CN108100913A - A kind of boom hoisting applied to indoor construction - Google Patents

A kind of boom hoisting applied to indoor construction Download PDF

Info

Publication number
CN108100913A
CN108100913A CN201810089644.0A CN201810089644A CN108100913A CN 108100913 A CN108100913 A CN 108100913A CN 201810089644 A CN201810089644 A CN 201810089644A CN 108100913 A CN108100913 A CN 108100913A
Authority
CN
China
Prior art keywords
boom hoisting
chassis
sleeve
fixes sleeve
indoor construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810089644.0A
Other languages
Chinese (zh)
Other versions
CN108100913B (en
Inventor
朱金孝
孟庆杰
庞继勇
李晓东
段鸣利
潘玉猛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SEPCO Electric Power Construction Co Ltd
Original Assignee
SEPCO Electric Power Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SEPCO Electric Power Construction Co Ltd filed Critical SEPCO Electric Power Construction Co Ltd
Priority to CN201810089644.0A priority Critical patent/CN108100913B/en
Publication of CN108100913A publication Critical patent/CN108100913A/en
Application granted granted Critical
Publication of CN108100913B publication Critical patent/CN108100913B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D3/00Portable or mobile lifting or hauling appliances
    • B66D3/18Power-operated hoists
    • B66D3/20Power-operated hoists with driving motor, e.g. electric motor, and drum or barrel contained in a common housing
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66DCAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
    • B66D3/00Portable or mobile lifting or hauling appliances
    • B66D3/18Power-operated hoists
    • B66D3/26Other details, e.g. housings

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Jib Cranes (AREA)

Abstract

The invention discloses a kind of boom hoisting applied to indoor construction, which includes chassis, lifting unit, hoist engine and fixed cell.The lifting unit includes the door shape frame that vertical beam and crossbeam are formed, the first fixes sleeve is provided between the crossbeam and chassis, sliding sleeve is provided in first fixes sleeve, driving mechanism is provided between the sliding sleeve and door shape frame.Support column is provided in the sliding sleeve, the upper end of the support column is provided with the 3rd pulley and second pulley, first pulley is provided between the hoist engine and lifting unit on the chassis.By using the device, without additionally arranging suspension centre, the lifting of steel member, pipeline, installation are aided in by device in itself, construction efficiency is high, and safety coefficient is big, and with very big flexibility, it is adaptable.

Description

A kind of boom hoisting applied to indoor construction
Technical field
The present invention relates to technical field of building construction, specifically a kind of boom hoisting applied to indoor construction.
Background technology
In the construction of building and electromechanical installation, due to construction characteristic, majority construction manpower can not be moved directly Or lift, and site environment lacks sling point, the boom hoisting needed for auxiliary installation.Construction site generally uses two ways:
First, (such as interim lifting lug, interim beam after interim hanging structure are welded on original steel structure girder or built-in fitting Deng), then aid in installing with measures such as chain blocks.This mode is affected by site environment, is lacked flexibility, is often deposited The situation of installation site can not met.
Second, hanging structure is built according to installation site again, is generally required when arranging suspension centre above on-station position The means such as welded steel beam, hanging scaffold or floor with opening complete the arrangement work of suspension centre.During using these methods, risk factor increases More, safety coefficient reduces, meanwhile, it is more that larger and labor intensive is destroyed to completed civil engineering operation finished product.
The content of the invention
In view of the above-mentioned problems, the present invention provides a kind of boom hoisting applied to indoor construction, by using the device, Without additionally arranging suspension centre, the lifting of steel member, pipeline, installation are aided in by device in itself, construction efficiency is high, safety coefficient Greatly, it is adaptable and with very big flexibility.
The technical scheme adopted by the invention to solve the technical problem is that:
A kind of boom hoisting applied to indoor construction including chassis, is disposed with from front to back on the chassis Lifting unit and hoist engine;
The lifting unit includes two vertical beams arranged in left-right direction, is set between the vertical beam described in two horizontal Beam is provided with the first fixes sleeve, sliding sleeve is provided in first fixes sleeve between the crossbeam and chassis, The arranged on left and right sides of the sliding sleeve lower end is respectively arranged with driving beam, is provided with to hold in first fixes sleeve Receive it is described driving beam sliding slot;
Screw rod is set on the driving beam, and the upper/lower terminal of the screw rod turns respectively with the crossbeam and chassis Dynamic connection;
The upper end of the screw rod is provided with the first worm gear, distinguishes with the both ends of the first worm screw of first worm wheel It is rotatablely connected by the first support plate and the crossbeam, one end of first worm screw is provided with the first in command;
It is provided with support column in the sliding sleeve, the upper end of the support column is provided with the second tablet, and described second The front and rear sides of tablet are respectively arranged with the 3rd pulley and second pulley, and first pulley is provided on the chassis.
Further, fixed cell is further included, the fixed cell includes supporting rack and at least three second fixing sleeves Cylinder, and the second fixes sleeve described in more together forms convex polygon, and supporting leg, the branch are provided on the supporting rack The quantity of leg is identical with the quantity of second fixes sleeve, and position corresponds, and the supporting leg is plugged on accordingly respectively The second fixes sleeve in, be provided with Adjusting bolt Adjusting screw between second fixes sleeve and supporting leg.
Further, the Adjusting bolt Adjusting screw is sheathed on the outside of second fixes sleeve, and the Adjusting bolt Adjusting screw Lower end is rotatablely connected with second fixes sleeve, and the upper end of the Adjusting bolt Adjusting screw is threadedly coupled with the supporting leg.
Further, the hoist engine is located at the inside for the polygon that second fixes sleeve is formed.
Further, the support column is rotatablely connected with the sliding sleeve, is fixedly installed on the support column There is the second worm gear, pass through the second support plate and the sliding sleeve with the both ends of the second worm screw of second worm wheel Cylinder rotation connection, one end of second worm screw is provided with the second in command.
Further, the first in command includes the rocking bar that one end is fixedly connected with first worm screw, described to shake The other end slip of bar is provided with the positioning column with first worm screw parallel arrangement, the left and right both ends point of the positioning column Baffle is not provided with, is provided with and the matched location hole of the positioning column in the first support plate of the first in command.
Further, guide rail and sliding block, the free end point of the driving beam are respectively arranged on the medial surface of the vertical beam It is not fixedly connected with the sliding block.
Further, first worm screw is located at the rear side of first worm gear.
Further, second worm screw in left-right direction, and positioned at second worm gear rear side.
Further, it is provided with idler wheel on the chassis.
The beneficial effects of the invention are as follows:
1st, use the boom hoisting carry out lifting construction during, without additionally arranging suspension centre, by device in itself come Steel member, the lifting of pipeline, installation are aided in, construction efficiency is high, and safety coefficient is big, has very big flexibility, and will not be to original Some civil engineering operation finished products damage.
2nd, by the way that lifting unit is designed to telescopic form, so as to meet different factory building heights, adaptability By force.
3rd, the lifting unit of boom hoisting can not only lift, and can also rotate, and disclosure satisfy that different position and angle Lifting requirements, it is easy to operate using flexible.
4th, the boom hoisting is when being fixed, the form for the traditional increase chassis weight abandoned, but by the bottom of at Telescopic fixed cell on disk is set, only needs to extend fixed cell when needing fixed, supports the upper plane of fixed cell It leans against on the upper side of workshop, so as to which boom hoisting be avoided to topple over, so not only ensure that fixed reliability, but also subtract The small weight of entire boom hoisting applies more flexibly.
5th, the supporting rack of fixed cell is a square frame, and tool is there are one plane, accordingly even when the upper side of workshop is not One plane, can also realize the fixation of boom hoisting.
6th, by that in the inside of fixed cell, falling object from high altitude can be avoided to damage hoist engine hoist engine design, Play the role of protection.
Description of the drawings
Fig. 1 is the dimensional structure diagram of the present invention;
Fig. 2 is the enlarged structure schematic diagram of part A in Fig. 1;
Fig. 3 is the enlarged structure schematic diagram of part B in Fig. 1;
Fig. 4 is the enlarged structure schematic diagram of C portion in Fig. 1;
Connection relationship diagrams of the Fig. 5 between rocking bar and positioning column;
Fig. 6 is the enlarged structure schematic diagram of D parts in Fig. 1;
Connection relationship diagrams of the Fig. 7 between the first fixes sleeve, sliding sleeve and support column;
Fig. 8 is the side view of the present invention;
Fig. 9 is the structure diagram when present invention is in stationary state;
Figure 10 is the A-A sectional views in Fig. 9.
In figure:1- chassis, 11- idler wheels, 12- first pulleys, 2- hoist engines, 21- hawsers, 3- lifting units, 31- vertical beams, 311- guide rails, 312- sliding blocks, 32- crossbeams, the first support plates of 321-, 3211- location holes, the first fixes sleeves of 33-, 331- are slided Slot, 34- sliding sleeves, 341- driving beams, the first tablets of 342-, 343- gussets, the second support plates of 344-, the second worm screws of 345-, The 346- second in command, 35- screw rods, the first worm gears of 351-, the first worm screws of 36-, the 37- first in command, 371- rocking bars, 372- positioning Column, 373- baffles, 38- support columns, the second worm gears of 381-, the second tablets of 382-, 383- second pulleys, the 3rd pulleys of 384-, 4- Fixed cell, the second fixes sleeves of 41-, 42- supporting racks, 421- supporting legs, 43- Adjusting bolt Adjusting screws.
Specific embodiment
In order to facilitate description, it is as shown in Figure 1 now to define coordinate system.
As shown in Figure 1, a kind of boom hoisting applied to indoor construction includes chassis 1, on the chassis 1 from front to back It is disposed with lifting unit 3 and hoist engine 2.It moves in order to facilitate boom hoisting, is set respectively on four angles on the chassis 1 There is idler wheel 11.
As shown in Figure 1, vertical beam 31 of the lifting unit 3 including being respectively arranged at 1 arranged on left and right sides of chassis, two Crossbeam 32, and the left and right both ends difference of the crossbeam 32 are set positioned at the upper end of the vertical beam 31 between vertical beam 31 described in root It is fixedly connected by welding with the vertical beam 31.
As shown in Figure 1, the first fixes sleeve 33 is provided between the crossbeam 32 and chassis 1, and described first fixes The upper/lower terminal of sleeve 33 is bolted to connection respectively with the crossbeam 32 and chassis 1.First fixes sleeve The sliding sleeve 34 that can be slided up and down along first fixes sleeve 33 is provided in 33.As shown in Fig. 2, the sliding sleeve It (is interior using the one side that two vertical beams 31 are opposite that the arranged on left and right sides of 34 lower end, which is respectively arranged with the driving beam 341 extended outward, Side), the left and right sides of first fixes sleeve 33 is separately provided for accommodating the sliding slot 331 of the driving beam 341.It is described On the medial surface of vertical beam 31 guide rail being arranged in a vertical direction is respectively arranged with (using the opposite one side of two vertical beams 31 as inside) 311, be provided on the guide rail 311 with 311 matched sliding block 312 of the guide rail, two driving beams 341 it is outstanding Dead end is fixedly connected respectively with the sliding block 312 by screw.
As shown in Figures 2 and 3, left and right the two of first fixes sleeve 33 is located between the crossbeam 32 and chassis 1 Side is respectively arranged with screw rod 35, and the upper/lower terminal of the screw rod 35 passes through bearing assembly and the crossbeam 32 and bottom respectively Disk 1 is rotatablely connected.It is provided on the driving beam 341 and 35 matched threaded hole of the screw rod.Two screw rods Top on 35 positioned at the crossbeam 32 is fixedly installed the first worm gear 351 respectively.As shown in Figure 1 and Figure 4, the crossbeam 32 Left and right both ends are fixedly installed the first support plate 321 respectively, a left side with 351 matched first worm screw 36 of the first worm gear, Right both ends are rotatablely connected respectively by bearing assembly and first support plate 321, and one end of first worm screw 36 is set It is equipped with to drive the first in command 37 that the first worm screw 36 rotates.
In order to avoid in hoisting heavy, colliding between weight and the first worm screw 36, the damage of the first worm screw 36 is caused It is bad, as shown in Figure 1, first worm screw 36 is located at the rear side of first worm gear 351.
Further, due to during work lifting unit 3 hung weight, under gravity, 35 He of screw rod Self-lock force between threaded hole possibly can not meet, and sliding sleeve 34 is caused to glide.For this purpose, as shown in Figure 4 and Figure 5, it is described The first in command 37 includes rocking bar 371, and one end of the rocking bar 371 is fixedly connected with first worm screw 36, the rocking bar 371 The other end be provided with positioning column 372 with described first worm screw 36 parallel arrangement, the left and right both ends of the positioning column 372 It is separately provided for the baffle 373 of limitation 372 axial displacement of positioning column.It is provided on the rocking bar 371 for accommodating The through hole of positioning column 372 is stated, and the positioning column 372 can horizontally slip along the through hole.Close to the first in command 37 The first support plate 321 on be provided with multiple with the 372 matched location hole 3211 of positioning column, and multiple positioning Hole 3211 is evenly distributed with along with the first worm screw 36 for the circumferencial direction in the center of circle.
As shown in Figure 6 and Figure 7, the lifting unit 3 further includes support column 38, and the lower end of the support column 38 is inserted into The inside of the sliding sleeve 34, and between the support column 38 and sliding sleeve 34 positioned at the sliding sleeve 34 it is upper, Lower both ends are respectively arranged with bearing assembly, and the support column 38 is rotated by bearing assembly with the sliding sleeve 34 to be connected It connects.
As shown in Figure 6 and Figure 7, the top on the support column 38 positioned at the sliding sleeve 34 is fixedly installed second Worm gear 381.The upper end of the sliding sleeve 34 is provided with and vertically arranged first tablet of the axis of the sliding sleeve 34 342, further, polylith gusset 343, and polylith are provided between 342 downside of the first tablet and sliding sleeve 34 Gusset 343 is along the circumferential direction uniformly distributed.The arranged on left and right sides of the upper side of first tablet 342 is respectively arranged with the second support plate 344, be provided between the second support plate 344 described in two pieces with 381 matched second worm screw 345 of the second worm gear, And the left and right both ends of second worm screw 345 are rotatablely connected respectively by bearing assembly and second support plate 344.Institute The one end for stating the second worm screw 345 is provided with to drive the second in command 346 of second worm screw 345.
Preferably, second worm screw 345 in left-right direction, and positioned at second worm gear 381 rear side.
As illustrated in figures 1 and 8, is provided on the chassis 1 between the hoist engine 2 and lifting unit 3 One pulley 12 is provided with the second tablet 382 with the axially vertical arrangement of the support column 38 on the support column 38, described The front and rear sides of second tablet 382 are respectively arranged with the 3rd pulley 384 and second pulley 383.Roll up the freedom of the hawser 21 of model machine End is successively around first pulley 12,383 and the 3rd pulley 384 of second pulley.
During work, working depth as needed first adjusts the overhang of sliding sleeve 34, that is, rotates the first in command 37, By the first worm screw 36 and the first worm gear 351 screw rod 35 is driven to rotate, so as to control the raising and lowering of driving beam 341, and then Control the raising and lowering of sliding sleeve 34.When adjusting to suitable position, positioning column 372 is promoted inwardly (with two first The opposite one side of support plate 321 is inside) positioning column 372 is made to be inserted into corresponding location hole 3211.Then in 2 cable of hoist engine The free end binding installed part of rope 21, hoist engine 2 starts, and installed part is lifted to suitable height, then construction personnel according to It needs to rotate the second in command 346, until installed part turns to suitable angle position.
Further, in order to avoid boom hoisting is toppled over during lifting, the weight on chassis 1 usually can all be increased Amount can so increase the weight of entire boom hoisting, and heavy, application is dumb.
For this purpose, as shown in Figure 8 and Figure 9, fixed cell 4 is provided on the chassis 1.The fixed cell 4 includes At least three second fixes sleeves 41, and the second fixes sleeve 41 described in more together forms convex polygon, described second The lower end of fixes sleeve 41 is fixedly connected with the chassis 1.As a kind of specific embodiment, second described in the present embodiment The quantity of fixes sleeve 41 is four, and the second fixes sleeve 41 described in four is in the matrix arrangement of two rows two row.Described Fixed cell 4 further includes supporting rack 42, and supporting leg 421, the quantity of the supporting leg 421 are provided on the downside of support frame as described above 42 Identical with the quantity of second fixes sleeve 41, position corresponds, and the supporting leg 421 is plugged on corresponding the respectively In two fixes sleeves 41.
As shown in Figure 10, Adjusting bolt Adjusting screw 43 is both provided between second fixes sleeve 41 and supporting leg 421, it is described Socket swivel nut is arranged the outside with second fixes sleeve 41, and the lower end of the Adjusting bolt Adjusting screw 43 is fixed with described second Sleeve 41 is rotatablely connected, and the upper end of the Adjusting bolt Adjusting screw 43 is threadedly coupled with the supporting leg 421.
Further, in order to improve work efficiency, the supporting leg 421 is divided into optical axis section and screw thread from top to bottom Section, and the root diameter of the end of thread is more than the diameter of the optical axis section.
Further, in order to protect hoist engine 2, falling object from high altitude is avoided to damage, as shown in Figure 1, the volume It raises machine 2 and is located at the inside for the polygon that second fixes sleeve 41 is formed, and cover board is provided on the supporting rack 42 (not shown).
When needing fixed, the supporting rack 42 is pulled up upwards first, until the Adjusting bolt Adjusting screw 43 starts to depart from institute The second fixes sleeve 41 stated, then four Adjusting bolt Adjusting screws 43 of turn simultaneously, make the supporting rack 42 continue to rise, until institute The step surface for stating Adjusting bolt Adjusting screw 43 is held out against on the upper surface of second fixes sleeve 41, the step surface be with it is described 421 matched threaded hole of supporting leg and the step surface between the second fixation matched unthreaded hole of swivel nut.

Claims (10)

1. a kind of boom hoisting applied to indoor construction, it is characterised in that:Including chassis, on the chassis from front to back according to It is secondary to be provided with lifting unit and hoist engine;
The lifting unit includes two vertical beams arranged in left-right direction, sets crossbeam between the vertical beam described in two, institute The first fixes sleeve is provided between the crossbeam stated and chassis, sliding sleeve is provided in first fixes sleeve, it is described The arranged on left and right sides of sliding sleeve lower end is respectively arranged with driving beam, is provided in first fixes sleeve for accommodating State the sliding slot of driving beam;
Screw rod is set on the driving beam, and the upper/lower terminal of the screw rod rotates with the crossbeam and chassis connect respectively It connects;
The upper end of the screw rod is provided with the first worm gear, passes through respectively with the both ends of the first worm screw of first worm wheel First support plate is rotatablely connected with the crossbeam, and one end of first worm screw is provided with the first in command;
Support column is provided in the sliding sleeve, the upper end of the support column is provided with the second tablet, second tablet Front and rear sides be respectively arranged with the 3rd pulley and second pulley, be provided with first pulley on the chassis.
2. a kind of boom hoisting applied to indoor construction according to claim 1, it is characterised in that:It further includes fixed single Member, the fixed cell includes supporting rack and at least three second fixes sleeves, and the second fixes sleeve described in more is total to With convex polygon is formd, supporting leg, the quantity of the supporting leg and second fixes sleeve are provided on the supporting rack Quantity is identical, and position corresponds, and the supporting leg is plugged on respectively in corresponding second fixes sleeve, and described second is solid Determine to be provided with Adjusting bolt Adjusting screw between sleeve and supporting leg.
3. a kind of boom hoisting applied to indoor construction according to claim 2, it is characterised in that:The adjusting spiral shell The outside of second fixes sleeve is sheathed on, and the lower end of the Adjusting bolt Adjusting screw rotates with second fixes sleeve and connects It connects, the upper end of the Adjusting bolt Adjusting screw is threadedly coupled with the supporting leg.
4. a kind of boom hoisting applied to indoor construction according to claim 2, it is characterised in that:The hoist engine The inside of the polygon formed positioned at second fixes sleeve.
5. a kind of boom hoisting applied to indoor construction according to claim 1, it is characterised in that:The support column It is rotatablely connected with the sliding sleeve, the second worm gear is fixedly installed on the support column, with the second worm gear phase The both ends of second worm screw of cooperation are rotatablely connected by the second support plate and the sliding sleeve, one end of second worm screw It is provided with the second in command.
6. a kind of boom hoisting applied to indoor construction according to claim 1, it is characterised in that:The first Hand includes the rocking bar that is fixedly connected with first worm screw of one end, and the other end of the rocking bar, which slides, to be provided with and described the The positioning column of one worm screw parallel arrangement, the left and right both ends of the positioning column are respectively arranged with baffle, close to the first in command's It is provided in first support plate and the matched location hole of the positioning column.
7. a kind of boom hoisting applied to indoor construction according to claim 1, it is characterised in that:The vertical beam it is interior Guide rail and sliding block are respectively arranged on side, the free end of the driving beam is fixedly connected respectively with the sliding block.
8. a kind of boom hoisting applied to indoor construction according to claim 1, it is characterised in that:First snail Bar is located at the rear side of first worm gear.
9. a kind of boom hoisting applied to indoor construction according to claim 1, it is characterised in that:Second snail Bar in left-right direction, and is located at the rear side of second worm gear.
10. a kind of boom hoisting applied to indoor construction according to claim 1, it is characterised in that:The chassis On be provided with idler wheel.
CN201810089644.0A 2018-01-30 2018-01-30 Hoisting device applied to indoor construction Active CN108100913B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810089644.0A CN108100913B (en) 2018-01-30 2018-01-30 Hoisting device applied to indoor construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810089644.0A CN108100913B (en) 2018-01-30 2018-01-30 Hoisting device applied to indoor construction

Publications (2)

Publication Number Publication Date
CN108100913A true CN108100913A (en) 2018-06-01
CN108100913B CN108100913B (en) 2023-09-26

Family

ID=62221369

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810089644.0A Active CN108100913B (en) 2018-01-30 2018-01-30 Hoisting device applied to indoor construction

Country Status (1)

Country Link
CN (1) CN108100913B (en)

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2422229A1 (en) * 1974-05-08 1975-11-27 Erik Ingvar Andersson Prefabricated building mobile crane - has chassis and telescopic derricking jib allowing passage through doorways and hydraulic derricking rams
JPS5749888U (en) * 1980-09-03 1982-03-20
JPS5762779U (en) * 1980-10-02 1982-04-14
JPH1143286A (en) * 1997-05-27 1999-02-16 Daisan Unyu Kk Crane
CN201473224U (en) * 2009-08-31 2010-05-19 谈德振 Miniature translational lifting machine
CN203653144U (en) * 2013-12-17 2014-06-18 中建一局集团第五建筑有限公司 Building construction lifting device
CN204138205U (en) * 2014-08-18 2015-02-04 中国建筑第七工程局有限公司 A kind of movable suspending arm hanging device of safety and stability
CN204384739U (en) * 2014-12-26 2015-06-10 天津东方海川门窗幕墙工程有限公司 Loop wheel machine
CN204569219U (en) * 2015-01-12 2015-08-19 岳中珩 A kind of airplane wheel installation and removal device
CN105584937A (en) * 2016-03-03 2016-05-18 上汽大众汽车有限公司 Tool turret hoisting tool
CN107445072A (en) * 2017-08-17 2017-12-08 孙文站 A kind of power equipment maintenance hanging apparatus
CN208022627U (en) * 2018-01-30 2018-10-30 中国电建集团山东电力建设第一工程有限公司 A kind of boom hoisting applied to indoor construction

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2422229A1 (en) * 1974-05-08 1975-11-27 Erik Ingvar Andersson Prefabricated building mobile crane - has chassis and telescopic derricking jib allowing passage through doorways and hydraulic derricking rams
JPS5749888U (en) * 1980-09-03 1982-03-20
JPS5762779U (en) * 1980-10-02 1982-04-14
JPH1143286A (en) * 1997-05-27 1999-02-16 Daisan Unyu Kk Crane
CN201473224U (en) * 2009-08-31 2010-05-19 谈德振 Miniature translational lifting machine
CN203653144U (en) * 2013-12-17 2014-06-18 中建一局集团第五建筑有限公司 Building construction lifting device
CN204138205U (en) * 2014-08-18 2015-02-04 中国建筑第七工程局有限公司 A kind of movable suspending arm hanging device of safety and stability
CN204384739U (en) * 2014-12-26 2015-06-10 天津东方海川门窗幕墙工程有限公司 Loop wheel machine
CN204569219U (en) * 2015-01-12 2015-08-19 岳中珩 A kind of airplane wheel installation and removal device
CN105584937A (en) * 2016-03-03 2016-05-18 上汽大众汽车有限公司 Tool turret hoisting tool
CN107445072A (en) * 2017-08-17 2017-12-08 孙文站 A kind of power equipment maintenance hanging apparatus
CN208022627U (en) * 2018-01-30 2018-10-30 中国电建集团山东电力建设第一工程有限公司 A kind of boom hoisting applied to indoor construction

Also Published As

Publication number Publication date
CN108100913B (en) 2023-09-26

Similar Documents

Publication Publication Date Title
CN111058618A (en) Combined type telescopic sleeve jacking device and method thereof
CN206188316U (en) Multistage thick stick synchronous lifting gear
CN102146729B (en) Easily-assembled and disassembled umbrella-shaped platform for top construction in spherical container and use method thereof
CN112661030B (en) Hanging and connecting drag-and-drop device applied to steel framework and using method thereof
CN105692470A (en) Internal climbing tower crane and operating method thereof
CN104150353A (en) Liftable and detachable bridge crane
CN108590322A (en) A kind of method of free-standing steel chimney upside-down method of hull-section construction assembling segmental hoisting
CN211602680U (en) Universal loading device for low-cycle repeated load test
CN205677222U (en) A kind of civil engineering work construction bracket
CN203625889U (en) Hanging cage structure for large-diameter hole drilling cast pile reinforcement cage hanging
CN201770018U (en) Automatic packing device special for oil bushing production line
CN208022627U (en) A kind of boom hoisting applied to indoor construction
JP4221761B2 (en) Boiler module lifting construction method and lifting device
JP3511239B2 (en) Steel tower intermediate raising device and steel tower intermediate raising method
CN108100913A (en) A kind of boom hoisting applied to indoor construction
CN209686827U (en) A kind of fall arrest construction bracket
CN207451514U (en) A kind of building machinery lifting gear
CN205820800U (en) The hydraulic lift without scaffold building template frame can be realized
CN205873739U (en) Tower machine structure and tower machine that climbs for super high -rise building
CN107866669A (en) The special assembly machine of pneumatic actuator and method
CN202206102U (en) Unwinding rack used for construction site
CN203701552U (en) Attached scaffold for lifted through worm, gear and screw rod
CN204252868U (en) New gear tooth bar well repairing device
CN106006461A (en) Lifting platform for hidden maintenance of motorcycles
CN210048454U (en) Adjustable lifting platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant