CN204144691U - The copper bar installation structure of circuit breaker incoming line cabinet - Google Patents
The copper bar installation structure of circuit breaker incoming line cabinet Download PDFInfo
- Publication number
- CN204144691U CN204144691U CN201420648801.4U CN201420648801U CN204144691U CN 204144691 U CN204144691 U CN 204144691U CN 201420648801 U CN201420648801 U CN 201420648801U CN 204144691 U CN204144691 U CN 204144691U
- Authority
- CN
- China
- Prior art keywords
- row
- propped
- bus
- incoming line
- cabinet
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000009434 installation Methods 0.000 title claims abstract description 21
- RYGMFSIKBFXOCR-UHFFFAOYSA-N Copper Chemical compound [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 title claims abstract description 18
- 229910052802 copper Inorganic materials 0.000 title claims abstract description 18
- 239000010949 copper Substances 0.000 title claims abstract description 18
- 239000012212 insulator Substances 0.000 claims abstract description 5
- 239000000463 material Substances 0.000 abstract description 6
- 238000011900 installation process Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
Landscapes
- Distribution Board (AREA)
Abstract
Description
技术领域 technical field
本实用新型涉及电力配电装置技术领域,具体为断路器进线柜的铜排安装结构。 The utility model relates to the technical field of power distribution devices, in particular to a copper bar installation structure of a circuit breaker inlet cabinet.
背景技术 Background technique
现有的进线断路器铜排结构下端汇流排固定于柜体两侧的母线夹,下端支排搭接于汇流排上,两侧母线夹支撑着下端母排和汇流排,从而满足一次系统方案,但是该结构铜排用量增加,辅材用量增加,大大增加了生产成本。 The lower bus bar of the existing incoming line circuit breaker copper bar structure is fixed to the bus bar clamps on both sides of the cabinet, the lower branch bar is lapped on the bus bar, and the bus bar clamps on both sides support the lower bus bar and bus bar, so as to meet the requirements of the primary system. However, the amount of copper bars and auxiliary materials used in this structure increases, which greatly increases the production cost.
实用新型内容 Utility model content
本实用新型的目的在于提供一种断路器进线柜的铜排安装结构,以节省材料,简化安装。 The purpose of the utility model is to provide a copper bar installation structure of a circuit breaker incoming cabinet, so as to save materials and simplify installation.
为实现上述目的,本实用新型公开了断路器进线柜的铜排安装结构,包括平行固定在绝缘子上的若干主母排、侧进主排、上端支排、汇流排、下端支排,还包括两个母线支撑梁,所述的主母排通过汇流排与下端支排搭接,所述的侧进主排搭接上端支排,所述的上端支排位于下端支排的正上方,所述的上端支排通过第一母线支撑梁固定在进线柜柜体内,所述的下端支排通过第二母线支撑梁固定在进线柜柜体两侧。 In order to achieve the above purpose, the utility model discloses a copper bar installation structure of the circuit breaker incoming cabinet, including several main bus bars, side-entry main bars, upper branch bars, bus bars, and lower end branch bars fixed on the insulators in parallel. It includes two busbar support beams, the main busbar overlaps the lower branch bar through the bus bar, the side-entry main bar overlaps the upper branch bar, and the upper branch bar is located directly above the lower branch bar, The upper branch bar is fixed in the incoming cabinet body through the first busbar support beam, and the lower branch bar is fixed on both sides of the incoming cabinet body through the second busbar supporting beam.
其中,所述的下端支排的安装面朝上,所述的汇流排搭接在下端支排的安装面上。 Wherein, the installation surface of the lower branch row faces upward, and the bus bar overlaps the installation surface of the lower branch row.
优选地,所述的第一母线支撑梁及第二母线支撑梁上均布设置若干“跑道形”安装孔。 Preferably, a number of "racetrack-shaped" mounting holes are evenly distributed on the first busbar support beam and the second busbar support beam.
采用上述技术方案后,本实用新型具有如下有益效果: After adopting the above technical scheme, the utility model has the following beneficial effects:
1.上端支排通过第一母线支撑梁固定在柜体内,增加铜排的整体稳固性。 1. The upper branch bar is fixed in the cabinet through the first bus support beam, which increases the overall stability of the copper bar.
2.断路器下端增设第二母线支撑梁,取消侧进线侧的母线夹,汇流排在与下端母线搭接的位置处断开,且将汇流排安装位置提高,该方案能简化安装、大大减少铜材及辅材用量成本。 2. A second busbar support beam is added at the lower end of the circuit breaker, and the busbar clamp on the side incoming line side is canceled. The busbar is disconnected at the position where it overlaps with the lower busbar, and the installation position of the busbar is raised. Reduce the cost of copper and auxiliary materials. the
3.下端支排的安装面朝上,同时将汇流排的母线夹提高至下端支排的搭面,可以节省侧面汇流排的铜排用量; 3. The installation surface of the lower branch bar is facing upwards, and at the same time, the bus bar clamp of the bus bar is raised to the overlapping surface of the lower end branch bar, which can save the copper consumption of the side bus bar;
4.第一母线支撑梁及第二母线支撑梁上均布设置若干“跑道形”安装孔,便于安装过程位置的调整,使安装更加简易、灵活。 4. A number of "racetrack-shaped" installation holes are evenly distributed on the first busbar support beam and the second busbar support beam, which facilitates the adjustment of the position during the installation process and makes the installation easier and more flexible.
附图说明 Description of drawings
图1为本实用新型的结构示意图。 Fig. 1 is the structural representation of the utility model.
主要组件符号说明: Description of main component symbols:
1:主母排,2:侧进主排,3:上端支排,4:汇流排,5:下端支排,6:第一母线支撑梁,7:第二母线支撑梁,8:绝缘子。 1: Main busbar, 2: Side entry main bar, 3: Upper branch bar, 4: Bus bar, 5: Lower end branch bar, 6: First busbar support beam, 7: Second busbar support beam, 8: Insulator.
具体实施方式 Detailed ways
为了使本实用新型的目的、技术方案及优点更加清楚明白,以下结合附图及实施例,对本实用新型进行进一步详细说明。 In order to make the purpose, technical solution and advantages of the utility model clearer, the utility model will be further described in detail below in conjunction with the accompanying drawings and embodiments.
如图1所示,本实用新型公开了一种断路器进线柜的铜排安装结构,布设在进线柜柜体内,包括平行固定在绝缘子8上的若干铜排及两个母线支撑梁,本实例为三个主母排1、三个侧进主排2、三个上端支排3、三个汇流排4、三个下端支排5。 As shown in Figure 1, the utility model discloses a copper bar installation structure of the circuit breaker incoming cabinet, which is arranged in the incoming cabinet and includes several copper bars and two busbar support beams fixed on the insulator 8 in parallel, In this example, there are three main busbars 1, three side-entry main bars 2, three upper branch bars 3, three bus bars 4, and three lower branch bars 5.
主母排1通过汇流排4与下端支排5搭接,下端支排5的安装面朝上,汇流排4搭接在下端支排5的安装面上。侧进主排2搭接上端支排3,上端支排3位于下端支排5的正上方。上端支排3通过第一母线支撑梁6固定在柜体内,下端支排5通过第二母线支撑梁7固定在配电柜柜体两侧。该方案能简化安装、大大减少铜排及辅材用量成本。 The main busbar 1 is overlapped with the lower branch bar 5 through the bus bar 4 , the installation surface of the lower branch bar 5 faces upward, and the bus bar 4 is overlapped on the installation surface of the lower end branch bar 5 . The side entry main row 2 overlaps the upper branch row 3 , and the upper branch row 3 is located directly above the lower branch row 5 . The upper branch bar 3 is fixed in the cabinet through the first busbar support beam 6, and the lower branch bar 5 is fixed on both sides of the power distribution cabinet body through the second busbar support beam 7. This solution can simplify installation and greatly reduce the cost of copper bars and auxiliary materials.
第一母线支撑梁6及第二母线支撑梁7上均布设置若干“跑道形”安装孔71,“跑道形”为两边为半圆形,中间为矩形,设置“跑道形”安装孔71,便于安装过程位置的调整,使安装更加简易、灵活。 A number of "racetrack-shaped" mounting holes 71 are evenly distributed on the first busbar support beam 6 and the second busbar support beam 7. The "racetrack shape" is a semicircle on both sides and a rectangle in the middle. It is convenient to adjust the position during the installation process, making the installation easier and more flexible.
以上所述,仅为本实用新型较佳的具体实施方式,但本实用新型的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本实用新型揭露的技术范围内,可轻易想到的变化或替换,都应涵盖在本实用新型的保护范围之内。 The above is only a preferred embodiment of the utility model, but the scope of protection of the utility model is not limited thereto, and any person familiar with the technical field can easily think of All changes or replacements should fall within the protection scope of the present utility model.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420648801.4U CN204144691U (en) | 2014-11-04 | 2014-11-04 | The copper bar installation structure of circuit breaker incoming line cabinet |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201420648801.4U CN204144691U (en) | 2014-11-04 | 2014-11-04 | The copper bar installation structure of circuit breaker incoming line cabinet |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204144691U true CN204144691U (en) | 2015-02-04 |
Family
ID=52421356
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201420648801.4U Expired - Lifetime CN204144691U (en) | 2014-11-04 | 2014-11-04 | The copper bar installation structure of circuit breaker incoming line cabinet |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204144691U (en) |
Cited By (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104979785A (en) * | 2015-08-04 | 2015-10-14 | 南车戚墅堰机车有限公司 | Main power generator copper bar mounting rack |
| CN106583910A (en) * | 2017-01-06 | 2017-04-26 | 深圳市德知拓电源技术有限公司 | Ultrasonic welding power supply |
| CN107171190A (en) * | 2017-06-30 | 2017-09-15 | 天津瑞能电气有限公司 | A kind of switching cabinet internal structure that controlling switch is overlapped with copper bar |
| CN108054651A (en) * | 2018-01-30 | 2018-05-18 | 镇江西门子母线有限公司 | A kind of double frame circuit breaker low-voltage cabinets |
| CN108233188A (en) * | 2016-12-14 | 2018-06-29 | 施耐德电器工业公司 | Low-voltage distribution apparatus |
| CN108808458A (en) * | 2017-04-26 | 2018-11-13 | 贵州吉兆电气工程技术有限公司 | A kind of cutting system in parallel of incoming line cabinet |
| CN109301705A (en) * | 2018-10-16 | 2019-02-01 | 浙江正泰电器股份有限公司 | Power distribution cabinet |
| CN111739768A (en) * | 2020-07-02 | 2020-10-02 | 乐清市高科环保电子有限公司 | A wiring device for circuit breaker and its circuit breaker |
| CN112467661A (en) * | 2019-09-06 | 2021-03-09 | 河南森源电气股份有限公司 | Female clamping device that arranges |
-
2014
- 2014-11-04 CN CN201420648801.4U patent/CN204144691U/en not_active Expired - Lifetime
Cited By (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104979785A (en) * | 2015-08-04 | 2015-10-14 | 南车戚墅堰机车有限公司 | Main power generator copper bar mounting rack |
| CN108233188A (en) * | 2016-12-14 | 2018-06-29 | 施耐德电器工业公司 | Low-voltage distribution apparatus |
| CN108233188B (en) * | 2016-12-14 | 2021-03-19 | 施耐德电器工业公司 | Low voltage power distribution equipment |
| CN106583910A (en) * | 2017-01-06 | 2017-04-26 | 深圳市德知拓电源技术有限公司 | Ultrasonic welding power supply |
| CN108808458A (en) * | 2017-04-26 | 2018-11-13 | 贵州吉兆电气工程技术有限公司 | A kind of cutting system in parallel of incoming line cabinet |
| CN107171190A (en) * | 2017-06-30 | 2017-09-15 | 天津瑞能电气有限公司 | A kind of switching cabinet internal structure that controlling switch is overlapped with copper bar |
| CN107171190B (en) * | 2017-06-30 | 2023-07-25 | 天津瑞源电气有限公司 | Switching cabinet internal structure with copper bar overlap joint control switch |
| CN108054651A (en) * | 2018-01-30 | 2018-05-18 | 镇江西门子母线有限公司 | A kind of double frame circuit breaker low-voltage cabinets |
| CN109301705A (en) * | 2018-10-16 | 2019-02-01 | 浙江正泰电器股份有限公司 | Power distribution cabinet |
| CN112467661A (en) * | 2019-09-06 | 2021-03-09 | 河南森源电气股份有限公司 | Female clamping device that arranges |
| CN111739768A (en) * | 2020-07-02 | 2020-10-02 | 乐清市高科环保电子有限公司 | A wiring device for circuit breaker and its circuit breaker |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104701770B (en) | A kind of insulating support for fixing drainage thread | |
| CN208078525U (en) | Three-phase conducting wire for distribution network live line work upright bar struts insulating frame | |
| CN203260976U (en) | Cable termination tower | |
| CN103825219A (en) | Live-working drainage wire bracket | |
| CN101567528B (en) | Method for electrification end-hanging operation at 60-90 degrees of corners on 10 kilovolt lines | |
| CN101567527A (en) | Insulated fixed bracket of three-phase lead | |
| CN203891557U (en) | Compact insulation support | |
| CN103280758A (en) | Cable terminal tower | |
| CN201191741Y (en) | Three-phase wire insulation fixing bracket | |
| CN204645805U (en) | Double back becomes single time angle steel tower | |
| CN205745658U (en) | A kind of double back iron anchor ear | |
| CN204597230U (en) | One is high voltage distribution installation line framework arrangement within doors | |
| CN204112824U (en) | A kind of high-tension pole increases lightning protection device | |
| CN205724820U (en) | A kind of buried terminal box | |
| CN205193122U (en) | Multifunctional electricity meter linking bridge of transformer substation | |
| CN203983899U (en) | A kind of vertically arranged three-phase bus fixture | |
| CN202834409U (en) | Tail wire fixing clip of three-phase four-wire electric energy meter | |
| CN205544114U (en) | Active wire clamps for guiding the direction of the outgoing wires on the overhead outgoing wire frame | |
| CN205282891U (en) | Distribution lines column switch insulating boot | |
| CN203434490U (en) | Support structure capable of achieving quick replacement and installation of distribution network equipment | |
| CN203660320U (en) | Low-voltage switch cabinet body | |
| CN204732804U (en) | A kind of rain-proof dust-proof type trough type bridge frame | |
| CN204668117U (en) | A kind of Multifunction bushing shell for transformer outlet installing rack | |
| CN104270069A (en) | Solar panel support for power failure indicator receiver | |
| CN204732803U (en) | A kind of rain-proof type trough type bridge frame being convenient to install |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CP01 | Change in the name or title of a patent holder | ||
| CP01 | Change in the name or title of a patent holder |
Address after: No. 47 Huanzhu Road, North Industrial Zone, Jimei District, Xiamen City, Fujian Province, 361000 Patentee after: SOUTH CHINAELECTRIC DEVELOPMENT Ltd. Address before: No. 47 Huanzhu Road, North Industrial Zone, Jimei District, Xiamen City, Fujian Province, 361000 Patentee before: SOUTH CHINA ELECTRIC DEVELOPMENT (XIAMEN) LTD. |
|
| CX01 | Expiry of patent term | ||
| CX01 | Expiry of patent term |
Granted publication date: 20150204 |