CN108107782A - A kind of automatic control concurrent data acquisition method for electric power energy collecting device - Google Patents

A kind of automatic control concurrent data acquisition method for electric power energy collecting device Download PDF

Info

Publication number
CN108107782A
CN108107782A CN201711369952.0A CN201711369952A CN108107782A CN 108107782 A CN108107782 A CN 108107782A CN 201711369952 A CN201711369952 A CN 201711369952A CN 108107782 A CN108107782 A CN 108107782A
Authority
CN
China
Prior art keywords
data
automatic control
concurrent
acquisition
acquisition method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711369952.0A
Other languages
Chinese (zh)
Other versions
CN108107782B (en
Inventor
梁增辉
邹连明
袁志民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Sanxing Medical and Electric Co Ltd
Original Assignee
Ningbo Sanxing Medical and Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Sanxing Medical and Electric Co Ltd filed Critical Ningbo Sanxing Medical and Electric Co Ltd
Priority to CN201711369952.0A priority Critical patent/CN108107782B/en
Publication of CN108107782A publication Critical patent/CN108107782A/en
Application granted granted Critical
Publication of CN108107782B publication Critical patent/CN108107782B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/042Programme control other than numerical control, i.e. in sequence controllers or logic controllers using digital processors
    • G05B19/0428Safety, monitoring
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/20Pc systems
    • G05B2219/26Pc applications
    • G05B2219/2612Data acquisition interface

Abstract

The present invention relates to a kind of automatic control concurrent data acquisition methods for electric power energy collecting device, and the described method includes S1:Whether the data of detection acquisition meet transmission condition, and satisfaction then performs S2, is unsatisfactory for, performs S3;S2:The data are sent, after operating the data according to corresponding transmission protocol, next data object is obtained, performs S1 again, realize the concurrently acquisition of data;S3:It receives and handles the data, draw the error code of the data, and the error code is modified, revised information is fed back to the transmitting terminal of collecting device, realize automatic adjusument.Compared with the prior art, automatic control concurrent data acquisition method provided by the invention can play the efficiency of concurrent acquisition module to the greatest extent.

Description

A kind of automatic control concurrent data acquisition method for electric power energy collecting device
Technical field
The present invention relates to communication data acquisition field more particularly to electric power energy collecting devices, are especially that one kind is used for The automatic control concurrent data acquisition method of electric power energy collecting device.
Background technology
With the development of electric system, the data capacity that electric power energy collecting device needs gather is increasing, to data Requirement of real-time it is higher and higher, how to improve the efficiency of data acquisition is a urgent problem.
Existing electric power energy collecting device is aided with concurrent data acquisition mode still based on single-shot data acquisition modes. But not only efficiency is too low for traditional single-shot data acquisition, but also seriously affects the real-time of data;Existing concurrent data acquisition Though can solve the problems, such as that data acquisition efficiency is low, can not adaptive each acquisition module, maximum can not play concurrent data acquisition Efficiency.
The content of the invention
In view of the above problems, it is an object of the invention to provide a kind of automatic control number of concurrent for electric power energy collecting device According to acquisition method, this method energy auto negotiation concurrently gathers the service logic from number of nodes to data item quantity, by self tuning Business, the adaptive acquisition module characteristic of energy, the efficiency of the maximum concurrent acquisition module of performance.
To achieve these goals, the technical solution adopted by the present invention is:It is a kind of for electric power energy collecting device from Control concurrent data acquisition method, it is characterised in that:The described method includes,
S1:Whether the data of detection acquisition meet transmission condition, and satisfaction then performs S2, is unsatisfactory for, performs S3;
S2:The data are sent, after operating the data according to corresponding transmission protocol, obtain next data object, then Secondary execution S1 realizes the concurrently acquisition of data;
S3:It receives and handles the data, draw the error code of the data, and the error code is modified, will repair Information after just feeds back to the transmitting terminal of collecting device, realizes automatic adjusument.
Further, the error code for drawing the data in the S3 includes,
A1:Concurrently token quantity transfinites;
A2:Concurrent data quantity transfinites.
Further, in the S3 the error code is modified including,
B1:The data point reuse that characteristic and receiving terminal according to collecting device receive concurrently marks quantity;
B2:The data point reuse concurrent data quantity that characteristic and receiving terminal according to collecting device receive.
Further, include in the S2 according to the corresponding transmission protocol operation data,
C1 is transmitted in the data procedures, and detection judges concurrently whether token quantity transfinites, if so, performing S3.
Further, being further included according to the corresponding transmission protocol operation data in the S2,
D1:If concurrently token quantity does not transfinite, continue detection and send whether buffering area has expired, if so, performing D2;
D2:Transmission mark is put, performs D3;
D3:Increase the number of current concurrent quantity, judge currently whether successfully carry out the data acquisition of next token, if It then records increase once, and performs the next data object of the acquisition in S2, perform S1 again, realize the concurrently acquisition of data.
Further, being further included according to the corresponding transmission protocol operation data in the S2,
E1:If send buffering area less than, continue detection receive buffering area whether expire, if so, successively perform D2 with D3。
Further, being further included according to the corresponding transmission protocol operation data in the S2,
F1:If buffering area is received less than being analyzed and processed to current data, judge whether current token address needs to send out Changing, if so, performing D2 and D3 successively.
Further, being further included according to the corresponding transmission protocol operation data in the S2,
G1:If currently token address does not change, continue to detect whether concurrent message amount transfinites, if so, according to Secondary execution D2 and D3.
Further, being further included according to the corresponding transmission protocol operation data in the S2,
H1:If concurrent message amount does not transfinite, data number is replaced, performs the next data object of acquisition in S2, S1 is performed again, realizes the concurrently acquisition of data.
Further, before whether the data of the detection acquisition of the S1 meet transmission condition, the data are carried out Group bag, is converted into data to be sent.
Compared with prior art, the advantage of the invention is that:This method analyzes and processes the data under reception state, It therefrom draws and corrects data capacity with the unmatched data capacity of present collection device, the attribute according to present collection device, and Correction result is fed back to the collection terminal of collecting device, and then convenient for subsequently being communicated using new data capacity as standard, is made Different collecting device can automatic adjusument data acquisition size and how many, to realize the adaptive of electric power energy collecting device Control;And this method allow electric power energy collecting device simultaneously to it is multiple token, multiple data of each token are carried out at the same time Acquisition, realization concurrently gather, also effectively increase data acquisition efficiency, realize the transmission real-time of data, utmostly send out The advantages of having waved concurrent data acquisition.
Description of the drawings
Fig. 1 is flow chart of the present invention for the automatic control concurrent data acquisition method of electric power energy collecting device.
Specific embodiment
The embodiment of the present invention is described below in detail, the example of the embodiment is shown in the drawings, wherein from beginning to end Same or similar label represents same or similar element or has the function of same or like element.Below with reference to attached The embodiment of figure description is exemplary, and is only used for explaining the present invention, and is not considered as limiting the invention.
Electric system is with development, it is necessary to multiple data messages of multiple electric energy meters be gathered simultaneously, if an acquisition is eventually The corresponding N number of electric energy meter in end, and each electric energy meter has M data to need to be collected, then finally needs to gather N*M data, tradition Single-shot data, i.e., once transmission is only capable of a data message of one electric energy meter of conveying, to having gathered all data, it is necessary to It takes considerable time, causing can not real-time Transmission electric energy meter information.
In order to improve information gathering efficiency of transmission, concurrent data acquisition starts to be proposed for electric power energy collecting device In, i.e., for N number of electric energy meter, each electric energy meter need to be collected the situation of M data, can be realized simultaneously in a power line pair Multiple data are acquired the information of multiple electric energy meters, so as to shorten the information gathering time, improve the real-time of data.
It is also immature at present yet with this kind of technology, specifically how to carry out data transmission in practice also especially unclear It is clear, and the concurrent acquisition mode more importantly proposed at present can not realize automatic adjusument, a kind of communication is only capable of being applicable in specific Acquisition terminal, once this kind of communication mode is applied into other kinds of acquisition terminal, then can be because of data capacity etc. not With causing not realizing transmission.
So the present invention applies to electric power energy collecting device and is studied and improved to concurrently gathering, and emphasis pair The adaptivity of the acquisition method has been disclosed.A kind of implementation of the present invention as shown in Figure 1, one kind are used for electric power energy The automatic control concurrent data acquisition method of source collecting device, the electric system have N number of electric energy meter, and each electric energy meter need to have M number According to being collected, which can be the property parameters such as the voltage, electric current, electrical power of electric energy meter, for convenience to each attribute Parameter distinguishes, and is each parameter designing data encoding, i.e. ID, can order the ID=1 to represent the voltage of electric energy meter, ID= 2 represent the electric current of electric energy meter, ID=3 represents electrical power of electric energy meter etc., which kind of property parameters specific each ID represents, can To be determined according to actual situation.
The data are packaged after the data of the extraneous transmission of acquisition, are converted into data to be sent, at this time by collecting device The transmitting terminal of collecting device is in transmission state, i.e., " the transmission state " of left end in corresponding diagram 1, then carries out following operation:
S1:Whether the data of detection acquisition meet transmission condition, and satisfaction then performs S2, is unsatisfactory for, performs S3;
S2:The data are sent, after operating the data according to corresponding transmission protocol, obtain next data object, then Secondary execution S1 realizes the concurrently acquisition of data;
S3:It receives and handles the data, draw the error code of the data, and the error code is modified, will repair Information after just feeds back to the transmitting terminal of collecting device, realizes automatic adjusument.
In S2, after obtaining next data object, and the transmitting and receiving process of the upper data of left end repetition from flow chart, So by circulate operation, data acquisition, data sending, data receiver are constantly carried out, so as to fulfill concurrent acquisition function.
In S3, receiving terminal receives the data, and the data are handled, i.e., meets transmission condition why not to data It is analyzed, draws reason, i.e. error code.In the present invention, specifically, the error code includes,
A1:Concurrently token quantity transfinites;
A2:Concurrent data quantity transfinites.
After error code is drawn, error code is modified by automatic adjusument function, to obtain being suitable for currently adopting Collect the parameter of device attribute, i.e. in S3 the error code is modified including,
B1:The data point reuse that characteristic and receiving terminal according to collecting device receive concurrently marks quantity;
B2:The data point reuse concurrent data quantity that characteristic and receiving terminal according to collecting device receive.
If data to be sent meet transmission condition, transmission transmission is carried out, it can be to the specific phase of transmission in transmission process Pass condition judged, so as to determine whether the data can realize continuous continual transmission, specifically, in the S2 according to Corresponding transmission protocol, which operates the data, to be included,
C1 is transmitted in the data procedures, and detection judges concurrently whether token quantity transfinites, if so, performing S3.Even The number of the electric energy meter gathered this moment has reached the maximum size of collecting device, then can not carry out new data acquisition, then need Reception state is changed into, pending data vacates extra channel position after being received, next data can be just transmitted. D1:It is if concurrent Token quantity does not transfinite, then continues detection and send whether buffering area has expired, if so, performing D2;
D2:Transmission mark is put, performs D3;The capacity of buffering area is sent this moment up to maximum, to cause the number of subsequent transmission According to that there can be position storage, then first Data Labels flag is arranged to send mark, it is corresponding to vacate after which is gone out Position.
D3:Increase the number of current concurrent quantity, judge currently whether successfully carry out the data acquisition of next token, if It then records increase once, and performs the next data object of the acquisition in S2, perform S1 again, realize the concurrently acquisition of data.
E1:If send buffering area less than, continue detection receive buffering area whether expire, if so, successively perform D2 with D3。
F1:If buffering area is received less than being analyzed and processed to current data, judge whether current token address needs to send out Changing, if so, performing D2 and D3 successively.For operating F1, specific concrete operations principle is, it is assumed that in present channel Data are the data of n-th (n < N) a electric energy meter, and the data that n-th electric energy meter is completed after the data sending is gone out are adopted Collection, then lower a moment immediately the data of (n+1) a electric energy meter are acquired, in order to ensure the data of each electric energy meter acquisition Integrality, even if this moment receive buffering area capacity also be not up to the upper limit, current Data Concurrent message length and quantity are simultaneously The not up to upper limit also still redirects and performs D2 and D3, i.e., first completes the transmission of current data, then carry out (n+1) a electricity again The data acquisition of energy table.
Further, being further included according to the corresponding transmission protocol operation data in the S2,
G1:If currently token address does not change, continue to detect whether concurrent message amount transfinites, if so, according to Secondary execution D2 and D3.Even current Data Concurrent message amount reaches maximum size, then data sending is immediately carried out, to vacate It is convenient for the transmission of follow-up data in extra position.
H1:If concurrent message amount does not transfinite, data number is replaced, and performs the next data pair of the acquisition in S2 As performing S1 again, realizing the concurrently acquisition of data.If corresponding to current message length or quantity and the not up to upper limit, The acquisition transmission of next data can also be then carried out, and the data that an electric energy meter is collected have multiple, different property parameters It is numbered with different ID, then by the variation of ID values, to realize the acquisition of next data, that is, obtains next data pair As the transmission, transmission, detection process of a data being then repeated in, until all data are collected completion.
The present invention draws the condition that cannot be sent by analyzing the data for being unsatisfactory for transmission condition --- may be The capacity of the communication mode and present collection device mismatches, and by automatic adjusument, the communication of change present communications mode is held Amount, while the collection terminal of collecting device is fed back to, self-renewing adjusting is carried out so as to fulfill according to different collecting devices, with reality Existing Data Matching expands the usability of this kind of concurrent acquisition method;Meanwhile the acquisition method to each by needing to be collected Property parameters encoded, mark to distribute into row address to each, and multiple capacity regions are detected in transmission process Judge, when the capacity of capacity region reaches the upper limit, set and send mark, carry out data sending, extra capacity is vacateed, so as to protect The reliable and effective transmission of data energy has been demonstrate,proved, has improved the real-time of the efficiency concurrently gathered and data.
In addition to above-mentioned improvement, other similar improvement are also contained in the improvement threshold of the present invention, are not just existed herein It repeats.
Although an embodiment of the present invention has been shown and described, it will be appreciated by those skilled in the art that:This is not being departed from In the case of the principle and objective of invention can these embodiments be carried out with a variety of variations, modification, replace and deform.

Claims (10)

1. a kind of automatic control concurrent data acquisition method for electric power energy collecting device, it is characterised in that:The described method includes,
S1:Whether the data of detection acquisition meet transmission condition, and satisfaction then performs S2, is unsatisfactory for, performs S3;
S2:The data are sent, after operating the data according to corresponding transmission protocol, next data object is obtained, holds again Row S1 realizes the concurrently acquisition of data;
S3:It receives and handles the data, draw the error code of the data, and the error code is modified, after amendment Information feed back to the transmitting terminal of collecting device, realize automatic adjusument.
2. automatic control concurrent data acquisition method according to claim 1, it is characterised in that:The number is drawn in the S3 According to error code include,
A1:Concurrently token quantity transfinites;
A2:Concurrent data quantity transfinites.
3. automatic control concurrent data acquisition method according to claim 2, it is characterised in that:In the S3 to the mistake Code be modified including,
B1:The data point reuse that characteristic and receiving terminal according to collecting device receive concurrently marks quantity;
B2:The data point reuse concurrent data quantity that characteristic and receiving terminal according to collecting device receive.
4. the automatic control concurrent data acquisition method according to claim 1 or 2 or 3, it is characterised in that:In the S2 according to Corresponding transmission protocol, which operates the data, to be included,
C1 is transmitted in the data procedures, and detection judges concurrently whether token quantity transfinites, if so, performing S3.
5. automatic control concurrent data acquisition method according to claim 4, it is characterised in that:In the S2 according to corresponding Transmission protocol operates the data and further includes,
D1:If concurrently token quantity does not transfinite, continue detection and send whether buffering area has expired, if so, performing D2;
D2:Transmission mark is put, performs D3;
D3:Increase the number of current concurrent quantity, judge currently whether successfully carry out the data acquisition of next token, if then remembering Record increases once, and performs the next data object of the acquisition in S2, performs S1 again, realizes the concurrently acquisition of data.
6. automatic control concurrent data acquisition method according to claim 5, it is characterised in that:In the S2 according to corresponding Transmission protocol operates the data and further includes,
E1:If send buffering area less than, continue detection receive buffering area whether expire, if so, successively execution D2 and D3.
7. automatic control concurrent data acquisition method according to claim 6, it is characterised in that:In the S2 according to corresponding Transmission protocol operates the data and further includes,
F1:If buffering area is received less than being analyzed and processed to current data, judge whether current token address needs to become Change, if so, performing D2 and D3 successively.
8. automatic control concurrent data acquisition method according to claim 7, it is characterised in that:In the S2 according to corresponding Transmission protocol operates the data and further includes,
G1:If currently token address does not change, continue to detect whether concurrent message amount transfinites, if so, holding successively Row D2 and D3.
9. automatic control concurrent data acquisition method according to claim 8, it is characterised in that:In the S2 according to corresponding Transmission protocol operates the data and further includes,
H1:If concurrent message amount does not transfinite, data number is replaced, and performs the next data object of the acquisition in S2, then Secondary execution S1 realizes the concurrently acquisition of data.
10. automatic control concurrent data acquisition method according to claim 9, it is characterised in that:It is gathered in the detection of the S1 Data whether meet transmission condition before, package to the data, be converted into data to be sent.
CN201711369952.0A 2017-12-18 2017-12-18 Self-control concurrent data acquisition method for electric power energy acquisition equipment Active CN108107782B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711369952.0A CN108107782B (en) 2017-12-18 2017-12-18 Self-control concurrent data acquisition method for electric power energy acquisition equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711369952.0A CN108107782B (en) 2017-12-18 2017-12-18 Self-control concurrent data acquisition method for electric power energy acquisition equipment

Publications (2)

Publication Number Publication Date
CN108107782A true CN108107782A (en) 2018-06-01
CN108107782B CN108107782B (en) 2021-04-16

Family

ID=62210860

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711369952.0A Active CN108107782B (en) 2017-12-18 2017-12-18 Self-control concurrent data acquisition method for electric power energy acquisition equipment

Country Status (1)

Country Link
CN (1) CN108107782B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116582772A (en) * 2023-03-29 2023-08-11 四川辰鳗科技有限公司 Electric energy data acquisition method, system, electronic equipment and medium

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060071813A1 (en) * 2004-10-05 2006-04-06 Erran Kagan Meter having a communication interface for receiving and interfacing with a communication device
CN101076770A (en) * 2004-09-28 2007-11-21 英特尔公司 Method and apparatus for varying energy per instruction according to the amount of available parallelism
CN101719306A (en) * 2009-10-30 2010-06-02 深圳市科陆电子科技股份有限公司 Parallel electric quantity data acquisition method
CN101776915A (en) * 2009-12-28 2010-07-14 国电南京自动化股份有限公司 Cross-platform station automatic monitoring system testing method based on concurrency simulating tools
CN201654088U (en) * 2010-03-19 2010-11-24 内江电业局 Multi-path real-time synchronous parallel electric energy acquisition device
CN102410391A (en) * 2011-08-01 2012-04-11 西安交通大学 Real-time throttling device and method for eliminating severe slugging of gathering-riser system
CN103763396A (en) * 2014-02-12 2014-04-30 浙江大学 Energy consumption data acquisition unit and method based on multi-protocol parallel acquisition technology
CN105139629A (en) * 2015-08-21 2015-12-09 光一科技股份有限公司 Method for improving data acquisition efficiency of low voltage power line broadband carrier waves
CN105632146A (en) * 2015-12-30 2016-06-01 宁波三星医疗电气股份有限公司 Collecting system for collecting water, gas, heat and electricity meter data
CN106534368A (en) * 2016-12-19 2017-03-22 山东省科学院自动化研究所 Message transceiving method and system for car CAN bus gateway

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101076770A (en) * 2004-09-28 2007-11-21 英特尔公司 Method and apparatus for varying energy per instruction according to the amount of available parallelism
US20060071813A1 (en) * 2004-10-05 2006-04-06 Erran Kagan Meter having a communication interface for receiving and interfacing with a communication device
CN101719306A (en) * 2009-10-30 2010-06-02 深圳市科陆电子科技股份有限公司 Parallel electric quantity data acquisition method
CN101776915A (en) * 2009-12-28 2010-07-14 国电南京自动化股份有限公司 Cross-platform station automatic monitoring system testing method based on concurrency simulating tools
CN201654088U (en) * 2010-03-19 2010-11-24 内江电业局 Multi-path real-time synchronous parallel electric energy acquisition device
CN102410391A (en) * 2011-08-01 2012-04-11 西安交通大学 Real-time throttling device and method for eliminating severe slugging of gathering-riser system
CN103763396A (en) * 2014-02-12 2014-04-30 浙江大学 Energy consumption data acquisition unit and method based on multi-protocol parallel acquisition technology
CN105139629A (en) * 2015-08-21 2015-12-09 光一科技股份有限公司 Method for improving data acquisition efficiency of low voltage power line broadband carrier waves
CN105632146A (en) * 2015-12-30 2016-06-01 宁波三星医疗电气股份有限公司 Collecting system for collecting water, gas, heat and electricity meter data
CN106534368A (en) * 2016-12-19 2017-03-22 山东省科学院自动化研究所 Message transceiving method and system for car CAN bus gateway

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116582772A (en) * 2023-03-29 2023-08-11 四川辰鳗科技有限公司 Electric energy data acquisition method, system, electronic equipment and medium
CN116582772B (en) * 2023-03-29 2024-01-16 四川辰鳗科技有限公司 Electric energy data acquisition method, system, electronic equipment and medium

Also Published As

Publication number Publication date
CN108107782B (en) 2021-04-16

Similar Documents

Publication Publication Date Title
CN108965484B (en) Internet of things data transmission method, system and terminal
CN102377650B (en) Data transmission processing method, device and system
CN103716137A (en) Method and system for identifying reasons of ZigBee sensor network packet loss
CN107925652B (en) Fixed conversion method and device of transmission protocol based on message protocol identification
EP3605881A1 (en) Method and device for transmitting and receiving network management information, transmitting apparatus and receiving apparatus
CN102412999A (en) Packet capturing based remote fault location method, system and device
EP3422655B1 (en) Method for managing address of meter device, and acquisition terminal and meter device
CN104104480A (en) Method and device for detecting retransmission packet loss of TCP (transmission control protocol)
CN105450969A (en) Real-time video data transmission method and electronic equipment
CN108107782A (en) A kind of automatic control concurrent data acquisition method for electric power energy collecting device
CN105337850A (en) Internet of Things data processing method and internet of Things gateway
CN103312540A (en) User service requirement parameter determining method and device
JP5066064B2 (en) Transmitting terminal, receiving terminal and transmission system used in one-way transmission path
CN105050123A (en) Load control method for wireless network and terminal
CN104852785A (en) Data transmission method and data transmission device
CN104980259A (en) Method and device for multilink data transmission
CN108702335B (en) Method and apparatus for transmitting and receiving data packet in multimedia system
CN106875660B (en) Method and collector for the communication of meter equipment
CN105813142A (en) Data frame transmission method, data frame transmission device, and data frame transmission system
CN104349345A (en) Flow statistics method, flow statistics device and mobile terminal
CN104902350B (en) A kind of digital walkie-talkie and its data processing equipment, data transmission method for uplink
CN107678293A (en) A kind of smart home health management information data-pushing management method
CN108173950A (en) Data transmission method, device, system, image capture device and storage medium
CN107249194A (en) Manage method, device and the equipment of wireless network connection
CN111770055A (en) Multi-protocol communication frame rapid distinguishing method applied to electric energy meter

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant