1) CN108117255A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204413986U (en) * 2015-02-02 2015-06-24 西安科迅机械制造有限公司 Dry vibratory sieve voussoir dismantling device
CN105058354A (en) * 2015-08-17 2015-11-18 苏州速腾电子科技有限公司 Workpiece clamp
CN205074987U (en) * 2015-09-30 2016-03-09 江西昌河汽车有限责任公司 Adjustable extracting tool
CN205272014U (en) * 2016-01-15 2016-06-01 浙江机电职业技术学院 Lead accumulator groove robot customization tongs based on servo motor
CN205874215U (en) * 2016-07-30 2017-01-11 山西晋投玄武岩开发有限公司 Basalt fiber wire -drawing bushing changes special bracket
CN107263515A (en) * 2017-08-21 2017-10-20 东莞合安机电有限公司 A kind of NC films bar folds up machine
CN206764378U (en) * 2017-06-13 2017-12-19 厦门鸿方圆工贸有限公司 A kind of numerical control machine tool clamp

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204413986U (en) * 2015-02-02 2015-06-24 西安科迅机械制造有限公司 Dry vibratory sieve voussoir dismantling device
CN105058354A (en) * 2015-08-17 2015-11-18 苏州速腾电子科技有限公司 Workpiece clamp
CN205074987U (en) * 2015-09-30 2016-03-09 江西昌河汽车有限责任公司 Adjustable extracting tool
CN205272014U (en) * 2016-01-15 2016-06-01 浙江机电职业技术学院 Lead accumulator groove robot customization tongs based on servo motor
CN205874215U (en) * 2016-07-30 2017-01-11 山西晋投玄武岩开发有限公司 Basalt fiber wire -drawing bushing changes special bracket
CN206764378U (en) * 2017-06-13 2017-12-19 厦门鸿方圆工贸有限公司 A kind of numerical control machine tool clamp
CN107263515A (en) * 2017-08-21 2017-10-20 东莞合安机电有限公司 A kind of NC films bar folds up machine

Similar Documents

Publication Publication Date Title
JP2005528781A (en) Method and apparatus for preparing a semiconductor wafer and / or hybrid
JP2015108540A5 (en)
CN108117255A (en) Quartz fibre bushing loading and unloading bracket
ES2575579T3 (en) Glass coated threads and their production procedures
CN104716250A (en) Extremely fine gold free silver alloy gold-plating bonding wire and manufacture method thereof
CN108982176A (en) The processing method of flexible glass plate and the measurement method of thermal expansion coefficient
CN206408312U (en) Monocrystalline pre-installs material clamp
JP2005336695A (en) Glass cloth
JP3316068B2 (en) Boat for heat treatment
JP2011080813A (en) Thermocouple mounting temperature measuring plate
CN108526233A (en) A kind of noble metal silk material pointing machine
JP5747970B2 (en) Copper wire for bonding wire
CN108046585A (en) Quartz fibre bushing cooling device
CN205607556U (en) A multiple spot thermocouple structure that is used for whole section of diffusion furnace temperature measurement
CN207313757U (en) Apparatus for melt spinning
US1835113A (en) Protective coating for metal surfaces
CN108046586A (en) Quartz fibre wire drawing high temperature alloy bushing
CN211805405U (en) Novel mechatronic polisher
CN207031508U (en) A kind of annealing device of bonding wire
CN110402307A (en) The manufacturing method of acrylic fibre beam and the manufacturing method of carbon fiber bundle
CN220703509U (en) Auxiliary heating device and system for carrier plate glass overflow bricks
CN219321310U (en) Detachable silicon wafer cleaning flower basket with adjustable size
CN220318043U (en) Diffusion furnace with composite hot zone
US20210183673A1 (en) Rapid thermal processing apparatus
KR100225606B1 (en) Method of preparing an ultra-fine nylon grey yarn having excellent eveness

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180605

WD01 Invention patent application deemed withdrawn after publication