CN108110696A - A kind of convenient mounting cable crane span structure of modularization - Google Patents

A kind of convenient mounting cable crane span structure of modularization Download PDF

Info

Publication number
CN108110696A
CN108110696A CN201711318115.5A CN201711318115A CN108110696A CN 108110696 A CN108110696 A CN 108110696A CN 201711318115 A CN201711318115 A CN 201711318115A CN 108110696 A CN108110696 A CN 108110696A
Authority
CN
China
Prior art keywords
crane span
clamp plate
span structure
magnet
groove body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711318115.5A
Other languages
Chinese (zh)
Inventor
李欣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Tianshun Electronic Technology Co Ltd
Original Assignee
Zhengzhou Tianshun Electronic Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Tianshun Electronic Technology Co Ltd filed Critical Zhengzhou Tianshun Electronic Technology Co Ltd
Priority to CN201711318115.5A priority Critical patent/CN108110696A/en
Publication of CN108110696A publication Critical patent/CN108110696A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G3/00Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
    • H02G3/02Details
    • H02G3/04Protective tubing or conduits, e.g. cable ladders or cable troughs
    • H02G3/0456Ladders or other supports

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Load-Engaging Elements For Cranes (AREA)

Abstract

The invention discloses a kind of convenient mounting cable crane span structures of modularization, including lamina tecti, crane span structure groove body and card line component, the lamina tecti is installed on the top of crane span structure groove body, several card line components are provided on the inside of crane span structure groove body, card line component is including there are one upper clamp plates, one lower clamp plate, two support bases and a snap-gauge, upper clamp plate and lower clamp plate are oppositely arranged, it is equipped at left and right sides of the bottom of crane span structure groove body and coordinates and to the support base of lower clamp plate flying shore with lower clamp plate, card slot is offered among the bottom of lower clamp plate, the downside of lower clamp plate is equipped with the snap-gauge that can be positioned on card slot, swingle is installed among the bottom of snap-gauge.Structure novel of the present invention, design is reasonable, and dustproof and waterproof effect is preferable, convenient for disassembly and assembly, reliable and stable, and convenient for safeguarding.

Description

A kind of convenient mounting cable crane span structure of modularization
Technical field
The present invention relates to cable testing bridge fields, are specifically a kind of convenient mounting cable crane span structure of modularization.
Background technology
Cable testing bridge is widely used in industries such as oil, chemical industry, electric power, light industry, telecommunications, is mainly used for empty electricity Power cable, the laying for controlling cable, light conduits, telecommunication cable.Cable testing bridge is divided into slot type, pellet type and ladder-type, grid The structures such as formula, crane span structure can independently be set up in building, can also be attached on various buildings or structures and piping lane stent, should Embody it is simple in structure, it is handsome in appearance, configuration it is flexible and easy to maintenance the features such as.
Existing cable testing bridge, dustproof and waterproof effect is bad, and since present cable laying amount is larger, cable accumulation is laid with , can be more chaotic in bridge trough body, and the upkeep operation in later stage is not easy to, reliability is poor.
The content of the invention
It is an object of the invention to provide a kind of convenient mounting cable crane span structure of modularization, to solve to carry in above-mentioned background technology The problem of going out.
To achieve the above object, the present invention provides following technical solution:
A kind of convenient mounting cable crane span structure of modularization, including lamina tecti, crane span structure groove body and card line component, the lamina tecti is installed on The top of crane span structure groove body, between lamina tecti and crane span structure groove body by several first screws connect fix, the crane span structure groove body it is interior Side is provided with several card line components, and the card line component is including there are one upper clamp plate, a lower clamp plate, two support bases and one Snap-gauge, the upper clamp plate and lower clamp plate are oppositely arranged, and the left and right ends of upper clamp plate and lower clamp plate are respectively arranged with installation otic placode With lower installation otic placode, connected and fixed by several second screws between upper installation otic placode and lower installation otic placode, the upper clamp plate Downside and the upside of lower clamp plate offer multiple upper grooves and lower groove respectively, are equipped at left and right sides of the bottom of the crane span structure groove body Coordinate with lower clamp plate and to the support base of lower clamp plate flying shore, offer card slot among the bottom of the lower clamp plate, in card slot Embedded with multiple first magnet, the downside of the lower clamp plate is equipped with the snap-gauge that can be positioned on card slot, the top of the snap-gauge Embedded with multiple second magnet, face that the first magnet and the second magnet are in contact synonyms pole each other, in the bottom of the snap-gauge Between swingle is installed, swingle is stretched out from the basal sliding of crane span structure groove body, and the outside of crane span structure groove body is installed in swingle lower end There is rotating handle.
As further embodiment of the present invention:The top of the crane span structure groove body in being obliquely installed inwardly, lamina tecti be with The inverted u-shaped structure that crane span structure groove body matches.
As further embodiment of the present invention:The upper groove and lower groove are the identical semicircle groove body of size, and fovea superior Slot and lower groove are correspondingly arranged vertically.
As further embodiment of the present invention:Rubber layer is additionally provided on the inside of the upper groove and lower groove.
As further embodiment of the present invention:When the lower clamp plate and support base are in close contact, the lower surface of lower clamp plate away from The distance of bottom is 1~3cm in bridge trough body.
As further embodiment of the present invention:The card slot is rounded, there are three the first magnet is circumferentially uniformly arranged, first Magnet is rounded, and 1/4 that the radius of the first magnet is card slot radius.
As further embodiment of the present invention:After the snap-gauge is rounded, and snap-gauge is positioned on card slot, the following table of snap-gauge Face is located at the downside of the lower surface of lower clamp plate.
As further embodiment of the present invention:Second magnet is in the circle identical with the first magnet size, the second magnetic There are three iron is circumferentially uniformly arranged, and after snap-gauge rotates by a certain angle, the first magnet and the second magnet can correspond.
Compared with prior art, the beneficial effects of the invention are as follows:The convenient mounting cable crane span structure of the modularization, structure novel, Design is reasonable, and dustproof and waterproof effect is preferable, convenient for disassembly and assembly, and the upper clamp plate and lower clamp plate of card line component can be first installed on cable, It, can be to upper clamp plate by support base between upper clamp plate and lower clamp plate sub-assembly are put into vivo two support bases of bridge trough afterwards Stablize flying shore with lower clamp plate sub-assembly, acted on by the magnetic of the first magnet and the second magnet, snap-gauge, which can be stablized, to be positioned in In card slot, play the role of to upper clamp plate and lower clamp plate sub-assembly /V, it is reliable and stable;Snap-gauge is revolved by operating rotating handle Turn, after the first magnet and the dislocation of the second magnet, facilitate separating for upper clamp plate and lower clamp plate sub-assembly and snap-gauge, convenient for safeguarding.
Description of the drawings
Fig. 1 is the structural diagram of the present invention.
Fig. 2 is card slot and the enlarged drawing of snap-gauge junction in the present invention.
Fig. 3 is the bottom view of lower clamp plate part in the present invention.
Fig. 4 is the top view of snap-gauge part in the present invention.
In figure:1- lamina tectis, the first screws of 2-, the second screws of 3-, 4- upper clamp plates, 5- upper grooves, 6- rubber layers, 7- crane span structures Groove body, 8- support bases, 9- lower clamp plates, 10- lower grooves, 11- card slots, 12- snap-gauges, 13- rotating handles, 14- swingles, 15- first Magnet, the second magnet of 16- install otic placode under 17-, otic placode are installed on 18-.
Specific embodiment
Below in conjunction with the attached drawing in the embodiment of the present invention, the technical solution in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other without making creative work Embodiment belongs to the scope of protection of the invention.
Please refer to Fig.1~4, in the embodiment of the present invention, a kind of convenient mounting cable crane span structure of modularization, including lamina tecti 1, bridge Rack slot body 7 and card line component, the lamina tecti 1 are installed on the top of crane span structure groove body 7, pass through between lamina tecti 1 and crane span structure groove body 7 The connection of several first screws 2 is fixed, specifically, the top of the crane span structure groove body 7 is in being obliquely installed inwardly, lamina tecti 1 be with The inverted u-shaped structure that crane span structure groove body 7 matches so sets the Fast Installation being beneficial between lamina tecti 1 and crane span structure groove body 7, and Waterproof and dustproof effect is good.
The inside of the crane span structure groove body 7 is provided with several card line components, the card line component include there are one upper clamp plate 4, One lower clamp plate, 9, two support bases 8 and a snap-gauge 12, the upper clamp plate 4 and lower clamp plate 9 are oppositely arranged, and upper clamp plate 4 is under The left and right ends of clamping plate 9 are respectively arranged with installation otic placode 18 and lower installation otic placode 17, upper installation otic placode 18 and lower installation otic placode Fixation is connected by several second screws 3 between 17, the downside of the upper clamp plate 4 and the upside of lower clamp plate 9 offer more respectively A upper groove 5 and lower groove 10, the upper groove 5 and lower groove 10 are the identical semicircle groove body of size, and upper groove 5 and recessed Slot 10 is correspondingly arranged vertically, and the inside of the upper groove 5 and lower groove 10 is additionally provided with rubber layer 6, can be to cable by rubber layer 6 It is protected.
It is equipped with and coordinates with lower clamp plate 9 and to the support of 9 flying shore of lower clamp plate at left and right sides of the bottom of the crane span structure groove body 7 Seat 8, when lower clamp plate 9 and support base 8 are in close contact, distance of the lower surface of lower clamp plate 9 away from bottom in crane span structure groove body 7 for 1~ 3cm。
Card slot 11 is offered among the bottom of the lower clamp plate 9, card slot 11 is rounded, and multiple first are embedded in card slot 11 Magnet 15, first magnet 15 is circumferential be uniformly arranged there are three, the first magnet 15 is rounded, and the radius of the first magnet 15 is The 1/4 of 11 radius of card slot, the downside of the lower clamp plate 9 are equipped with the snap-gauge 12 that can be positioned on card slot 11, and the snap-gauge 12 is in Circle, and after snap-gauge 12 is positioned on card slot 11, the lower surface of snap-gauge 12 is located at the downside of the lower surface of lower clamp plate 9, the card The top of plate 12 is embedded with multiple second magnet 16, and second magnet 16 is in the circle identical with 15 size of the first magnet, the Two magnet 16 is circumferential be uniformly arranged there are three, and after snap-gauge 12 rotates by a certain angle, the first magnet 15 and the second magnet 16 can It corresponds, the face that 15 and second magnet 16 of the first magnet is in contact synonyms pole each other, the first magnet 15 and the first magnetic 15 magnetic of iron can promote the stability of lower clamp plate 9, be equipped with swingle 14 among the bottom of the snap-gauge 12, swingle 14 from The basal sliding of crane span structure groove body 7 is stretched out, and the outside of crane span structure groove body 7 is equipped with rotating handle 13 in 14 lower end of swingle, passes through rotation Handle 13 is convenient to rotate swingle 14, and then snap-gauge 12 is rotated, and after the first magnet 15 and the dislocation of the second magnet 16, facilitates snap-gauge 12 separate with lower clamp plate 9, and swingle 14 can move up and down, and are provided for upper clamp plate 4 and 9 sub-assembly of lower clamp plate more than longitudinal buffer Amount, and promote support effect of the support base 8 to 9 sub-assembly of upper clamp plate 4 and lower clamp plate.
The convenient mounting cable crane span structure of the modularization, structure novel, design is reasonable, and dustproof and waterproof effect is preferable, convenient for disassembly and assembly, The upper clamp plate 4 of card line component and lower clamp plate 9 can be first installed on cable, after upper clamp plate 4 and 9 sub-assembly of lower clamp plate be put into bridge Between two support bases 8 in rack slot body 7, flying shore can be stablized to upper clamp plate 4 and 9 sub-assembly of lower clamp plate by support base 8, It is acted on by the magnetic of the first magnet 15 and the second magnet 16, snap-gauge 12, which can be stablized, to be positioned in card slot 11, is played to upper clamp plate 4 It is reliable and stable with the effect of 9 sub-assembly /V of lower clamp plate;Snap-gauge 12 is rotated by operating rotating handle 13,15 He of the first magnet After the dislocation of second magnet 16, facilitate separating for upper clamp plate 4 and 9 sub-assembly of lower clamp plate and snap-gauge 12, convenient for maintenance.
Above is only the preferred embodiment of the present invention, it is noted that for those skilled in the art, not On the premise of departing from present inventive concept, several modifications and improvements can also be made, these should also be considered as the protection model of the present invention It encloses, these all do not interfere with the effect and practical applicability that the present invention is implemented.

Claims (8)

1. a kind of convenient mounting cable crane span structure of modularization, including lamina tecti(1), crane span structure groove body(7)With card line component, feature exists In the lamina tecti(1)It is installed on crane span structure groove body(7)Top, lamina tecti(1)With crane span structure groove body(7)Between pass through several One screw(2)Connection is fixed, the crane span structure groove body(7)Inside be provided with several card line components, the card line component includes One upper clamp plate(4), a lower clamp plate(9), two support bases(8)With a snap-gauge(12), the upper clamp plate(4)And lower clamp plate (9)It is oppositely arranged, upper clamp plate(4)And lower clamp plate(9)Left and right ends be respectively arranged with installation otic placode(18)With lower mounting ear Plate(17), upper installation otic placode(18)With lower installation otic placode(17)Between pass through several second screws(3)Connection is fixed, the upper folder Plate(4)Downside and lower clamp plate(9)Upside offer multiple upper grooves respectively(5)And lower groove(10), the crane span structure groove body (7)Bottom at left and right sides of be equipped with and lower clamp plate(9)Coordinate and to lower clamp plate(9)The support base of flying shore(8), the lower folder Plate(9)Bottom among offer card slot(11), card slot(11)It is interior to be embedded with multiple first magnet(15), the lower clamp plate(9) Downside be equipped with can be positioned in card slot(11)On snap-gauge(12), the snap-gauge(12)Top be embedded with multiple second magnet (16), the first magnet(15)With the second magnet(16)The face being in contact synonyms pole each other, the snap-gauge(12)Bottom among Swingle is installed(14), swingle(14)From crane span structure groove body(7)Basal sliding stretch out, crane span structure groove body(7)Outside in rotation Bull stick(14)Lower end is equipped with rotating handle(13).
2. the convenient mounting cable crane span structure of modularization according to claim 1, which is characterized in that the crane span structure groove body(7)'s Top is in be obliquely installed inwardly, lamina tecti(1)For with crane span structure groove body(7)The inverted u-shaped structure to match.
3. the convenient mounting cable crane span structure of modularization according to claim 1, which is characterized in that the upper groove(5)With under Groove(10)For the identical semicircle groove body of size, and upper groove(5)And lower groove(10)It is correspondingly arranged vertically.
4. the convenient mounting cable crane span structure of modularization according to claim 1 or 3, which is characterized in that the upper groove(5)With Lower groove(10)Inside be additionally provided with rubber layer(6).
5. the convenient mounting cable crane span structure of modularization according to claim 1, which is characterized in that the lower clamp plate(9)With branch Support seat(8)During close contact, lower clamp plate(9)Lower surface away from crane span structure groove body(7)The distance of interior bottom is 1~3cm.
6. the convenient mounting cable crane span structure of modularization according to claim 1, which is characterized in that the card slot(11)In circle Shape, the first magnet(15)There are three being circumferentially uniformly arranged, the first magnet(15)It is rounded, and the first magnet(15)Radius for card Slot(11)The 1/4 of radius.
7. the convenient mounting cable crane span structure of modularization according to claim 1 or 6, which is characterized in that the snap-gauge(12)It is in Circle, and snap-gauge(12)It is positioned in card slot(11)After upper, snap-gauge(12)Lower surface be located at lower clamp plate(9)Lower surface under Side.
8. the convenient mounting cable crane span structure of modularization according to claim 7, which is characterized in that second magnet(16)It is in With the first magnet(15)The identical circle of size, the second magnet(16)There are three being circumferentially uniformly arranged, and snap-gauge(12)Rotation one After determining angle, the first magnet(15)With the second magnet(16)It can correspond.
CN201711318115.5A 2017-12-12 2017-12-12 A kind of convenient mounting cable crane span structure of modularization Pending CN108110696A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711318115.5A CN108110696A (en) 2017-12-12 2017-12-12 A kind of convenient mounting cable crane span structure of modularization

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711318115.5A CN108110696A (en) 2017-12-12 2017-12-12 A kind of convenient mounting cable crane span structure of modularization

Publications (1)

Publication Number Publication Date
CN108110696A true CN108110696A (en) 2018-06-01

Family

ID=62215696

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711318115.5A Pending CN108110696A (en) 2017-12-12 2017-12-12 A kind of convenient mounting cable crane span structure of modularization

Country Status (1)

Country Link
CN (1) CN108110696A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110004555A (en) * 2019-04-24 2019-07-12 浙江绿净环保科技股份有限公司 A kind of PTFE sewing thread

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07236217A (en) * 1994-02-23 1995-09-05 Sumitomo Wiring Syst Ltd Molded protector for wire harness
CN204012500U (en) * 2014-06-26 2014-12-10 国家电网公司 The interim securing device of secondary cable wiring
CN205350561U (en) * 2015-12-11 2016-06-29 重庆拓卓金属材料有限公司 Withstand voltage cable testing bridge of metal material
CN106972428A (en) * 2017-05-18 2017-07-21 镇江华源晋昌电器有限公司 One kind can classify wiring cable crane span structure
CN206498162U (en) * 2017-02-27 2017-09-15 江西科得玻璃钢科技协同创新有限公司 A kind of self-locking cable trough
CN206506253U (en) * 2017-02-21 2017-09-19 江苏川都电力科技有限公司 A kind of Upset hinge formula cable fixes gold utensil

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07236217A (en) * 1994-02-23 1995-09-05 Sumitomo Wiring Syst Ltd Molded protector for wire harness
CN204012500U (en) * 2014-06-26 2014-12-10 国家电网公司 The interim securing device of secondary cable wiring
CN205350561U (en) * 2015-12-11 2016-06-29 重庆拓卓金属材料有限公司 Withstand voltage cable testing bridge of metal material
CN206506253U (en) * 2017-02-21 2017-09-19 江苏川都电力科技有限公司 A kind of Upset hinge formula cable fixes gold utensil
CN206498162U (en) * 2017-02-27 2017-09-15 江西科得玻璃钢科技协同创新有限公司 A kind of self-locking cable trough
CN106972428A (en) * 2017-05-18 2017-07-21 镇江华源晋昌电器有限公司 One kind can classify wiring cable crane span structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110004555A (en) * 2019-04-24 2019-07-12 浙江绿净环保科技股份有限公司 A kind of PTFE sewing thread
CN110004555B (en) * 2019-04-24 2020-06-19 浙江绿净环保科技股份有限公司 Device for marking PTFE sewing thread

Similar Documents

Publication Publication Date Title
CN204144691U (en) The copper bar installation structure of circuit breaker incoming line cabinet
CN104868405B (en) Multi-angle cable retention clip
CN108110696A (en) A kind of convenient mounting cable crane span structure of modularization
CN207504503U (en) A kind of modularization is clamped cable testing bridge
CN208797461U (en) A kind of insulation shunt line support device suitable for bypass operation
CN206742549U (en) Rotary connector
CN207401858U (en) A kind of cleaning device of cable accessory
CN104242214B (en) Electric cable with large cross-section lays the general fixing device that wish-bone arm type is installed
CN208190164U (en) For electricity laboratory power supply line wire clamp
CN207021621U (en) It is a kind of to be easy to fixed photoelectric terminal box
CN204167775U (en) The instrument that relief cable is fixing
CN209002030U (en) Wireless charging mobile phone bracket
CN105735622B (en) A kind of tool box for soaking ceramic tile
CN207542015U (en) One kind is based on the fixed clamping of insulator processing
CN205275611U (en) Cell culture board application of sample auxiliary device
CN205141509U (en) Change ammeter with adjustable universal fixing -line device
CN204012500U (en) The interim securing device of secondary cable wiring
CN206834659U (en) One kind auxiliary winding displacement support
CN209161144U (en) A kind of heavy cable laying device
CN203434494U (en) Isolation board for upper pile head and lower pile head of falling-off type fuse
CN207926155U (en) A kind of adjustable type cable connection sleeve
CN207150071U (en) A kind of cable testing bridge with separation function
CN206567176U (en) Terminal box fixing tool fixture
CN108769314A (en) A method of improving mobile phone cruising ability
CN215482364U (en) Novel formwork support device for construction of building road and bridge

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180601

RJ01 Rejection of invention patent application after publication