CN108104175A - A kind of prefabricated pipe gallery water sealing structure and piping lane - Google Patents

A kind of prefabricated pipe gallery water sealing structure and piping lane Download PDF

Info

Publication number
CN108104175A
CN108104175A CN201711341329.4A CN201711341329A CN108104175A CN 108104175 A CN108104175 A CN 108104175A CN 201711341329 A CN201711341329 A CN 201711341329A CN 108104175 A CN108104175 A CN 108104175A
Authority
CN
China
Prior art keywords
connecting portion
frame body
pipe gallery
prefabricated pipe
detection hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711341329.4A
Other languages
Chinese (zh)
Inventor
夏葵
胡刚
侯正国
杨成凯
黄尚珩
夏艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHENGDU THIRD CONSTRUCTION ENGINEERING Co Ltd
Original Assignee
CHENGDU THIRD CONSTRUCTION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHENGDU THIRD CONSTRUCTION ENGINEERING Co Ltd filed Critical CHENGDU THIRD CONSTRUCTION ENGINEERING Co Ltd
Priority to CN201711341329.4A priority Critical patent/CN108104175A/en
Publication of CN108104175A publication Critical patent/CN108104175A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Building Environments (AREA)

Abstract

The present invention relates to a kind of prefabricated pipe gallery water sealing structure and piping lanes, are related to building field.The prefabricated pipe gallery water sealing structure, it includes sequentially connected first connecting portion, frame body and second connecting portion, the internal diameter of first connecting portion is less than the outer diameter of frame body, the outer diameter of second connecting portion is less than the outer diameter of frame body, the outer wall of second connecting portion is equipped with the concave ladder platform of axis to frame body, ladder platform is more than outer diameter of the ladder platform away from second connecting portion close to the outer diameter of second connecting portion, frame body is equipped with cricoid mounting groove close to the end face of first connecting portion, it being capable of effective sealing, convenient for splicing, effectively improve the security and durability of spliced prefabricated pipe gallery water sealing structure.It is spliced piping lane, stabilization safe to use, while effective waterproof by least two above-mentioned prefabricated pipe gallery water sealing structures, improves the service life of piping lane.

Description

A kind of prefabricated pipe gallery water sealing structure and piping lane
Technical field
The present invention relates to building field, in particular to a kind of prefabricated pipe gallery water sealing structure and piping lane.
Background technology
As urban development is grown, all kinds of water supply, draining, combustion gas, power communication official website.Increasingly gather, these cobwebs As city " blood vessel " it is stealthy in citizen beyond the invisible, once occur dangerous situation just as city occur " thrombus ", pavement excavation can not It avoids, more makes troubles urban life.In order to safeguard underground utilities, road, which is fixed, does not have just excavate repeatedly within several years, this " to open drawing The management method of chain " formula allows many citizen's headaches.Underground pipe gallery can effectively solve urban road excavate repeatedly bring it is all More problems.
For pipe gallery as Urban Underground facility artery engineering, leakage problem is always the matter for perplexing infrastructure engineering Common fault is measured, prevents pipeline and phenomenon is impregnated by percolating water for a long time, it is the skill that pipe gallery construction must take into consideration to resolve waterproof problem One of art problem.Prefabricated pipe gallery seam crossing is the weak part of structure, and seam crossing water resistance is that influence precast assembly is comprehensive Close the key technical problem of Pipe rack security and durability.
The content of the invention
It is an object of the invention to provide a kind of prefabricated pipe gallery water sealing structure, can effective sealing, convenient for splicing, Effectively improve the security and durability of spliced prefabricated pipe gallery water sealing structure.
Another object of the present invention is to provide a kind of piping lane, stabilization safe to use, while effective waterproof, piping lane is improved Service life.
What the embodiment of the present invention was realized in:
A kind of prefabricated pipe gallery water sealing structure, including sequentially connected first connecting portion, frame body and second Connecting portion, the internal diameter of first connecting portion are less than the outer diameter of frame body, and the outer diameter of second connecting portion is less than the outer diameter of frame body, The outer wall of second connecting portion is equipped with the concave ladder platform of axis to frame body, and ladder platform is big close to the outer diameter of second connecting portion In outer diameter of the ladder platform away from second connecting portion, frame body is equipped with cricoid mounting groove close to the end face of first connecting portion.
In preferred embodiments of the present invention, above-mentioned second connecting portion is equipped with detection hole, and frame sheet is run through in one end of detection hole The inner wall of body, the other end run through end face of the second connecting portion away from frame body, and detection hole is through the position of second connecting portion The horizontal plane at place is located at mounting groove close to the one side of the outer diameter of second connecting portion.
In preferred embodiments of the present invention, above-mentioned detection hole includes the first detection hole interconnected and the second detection Hole, the area of section of the first detection hole are more than the second detection hole, and the second detection hole is through second connecting portion away from frame body End face, the first detection hole run through the inner wall of frame body.
In preferred embodiments of the present invention, the junction rounding off of above-mentioned first detection hole and the second detection hole.
In preferred embodiments of the present invention, the above-mentioned sealing ring further included for sealing the first detection hole, sealing ring and the One detection hole is detachably connected.
In preferred embodiments of the present invention, the rectangular cross-section of said frame body, the quantity of detection hole is four, four Detection hole is opened in the side wall of frame body respectively.
In preferred embodiments of the present invention, the junction of the adjacent any two side wall of said frame body, which is equipped with, to be strengthened Block.
In preferred embodiments of the present invention, above-mentioned reinforcement block is equipped with tensioning hole and fixing groove, and tensioning hole, which sequentially passes through, to be added Strong block is located at the end face of first connecting portion and positioned at the end face of second connecting portion, and fixing groove is connected with tensioning hole.
In preferred embodiments of the present invention, the section of above-mentioned mounting groove is isosceles trapezoid, and the opening of mounting groove is to close to the The one side of two connecting portions tapers into.
A kind of piping lane is spliced by above-mentioned prefabricated pipe gallery water sealing structure.
The advantageous effect of the embodiment of the present invention is:
The set-up mode of first connecting portion, frame body and second connecting portion effectively improves prefabricated pipe gallery sealing The structural compactness of structure, while effectively make the stitching portion more waterproof of at least two prefabricated pipe gallery water sealing structures.Meanwhile The setting of ladder platform and mounting groove further improves the sealing waterproof effect of prefabricated pipe gallery water sealing structure, improves piping lane Service life.
Description of the drawings
It in order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be to needed in the embodiment attached Figure is briefly described, it should be understood that the following drawings illustrates only certain embodiments of the present invention, therefore is not construed as pair The restriction of scope, for those of ordinary skill in the art, without creative efforts, can also be according to this A little attached drawings obtain other relevant attached drawings.
Fig. 1 is the structure diagram at the first visual angle of piping lane provided in an embodiment of the present invention;
Fig. 2 is the structure diagram at the first visual angle of prefabricated pipe gallery water sealing structure provided in an embodiment of the present invention;
Fig. 3 is the structure diagram at the second visual angle of prefabricated pipe gallery water sealing structure provided in an embodiment of the present invention
Fig. 4 is the structure diagram of the first cushion rubber in another piping lane that other embodiments of the invention provide;
Fig. 5 is the structure diagram at the second visual angle of the piping lane that other embodiments of the invention provide.
In figure:10- piping lanes;The prefabricated pipe gallery water sealing structures of 100-;110- frame bodies;113- mounting grooves;120- One connecting portion;The first cushion rubbers of 130-;131- the first water-swellable cushion rubbers;The first non-water-swellable cushion rubbers of 133-;134- second is met Water expands cushion rubber;140- detection holes;The first detection holes of 141-;The second detection holes of 143-;145- sealing rings;150- second is connected Portion;153- ladder platforms;The second cushion rubbers of 160-;170- reinforcement blocks;171- tensioning hole;173- fixing grooves.
Specific embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, the technical solution in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is Part of the embodiment of the present invention, instead of all the embodiments.The present invention implementation being usually described and illustrated herein in the accompanying drawings The component of example can configure to arrange and design with a variety of.
Therefore, below the detailed description of the embodiment of the present invention to providing in the accompanying drawings be not intended to limit it is claimed The scope of the present invention, but be merely representative of the present invention selected embodiment.Based on the embodiments of the present invention, this field is common Technical staff's all other embodiments obtained without creative efforts belong to the model that the present invention protects It encloses.
It should be noted that:Similar label and letter represents similar terms in following attached drawing, therefore, once a certain Xiang Yi It is defined, then it further need not be defined and explained in subsequent attached drawing in a attached drawing.
In the description of the present invention, it is necessary to explanation, term " " center ", " on ", " under ", "left", "right", " vertical ", The orientation or position relationship of the instructions such as " level ", " interior ", " outer " are based on orientation shown in the drawings or position relationship or are somebody's turn to do Invention product using when the orientation usually put or position relationship, be for only for ease of the description present invention and simplify description, without It is instruction or implies that signified device or element there must be specific orientation, with specific azimuth configuration and operation, therefore not It is understood that as limitation of the present invention.In addition, term " first ", " second ", " the 3rd " etc. are only used for distinguishing description, and cannot manage It solves to indicate or imply relative importance.
In addition, the terms such as term " level ", " vertical ", " pendency " are not offered as requiring component abswolute level or pendency, and It is that can be slightly tilted.It is not to represent the structure if " level " only refers to that its direction is more horizontal with respect to for " vertical " It has to fully horizontally, but can be slightly tilted.
In the description of the present invention, it is also necessary to explanation, unless otherwise clearly defined and limited, term " setting ", " installation ", " connected ", " connection " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected or one It connects body;Can be mechanical connection or electrical connection;It can be directly connected, it can also be indirect by intermediary It is connected, can is the connection inside two elements.For the ordinary skill in the art, on being understood with concrete condition State the concrete meaning of term in the present invention.
First embodiment
Fig. 1 is refer to, the present embodiment provides a kind of piping lane 10, by least two prefabricated pipe gallery water sealing structures 100 It is spliced, stabilization safe to use, and meanwhile effective waterproof, the service life of raising piping lane 10.
Optionally, at least two prefabricated pipe gallery water sealing structures 100 can be through glue-line (not shown), such as phenolic resin etc. Bonding, for consolidating the junction of the prefabricated pipe gallery water sealing structure 100 of adjacent any two, while for preventing from seeping water, Improve the security of piping lane 10.
For the ease of placing prefabricated pipe gallery water sealing structure 100, in the present embodiment, refer to Fig. 2, tubulose it is prefabricated comprehensive The outer wall rectangular in cross-section of piping lane water sealing structure 100 is closed, is preferably square, makes stress more balanced.Other implementations of the present invention In example, outer wall section semicircular in shape, dish or arch or irregular shape.
Also referring to Fig. 2 and Fig. 3, prefabricated pipe gallery water sealing structure 100 is prefabricated by armored concrete, including according to First connecting portion 120, frame body 110 and the second connecting portion 150 of secondary connection.
Wherein, the internal diameter of first connecting portion 120 is less than the outer diameter of frame body 110, and the outer diameter of second connecting portion 150 is less than The outer diameter of frame body 110.Frame body 110 has the space for accommodating goods and materials etc..
When two prefabricated pipe gallery water sealing structures 100 coordinate, the first of a prefabricated pipe gallery water sealing structure 100 Connecting portion 120 and the second connecting portion 150 of another prefabricated pipe gallery water sealing structure 100 are clamped, and are made so as to effectively save Technological process, while effectively improve sealing performance.Stress concentration when being easily installed, while effectively reducing against each other simultaneously.
Specifically, frame body 110 is equipped with cricoid mounting groove 113 close to the end face of first connecting portion 120.Mounting groove 113 are located on the end face of first connecting portion 120 along the axis of frame body 110.
The section of mounting groove 113 is preferably isosceles trapezoid, and the diameter of section of mounting groove 113 is by close to first connecting portion 120 one side to the one side away from first connecting portion 120 becomes larger.For installing the first cushion rubber 130.
Preferably, second connecting portion 150 has cricoid ladder platform 153.Ladder platform 153 is located at second connecting portion 150 Outer wall is simultaneously recessed to the axis of frame body 110, and ladder platform 153 is more than ladder platform 153 far close to the outer diameter of second connecting portion 150 Outer diameter from second connecting portion 150, for installing the second cushion rubber 160.
Optionally, prefabricated pipe gallery water sealing structure 100 includes the first cushion rubber 130 and the second cushion rubber 160 of wedge shape.
Wherein, in the present embodiment, 130 section of the first cushion rubber is trapezoidal, is arranged in mounting groove 113.
In the present embodiment, the first cushion rubber 130 is made by hydro-expansive rubber, and the second cushion rubber 160 is by non-hydro-expansive rubber It is made.It works in coordination, effectively improves sealing performance.
In others embodiment of the invention, referring to Fig. 4, the first cushion rubber 130 includes sequentially connected first water-swellable Cushion rubber 131, the first non-133 and second water-swellable cushion rubber 134 of water-swellable cushion rubber, the second water-swellable cushion rubber 134 and peace Tankage 113 connects.Wherein, the cross-sectional width of the first cushion rubber 130 is along the second water-swellable cushion rubber 134 to the first water-swellable cushion rubber 131 taper into after become larger so that being left between the side of the second water-swellable cushion rubber 134 and the side wall of mounting groove 113 swollen Swollen gap, while make its lateral expansion, sealing effect is more preferably.Make it have the effect of elastic waterstop and expansion water-stop.
Under above-mentioned set-up mode, first, elastic packing is carried out, secondly, pipeline first makes the first chance after external world's infiltration is come in Water expansion cushion rubber 131 expands and 134 lateral expansion of the second water-swellable cushion rubber, makes its sealing effect more preferably, while first meets Water expansion cushion rubber 131, the joint face of the first non-133 and second water-swellable cushion rubber 134 of water-swellable cushion rubber are cambered surface, effectively It gives expansion space and water is made to be more convenient for discharging from detection hole 140.
While in order to further improve the first cushion rubber 130 and the stability of the junction of mounting groove 113, the first cushion rubber 130 Glue-line (not shown), such as novolac resin layer etc. are equipped between the contact surface of mounting groove 113.
Second cushion rubber 160 can also be made by the hydro-expansive rubber interconnected with non-hydro-expansive rubber.So that Second cushion rubber 160 can either elastic waterstop, and can be with expansion water-stop.So that when by elastic waterstop can not sealing when, expand rubber Glue meets water and generates expansion.
While in order to further improve the second cushion rubber 160 and the stability of the junction of ladder platform 153, the second cushion rubber 160 Glue-line (not shown), such as novolac resin layer etc. are equipped between the contact surface of ladder platform 153.
In order to detect the leakproofness between the prefabricated pipe gallery water sealing structure 100 of adjacent any two, prevent from seeping water, because This, second connecting portion 150 is equipped with detection hole 140, and the wherein quantity of detection hole 140 is four, in the present embodiment, frame body 110 rectangular cross-section, four detection holes 140 are located at the side wall for surrounding frame body 110 respectively, for detecting each side wall Leakproofness.
Specifically, the inner wall of frame body 110 is run through in one end of detection hole 140, and the other end is remote through second connecting portion 150 End face from frame body 110, horizontal plane of the detection hole 140 through the place of the position of second connecting portion 150 are located at mounting groove 113 close to the one side of the outer diameter of second connecting portion 150.I.e. when two prefabricated pipe gallery water sealing structures 100 coordinate, detection hole 140 through the position of second connecting portion 150 between mounting groove 113 and ladder platform 153, i.e., positioned at the first cushion rubber 130 and Between second cushion rubber 160.Meanwhile the setting of detection hole 140, it can also be filled out between the first cushion rubber 130 and the second cushion rubber 160 It fills slurry and is sealed repairing, can also carry out draining in water after the second cushion rubber 160 enters the first cushion rubber 130, further prevent Only seep water, meanwhile, further improve the durability of the first cushion rubber 130.
Optionally, referring to Fig. 5, in another kind embodiment provided by the invention, detection hole 140 includes interconnect the One detection hole 141 and the second detection hole 143, the area of section of the first detection hole 141 are more than the second detection hole 143, the second inspection Gaging hole 143 runs through end face of the second connecting portion 150 away from frame body 110, and the first detection hole 141 is through frame body 110 Inner wall.The junction rounding off of first detection hole 141 and the second detection hole 143.Pass through the area of section of the first detection hole 141 More than the second detection hole 143, negative pressure, automatic absorption draining are effectively formed.
Preferably, further include to seal the sealing ring 145 of the first detection hole 141,145 and first detection hole of sealing ring 141 are detachably connected.After sealing, moisture is absorbed into the second detection hole 143 from the first detection hole 141 by principle of negative pressure It is interior, it opens sealing ring 145 and carries out 145 communicated drainage device of draining or sealing ring, such as water tank being connected with suction pump etc., i.e., It can effective draining.
Wherein, detection hole 140 is surrounded by waterproof material, prevents water from entering frame body 110 and reducing the service life.
The junction of the adjacent any two side wall of frame body 110 is equipped with reinforcement block 170, effectively reduces stress heap Product, wherein, reinforcement block 170 herein refer in reinforcement block 170 obtained by pouring into a mould through concrete equipped with reinforcing rib (not shown).
In order to make the connection of the prefabricated pipe gallery water sealing structure 100 of adjacent any two more firm, each reinforcement block 170 are equipped with tensioning hole 171 and fixing groove 173, and tensioning hole 171 sequentially passes through the end that reinforcement block 170 is located at first connecting portion 120 Face and positioned at the end face of second connecting portion 150, fixing groove 173 is connected with tensioning hole 171.That is fixing groove 173 is by tensioning hole 171 It is divided into the first tensioning hole (not shown) and the second tensioning hole (not shown), one end and the first connecting portion 120 in the first tensioning hole Connection, the other end are connected with fixing groove 173, and the one end in the second tensioning hole is connected with second connecting portion 150, the other end and fixing groove 173 connections, the first tensioning hole and the second tensioning hole are set along the axisymmetrical of fixing groove 173.
Optionally, prefabricated pipe gallery water sealing structure 100 further includes multiple spiral (not shown), multiple spirals Be respectively used to the first tensioning hole, the cooperation of the second tensioning hole, optionally, the calibers of multiple spirals be less than the first tensioning hole with And second tensioning hole aperture so that two adjacent prefabricated pipe gallery water sealing structures 100 can be flexibly connected, effectively Improve its leakproofness.
The splicing of prefabricated pipe gallery 10 is:
Prefabricated pipe gallery water sealing structure 100 is lifted in place, first connecting portion 120 installs the second cushion rubber 160, and second connects After socket part 150 installs the first cushion rubber 130, assembled, the seam of tensioning, then prefabricated pipe gallery water sealing structure 100 is then carried out Place carries out closed-water test, is finally sealed in the external fluid sealant of prefabricated pipe gallery water sealing structure 100, you can.
To sum up, prefabricated pipe gallery water sealing structure provided by the invention, can effective sealing, convenient for splicing, effectively carry The security and durability of high spliced prefabricated pipe gallery water sealing structure.Piping lane provided by the invention is safe to use steady It is fixed, while effective waterproof, improve the service life of piping lane.
It these are only the preferred embodiment of the present invention, be not intended to limit the invention, for those skilled in the art For member, the invention may be variously modified and varied.Any modification within the spirit and principles of the invention, being made, Equivalent substitution, improvement etc., should all be included in the protection scope of the present invention.

Claims (10)

1. a kind of prefabricated pipe gallery water sealing structure, which is characterized in that including sequentially connected first connecting portion, frame body with And second connecting portion, the internal diameter of the first connecting portion are less than the outer diameter of the frame body, the outer diameter of the second connecting portion Less than the outer diameter of the frame body, the outer wall of the second connecting portion is equipped with the concave ladder of axis to the frame body Platform, the ladder platform are more than outer diameter of the ladder platform away from the second connecting portion close to the outer diameter of the second connecting portion, The frame body is equipped with cricoid mounting groove close to the end face of the first connecting portion.
2. prefabricated pipe gallery water sealing structure according to claim 1, which is characterized in that the second connecting portion is equipped with inspection The inner wall of the frame body is run through in gaging hole, one end of the detection hole, and the other end is through the second connecting portion away from described The end face of frame body, horizontal plane of the detection hole through the place of the position of the second connecting portion are located at the mounting groove Close to the one side of the outer diameter of the second connecting portion.
3. prefabricated pipe gallery water sealing structure according to claim 2, which is characterized in that the detection hole includes mutually being connected Logical the first detection hole and the second detection hole, the area of section of first detection hole is more than second detection hole, described Second detection hole runs through end face of the second connecting portion away from the frame body, and first detection hole runs through the frame The inner wall of body.
4. prefabricated pipe gallery water sealing structure according to claim 3, which is characterized in that first detection hole with it is described The junction rounding off of second detection hole.
5. prefabricated pipe gallery water sealing structure according to claim 3, which is characterized in that further include to seal described The sealing ring of one detection hole, the sealing ring are detachably connected with first detection hole.
6. prefabricated pipe gallery water sealing structure according to claim 2, which is characterized in that the section of the frame body is Rectangle, the quantity of the detection hole is four, and four detection holes are opened in the side wall of the frame body respectively.
7. prefabricated pipe gallery water sealing structure according to claim 1, which is characterized in that the frame body it is adjacent The junction of any two side wall is equipped with reinforcement block.
8. prefabricated pipe gallery water sealing structure according to claim 7, which is characterized in that the reinforcement block is equipped with tensioning hole And fixing groove, the tensioning hole sequentially pass through the reinforcement block and are located at the end face of the first connecting portion and positioned at described The end face of two connecting portions, the fixing groove are connected with the tensioning hole.
9. prefabricated pipe gallery water sealing structure according to claim 1, which is characterized in that the section of the mounting groove for etc. Waist is trapezoidal, and the opening of the mounting groove is tapered into the one side close to the second connecting portion.
10. a kind of piping lane, which is characterized in that by least two prefabricated pipe galleries as described in any one of claims 1-9 Water sealing structure is spliced.
CN201711341329.4A 2017-12-14 2017-12-14 A kind of prefabricated pipe gallery water sealing structure and piping lane Pending CN108104175A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711341329.4A CN108104175A (en) 2017-12-14 2017-12-14 A kind of prefabricated pipe gallery water sealing structure and piping lane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711341329.4A CN108104175A (en) 2017-12-14 2017-12-14 A kind of prefabricated pipe gallery water sealing structure and piping lane

Publications (1)

Publication Number Publication Date
CN108104175A true CN108104175A (en) 2018-06-01

Family

ID=62216978

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711341329.4A Pending CN108104175A (en) 2017-12-14 2017-12-14 A kind of prefabricated pipe gallery water sealing structure and piping lane

Country Status (1)

Country Link
CN (1) CN108104175A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN206204992U (en) * 2016-11-17 2017-05-31 中建五局第三建设有限公司 A kind of removable waterproofing node construction of prefabricated pipe gallery internode
CN107059917A (en) * 2016-12-30 2017-08-18 中建五局第三建设有限公司 One kind splits element precast formula pipe gallery and its construction method
CN107386322A (en) * 2017-07-31 2017-11-24 广西路桥工程集团有限公司 A kind of prefabricated installation pipe gallery
CN207597443U (en) * 2017-12-14 2018-07-10 成都市第三建筑工程公司 A kind of prefabricated pipe gallery water sealing structure and piping lane

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN206204992U (en) * 2016-11-17 2017-05-31 中建五局第三建设有限公司 A kind of removable waterproofing node construction of prefabricated pipe gallery internode
CN107059917A (en) * 2016-12-30 2017-08-18 中建五局第三建设有限公司 One kind splits element precast formula pipe gallery and its construction method
CN107386322A (en) * 2017-07-31 2017-11-24 广西路桥工程集团有限公司 A kind of prefabricated installation pipe gallery
CN207597443U (en) * 2017-12-14 2018-07-10 成都市第三建筑工程公司 A kind of prefabricated pipe gallery water sealing structure and piping lane

Similar Documents

Publication Publication Date Title
CN107859075A (en) A kind of prefabricated pipe gallery joint waterproof structure and its construction method
CN208039480U (en) The connection structure of assembling type outer wall and ground base
CN205917610U (en) Prefabricated assembled concrete box culvert
CN110424458A (en) Tunneling boring PC piping lane piece construction and its closed-water test method
CN111364517A (en) Waterproof connection structure for prefabricated comprehensive pipe gallery connector
CN207392242U (en) Piping lane waterproof structure for deformation seams and piping lane
CN207498999U (en) A kind of basement bottom board subsiding crack crack treatment node
CN204781016U (en) Gasbag formula open trench tunnel movement joint seal structure
CN110747764A (en) Assembly type box culvert settlement joint waterproof structure and construction method thereof
CN207597443U (en) A kind of prefabricated pipe gallery water sealing structure and piping lane
CN106049644A (en) Detection boring rapid restoration support mould apparatus for concrete drain pipe culvert and restoration method thereof
CN111549888A (en) Prefabricated assembly type drainage inspection well and construction method thereof
CN103205986A (en) Concrete raft foundation construction-joint grouting device and construction method
CN108104175A (en) A kind of prefabricated pipe gallery water sealing structure and piping lane
CN205894103U (en) Prefabricated parabola type utility tunnel
CN107504277A (en) A kind of underground structure embedded wall penetration pipe water-tight device
CN106638707A (en) Novel underground continuous wall joint water-proof structure
CN113028139B (en) Combined type connector of rain and sewage pipe and construction method
CN208136954U (en) Precast splice type Pipe rack
CN110486538A (en) A kind of service sleeve connect plugging structure and method for blocking with pipeline
CN216405651U (en) Prefabricated assembled concrete drainage inspection shaft structure
CN212251495U (en) Concrete pond underwater equipment installation device
KR100765360B1 (en) Precast structure connecting part
CN212478001U (en) Prefabricated inspection shaft of assembled drainage
CN111719664A (en) Assembled rain and sewage diversion interchange inspection well

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180601

RJ01 Rejection of invention patent application after publication