CN204144691U - The copper bar installation structure of circuit breaker incoming line cabinet - Google Patents

The copper bar installation structure of circuit breaker incoming line cabinet Download PDF

Info

Publication number
CN204144691U
CN204144691U CN201420648801.4U CN201420648801U CN204144691U CN 204144691 U CN204144691 U CN 204144691U CN 201420648801 U CN201420648801 U CN 201420648801U CN 204144691 U CN204144691 U CN 204144691U
Authority
CN
China
Prior art keywords
row
propped
bus
incoming line
cabinet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420648801.4U
Other languages
Chinese (zh)
Inventor
杨玉福
陈腾林
吴定永
陈兴金
苏宏燕
罗志婷
林兴文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
South Chinaelectric Development Ltd
Original Assignee
SOUTH CHINA ELECTRIC DEVELOPMENT (XIAMEN) Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SOUTH CHINA ELECTRIC DEVELOPMENT (XIAMEN) Ltd filed Critical SOUTH CHINA ELECTRIC DEVELOPMENT (XIAMEN) Ltd
Priority to CN201420648801.4U priority Critical patent/CN204144691U/en
Application granted granted Critical
Publication of CN204144691U publication Critical patent/CN204144691U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Distribution Board (AREA)

Abstract

The utility model discloses the copper bar installation structure of circuit breaker incoming line cabinet, be laid in incoming line cabinet cabinet, comprise parallel fixing some main busbar on the insulator, main row is entered in side, row is propped up in upper end, bus-bar, lower end prop up row, also comprise two bus brace summers, main busbar props up to arrange by bus-bar and lower end and overlaps, side is entered main row overlap joint upper end and is propped up row, upper end is propped up ranking and is propped up directly over row in lower end, upper end is propped up row and is fixed in incoming line cabinet cabinet by the first bus brace summer, and lower end is propped up row and is fixed on incoming line cabinet cabinet both sides by the second bus brace summer.This utility model can simplify the installation of structure of copper bar and greatly reduce copper material and auxiliary material use quantity cost.

Description

断路器进线柜的铜排安装结构Copper bar installation structure of circuit breaker incoming cabinet

技术领域 technical field

本实用新型涉及电力配电装置技术领域,具体为断路器进线柜的铜排安装结构。 The utility model relates to the technical field of power distribution devices, in particular to a copper bar installation structure of a circuit breaker inlet cabinet.

背景技术 Background technique

现有的进线断路器铜排结构下端汇流排固定于柜体两侧的母线夹,下端支排搭接于汇流排上,两侧母线夹支撑着下端母排和汇流排,从而满足一次系统方案,但是该结构铜排用量增加,辅材用量增加,大大增加了生产成本。 The lower bus bar of the existing incoming line circuit breaker copper bar structure is fixed to the bus bar clamps on both sides of the cabinet, the lower branch bar is lapped on the bus bar, and the bus bar clamps on both sides support the lower bus bar and bus bar, so as to meet the requirements of the primary system. However, the amount of copper bars and auxiliary materials used in this structure increases, which greatly increases the production cost.

实用新型内容 Utility model content

本实用新型的目的在于提供一种断路器进线柜的铜排安装结构,以节省材料,简化安装。 The purpose of the utility model is to provide a copper bar installation structure of a circuit breaker incoming cabinet, so as to save materials and simplify installation.

为实现上述目的,本实用新型公开了断路器进线柜的铜排安装结构,包括平行固定在绝缘子上的若干主母排、侧进主排、上端支排、汇流排、下端支排,还包括两个母线支撑梁,所述的主母排通过汇流排与下端支排搭接,所述的侧进主排搭接上端支排,所述的上端支排位于下端支排的正上方,所述的上端支排通过第一母线支撑梁固定在进线柜柜体内,所述的下端支排通过第二母线支撑梁固定在进线柜柜体两侧。 In order to achieve the above purpose, the utility model discloses a copper bar installation structure of the circuit breaker incoming cabinet, including several main bus bars, side-entry main bars, upper branch bars, bus bars, and lower end branch bars fixed on the insulators in parallel. It includes two busbar support beams, the main busbar overlaps the lower branch bar through the bus bar, the side-entry main bar overlaps the upper branch bar, and the upper branch bar is located directly above the lower branch bar, The upper branch bar is fixed in the incoming cabinet body through the first busbar support beam, and the lower branch bar is fixed on both sides of the incoming cabinet body through the second busbar supporting beam.

其中,所述的下端支排的安装面朝上,所述的汇流排搭接在下端支排的安装面上。 Wherein, the installation surface of the lower branch row faces upward, and the bus bar overlaps the installation surface of the lower branch row.

优选地,所述的第一母线支撑梁及第二母线支撑梁上均布设置若干“跑道形”安装孔。 Preferably, a number of "racetrack-shaped" mounting holes are evenly distributed on the first busbar support beam and the second busbar support beam.

采用上述技术方案后,本实用新型具有如下有益效果: After adopting the above technical scheme, the utility model has the following beneficial effects:

1.上端支排通过第一母线支撑梁固定在柜体内,增加铜排的整体稳固性。 1. The upper branch bar is fixed in the cabinet through the first bus support beam, which increases the overall stability of the copper bar.

2.断路器下端增设第二母线支撑梁,取消侧进线侧的母线夹,汇流排在与下端母线搭接的位置处断开,且将汇流排安装位置提高,该方案能简化安装、大大减少铜材及辅材用量成本。   2. A second busbar support beam is added at the lower end of the circuit breaker, and the busbar clamp on the side incoming line side is canceled. The busbar is disconnected at the position where it overlaps with the lower busbar, and the installation position of the busbar is raised. Reduce the cost of copper and auxiliary materials. the

3.下端支排的安装面朝上,同时将汇流排的母线夹提高至下端支排的搭面,可以节省侧面汇流排的铜排用量; 3. The installation surface of the lower branch bar is facing upwards, and at the same time, the bus bar clamp of the bus bar is raised to the overlapping surface of the lower end branch bar, which can save the copper consumption of the side bus bar;

4.第一母线支撑梁及第二母线支撑梁上均布设置若干“跑道形”安装孔,便于安装过程位置的调整,使安装更加简易、灵活。 4. A number of "racetrack-shaped" installation holes are evenly distributed on the first busbar support beam and the second busbar support beam, which facilitates the adjustment of the position during the installation process and makes the installation easier and more flexible.

附图说明 Description of drawings

图1为本实用新型的结构示意图。 Fig. 1 is the structural representation of the utility model.

主要组件符号说明: Description of main component symbols:

1:主母排,2:侧进主排,3:上端支排,4:汇流排,5:下端支排,6:第一母线支撑梁,7:第二母线支撑梁,8:绝缘子。 1: Main busbar, 2: Side entry main bar, 3: Upper branch bar, 4: Bus bar, 5: Lower end branch bar, 6: First busbar support beam, 7: Second busbar support beam, 8: Insulator.

具体实施方式 Detailed ways

为了使本实用新型的目的、技术方案及优点更加清楚明白,以下结合附图及实施例,对本实用新型进行进一步详细说明。 In order to make the purpose, technical solution and advantages of the utility model clearer, the utility model will be further described in detail below in conjunction with the accompanying drawings and embodiments.

如图1所示,本实用新型公开了一种断路器进线柜的铜排安装结构,布设在进线柜柜体内,包括平行固定在绝缘子8上的若干铜排及两个母线支撑梁,本实例为三个主母排1、三个侧进主排2、三个上端支排3、三个汇流排4、三个下端支排5。 As shown in Figure 1, the utility model discloses a copper bar installation structure of the circuit breaker incoming cabinet, which is arranged in the incoming cabinet and includes several copper bars and two busbar support beams fixed on the insulator 8 in parallel, In this example, there are three main busbars 1, three side-entry main bars 2, three upper branch bars 3, three bus bars 4, and three lower branch bars 5.

主母排1通过汇流排4与下端支排5搭接,下端支排5的安装面朝上,汇流排4搭接在下端支排5的安装面上。侧进主排2搭接上端支排3,上端支排3位于下端支排5的正上方。上端支排3通过第一母线支撑梁6固定在柜体内,下端支排5通过第二母线支撑梁7固定在配电柜柜体两侧。该方案能简化安装、大大减少铜排及辅材用量成本。 The main busbar 1 is overlapped with the lower branch bar 5 through the bus bar 4 , the installation surface of the lower branch bar 5 faces upward, and the bus bar 4 is overlapped on the installation surface of the lower end branch bar 5 . The side entry main row 2 overlaps the upper branch row 3 , and the upper branch row 3 is located directly above the lower branch row 5 . The upper branch bar 3 is fixed in the cabinet through the first busbar support beam 6, and the lower branch bar 5 is fixed on both sides of the power distribution cabinet body through the second busbar support beam 7. This solution can simplify installation and greatly reduce the cost of copper bars and auxiliary materials.

第一母线支撑梁6及第二母线支撑梁7上均布设置若干“跑道形”安装孔71,“跑道形”为两边为半圆形,中间为矩形,设置“跑道形”安装孔71,便于安装过程位置的调整,使安装更加简易、灵活。 A number of "racetrack-shaped" mounting holes 71 are evenly distributed on the first busbar support beam 6 and the second busbar support beam 7. The "racetrack shape" is a semicircle on both sides and a rectangle in the middle. It is convenient to adjust the position during the installation process, making the installation easier and more flexible.

以上所述,仅为本实用新型较佳的具体实施方式,但本实用新型的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本实用新型揭露的技术范围内,可轻易想到的变化或替换,都应涵盖在本实用新型的保护范围之内。 The above is only a preferred embodiment of the utility model, but the scope of protection of the utility model is not limited thereto, and any person familiar with the technical field can easily think of All changes or replacements should fall within the protection scope of the present utility model.

Claims (3)

1. the copper bar installation structure of circuit breaker incoming line cabinet, be laid in incoming line cabinet cabinet, comprise parallel fixing some main busbar on the insulator, main row is entered in side, row is propped up in upper end, bus-bar, row is propped up in lower end, it is characterized in that: also comprise two bus brace summers, described main busbar props up to arrange by bus-bar and lower end and overlaps, described side is entered main row overlap joint upper end and is propped up row, described upper end is propped up ranking and is propped up directly over row in lower end, described upper end is propped up row and is fixed in incoming line cabinet cabinet by the first bus brace summer, described lower end is propped up row and is fixed on incoming line cabinet cabinet both sides by the second bus brace summer.
2. the copper bar installation structure of circuit breaker incoming line cabinet as claimed in claim 1, it is characterized in that: the installed surface of row is propped up upward in described lower end, described bus-bar is overlapped on lower end and props up on the installed surface of row.
3. the copper bar installation structure of circuit breaker incoming line cabinet as claimed in claim 1, is characterized in that: uniformly on the first described bus brace summer and the second bus brace summer arrange some " track type " installing hole.
CN201420648801.4U 2014-11-04 2014-11-04 The copper bar installation structure of circuit breaker incoming line cabinet Expired - Lifetime CN204144691U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420648801.4U CN204144691U (en) 2014-11-04 2014-11-04 The copper bar installation structure of circuit breaker incoming line cabinet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420648801.4U CN204144691U (en) 2014-11-04 2014-11-04 The copper bar installation structure of circuit breaker incoming line cabinet

Publications (1)

Publication Number Publication Date
CN204144691U true CN204144691U (en) 2015-02-04

Family

ID=52421356

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420648801.4U Expired - Lifetime CN204144691U (en) 2014-11-04 2014-11-04 The copper bar installation structure of circuit breaker incoming line cabinet

Country Status (1)

Country Link
CN (1) CN204144691U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104979785A (en) * 2015-08-04 2015-10-14 南车戚墅堰机车有限公司 Main power generator copper bar mounting rack
CN106583910A (en) * 2017-01-06 2017-04-26 深圳市德知拓电源技术有限公司 Ultrasonic welding power supply
CN107171190A (en) * 2017-06-30 2017-09-15 天津瑞能电气有限公司 A kind of switching cabinet internal structure that controlling switch is overlapped with copper bar
CN108054651A (en) * 2018-01-30 2018-05-18 镇江西门子母线有限公司 A kind of double frame circuit breaker low-voltage cabinets
CN108233188A (en) * 2016-12-14 2018-06-29 施耐德电器工业公司 Low-voltage distribution apparatus
CN108808458A (en) * 2017-04-26 2018-11-13 贵州吉兆电气工程技术有限公司 A kind of cutting system in parallel of incoming line cabinet
CN109301705A (en) * 2018-10-16 2019-02-01 浙江正泰电器股份有限公司 Power distribution cabinet
CN111739768A (en) * 2020-07-02 2020-10-02 乐清市高科环保电子有限公司 A wiring device for circuit breaker and its circuit breaker
CN112467661A (en) * 2019-09-06 2021-03-09 河南森源电气股份有限公司 Female clamping device that arranges

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104979785A (en) * 2015-08-04 2015-10-14 南车戚墅堰机车有限公司 Main power generator copper bar mounting rack
CN108233188A (en) * 2016-12-14 2018-06-29 施耐德电器工业公司 Low-voltage distribution apparatus
CN108233188B (en) * 2016-12-14 2021-03-19 施耐德电器工业公司 Low voltage power distribution equipment
CN106583910A (en) * 2017-01-06 2017-04-26 深圳市德知拓电源技术有限公司 Ultrasonic welding power supply
CN108808458A (en) * 2017-04-26 2018-11-13 贵州吉兆电气工程技术有限公司 A kind of cutting system in parallel of incoming line cabinet
CN107171190A (en) * 2017-06-30 2017-09-15 天津瑞能电气有限公司 A kind of switching cabinet internal structure that controlling switch is overlapped with copper bar
CN107171190B (en) * 2017-06-30 2023-07-25 天津瑞源电气有限公司 Switching cabinet internal structure with copper bar overlap joint control switch
CN108054651A (en) * 2018-01-30 2018-05-18 镇江西门子母线有限公司 A kind of double frame circuit breaker low-voltage cabinets
CN109301705A (en) * 2018-10-16 2019-02-01 浙江正泰电器股份有限公司 Power distribution cabinet
CN112467661A (en) * 2019-09-06 2021-03-09 河南森源电气股份有限公司 Female clamping device that arranges
CN111739768A (en) * 2020-07-02 2020-10-02 乐清市高科环保电子有限公司 A wiring device for circuit breaker and its circuit breaker

Similar Documents

Publication Publication Date Title
CN104701770B (en) A kind of insulating support for fixing drainage thread
CN208078525U (en) Three-phase conducting wire for distribution network live line work upright bar struts insulating frame
CN203260976U (en) Cable termination tower
CN103825219A (en) Live-working drainage wire bracket
CN101567528B (en) Method for electrification end-hanging operation at 60-90 degrees of corners on 10 kilovolt lines
CN101567527A (en) Insulated fixed bracket of three-phase lead
CN203891557U (en) Compact insulation support
CN103280758A (en) Cable terminal tower
CN201191741Y (en) Three-phase wire insulation fixing bracket
CN204645805U (en) Double back becomes single time angle steel tower
CN205745658U (en) A kind of double back iron anchor ear
CN204597230U (en) One is high voltage distribution installation line framework arrangement within doors
CN204112824U (en) A kind of high-tension pole increases lightning protection device
CN205724820U (en) A kind of buried terminal box
CN205193122U (en) Multifunctional electricity meter linking bridge of transformer substation
CN203983899U (en) A kind of vertically arranged three-phase bus fixture
CN202834409U (en) Tail wire fixing clip of three-phase four-wire electric energy meter
CN205544114U (en) Active wire clamps for guiding the direction of the outgoing wires on the overhead outgoing wire frame
CN205282891U (en) Distribution lines column switch insulating boot
CN203434490U (en) Support structure capable of achieving quick replacement and installation of distribution network equipment
CN203660320U (en) Low-voltage switch cabinet body
CN204732804U (en) A kind of rain-proof dust-proof type trough type bridge frame
CN204668117U (en) A kind of Multifunction bushing shell for transformer outlet installing rack
CN104270069A (en) Solar panel support for power failure indicator receiver
CN204732803U (en) A kind of rain-proof type trough type bridge frame being convenient to install

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: No. 47 Huanzhu Road, North Industrial Zone, Jimei District, Xiamen City, Fujian Province, 361000

Patentee after: SOUTH CHINAELECTRIC DEVELOPMENT Ltd.

Address before: No. 47 Huanzhu Road, North Industrial Zone, Jimei District, Xiamen City, Fujian Province, 361000

Patentee before: SOUTH CHINA ELECTRIC DEVELOPMENT (XIAMEN) LTD.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20150204