CN108104839B CN201711335366.4A CN201711335366A CN108104839B CN 108104839 B CN108104839 B CN 108104839B CN 201711335366 A CN201711335366 A CN 201711335366A CN 108104839 B CN108104839 B CN 108104839B
Authority
CN
China
Prior art keywords
construction
equipment
drilling machine
baseboard
coal mine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711335366.4A
Other languages
Chinese (zh)
Other versions
CN108104839A (en
Inventor
张幼振
叶根飞
邵俊杰
陈盼
田宏亮
田东庄
张宁
李旭涛
阚志涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian Research Institute Co Ltd of CCTEG
Original Assignee
Xian Research Institute Co Ltd of CCTEG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian Research Institute Co Ltd of CCTEG filed Critical Xian Research Institute Co Ltd of CCTEG
Priority to CN201711335366.4A priority Critical patent/CN108104839B/en
Publication of CN108104839A publication Critical patent/CN108104839A/en
Application granted granted Critical
Publication of CN108104839B publication Critical patent/CN108104839B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • E21D20/025Grouting with organic components, e.g. resin
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/0006Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection characterised by the bolt material
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F13/00Transport specially adapted to underground conditions
    • E21F13/06Transport of mined material at or adjacent to the working face
    • E21F13/066Scraper chain conveyors

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Road Repair (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

A kind of quick repairing construction system of baseboard of coal mine roadway and its construction method, construction system includes prosthetic appliance, two operating load equipment, anchor bolt grouting equipment and tensioning equipment, the prosthetic appliance is laneway repair machine, anchor bolt grouting equipment includes anchoring drilling machine, flat car, mixing plant and grouting pump, tensioning equipment includes tensioner and tensioning pump station, and construction method includes step 1: optimization distribution of equipment;Step 2: each equipment conveying in construction system in place and is debugged;Step 3: pre-pouring grout construction;Step 4: anchoring construction;Step 5: anchorage cable stretching;The present invention uses procedure operation as a result, and automatically walk can be achieved in each equipment in construction system, and mechanization degree is high, and labor intensity is small, can greatly improve baseboard of coal mine roadway repairing construction speed, improves operating environment, reduces construction cost.

Description

The quick repairing construction system of baseboard of coal mine roadway and its construction method
Technical field
The present invention relates to the technical fields of baseboard of coal mine roadway reparation more particularly to a kind of baseboard of coal mine roadway quickly to repair Construction system and its construction method.
Background technique
In recent years, as the increase of coal mining depth and intensity, roadway surrounding rock control and safety issue become increasingly conspicuous, Especially under the conditions of high-ground stress, reinforcing soft broken coal rock, deformation of the surrounding rock in tunnel is serious, and wherein Floor Heave in Roadway is particularly problematic. For having occurred and that the tunnel of serious pucking, no matter which kind of administration way is used, top priority has been exactly bottom application work, is then adopted Take further technical measures.
Current roadway floor repairing construction generally uses pneumatic pick, jumbolter, loading machine, a variety of constructions such as rubber tire transport trolley Equipment corresponding construction technology and specification need to successively construct with each equipment, each equipment, almost without rank between each work post Cooperation is connect, the construction working between each construction team lacks coordinative operation, organizes construction system complicated in this way, needs to be familiar with The performance characteristics of each equipment reasonably select the model and quantity of construction machinery, also need to understand thoroughly various construction methods, construction technology rule Model, but at present in roadway floor repairing construction, mainly with working experience or qualitative analysis, can not accomplish construction organization Rationalization and management it is scientific, cause roadway repair construction efficiency low, complicated organization, equipment replacement is frequent, people Work large labor intensity, long construction period, construction cost are high.
With the promotion of roadway repair machineryization level, laneway repair machine, the roadway floors such as anchoring drilling machine repair dedicated set It is standby more and more to be applied, largely improve roadway floor remediation efficiency, but at this stage each equipment still with only Based on vertical work, lacking and cooperate, no and roadway floor renovation technique organically combines, and cause equipment component vacancy rate high, Process is many and diverse, and construction organization is chaotic.
For this purpose, designer of the invention, in view of drawbacks described above, by concentrating on studies and designing, synthesis is engaged in for many years for a long time The experience and achievement of related industry, researching and designing go out a kind of quick repairing construction system of baseboard of coal mine roadway and its construction method, To overcome drawbacks described above.
Summary of the invention
The purpose of the present invention is to provide a kind of quick repairing construction system of baseboard of coal mine roadway and its construction methods, use Procedure operation, automatically walk can be achieved in each equipment in construction system, and mechanization degree is high, and labor intensity is small, can be big Width improves baseboard of coal mine roadway repairing construction speed, improves operating environment, reduces construction cost.
To solve the above problems, it includes repair the invention discloses a kind of quick repairing construction system of baseboard of coal mine roadway Multiple equipment, two operatings carry equipment, anchor bolt grouting equipment and tensioning equipment, it is characterised in that:
The prosthetic appliance is laneway repair machine, and anchor bolt grouting equipment includes anchoring drilling machine, flat car, mixing plant and slip casting Pump, tensioning equipment include tensioner and tensioning pump station;
The laneway repair machine is by quartering hammer, dipper, bucket, swing arm, a fortune scratch board conveyor structure, motor pump group and walking Crawler belt composition, the traveling crawler are equipped with car body, carry a fortune scratch board conveyor structure and motor pump group, institute on the car body The front end for stating car body is equipped with swing arm, and the swing arm is moved by hydraulic cylinder driving, and the front end of the swing arm is hinged with Dipper, the dipper carry out driving campaign by another hydraulic cylinder, and the quartering hammer is fixed on dipper, and the bucket is set to The free end of dipper;
The anchoring drilling machine is at least 2, and wherein First anchoring drilling machine is arranged in laneway repair machine rear certain distance It is interior to carry out the construction of pre-pouring grout hole, wherein second anchoring drilling machine be arranged in the First anchoring drilling machine rear certain distance with Carry out the construction of anchor hole;
The flat car quantity corresponds to anchoring drilling machine, therefore at least 2 flat cars are separately positioned at least 2 anchoring drilling machines Rear and wirerope hook is installed, it is connected that the flat car passes through wirerope and the pump truck of corresponding anchoring drilling machine respectively, by The pump truck of anchoring drilling machine carries out driving walking, and the grouting pump and mixing plant are fixed on the flat car in front, the tensioning pump Station is fixed on the flat car at rear, and is connected by hydralic hose with tensioner.
Wherein: it is trackless truck that two operating, which carries equipment, and the trackless truck is in laneway repair machine and abandons between cash field Reciprocation cycle transports spoil.
Wherein: it includes belt transport unit and elevating conveyor that two operating, which carries equipment, and the elevating conveyor is spread along roadway direction It is located at roadway floor side, the elevating conveyor is scraper blade elevating conveyor or leather belt reshipment machine.
Wherein: 2 rear support legs of the belt transport unit are attached by bolt and laneway repair machine, to guarantee skin Stability with transport device operation.
Wherein: the belt transport unit further includes belt, 2 deflection oil cylinders and 2 flexion-extension oil cylinders, 2 flexion-extensions Oil cylinder be individually fixed in 2 deflection oil cylinder telescopic rod end attachment bases, the belt be hingedly connected to 2 deflection oil cylinders with The telescopic rod end of 2 flexion-extension oil cylinders, is thus supported belt and angular adjustment.
Wherein: the anchoring drilling machine includes pump truck and drill carriage, and the pump truck includes the fuel tank on movable pump car body With motor pump group, the drill carriage mainly includes dust-extraction unit, securing device and the radiator on mobile drill carriage body, described Radiator is located at the front of dust-extraction unit, and the front end of the radiator is fixed with feeding body and work by double leval jib translation system Make arm.
Wherein: the double leval jib translation system includes four-bar mechanism and driven in translation oil cylinder to realize firm shifting Dynamic, the feeding body is mounted on the working arm of amplitude-variable adjusting.
Wherein: the securing device contains at least two firm supporting leg, and the bottom of the firm supporting leg is equipped with firm Seat.
A kind of quick method for repairing and constructing of baseboard of coal mine roadway is also disclosed, it is fast by baseboard of coal mine roadway as described above Fast repairing construction system is realized, characterized by comprising the steps of:
Step 1: optimization distribution of equipment;
Step 2: each equipment conveying in construction system in place and is debugged, and to be repaired section of tunnel is cleared up, by striking Side jowling checks back and two stability helped, uses anchor cable reinforcement to unstable surrounding rock;
Step 3: pre-pouring grout construction carries out the construction of pre-pouring grout hole, installation pre-pouring grout pipe and sealing of hole using anchoring drilling machine, adopts Grouting slurries are prepared with mixing plant, complete slip casting operation using grouting pump, and carry out Hou Ning;
Step 4: anchoring construction, operator are carried out the construction of anchor hole using anchoring drilling machine, are used cooperatively tree after pore-forming Rouge Anchor Agent installs high strength steel strand anchor cable, configures the high-intensitive arch tray of abnormity, installs aligning ball pad additional, and in drilling interpolation Enter slip casting aluminium-plastic pipe, after the completion of slip casting, is gone forward side by side using cotton yarn and double slurries sealing of holes by slip casting aluminium-plastic pipe to anchor cable hole slip casting Row Hou Ning;
Step 5: anchorage cable stretching pre-tightens anchor cable using tensioner tensioning, artificial to separate anchor cable head reinforcing bar after the completion of tensioning Beam is bent around, to prevent lockset from loosening, and smooth location.
By above structure it is found that the quick repairing construction system of baseboard of coal mine roadway of the invention and its construction method have Following effect:
1, it is required according to roadway floor repairing construction technique, reasonably select relative special-purpose equipment and arranges the construction of each equipment Position, by Optimal Configuration Method and scheduling decision method, determine respectively each equipment quantity and real-time matching relationship, formed coal The construction system that mine roadway floor is quickly repaired;
2, using procedure operation, automatically walk is can be achieved in each equipment in construction system, and mechanization degree is high, artificial labor Fatigue resistance is small, can greatly improve baseboard of coal mine roadway repairing construction speed, improves operating environment, reduces construction cost.
Detailed content of the invention can be obtained by aftermentioned explanation and institute's attached drawing.
Detailed description of the invention
Fig. 1 shows a kind of side view cloth of the first embodiment of the quick repairing construction system of baseboard of coal mine roadway of the invention Set figure;
Fig. 2 shows a kind of vertical view cloth of the first embodiment of the quick repairing construction system of baseboard of coal mine roadway of the invention Set figure;
Fig. 3 shows the side view arrangement schematic diagram of another embodiment of the present invention;
Fig. 4 shows the vertical view arrangement schematic diagram of another embodiment of the present invention;
Fig. 5 shows laneway repair machine and belt transport unit connection schematic diagram of the invention;
Fig. 6 shows anchoring drilling machine structural schematic diagram of the invention;
Fig. 7 a and Fig. 7 b show the side view arrangement schematic diagram of pre-pouring grout and anchor cable (bar) construction of the invention;
Fig. 8 shows the vertical view arrangement schematic diagram of pre-pouring grout and anchor cable (bar) construction.
Appended drawing reference:
1 it is laneway repair machine, 2 be trackless truck, 3 be anchoring drilling machine, 4 be grouting pump, 5 be mixing plant, 6 is flat car, 7 It is tensioning pump station for tensioner, 8,9 be belt transport unit, 10 be scraper blade elevating conveyor, 11 be quartering hammer, 12 be dipper, 13 is Bucket, 14 be swing arm, 15 be a fortune scratch board conveyor structure, 16 be motor pump group, 17 be traveling crawler, 18 be rear support leg, 19 be Deflection oil cylinder, 20 be pitching oil cylinder, 21 be belt, 22 be feeding body, 23 be working arm, 24 be securing device, 25 be heat dissipation Device, 26 be dust-extraction unit, 27 be fuel tank, 28 be motor pump group, 29 be anchor hole, 30 be pre-pouring grout hole.
Specific embodiment
It is described in further detail to technical solution of the present invention in the following with reference to the drawings and specific embodiments, so that this field Technical staff can better understand the present invention and be practiced, but illustrated embodiment is not as a limitation of the invention.
The quick repairing construction system of baseboard of coal mine roadway of the invention may include prosthetic appliance, two operating load equipment, anchoring Grouting equipment and tensioning equipment, and according to the difference of baseboard of coal mine roadway repairing construction environment and execution conditions, two operatings carry Two kinds of forms can be used in equipment, and one of which includes trackless truck 2, and another kind includes belt transport unit 9.
Referring to Fig. 1 and Fig. 2, it is shown that the first of the quick repairing construction system of a kind of baseboard of coal mine roadway of the invention is implemented The layout drawing of example, prosthetic appliance are laneway repair machine 1, and it is trackless truck 2 that two operatings, which carry equipment, and anchor bolt grouting equipment includes anchor Gu drilling machine 3, flat car 6, mixing plant 5 and grouting pump 4, tensioning equipment may include tensioner 7 and tensioning pump station 8, below with reference to attached Figure describes in detail.
Referring to Fig. 5, the laneway repair machine 1 mainly transports scraper plate fortune by quartering hammer 11, dipper 12, bucket 13, swing arm 14, one Transfer mechanism 15, motor pump group 16 and traveling crawler 17 form, and the traveling crawler 17 is equipped with car body, carry on the car body The front end of one fortune scratch board conveyor structure 15 and motor pump group 16, the car body is equipped with swing arm 14, and the swing arm 14 can pass through a liquid Compressing cylinder driving is moved, and the front end of the swing arm 14 is hinged with dipper 12, the dipper 12 by another hydraulic cylinder into Row driving movement (as shown in Figure 5), and the quartering hammer 11 is fixed on dipper 12, the bucket 13 is set to the freedom of dipper 12 End, the specific structure of specially designed laneway repair machine 1 of the invention, can realize the broken of tunnel, moreover it is possible to quickly in time as a result, Carry out the transfer of material.
The laneway repair machine 1 can drive corresponding component to carry out brokenly to realize to Floor Heave in Roadway by operating cylinder as a result, Function that is broken, skimming, and using a fortune scratch board conveyor structure 15 by gangue reprint to trackless truck 2, the trackless truck 2 exists Reciprocation cycle transports spoil between laneway repair machine 1 and abandoning cash field.
The anchoring drilling machine 3 can be at least 2, wherein First anchoring drilling machine 3 and be arranged in 1 rear one of laneway repair machine In set a distance, to carry out the construction of pre-pouring grout hole, wherein second anchoring drilling machine 3 is arranged in 3 rear one of First anchoring drilling machine In set a distance, to carry out the construction of anchor hole, pre-pouring grout hole and anchor hole are mutually staggered, and are arranged in blossom type, the tunnel The bottom application work that rises of repair machine 1 has certain independence relative to pre-pouring grout hole and anchor hole construction, but not completely independent, applies Construction equipment distance is too close, easily interferes, can not normal operation, apart from too far, easily there is the problems such as secondary pucking in tunnel, increases Workload, so two 3 speed of applications of anchoring drilling machine should match with the bottom speed of application that rises of laneway repair machine 1, distance of constructing Holding is basically unchanged.
Referring to Fig. 6, it is shown that the structural schematic diagram of anchoring drilling machine, the anchoring drilling machine 3 include pump truck and drill carriage, the pump Car owner will include fuel tank 27 and motor pump group 28 on movable pump car body, and the drill carriage mainly includes being located at mobile bore Dust-extraction unit 26, securing device 24 and radiator 25 on car body, the radiator is located at the front of dust-extraction unit 26, described to dissipate The front end of hot device 25 is fixed with feeding body 22 and working arm 23, the double leval jib translation system packet by double leval jib translation system Containing four-bar mechanism and driven in translation oil cylinder to realize firm movement, the feeding body 22 is mounted on amplitude-variable adjusting On working arm 23, the deflection of feeding body 22 is realized by the adjusting of working arm 23, to not have to moving body, it will be able to Two bottom plate anchor hole constructions are completed in primary parking, wherein the securing device 24 may include at least two firm supporting legs, institute The bottom for stating firm supporting leg can be equipped with firm seat, it is preferred that the firm seat is cross, to provide preferably firm effect Fruit.
6 quantity of flat car corresponds to anchoring drilling machine 3, therefore at least 2 flat cars 6 are separately positioned at least 2 anchorings The rear of drilling machine 3 is simultaneously equipped with wirerope hook, and the flat car 6 passes through the pump truck of wirerope and corresponding anchoring drilling machine 3 respectively It is connected, driving walking is carried out by the pump truck of anchoring drilling machine 3, the grouting pump 4 and mixing plant 5 are fixed on the flat car 6 in front, The tensioning pump station 8 is fixed on the flat car 6 at rear, and is connected by hydralic hose with tensioner 7, and the flat car 6 is It is provided with holding brake device.
Wherein, the easily-consumed products such as slip casting raw material needed for the construction system, anchor cable (bar), tool box are also disposed in flat car On 6.It when flat car 6 needs to move forwards, is dragged by 3 pump truck of anchoring drilling machine by wirerope, when the needs of flat car 6 stop When machine works, it is fixed using holding brake device.
The mixing plant 5 can prepare grouting slurries, and auxiliary staircase is fixed with beside it, convenient for completing slurries stirring Operation, the grouting pump 4 can complete slip casting operation using slurries, and the tensioning pump station 8 can provide hydraulic oil completion for tensioner 7 Anchor cable (bar) tensioning.
Referring to Fig. 3 and Fig. 4, it is shown that another embodiment of the quick repairing construction system of baseboard of coal mine roadway of the present invention, Prosthetic appliance is laneway repair machine 1, and it includes belt transport unit 9 and elevating conveyor that two operatings, which carry equipment, and anchor bolt grouting equipment includes Anchoring drilling machine 3, flat car 6, mixing plant 5 and grouting pump 4, tensioning equipment include tensioner 7 and tensioning pump station 8, the elevating conveyor It is laid on roadway floor side along roadway direction, the elevating conveyor can be scraper blade elevating conveyor 10, it is possible to use leather belt reshipment machine, to After the completion of tunnel other side pre-pouring grout and anchor cable (bar) construction, the scraper blade elevating conveyor 10 is just replaced to the tunnel other side, in this way It can guarantee that entire construction system is continuously constructed, and each equipment remains that relative position is constant.
Referring to Fig. 5, laneway repair machine 1 and 9 connection schematic diagram of belt transport unit, the belt transport unit are also shown 92 rear support legs 18 are attached by bolt with laneway repair machine 1, to guarantee the stability of the operation of belt transport unit 9, The belt transport unit 9 may also include 21,2 deflection oil cylinders 19 and 2 of belt and pitch oil cylinder 20, the 2 deflection oil cylinder 19 are fixed on the two sides of transport device ontology, and described 2 pitch the telescopic rod end that oil cylinder 20 is individually fixed in 2 deflection oil cylinders 19 The attachment base at end, the belt 21 are hingedly connected to the telescopic rod end that 2 deflection oil cylinders 19 and 2 pitch oil cylinder 20, as a result, Oil cylinders 20 can be pitched by 2 deflection oil cylinders 19 and 2 to be supported belt 21 and angular adjustment, the belt transport unit 9 are mounted at 1 tail pedestal of laneway repair machine, are driven using hydraulic motor, provide hydraulic oil by laneway repair machine 1, One end of the 2 deflection oil cylinder 19 and 2 pitching oil cylinder 20 by transport device ontology and 1 tail pedestal of laneway repair machine into It is on sale throughout axis to be connected, the other end is connected with belt 21, it can be achieved that the multi-faceted adjusting of belt transport unit 9, and certifiable scraper plate turn Carrier aircraft 10 is arranged in 9 range of deflection of belt transport unit.
The belt transport unit 9 can be adjusted by deflection oil cylinder 19 and pitching oil cylinder 20, certain up and down Adjustment in range, and the 21 end rotary shaft of belt of belt transport unit 9 is in the underface of 1 tail discharge port of laneway repair machine, The speed of service of belt transport unit 9 is greater than the speed of service that laneway repair machine one transports scratch board conveyor structure 15, scraper blade elevating conveyor 10 speed of service is greater than the speed of service of belt transport unit 9, i.e., the reprinting ability of subsequent corollary equipment is set slightly larger than front end Standby reprinting ability, to give full play to the construction ability of laneway repair machine 1, gangue reprint efficiency highest at this time, laneway repair machine 1 Bottom application work is played continuously without stagnation.
Referring to Fig. 7 a, 7b and Fig. 8, it is shown that for the arrangement schematic diagram that pre-pouring grout and anchor cable (bar) are constructed, 29 He of anchor hole Pre-pouring grout hole 30 mutually staggers, in blossom type arrange, the spacing of wells according to heading sizes, grouting pressure, anchor cable (bar) length, The parameters such as prestressing force size, which calculate, to be determined, guarantees that each adjacent anchor hole 29 and 30 coverage of pre-pouring grout hole are overlapped mutually.
The present invention discloses a kind of quick method for repairing and constructing of baseboard of coal mine roadway, the construction method passes through above-mentioned The quick repairing construction system of baseboard of coal mine roadway realize, mainly comprise the following steps:
Step 1: optimization distribution of equipment;
Since there is the relationships for cooperating, mutually restricting between various kinds of equipment in construction system, in order to guarantee tunnel Pucking administers the continuity of construction, and each equipment in Proper Match construction system is one of key, tunnel Forming Quality after reparation It is again closely related with the reasonable disposition of its equipment, and it is largely fixed the construction efficiency and construction speed of construction system.It closes The quantity of each equipment and the construction for using preferable decision dispatching method that construction system can be improved are imitated in reason configuration construction system Rate, economic benefit provide theoretical foundation to formulate arrangement and method for construction.
Each equipment optimizing configuration method is multi objective function optimization method, using multi objective function optimization method to applying Laneway repair machine, two operatings carry equipment, anchoring drilling machine, flat car, mixing plant, grouting pump, tensioner and tensioning pump in work system The quantity stood optimizes configuration, in the actual construction process, should be according to construction technology, execution conditions and each construction equipment The variation of working condition, is adjusted using this method in due course.It should be selected first according to construction condition and project amount leading Equipment, i.e. laneway repair machine and anchoring drilling machine, once laneway repair machine and anchoring drilling machine are selected, quantity will not be adjusted, then root Carrying the ancillary equipments such as equipment, flat car, mixing plant, grouting pump, tensioner and tensioning pump station according to two operatings should ensure that key machine The principle for playing peak performance carries out the quantity for matching them, guarantees that leading equipment is efficient.
According to the analysis of the working principle to equipment each in construction system, the unit construction cost with construction system can be established It is the multiple-objection optimization allocation models of objective function with One-Shift Costs comprehensive utilization ratio, then there are following objective functions:
In formula: F1--- the unit construction cost of construction system;
F2--- the One-Shift Costs comprehensive utilization ratio of construction system;
I --- 0,1,2,3,4,5,6,7 respectively represents laneway repair machine, anchoring drilling machine, trackless truck, flat car, stirring It stands, grouting pump, tensioner, tensioning pump station;
Xi--- the quantity of each equipment in construction system;
Ci--- the machine-team of each equipment takes in construction system;
Ki--- the utilization rate of each equipment in construction system;
N --- the laneway repair machine machine-team working time;
Q0--- laneway repair machine productivity;
P01--- the probability of laneway repair machine free time.
For the Optimization Solution problem of multiple objective function, the method for Ying Liyong static configuration is calculated, due to above-mentioned more Objective function Relationship Comparison is complicated, and F1And F2It is not XiContinuous function, calculate optimal solution X with conventional Method of Seeking DerivativeiIt is Unworkable, it can calculate by the following method, initial X should be set according to total construction work amount firstiValue, according to more Objective optimization configuration function calculates corresponding F1And F2;Then least square is pressed to these initial numerical value using MATLAB software Principle carries out fitting of a polynomial, draws F1And F2About XiHigher order functionality curve graph;Finally according to F1And F2Higher order functionality it is bent Line chart carries out coordinating to correct obtaining corresponding Z using set of weights is legal to two objective functions1And Z2, to obtain one to each point Opposite optimal solution of all preferable scheme of target as multiple objective function.
Step 2: each equipment conveying in construction system in place and is debugged, and to be repaired section of tunnel is cleared up, by striking Side jowling checks back and two stability helped, uses anchor cable (bar) reinforcement to unstable surrounding rock.
Operator carries equipment according to suitable two operating of site operation environment and condition selection, by operating roadway repair The quartering hammer 11 of machine is crushed pucking tunnel, the fortune scratch board conveyor that spoil is passed through laneway repair machine using bucket 13 Structure 15 is transferred to two operatings and carries in equipment, and two operatings carry equipment and are transported through spoil, and by laneway repair machine 1 to tunnel bottom Plate is compacted.
Step 3: pre-pouring grout construction for reinforced roadway floor crack and blocks tunnel bottom due to roadway floor soft broken Plate surface layer country rock prevents roadway floor anchor rope grouting hole collapse hole.Operator carries out the construction of pre-pouring grout hole using anchoring drilling machine 3, Pre-pouring grout pipe and sealing of hole are installed, grouting slurries are prepared using mixing plant 5, completes slip casting operation using grouting pump 4, and carry out marquis It is solidifying.
Step 4: anchoring construction, operator are carried out the construction of anchor hole using anchoring drilling machine 3, are used cooperatively after pore-forming Resin anchoring agent installs high strength steel strand anchor cable, configures the high-intensitive arch tray of abnormity, installs aligning ball pad additional, and in drilling It is inserted into slip casting aluminium-plastic pipe, using cotton yarn and double slurries sealing of holes, by slip casting aluminium-plastic pipe to anchor cable hole slip casting, after the completion of slip casting, and Carry out Hou Ning.
Step 5: anchorage cable stretching and smooth location, operator pre-tightens anchor cable using 7 tensioning of tensioner, after the completion of tensioning, Artificial separation anchor cable head tendon, bends, around to prevent lockset from loosening.
Entire construction system can carry out continuous high-efficient repairing construction operation, after the completion of construction, need to entire construction Place clear up perfect, and each equipment is transported and IMM algorithm.
The construction system and its construction method that baseboard of coal mine roadway of the invention is quickly repaired as a result, can be according to tunnel bottom The requirement of plate repairing construction technique reasonably selects relative special-purpose equipment and arranges the position of each equipment, by Optimal Configuration Method and Scheduling decision method, determine respectively each equipment quantity and real-time matching relationship.The construction system uses procedure operation, construction Each equipment can realize automatically walk in system, and mechanization degree is high, and labor intensity is small, can greatly improve baseboard of coal mine roadway Repairing construction speed improves operating environment, reduces construction cost.
It is readily apparent that above description and record is only illustrated in the disclosure being not intended to be limiting of the invention Appearance, application or use.Although describing and being described in the accompanying drawings embodiment in embodiment, the present invention is not limited Be described as by attached drawing example and in embodiment it is now recognized that optimal mode to implement the particular case of the teachings of the present invention Son, the scope of the present invention will include any embodiment for falling into the description and appended claims of front.

Claims (6)

1. a kind of quick repairing construction system of baseboard of coal mine roadway, it includes prosthetic appliance, two operatings carry equipment, anchor bolt grouting is set Standby and tensioning equipment, it is characterised in that:
The prosthetic appliance is laneway repair machine, and anchor bolt grouting equipment includes anchoring drilling machine, flat car, mixing plant and grouting pump, Tensioning equipment includes tensioner and tensioning pump station;
The laneway repair machine is by quartering hammer, dipper, bucket, swing arm, a fortune scratch board conveyor structure, motor pump group and traveling crawler Composition, the traveling crawler are equipped with car body, carry a fortune scratch board conveyor structure and motor pump group, the vehicle on the car body The front end of body is equipped with swing arm, and the swing arm is moved by hydraulic cylinder driving, and the front end of the swing arm is hinged with dipper, The dipper carries out driving campaign by another hydraulic cylinder, and the quartering hammer is fixed on dipper, and the bucket is set to dipper Free end;
The anchoring drilling machine is at least 2, wherein First anchoring drilling machine be arranged in the certain distance of laneway repair machine rear with The construction of pre-pouring grout hole is carried out, wherein second anchoring drilling machine is arranged in the First anchoring drilling machine rear certain distance to carry out The construction of anchor hole;
The flat car quantity corresponds to anchoring drilling machine, therefore after at least 2 flat cars are separately positioned at least 2 anchoring drilling machines Side is simultaneously equipped with wirerope hook, and the flat car passes through wirerope respectively and is connected with the pump truck of corresponding anchoring drilling machine, by anchoring The pump truck of drilling machine carries out driving walking, and the grouting pump and mixing plant are fixed on the flat car in front, and the tensioning pump station is solid It is scheduled on the flat car at rear, and is connected by hydralic hose with tensioner;
The anchoring drilling machine includes pump truck and drill carriage, and the pump truck includes the fuel tank and electric-motor pump on movable pump car body Group, the drill carriage include dust-extraction unit, securing device and the radiator on mobile drill carriage body, and the radiator, which is located at, to be removed The front of dirt device, the front end of the radiator are fixed with feeding body and working arm by double leval jib translation system, and described four Connecting rod translation system includes four-bar mechanism and driven in translation oil cylinder to realize firm movement, and the feeding body is mounted on On the working arm that amplitude-variable is adjusted, the deflection of feeding body is realized by the adjusting of working arm, thus do not have to moving body, Can once be stopped two bottom plate anchor hole constructions of completion, wherein and the securing device contains at least two firm supporting leg, The bottom of the firm supporting leg is equipped with firm seat, and the firm seat is cross to provide preferably firm effect.
2. the quick repairing construction system of baseboard of coal mine roadway as described in claim 1, it is characterised in that: two operating, which carries, to be set Standby is trackless truck, and the trackless truck is in laneway repair machine and abandons reciprocation cycle transport spoil between cash field.
3. the quick repairing construction system of baseboard of coal mine roadway as described in claim 1, it is characterised in that: two operating, which carries, to be set For comprising belt transport unit and elevating conveyor, the elevating conveyor is laid on roadway floor side, the elevating conveyor along roadway direction For scraper blade elevating conveyor or leather belt reshipment machine.
4. the quick repairing construction system of baseboard of coal mine roadway as claimed in claim 3, it is characterised in that: the belt-conveying dress 2 rear support legs set are attached by bolt and laneway repair machine, to guarantee the stability of belt transport unit operation.
5. the quick repairing construction system of baseboard of coal mine roadway as claimed in claim 3, it is characterised in that: the belt-conveying dress Setting further includes belt, 2 deflection oil cylinders and 2 flexion-extension oil cylinders, and described 2 pitch oil cylinder and are individually fixed in 2 deflection oil cylinders The attachment base of telescopic rod end, the belt are hingedly connected to the telescopic rod end of 2 deflection oil cylinders and 2 flexion-extension oil cylinders, by This is supported to belt and angular adjustment.
6. a kind of quick method for repairing and constructing of baseboard of coal mine roadway, passes through coal mine roadway such as claimed in any one of claims 1 to 5 The quick repairing construction system of bottom plate is realized, characterized by comprising the steps of:
Step 1: optimization distribution of equipment;
Step 2: each equipment conveying in construction system in place and is debugged, and is cleared up to be repaired section of tunnel, is asked by striking side Top checks back and two stability helped, uses anchor cable reinforcement to unstable surrounding rock;
Step 3: pre-pouring grout construction carries out the construction of pre-pouring grout hole using anchoring drilling machine, installation pre-pouring grout pipe and sealing of hole, using stirring It mixes station and prepares grouting slurries, complete slip casting operation using grouting pump, and carry out Hou Ning;
Step 4: anchoring construction, operator are carried out the construction of anchor hole using anchoring drilling machine, are used cooperatively resin anchor after pore-forming Gu high strength steel strand anchor cable is installed in agent, the high-intensitive arch tray of abnormity is configured, installs aligning ball pad, and the insertion note in drilling additional Aluminium-plastic pipe is starched, marquis after the completion of slip casting, and is carried out by slip casting aluminium-plastic pipe to anchor cable hole slip casting using cotton yarn and double slurries sealing of holes It is solidifying;
Step 5: anchorage cable stretching pre-tightens anchor cable using tensioner tensioning, artificial to separate anchor cable head tendon after the completion of tensioning, to Surrounding is bent, to prevent lockset from loosening, and smooth location.
CN201711335366.4A 2017-12-14 2017-12-14 The quick repairing construction system of baseboard of coal mine roadway and its construction method Active CN108104839B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711335366.4A CN108104839B (en) 2017-12-14 2017-12-14 The quick repairing construction system of baseboard of coal mine roadway and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711335366.4A CN108104839B (en) 2017-12-14 2017-12-14 The quick repairing construction system of baseboard of coal mine roadway and its construction method

Publications (2)

Publication Number Publication Date
CN108104839A CN108104839A (en) 2018-06-01
CN108104839B true CN108104839B (en) 2019-06-25

Family

ID=62216841

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711335366.4A Active CN108104839B (en) 2017-12-14 2017-12-14 The quick repairing construction system of baseboard of coal mine roadway and its construction method

Country Status (1)

Country Link
CN (1) CN108104839B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108952808A (en) * 2018-07-04 2018-12-07 中铁六局集团有限公司 Large volume internal axial pressure compensator installation engineering method
CN109667618A (en) * 2019-02-25 2019-04-23 闫红世 A kind of grouting vehicle backfilling coal cutting roadway

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09242476A (en) * 1996-03-08 1997-09-16 Maeda Corp Cutter head for drilling machine
CN103643707A (en) * 2013-12-19 2014-03-19 中煤科工集团西安研究院有限公司 Roadway repair machine integrating drilling, digging, transporting and loading
CN103899249A (en) * 2014-04-28 2014-07-02 中煤科工集团西安研究院有限公司 Coal mine roadway bottom board anchoring drill carriage
CN104564090A (en) * 2014-12-13 2015-04-29 中国煤炭科工集团太原研究院有限公司 Multifunctional tunnel repairing integrated machine
CN104632233A (en) * 2014-12-13 2015-05-20 中国煤炭科工集团太原研究院有限公司 Mechanical repair technology of distortional roadway and roadway repair machine
CN105201525A (en) * 2015-10-19 2015-12-30 河南理工大学 Repairable bottom heave control method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09242476A (en) * 1996-03-08 1997-09-16 Maeda Corp Cutter head for drilling machine
CN103643707A (en) * 2013-12-19 2014-03-19 中煤科工集团西安研究院有限公司 Roadway repair machine integrating drilling, digging, transporting and loading
CN103899249A (en) * 2014-04-28 2014-07-02 中煤科工集团西安研究院有限公司 Coal mine roadway bottom board anchoring drill carriage
CN104564090A (en) * 2014-12-13 2015-04-29 中国煤炭科工集团太原研究院有限公司 Multifunctional tunnel repairing integrated machine
CN104632233A (en) * 2014-12-13 2015-05-20 中国煤炭科工集团太原研究院有限公司 Mechanical repair technology of distortional roadway and roadway repair machine
CN105201525A (en) * 2015-10-19 2015-12-30 河南理工大学 Repairable bottom heave control method

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
《ZDY750L底锚钻机在新元矿底板锚固施工中的应用》;李旺年等;《中国煤炭学会钻探工程专业委员会2017年钻探工程学术研讨会论文集》;20170525;第74-76页
《全液压履带钻机在煤矿巷道底板锚固施工中的应用》;李旺年等;《煤矿现代化》;20170615(第3期);第7页右栏
《煤矿巷道底鼓机械化治理技术应用研究》;张幼振;《煤炭科学技术》;20180131;第46卷(第1期);第93-98页

Also Published As

Publication number Publication date
CN108104839A (en) 2018-06-01

Similar Documents

Publication Publication Date Title
CN205766713U (en) Building 3D printing equipment
CN102022122B (en) Support-type comprehensive tunneler
CN201354518Y (en) Walking trestle bridge
CN108104839B (en) The quick repairing construction system of baseboard of coal mine roadway and its construction method
CN201344039Y (en) Anchor rod trolley
CN203542830U (en) Spreader with weighing function
CN104879061A (en) Multifunctional self-propelled portal wagon drill
CN106979026B (en) Drilling and injecting integrated tunnel anchor rod construction equipment
CN204783054U (en) Tunnel invert concrete lining's sliding template
CN203174447U (en) Side-cutting type turnout screen scarifier
CN101250877A (en) Sliding form parallel translation concrete lining machine as well as construction method thereof
CN102042021A (en) Automatically walking stepped mobile trestle
CN105952469A (en) Full-automatic high-frequency vibrating leveling machine for tunnel inverted arch
CN112761691B (en) Distributed anchoring grouting supporting device for fault broken zone of deep mine
CN108867291B (en) Municipal road surface repairing equipment and repairing method
CN104632233A (en) Mechanical repair technology of distortional roadway and roadway repair machine
CN202391424U (en) Supporting type comprehensive bolter miner
CN1928238B (en) Railway turnout ballast cleaning-sieving machine(6)
CN207813620U (en) Tunnel defect comprehensive improvement automatization operation system
CN204140065U (en) Heavy grade rock drilling development machine
CN211144510U (en) Concrete feeding and spraying integrated machine
CN109322298A (en) Vibrating and impacting construction of ballast pile unit and construction method with bottom discharge
CN204753510U (en) Digital multi -functional canal lining machine
CN104295295A (en) Large-gradient drilling and tunneling machine
CN206513371U (en) A kind of Multifunction construction equipment constructed for drill+blast tunnel

Legal Events

Date Code Title Description