CN108097657A - A kind of CIP cleaning devices and cleaning method - Google Patents

A kind of CIP cleaning devices and cleaning method Download PDF

Info

Publication number
CN108097657A
CN108097657A CN201711414932.0A CN201711414932A CN108097657A CN 108097657 A CN108097657 A CN 108097657A CN 201711414932 A CN201711414932 A CN 201711414932A CN 108097657 A CN108097657 A CN 108097657A
Authority
CN
China
Prior art keywords
valve
purge tank
equipment
cleaning
inlet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711414932.0A
Other languages
Chinese (zh)
Other versions
CN108097657B (en
Inventor
项亚南
戴晨曦
殷翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Vocational College of Information Technology
Original Assignee
Jiangsu Vocational College of Information Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Vocational College of Information Technology filed Critical Jiangsu Vocational College of Information Technology
Priority to CN201711414932.0A priority Critical patent/CN108097657B/en
Publication of CN108097657A publication Critical patent/CN108097657A/en
Application granted granted Critical
Publication of CN108097657B publication Critical patent/CN108097657B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B3/00Cleaning by methods involving the use or presence of liquid or steam
    • B08B3/04Cleaning involving contact with liquid
    • B08B3/10Cleaning involving contact with liquid with additional treatment of the liquid or of the object being cleaned, e.g. by heat, by electricity or by vibration
    • AHUMAN NECESSITIES
    • A61MEDICAL OR VETERINARY SCIENCE; HYGIENE
    • A61LMETHODS OR APPARATUS FOR STERILISING MATERIALS OR OBJECTS IN GENERAL; DISINFECTION, STERILISATION OR DEODORISATION OF AIR; CHEMICAL ASPECTS OF BANDAGES, DRESSINGS, ABSORBENT PADS OR SURGICAL ARTICLES; MATERIALS FOR BANDAGES, DRESSINGS, ABSORBENT PADS OR SURGICAL ARTICLES
    • A61L2/00Methods or apparatus for disinfecting or sterilising materials or objects other than foodstuffs or contact lenses; Accessories therefor
    • A61L2/16Methods or apparatus for disinfecting or sterilising materials or objects other than foodstuffs or contact lenses; Accessories therefor using chemical substances
    • A61L2/18Liquid substances or solutions comprising solids or dissolved gases
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B13/00Accessories or details of general applicability for machines or apparatus for cleaning
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B3/00Cleaning by methods involving the use or presence of liquid or steam
    • B08B3/04Cleaning involving contact with liquid
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B3/00Cleaning by methods involving the use or presence of liquid or steam
    • B08B3/04Cleaning involving contact with liquid
    • B08B3/08Cleaning involving contact with liquid the liquid having chemical or dissolving effect
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/05Programmable logic controllers, e.g. simulating logic interconnections of signals according to ladder diagrams or function charts
    • AHUMAN NECESSITIES
    • A61MEDICAL OR VETERINARY SCIENCE; HYGIENE
    • A61LMETHODS OR APPARATUS FOR STERILISING MATERIALS OR OBJECTS IN GENERAL; DISINFECTION, STERILISATION OR DEODORISATION OF AIR; CHEMICAL ASPECTS OF BANDAGES, DRESSINGS, ABSORBENT PADS OR SURGICAL ARTICLES; MATERIALS FOR BANDAGES, DRESSINGS, ABSORBENT PADS OR SURGICAL ARTICLES
    • A61L2202/00Aspects relating to methods or apparatus for disinfecting or sterilising materials or objects
    • A61L2202/10Apparatus features
    • A61L2202/17Combination with washing or cleaning means

Landscapes

  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • General Chemical & Material Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Epidemiology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Animal Behavior & Ethology (AREA)
  • General Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Veterinary Medicine (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Cleaning By Liquid Or Steam (AREA)

Abstract

The invention discloses a kind of CIP cleaning devices and cleaning method, cleaning device washes equipment outlet valve, equipment blowdown valve, prerinse equipment outlet valve, supply pump, reflux pump, diaphragm pump and plate type heat exchanger including technique water valve, purge tank shower valve, purge tank inlet valve, purge tank outlet valve, purge tank blowdown valve, purge tank heat-riser valve, cleaning equipment inlet valve, temperature sensor, liquid level, flowmeter, cycling.By designing corresponding cleaning procedure burning in controller chip, when being cleaned, it is only necessary to select corresponding button by man-machine interface, it is possible to realize automatic cleaning, it is easy to operate, cleaning performance is good, cleaning efficiency is high.By prerinse, repeatedly Xun Huan is washed and is finally washed, and is cleaned multiple times step by step, ensures to equipment cleaning thoroughly, not staying raffinate, cleaning solution.

Description

A kind of CIP cleaning devices and cleaning method
Technical field
The present invention relates to a kind of CIP cleaning devices and cleaning methods.
Background technology
It is extremely important to the cleaning of equipment in fields such as food, biological medicines.General producer can pollute according to cleaning object Property and degree form material, water quality, selected cleaning method, cost and security etc. to select detergent.It is common to wash Washing agent has acid, alkalis and sterilizing detergent.Reagent if there is residual the product quality that produces below will be generated compared with It is big to influence.
It is most of at present to take artificial cleaning, but manually there are following shortcomings for cleaning:1), manually cleaning can because Artificial differentia influence cleaning performance, and cause cleaning agent, water waste;2) remaining venomous injurant in the equipment cleaned, is needed Matter can damage the person, cause danger;3), high labor cost, efficiency are low;4), because of human factor in artificial cleaning process Impurity has been re-introduced into, has caused secondary pollution, it is difficult to ensure quality requirement, and in-service monitoring and reality can not be carried out to production process When control.
The content of the invention
It is an object of the invention to provide a kind of CIP cleaning devices and cleaning methods, solve in the prior art manually cleaning The technical issues of efficiency is low, cleaning performance is poor.
In order to solve the above-mentioned technical problem the present invention, adopts the following technical scheme that:
A kind of CIP cleaning devices, including purge tank, heat exchanger and controller, the purge tank top be provided with first into Liquid mouth, the second inlet, the 3rd inlet and the 4th inlet;Purge tank lower part is provided with the first liquid outlet;First inlet Connected by technique waterpipe with technique water storage tank, be provided with technique water valve V2 on technique waterpipe, the 4th inlet by into Liquid pipe road is connected with cleaning water storage tank, and purge tank inlet valve V3 is provided in input duct;
First liquid outlet of the purge tank lower part is connected by outlet tube with the first port of four-way, on the first outlet tube First flowmeter is provided with, the second port of four-way is connected with the first blow-off line, and first row is provided on the first blow-off line Dirty valve V5, the third port of four-way are connected with the outlet end of diaphragm pump P3, and liquid feeding end and the cleaning agent holding vessel of diaphragm pump P3 connect It is logical;
4th port of the four-way is connected by the first circulation duct with the liquid feeding end of supply pump P1, the first circulation duct On be provided with purge tank outlet valve V4, supply pump P1 outlet end pass through one end of the second circulation duct and plate type heat exchanger connect Logical, the other end of plate type heat exchanger is connected with one end of the 3rd circulation duct, the other end and the one or three of the 3rd circulation duct Logical first port connection, the second port of the first threeway are connected by the 4th circulation duct with the second inlet of purge tank, Purge tank inlet valve V3 is provided on 4th circulation duct;The third port of first threeway and one end of the 5th circulation duct connect Logical, the other end of the 5th circulation duct is connected with the liquid feeding end of equipment to be cleaned, and cleaning equipment is provided on the 5th circulation duct Inlet valve V7, one end of the 6th circulation duct and the outlet end of equipment to be cleaned pass through, the other end of the 6th circulation duct and the The first port of two threeways connects, and second flowmeter, the second port of the second threeway and second are provided on the 6th circulation duct Blow-off line connects, and equipment blowdown valve V9 is provided on the second blow-off line, and the third port of the second threeway passes through the 7th circulation Pipeline is connected with the liquid feeding end of reflux pump P2, and the outlet end of reflux pump P2 is connected with one end of the 8th circulation duct, the 8th circulation The other end of pipeline is connected with the first port of the 4th threeway, and the second port of the 4th threeway is connected with the 3rd discharge line, is returned Prerinse equipment outlet valve V10 is provided on closed tube road, the third port of the 4th threeway passes through the 9th circulation duct and purge tank The 3rd inlet connection;
It is provided with temperature sensor and liquid level sensor in the purge tank, it is technique water valve V2, purge tank inlet valve V3, clear Cleaning of evaporator outlet valve V4, purge tank blowdown valve V5, purge tank heat-riser valve V6, cleaning equipment inlet valve V7, Xun Huan wash equipment outlet valve V8, equipment blowdown valve V9 and prerinse equipment outlet valve V10 are motor-driven valve;Supply pump P1, reflux pump P2, diaphragm pump P3, Flow meters, second flowmeter, temperature sensor, liquid level sensor, technique water valve V2, purge tank inlet valve V3, purge tank go out Water valve V4, purge tank blowdown valve V5, purge tank heat-riser valve V6, cleaning equipment inlet valve V7, Xun Huan wash equipment outlet valve V8, equipment Blowdown valve V9 and prerinse equipment outlet valve V10 are electrically connected between controller.
CIP (cleaning in place) cleanings obtain wide application in fields such as food, biological medicines.Pass through Corresponding cleaning procedure burning is designed in controller chip, when being cleaned, it is only necessary to be selected by man-machine interface corresponding Button, it is possible to realize automatic cleaning, it is easy to operate, cleaning performance is good, cleaning efficiency is high.It is filled in addition, being cleaned using the CIP It puts compared with artificial hand washing process, cleaning performance can be influenced by eliminating the difference of manual work, moreover it is possible to greatly eliminate clear The danger that may occur in operation is washed, saves labour, environmental protection saves cleaning agent and water.
It is further improved, the plate type heat exchanger is electric heating heat exchanger, and heating time is short, and heating effect is good.
Be further improved, the controller be PLC programmable controller, chip model FX3U-64MR.Reliability is high, Strong antijamming capability, the design of system, installation, debugging work load are small, easy to maintain.
It is further improved, the A/D modular converters and control of the first flowmeter, second flowmeter by model AD01 Device connects;Temperature sensor is connected by the A/D modular converters of model TM01 with controller;Supply pump P1, reflux pump P2 and Diaphragm pump P3 is communicated by RS485 modules with controller, and noise proof feature is good, and communication is stablized.
A kind of method cleaned using above-mentioned CIP cleaning devices to equipment, by the liquid feeding end of equipment to be cleaned and One end connection of five circulation ducts, the outlet end of equipment to be cleaned are connected with one end of the 6th circulation duct, specific cleaning process Include the following steps:
1), treat cleaning equipment and carry out prerinse:After the completion of preparation to be cleaned, purge tank inlet valve V3 is opened, Quantitative ejected wash water is added in, is then shut off purge tank inlet valve V3;Then first opening valve purge tank outlet valve V4, cleaning equipment water inlet Valve V7 and equipment blowdown valve V9;Supply pump P1 is then turned on, prerinse is carried out to equipment;After the prerinse time arrives, supply is closed P1 is pumped, is then shut off purge tank outlet valve V4, cleaning equipment inlet valve V7 and equipment blowdown valve V9;Using first flowmeter, Second-rate flowmeter measurement detects whether prerinse liquid in purge tank, cleaning equipment empties respectively.First opening valve purge tank outlet valve V4, Cleaning equipment inlet valve V7 and equipment blowdown valve V9 is to operating position;Supply pump P1 is then turned on, supply pump is protected, prevents supply pump It is burnt because of reversion;During similary closing, supply pump P1 is first closed, turns off purge tank outlet valve V4, cleaning equipment inlet valve V7 With equipment blowdown valve V9.
2), treat cleaning equipment carry out cycle wash:
2.1), using hot water wash:After to be cleaned be ready to complete, purge tank inlet valve V3 is opened, is added into purge tank Enter quantitative ejected wash water, be then shut off purge tank inlet valve V3, then first open purge tank outlet valve V4, cleaning equipment inlet valve V7, cycle wash equipment outlet valve V8, are then turned on supply pump P1, are then turned on reflux pump P2, carry out cycle and wash, cycle is washed the time and arrived Afterwards, purge tank blowdown valve V5, equipment blowdown valve V9 are opened, cleaning solution is emptied, is then shut off supply pump P1, reflux pump P2, then closes Purge tank outlet valve V4, cleaning equipment inlet valve V7 are closed, cycles and washes equipment outlet valve V8, purge tank blowdown valve V5 and equipment blowdown Valve V9 detects whether prerinse liquid in purge tank, cleaning equipment empties respectively using first flowmeter, second flowmeter measurement.
2.2), washed using chemical cleaning solution:After to be cleaned be ready to complete, purge tank outlet valve V4, cleaning are first opened Equipment inlet valve V7, Xun Huan wash equipment outlet valve V8, then open supply pump P1, reflux pump P2, are then turned on diaphragm pump P3, add Diaphragm pump P3 is turned off after entering quantitative chemical cleaning solution, cycle is carried out and washes, cycle is washed after the time arrives, and opens purge tank blowdown valve V5, equipment blowdown valve V9 empty cleaning solution, are then shut off supply pump P1, reflux pump P2, turn off purge tank outlet valve V4, clear Equipment inlet valve V7 is washed, cycles and washes equipment outlet valve V8, purge tank blowdown valve V5 and equipment blowdown valve V9, using first flow Meter, second flowmeter measurement detect whether prerinse liquid in purge tank, cleaning equipment empties respectively.
2.3), washed using thimerosal:After to be cleaned be ready to complete, purge tank outlet valve V4, cleaning equipment are first opened Inlet valve V7, Xun Huan wash equipment outlet valve V8, then open supply pump P1, reflux pump P2, are then turned on diaphragm pump P3, and it is fixed to add in Diaphragm pump P3 is turned off after the thimerosal of amount, cycle is carried out and washes, cycle is washed after the time arrives, and opens purge tank blowdown valve V5, equipment Blowdown valve V9, empty cleaning solution, be then shut off supply pump P1, reflux pump P2, turn off purge tank outlet valve V4, cleaning equipment into Water valve V7, Xun Huan wash equipment outlet valve V8, purge tank blowdown valve V5 and equipment blowdown valve V9, using first flowmeter, second Flowmeter measurement detects whether prerinse liquid in purge tank, cleaning equipment empties respectively.
3), cleaning equipment is treated finally to be washed:
After the completion of preparation to be cleaned, purge tank inlet valve V3 is opened, quantitative ejected wash water is added in, is then shut off cleaning Tank inlet valve V3;Then purge tank outlet valve V4, cleaning equipment inlet valve V7 and prerinse equipment outlet valve V10 are first opened;It connects Unlatching supply pump P1, is then turned on reflux pump P2, equipment is finally cleaned;After final scavenging period arrives, supply is closed P1, reflux pump P2 are pumped, is then shut off purge tank outlet valve V4, cleaning equipment inlet valve V7 and prerinse equipment outlet valve V10;It adopts Detect whether prerinse liquid in purge tank, cleaning equipment empties respectively with first flowmeter, second flowmeter measurement.
It is further improved, the cleaning preparation includes:Technique water valve V2 is opened into process water, the cleaning in purge tank After water reaches setting liquid level, technique water valve V2 is closed, purge tank outlet valve V4, purge tank heat-riser valve V6 is then opened, is then turned on Supply pump P1 and heat exchanger heat process water with heat exchanger, preheat pipeline and purge tank, after reaching preset temperature, first Close supply pump P1, then purge tank outlet valve V4, purge tank heat-riser valve V6 and heat exchanger.Every time before cleaning, using technique Water preheats pipeline and purge tank, and a part of the process water as cleaning solution in follow-up cleaning process.
It is further improved, the preheating sets temperature as 50-60 degree, achievees the purpose that preheat pipeline and purge tank.
It is further improved, the process water is distilled water.
It is further improved, prerinse time 5min in the step 1), Xun Huan washes the time as 10min in step 2), step 3) final scavenging period is 5min in, ensures that equipment is sufficiently rinsed.
Be further improved, the step 1), 2), 3) in be required to open heat exchanger cleaning solution heated, keep clear The temperature of washing lotion is 50-60 degree, improves cleaning performance.
Compared with prior art, the present invention has following advantageous effect:
1st, by designing corresponding cleaning procedure burning in controller chip, when being cleaned, it is only necessary to pass through people Machine interface selects corresponding button, it is possible to realize automatic cleaning, it is easy to operate, cleaning performance is good, cleaning efficiency is high.In addition, Using the CIP cleaning devices compared with artificial hand washing process, cleaning performance can be influenced by eliminating the difference of manual work, moreover it is possible to The danger that may occur in washing and cleaning operation is greatly eliminated, saves labour, environmental protection saves cleaning agent and water.
2nd, washed by prerinse, multiple cycle and finally washed, be cleaned multiple times step by step, ensured to equipment cleaning thoroughly, Raffinate, cleaning solution are not stayed.
Description of the drawings
Fig. 1 is a kind of structure chart of novel C IP cleaning equipments.
Fig. 2 is the circuit diagram of cleaning equipment.
Fig. 3 is flowmeter, the circuit connection diagram of temperature sensor.
Fig. 4 is the circuit connection diagram of supply pump, reflux pump and diaphragm pump.
Fig. 5 is to move the flow chart cleaned to equipment using novel C IP cleaning devices.
Fig. 6 is cleaning preparation flow chart.
Specific embodiment
To make the purpose of the present invention and technical solution clearer, below in conjunction with the embodiment of the present invention to the skill of the present invention Art scheme is clearly and completely described.
Embodiment one:
As shown in Figs 1-4, a kind of CIP cleaning devices, including purge tank 1, plate heat exchanger 13 and controller, the cleaning 1 top of tank is provided with the first inlet, the second inlet, the 3rd inlet and the 4th inlet;Purge tank lower part is provided with One liquid outlet;First inlet is connected by technique waterpipe with technique water storage tank, and technique water valve is provided on technique waterpipe V2, the 4th inlet are connected by input duct with cleaning water storage tank, and purge tank inlet valve V3 is provided in input duct;
First liquid outlet of the purge tank lower part is connected by outlet tube with the first port of four-way, on the first outlet tube First flowmeter 11 is provided with, the second port of four-way is connected with the first blow-off line, and first is provided on the first blow-off line Blowdown valve V5, the third port of four-way are connected with the outlet end of diaphragm pump P3, the liquid feeding end and cleaning agent holding vessel of diaphragm pump P3 Connection;
4th port of the four-way is connected by the first circulation duct with the liquid feeding end of supply pump P1, the first circulation duct On be provided with the outlet end of purge tank outlet valve V4, supply pump P1 and pass through one end of the second circulation duct and plate type heat exchanger 13 Connection, the other end of plate type heat exchanger are connected with one end of the 3rd circulation duct, the other end and first of the 3rd circulation duct The first port connection of threeway, the second port of the first threeway are connected by the second inlet of the 4th circulation duct and purge tank It is logical, purge tank inlet valve V3 is provided on the 4th circulation duct;The third port of first threeway and one end of the 5th circulation duct Connection, the other end of the 5th circulation duct are connected with the liquid feeding end of equipment to be cleaned, and being provided with cleaning on the 5th circulation duct sets Standby inlet valve V7, one end of the 6th circulation duct and the outlet end of equipment to be cleaned by, the other end of the 6th circulation duct with The first port connection of second threeway, is provided with second flowmeter 12 on the 6th circulation duct, the second port of the second threeway with Second blow-off line connects, and is provided with equipment blowdown valve V9 on the second blow-off line, the third port of the second threeway passes through the 7th Circulation duct is connected with the liquid feeding end of reflux pump P2, and the outlet end of reflux pump P2 is connected with one end of the 8th circulation duct, and the 8th The other end of circulation duct is connected with the first port of the 4th threeway, and second port and the 3rd discharge line of the 4th threeway connect It is logical, be provided with prerinse equipment outlet valve V10 on recovery channel, the third port of the 4th threeway by the 9th circulation duct with it is clear The 3rd inlet connection of cleaning of evaporator;
Temperature sensor 17, model pt100, upper liquid level sensor 18 and lower level sensing are provided in the purge tank Device 19, technique water valve V2, purge tank inlet valve V3, purge tank outlet valve V4, purge tank blowdown valve V5, purge tank heat-riser valve V6, It is electronic that cleaning equipment inlet valve V7, Xun Huan, which wash equipment outlet valve V8, equipment blowdown valve V9 and prerinse equipment outlet valve V10, Valve;Supply pump P1, reflux pump P2, diaphragm pump P3, first flowmeter 11, second flowmeter 12, temperature sensor, level sensing It is device, technique water valve V2, purge tank inlet valve V3, purge tank outlet valve V4, purge tank blowdown valve V5, purge tank heat-riser valve V6, clear Wash equipment inlet valve V7, cycle wash equipment outlet valve V8, equipment blowdown valve V9 and prerinse equipment outlet valve V10 respectively with control The corresponding pin electrical connection of device PLC, physical circuit connection relation is as in Figure 2-4.In Fig. 2 R, S, T respectively in Fig. 4 L1, L2, L3 are corresponding.First flowmeter, second flowmeter model are 4-20mA
In other embodiments, temperature sensor, first flowmeter, second flow can be other models.
The main body of the cleaning device is a purge tank and its auxiliary device, near equipment to be cleaned.Purge tank Equipped with liquid level sensor, temperature sensor and flow machine.When the equipment of somewhere process section needs cleaning, operating personnel are by rocking arm Corresponding pipeline is switched to, and opens the blowdown valve of equipment to be cleaned, empties the residuals in equipment to be cleaned.Diaphragm pump P3 Manually opened in cleaning process it can add cleaning agent.Different equipment to be washed corresponds to different cleaning calibers, in order to true Protect cleaning process in flow velocity and flow through spray ball convenient pressure, to ensure cleaning performance, using frequency converter adjust supply pump Rotating speed, so as to control the flow of cleaning solution and pressure.
In the present embodiment, the plate type heat exchanger is electric heating heat exchanger, and heating time is short, and heating effect is good. In other embodiment, heat exchanger can be heating agent heat exchanger.
In the present embodiment, the controller be PLC programmable controller, chip model FX3U-64MR.Reliability Height, strong antijamming capability, the design of system, installation, debugging work load are small, easy to maintain.
In the present embodiment, the A/D modular converters and control of the first flowmeter, second flowmeter by model AD01 Device connection processed;Temperature sensor is connected by the A/D modular converters of model TM01 with controller;Supply pump P1, reflux pump P2 It is communicated with diaphragm pump P3 by RS485 modules with controller, noise proof feature is good, and communication is stablized.
Embodiment two:
A kind of method cleaned using above-mentioned CIP cleaning devices to equipment, by the liquid feeding end of equipment to be cleaned and One end of one end connection of five circulation ducts, the outlet end of equipment to be cleaned and the 6th circulation duct passes through specific cleaning process Include the following steps, as shown in Figure 5:
1), treat cleaning equipment and carry out prerinse:After the completion of preparation to be cleaned, purge tank inlet valve V3 is opened, Quantitative ejected wash water is added in, is then shut off purge tank inlet valve V3;Then first opening valve purge tank outlet valve V4, cleaning equipment water inlet Valve V7 and equipment blowdown valve V9;Supply pump P1 is then turned on, prerinse is carried out to equipment;After the prerinse time arrives, supply is closed P1 is pumped, is then shut off purge tank outlet valve V4, cleaning equipment inlet valve V7 and equipment blowdown valve V9;Using first flowmeter, Second-rate flowmeter measurement detects whether prerinse liquid in purge tank, cleaning equipment empties respectively.First opening valve purge tank outlet valve V4, Cleaning equipment inlet valve V7 and equipment blowdown valve V9 is to operating position;Supply pump P1 is then turned on, supply pump is protected, prevents supply pump It is burnt because of reversion;During similary closing, supply pump P1 is first closed, turns off purge tank outlet valve V4, cleaning equipment inlet valve V7 With equipment blowdown valve V9.
2), treat cleaning equipment carry out cycle wash:
2.1), using hot water wash:After to be cleaned be ready to complete, purge tank inlet valve V3 is opened, is added into purge tank Enter quantitative ejected wash water, be then shut off purge tank inlet valve V3, then first open purge tank outlet valve V4, cleaning equipment inlet valve V7, cycle wash equipment outlet valve V8, are then turned on supply pump P1, are then turned on reflux pump P2, carry out cycle and wash, cycle is washed the time and arrived Afterwards, purge tank blowdown valve V5, equipment blowdown valve V9 are opened, cleaning solution is emptied, is then shut off supply pump P1, reflux pump P2, then closes Purge tank outlet valve V4, cleaning equipment inlet valve V7 are closed, cycles and washes equipment outlet valve V8, purge tank blowdown valve V5 and equipment blowdown Valve V9 detects whether prerinse liquid in purge tank, cleaning equipment empties respectively using first flowmeter, second flowmeter measurement.
2.2), washed using chemical cleaning solution:After to be cleaned be ready to complete, purge tank outlet valve V4, cleaning are first opened Equipment inlet valve V7, Xun Huan wash equipment outlet valve V8, then open supply pump P1, reflux pump P2, are then turned on diaphragm pump P3, add Diaphragm pump P3 is turned off after entering quantitative chemical cleaning solution, cycle is carried out and washes, cycle is washed after the time arrives, and opens purge tank blowdown valve V5, equipment blowdown valve V9 empty cleaning solution, are then shut off supply pump P1, reflux pump P2, turn off purge tank outlet valve V4, clear Equipment inlet valve V7 is washed, cycles and washes equipment outlet valve V8, purge tank blowdown valve V5 and equipment blowdown valve V9, using first flow Meter, second flowmeter measurement detect whether prerinse liquid in purge tank, cleaning equipment empties respectively.
2.3), washed using thimerosal:After to be cleaned be ready to complete, purge tank outlet valve V4, cleaning equipment are first opened Inlet valve V7, Xun Huan wash equipment outlet valve V8, then open supply pump P1, reflux pump P2, are then turned on diaphragm pump P3, and it is fixed to add in Diaphragm pump P3 is turned off after the thimerosal of amount, cycle is carried out and washes, cycle is washed after the time arrives, and opens purge tank blowdown valve V5, equipment Blowdown valve V9, empty cleaning solution, be then shut off supply pump P1, reflux pump P2, turn off purge tank outlet valve V4, cleaning equipment into Water valve V7, Xun Huan wash equipment outlet valve V8, purge tank blowdown valve V5 and equipment blowdown valve V9, using first flowmeter, second Flowmeter measurement detects whether prerinse liquid in purge tank, cleaning equipment empties respectively.
3), cleaning equipment is treated finally to be washed:
After the completion of preparation to be cleaned, purge tank inlet valve V3 is opened, quantitative ejected wash water is added in, is then shut off cleaning Tank inlet valve V3;Then purge tank outlet valve V4, cleaning equipment inlet valve V7 and prerinse equipment outlet valve V10 are first opened;It connects Unlatching supply pump P1, is then turned on reflux pump P2, equipment is finally cleaned;After final scavenging period arrives, supply is closed P1, reflux pump P2 are pumped, is then shut off purge tank outlet valve V4, cleaning equipment inlet valve V7 and prerinse equipment outlet valve V10;It adopts Detect whether prerinse liquid in purge tank, cleaning equipment empties respectively with first flowmeter, second flowmeter measurement.
In the present embodiment, as shown in fig. 6, the cleaning preparation includes:Technique water valve V2 is opened into distilled water, is reached To after setting liquid level, technique water valve V2 is closed, purge tank outlet valve V4, purge tank heat-riser valve V6 is then opened, is then turned on supplying P1 and heat exchanger are pumped, process water is heated with heat exchanger, pipeline and purge tank is preheated, after reaching preset temperature, first closes Supply pump P1, then purge tank outlet valve V4, purge tank heat-riser valve V6 and heat exchanger.
In the present embodiment, the preheating sets temperature as 55 degree, achievees the purpose that preheat pipeline and purge tank.
In the present embodiment, prerinse time 5min in the step 1), the middle cycle of step 2) wash the time as 10min, step It is rapid 3) in final scavenging period be 5min, ensure that equipment is sufficiently rinsed.
In other embodiments, prerinse time, cycle, which wash time and final scavenging period, to be set according to be cleaned Standby difference and adjust.
In the present embodiment, the step 1), 2), 3) in be required to open heat exchanger cleaning solution is heated, keep The temperature of cleaning solution is 55 degree, improves cleaning performance.
Do not done in the present invention illustrate be the prior art or can be realized by the prior art, and the present invention Described in be embodied case be only the present invention preferable case study on implementation, not be used for limit the present invention practical range. The equivalent changes and modifications that i.e. all contents according to scope of the present invention patent are made all should be used as the technology scope of the present invention.

Claims (10)

1. a kind of CIP cleaning devices, feature exist, including purge tank, heat exchanger and controller, the purge tank top is provided with First inlet, the second inlet, the 3rd inlet and the 4th inlet;Purge tank lower part is provided with the first liquid outlet;First Inlet is connected by technique waterpipe with technique water storage tank, and technique water valve V2, the 4th inlet are provided on technique waterpipe It is connected by input duct with cleaning water storage tank, purge tank inlet valve V3 is provided in input duct;
First liquid outlet of the purge tank lower part is connected by outlet tube with the first port of four-way, is set on the first outlet tube There is first flowmeter, the second port of four-way is connected with the first blow-off line, and the first blowdown valve is provided on the first blow-off line V5, the third port of four-way are connected with the outlet end of diaphragm pump P3, and the liquid feeding end of diaphragm pump P3 is connected with cleaning agent holding vessel;
4th port of the four-way is connected by the first circulation duct with the liquid feeding end of supply pump P1, is set on the first circulation duct The outlet end for being equipped with purge tank outlet valve V4, supply pump P1 is connected by the second circulation duct with one end of plate type heat exchanger, The other end of plate type heat exchanger is connected with one end of the 3rd circulation duct, the other end of the 3rd circulation duct and the first threeway First port connects, and the second port of the first threeway is connected by the 4th circulation duct with the second inlet of purge tank, and the 4th Purge tank inlet valve V3 is provided on circulation duct;The third port of first threeway is connected with one end of the 5th circulation duct, the The other end of five circulation ducts is connected with the liquid feeding end of equipment to be cleaned, and cleaning equipment inlet valve is provided on the 5th circulation duct V7, one end of the 6th circulation duct pass through the other end of the 6th circulation duct and the second threeway with the outlet end of equipment to be cleaned First port connection, second flowmeter, the second port of the second threeway and the second blow-off pipe are provided on the 6th circulation duct Road connects, and is provided with equipment blowdown valve V9 on the second blow-off line, the third port of the second threeway by the 7th circulation duct with The liquid feeding end connection of reflux pump P2, the outlet end of reflux pump P2 are connected with one end of the 8th circulation duct, the 8th circulation duct The other end is connected with the first port of the 4th threeway, and the second port of the 4th threeway is connected with the 3rd discharge line, recovery channel On be provided with prerinse equipment outlet valve V10, the third port of the 4th threeway pass through the 9th circulation duct and purge tank the 3rd Inlet connects;
Temperature sensor and liquid level sensor, technique water valve V2, purge tank inlet valve V3, purge tank are provided in the purge tank Outlet valve V4, purge tank blowdown valve V5, purge tank heat-riser valve V6, cleaning equipment inlet valve V7, Xun Huan wash equipment outlet valve V8, set Standby blowdown valve V9 and prerinse equipment outlet valve V10 is motor-driven valve;Supply pump P1, reflux pump P2, diaphragm pump P3, first flow Meter, second flowmeter, temperature sensor, liquid level sensor, technique water valve V2, purge tank inlet valve V3, purge tank outlet valve V4, Purge tank blowdown valve V5, purge tank heat-riser valve V6, cleaning equipment inlet valve V7, Xun Huan wash equipment outlet valve V8, equipment blowdown valve V9 and prerinse equipment outlet valve V10 are electrically connected between controller.
2. CIP cleaning devices according to claim 1, which is characterized in that the plate type heat exchanger exchanges heat for electrical heating Device.
3. CIP cleaning devices according to claim 1 or 2, which is characterized in that the controller is PLC PLC technologies Device, model FX3U-64MR.
4. CIP cleaning devices according to claim 3, which is characterized in that the first flowmeter, second flowmeter pass through The A/D modular converters of model AD01 are connected with controller;A/D modular converter and control of the temperature sensor by model TM01 Device connection processed;Supply pump P1, reflux pump P2 and diaphragm pump P3 are communicated by RS485 modules with controller.
5. the cleaning method of a kind of CIP cleaning devices using any one of claim 1-4, which is characterized in that will treat The liquid feeding end of cleaning equipment is connected with one end of the 5th circulation duct, and the one of the outlet end of equipment to be cleaned and the 6th circulation duct End connection, specific cleaning process include the following steps:
1), treat cleaning equipment and carry out prerinse:After the completion of preparation to be cleaned, purge tank inlet valve V3 is opened, is added in Quantitative ejected wash water, is then shut off purge tank inlet valve V3;Then first opening valve purge tank outlet valve V4, cleaning equipment inlet valve V7 With equipment blowdown valve V9;Supply pump P1 is then turned on, prerinse is carried out to equipment;After the prerinse time arrives, supply pump P1 is closed, It is then shut off purge tank outlet valve V4, cleaning equipment inlet valve V7 and equipment blowdown valve V9;Using first flowmeter, second flow Meter measurement detects whether prerinse liquid in purge tank, cleaning equipment empties respectively.
2), treat cleaning equipment carry out cycle wash:
2.1), using hot water wash:After to be cleaned be ready to complete, purge tank inlet valve V3 is opened, it is fixed to be added in into purge tank Ejected wash water is measured, is then shut off purge tank inlet valve V3, purge tank outlet valve V4, cleaning equipment inlet valve V7 is then first opened, follows Washing-round equipment outlet valve V8, is then turned on supply pump P1, is then turned on reflux pump P2, carries out cycle and washes, and cycle is washed after the time arrives, and is beaten Opening or cleaning cleaning of evaporator blowdown valve V5, equipment blowdown valve V9 empty cleaning solution, are then shut off supply pump P1, reflux pump P2, turn off cleaning Tank outlet valve V4, cleaning equipment inlet valve V7, Xun Huan wash equipment outlet valve V8, purge tank blowdown valve V5 and equipment blowdown valve V9, Detect whether prerinse liquid in purge tank, cleaning equipment empties respectively using first flowmeter, second flowmeter measurement.
2.2), washed using chemical cleaning solution:After to be cleaned be ready to complete, purge tank outlet valve V4, cleaning equipment are first opened Inlet valve V7, Xun Huan wash equipment outlet valve V8, then open supply pump P1, reflux pump P2, are then turned on diaphragm pump P3, and it is fixed to add in Diaphragm pump P3 is turned off after the chemical cleaning solution of amount, cycle is carried out and washes, cycle is washed after the time arrives, open purge tank blowdown valve V5, Equipment blowdown valve V9 empties cleaning solution, is then shut off supply pump P1, reflux pump P2, turns off purge tank outlet valve V4, cleaning is set Standby inlet valve V7, cycle wash equipment outlet valve V8, purge tank blowdown valve V5 and equipment blowdown valve V9, using first flowmeter, the Second-rate flowmeter measurement detects whether prerinse liquid in purge tank, cleaning equipment empties respectively.
2.3), washed using thimerosal:After to be cleaned be ready to complete, purge tank outlet valve V4, cleaning equipment water inlet are first opened Valve V7, Xun Huan wash equipment outlet valve V8, then open supply pump P1, reflux pump P2, are then turned on diaphragm pump P3, add in quantitative Diaphragm pump P3 is turned off after thimerosal, cycle is carried out and washes, cycle is washed after the time arrives, and opens purge tank blowdown valve V5, equipment blowdown Valve V9 empties cleaning solution, is then shut off supply pump P1, reflux pump P2, turns off purge tank outlet valve V4, cleaning equipment inlet valve V7, Xun Huan wash equipment outlet valve V8, purge tank blowdown valve V5 and equipment blowdown valve V9, using first flowmeter, second flowmeter Measurement detects whether prerinse liquid in purge tank, cleaning equipment empties respectively.
3), cleaning equipment is treated finally to be washed:
After the completion of preparation to be cleaned, open purge tank inlet valve V3, add in quantitative ejected wash water, be then shut off purge tank into Water valve V3;Then purge tank outlet valve V4, cleaning equipment inlet valve V7 and prerinse equipment outlet valve V10 are first opened;Then open Supply pump P1 is opened, is then turned on reflux pump P2, equipment is finally cleaned;After final scavenging period arrives, closing supply pump P1, Reflux pump P2 is then shut off purge tank outlet valve V4, cleaning equipment inlet valve V7 and prerinse equipment outlet valve V10;Using Flow meters, second flowmeter measurement detect whether prerinse liquid in purge tank, cleaning equipment empties respectively.
6. cleaning method according to claim 5, which is characterized in that the cleaning preparation includes:Open process water Valve V2 after the ejected wash water in purge tank reaches setting liquid level, closes technique water valve V2, then opens purge tank water outlet into process water Valve V4, purge tank heat-riser valve V6, are then turned on supply pump P1 and heat exchanger, and process water is heated with heat exchanger, preheat pipeline And purge tank, after reaching preset temperature, first close supply pump P1, then purge tank outlet valve V4, purge tank heat-riser valve V6 and heat exchange Device.
7. cleaning method according to claim 6, which is characterized in that the preheating sets temperature as 50-60 degree.
8. cleaning method according to claim 7, which is characterized in that the process water is distilled water.
9. cleaning method according to claim 8, which is characterized in that prerinse time 5min, step in the step 1) 2) Xun Huan washes the time as 10min in, and final scavenging period is 5min in step 3).
10. cleaning method according to claim 9, which is characterized in that the step 1), 2), 3) in be required to open change Hot device heats cleaning solution, and the temperature for keeping cleaning solution is 50-60 degree.
CN201711414932.0A 2017-12-22 2017-12-22 CIP cleaning device and cleaning method Active CN108097657B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711414932.0A CN108097657B (en) 2017-12-22 2017-12-22 CIP cleaning device and cleaning method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711414932.0A CN108097657B (en) 2017-12-22 2017-12-22 CIP cleaning device and cleaning method

Publications (2)

Publication Number Publication Date
CN108097657A true CN108097657A (en) 2018-06-01
CN108097657B CN108097657B (en) 2023-12-26

Family

ID=62212692

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711414932.0A Active CN108097657B (en) 2017-12-22 2017-12-22 CIP cleaning device and cleaning method

Country Status (1)

Country Link
CN (1) CN108097657B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109174837A (en) * 2018-09-20 2019-01-11 中国石油化工股份有限公司 Crude quality flowmeter on-line cleaning device
CN109261629A (en) * 2018-11-28 2019-01-25 楚天科技股份有限公司 A kind of on-line cleaning supports system and its cleaning method
CN109332324A (en) * 2018-11-27 2019-02-15 深圳市久大轻工机械有限公司 A kind of automatic CIP system and its control method
CN110758336A (en) * 2019-10-11 2020-02-07 中粮融氏生物科技有限公司 Cleaning method and cleaning system for tank container vehicle for transporting syrup
CN111014192A (en) * 2019-12-20 2020-04-17 李锦记(广州)食品有限公司 Cleaning control system and method thereof
CN112337884A (en) * 2020-10-15 2021-02-09 郑州恒博环境科技股份有限公司 Automatic cleaning device for pH meter of aluminum processing waste emulsion treatment system and control method
CN115815241A (en) * 2023-01-10 2023-03-21 中国万宝工程有限公司 Pipeline cleaning device and cleaning method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201558836U (en) * 2009-12-28 2010-08-25 中国船舶重工集团公司第七�三研究所 CIP (Cleaning In Place) automatic cleaning device
JP2012217866A (en) * 2011-04-04 2012-11-12 Miura Co Ltd Washing apparatus
CN204486400U (en) * 2015-01-21 2015-07-22 浙江省天正设计工程有限公司 The integrated equipment of multi-functional recyclable cleaning in a kind of extraction process
CN205128498U (en) * 2015-08-26 2016-04-06 邵素英 CIP cleaning system
CN205762817U (en) * 2016-06-21 2016-12-07 湖北恒丰医疗制药设备有限公司 A kind of CIP on-line cleaning system
CN106862180A (en) * 2017-01-24 2017-06-20 杭州凡腾科技股份有限公司 A kind of CIP on-line cleaning systems control method
CN207887580U (en) * 2017-12-22 2018-09-21 江苏信息职业技术学院 A kind of CIP cleaning devices

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201558836U (en) * 2009-12-28 2010-08-25 中国船舶重工集团公司第七�三研究所 CIP (Cleaning In Place) automatic cleaning device
JP2012217866A (en) * 2011-04-04 2012-11-12 Miura Co Ltd Washing apparatus
CN204486400U (en) * 2015-01-21 2015-07-22 浙江省天正设计工程有限公司 The integrated equipment of multi-functional recyclable cleaning in a kind of extraction process
CN205128498U (en) * 2015-08-26 2016-04-06 邵素英 CIP cleaning system
CN205762817U (en) * 2016-06-21 2016-12-07 湖北恒丰医疗制药设备有限公司 A kind of CIP on-line cleaning system
CN106862180A (en) * 2017-01-24 2017-06-20 杭州凡腾科技股份有限公司 A kind of CIP on-line cleaning systems control method
CN207887580U (en) * 2017-12-22 2018-09-21 江苏信息职业技术学院 A kind of CIP cleaning devices

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109174837A (en) * 2018-09-20 2019-01-11 中国石油化工股份有限公司 Crude quality flowmeter on-line cleaning device
CN109174837B (en) * 2018-09-20 2023-09-22 中国石油化工股份有限公司 Crude oil mass flowmeter online cleaning device
CN109332324A (en) * 2018-11-27 2019-02-15 深圳市久大轻工机械有限公司 A kind of automatic CIP system and its control method
CN109261629A (en) * 2018-11-28 2019-01-25 楚天科技股份有限公司 A kind of on-line cleaning supports system and its cleaning method
CN110758336A (en) * 2019-10-11 2020-02-07 中粮融氏生物科技有限公司 Cleaning method and cleaning system for tank container vehicle for transporting syrup
CN111014192A (en) * 2019-12-20 2020-04-17 李锦记(广州)食品有限公司 Cleaning control system and method thereof
CN111014192B (en) * 2019-12-20 2022-06-24 李锦记(广州)食品有限公司 Cleaning control system and method thereof
CN112337884A (en) * 2020-10-15 2021-02-09 郑州恒博环境科技股份有限公司 Automatic cleaning device for pH meter of aluminum processing waste emulsion treatment system and control method
CN112337884B (en) * 2020-10-15 2023-10-27 郑州恒博环境科技股份有限公司 Automatic cleaning device for pH meter of aluminum processing waste emulsion treatment system and control method
CN115815241A (en) * 2023-01-10 2023-03-21 中国万宝工程有限公司 Pipeline cleaning device and cleaning method

Also Published As

Publication number Publication date
CN108097657B (en) 2023-12-26

Similar Documents

Publication Publication Date Title
CN108097657A (en) A kind of CIP cleaning devices and cleaning method
CN106862180B (en) A kind of CIP on-line cleaning system control method
CN201558836U (en) CIP (Cleaning In Place) automatic cleaning device
CN201261022Y (en) Intelligent type on-line cleaning system
CN101780459B (en) Off-line filter-cell chemically-cleaning device
CN205463492U (en) A laboratory dish cleaning machine for pharmacy trade
CN106466680B (en) The auto-cleaning method and system of a kind of intelligent cooking apparatus pot body, batch can and pipeline
CN207887580U (en) A kind of CIP cleaning devices
CN101763093A (en) CIP (Cleaning In Place) automatic cleaning method
CN109304323A (en) A kind of full-automatic COP cleaning system of novel all-in-one
CN105320234B (en) The method of CIP cleaning station and its cleaning equipment
CN204034429U (en) A kind of dish-style cleaning filter production line
CN206460039U (en) A kind of water quality testing meter of timing automatic cleaning
CN208450052U (en) A kind of cleaning equipment of electrodialytic membranes block
CN207441272U (en) A kind of online washer of nuclear power facility primary Ioops radioactive pollution
CN206882336U (en) A kind of burner noz(zle) cleans detection means
CN204182620U (en) Energy-saving full-automatic cleaning station
CN207501460U (en) A kind of novel online Low Voltage Pure water heating system
CN109173787A (en) A kind of medical fluid mixed instrument automatically adjusting concentration
CN206966223U (en) A kind of clean purging system
CN209061701U (en) Decontamination plant
CN205628811U (en) Pipeline removes red rust system
CN208075335U (en) A kind of scale removal component and gas heater
CN215466743U (en) Liquid medicine pipeline cleaning system
CN108996651B (en) Thimerosal classified collection system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant