CN108093431A - It is a kind of using do data processing network element TDPNE be handle node data reporting method and device - Google Patents

It is a kind of using do data processing network element TDPNE be handle node data reporting method and device Download PDF

Info

Publication number
CN108093431A
CN108093431A CN201611039439.0A CN201611039439A CN108093431A CN 108093431 A CN108093431 A CN 108093431A CN 201611039439 A CN201611039439 A CN 201611039439A CN 108093431 A CN108093431 A CN 108093431A
Authority
CN
China
Prior art keywords
data
base station
reported
measurement report
measurement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611039439.0A
Other languages
Chinese (zh)
Other versions
CN108093431B (en
Inventor
庞思远
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Datang Mobile Communications Equipment Co Ltd
Original Assignee
Datang Mobile Communications Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Datang Mobile Communications Equipment Co Ltd filed Critical Datang Mobile Communications Equipment Co Ltd
Priority to CN201611039439.0A priority Critical patent/CN108093431B/en
Publication of CN108093431A publication Critical patent/CN108093431A/en
Application granted granted Critical
Publication of CN108093431B publication Critical patent/CN108093431B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W24/00Supervisory, monitoring or testing arrangements
    • H04W24/10Scheduling measurement reports ; Arrangements for measurement reports
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W28/00Network traffic management; Network resource management
    • H04W28/02Traffic management, e.g. flow control or congestion control
    • H04W28/10Flow control between communication endpoints
    • H04W28/14Flow control between communication endpoints using intermediate storage

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The embodiment of the present application provides a kind of method and apparatus reported to do data of the data processing network element TDPNE as processing node.The described method includes:Receive at least one measurement report that base station is sent;The measurement report is according to acquired in the period measurement report of terminal transmission after base station startup statistics task, by base station;At least one measurement report is handled accordingly, obtains reported data file;The reported data file is reported into data collection end.Relatively first technical solution, The present invention reduces the occupancy to base station memory, improve ability of the base station in terms of main business, and can be ensured that data accuracy, add the ability that base station is kept for terminal access and business.

Description

It is a kind of using do data processing network element TDPNE be processing node data reporting method with Device
Technical field
This application involves field of communication technology, more particularly to one kind using dry data processing network element TDPNE as processing node Data reporting method and it is a kind of using do data processing network element TDPNE be handle node data reporting device.
Background technology
Physical layer measurement is a critical function of LTE (Long Term Evolution, Long Term Evolution) system.Physics The measurement result that layer reports can be used for wireless heterogeneous networks sublayer in system and complete the times such as cell reselection and switching Triggering, can be used for system operation maintenance, the operating status of observing system can be also used for network evaluation and optimization, network Covering detection etc..The measurement report data of LTE is essentially from UE (User Equipment, user equipment) and base station eNodeb Physical layer and the measurement report of generation is calculated during wireless resource management.Raw measurement data passes through statistics Calculating reports and submits OMC-R (wireless access network Element management system) to be stored in the form of statistics or directly reported and submitted OMC-R is stored in the form of sample data.
At present, MR (Measurement Report, measurement report), MDT (minimization of drive are designed Tests minimizes drive test technology) when the characteristic of data statistics, base station is generally by OMC (Operation Maintenance Center, operation maintenance center) or LMT-B (local Maintainance Terminal, local terminal Safeguard) control the startup of statistics task, closing, the arrange parameter to safeguard (collection of such as measuring configuration, measurement result, measurement number According to processing and statistics etc.), and the parameter of configuration is stored in corresponding base station memory.It is well known that the main business of base station Business is the higher caps abilities in order to support more accessing users, the business datum handling capacity of bigger, however substantial amounts of data Statistics and storage leverage ability of the base station in terms of main business instead, limit the extension of base station functions.
It is using this measurement report cycle to adopt also, when base station receives the period measurement report reporting of end side The sample cycle takes mode or use cycle timer triggering that next period measurement report push previous cycle content reports Mode carries out data and reports, and the form that all metrical informations that current period is collected into are reported to after OM on request is sent to number According to collecting terminal, if there is excessively a plurality of duplicate measurements information, it is necessary to be carried out by base station by certain rule within the same sampling period Merge.However, the measurement of same period may cause data due to the difference of terminal timing mechanism or measurement realization mechanism It reports repeatedly, for the excessively a plurality of duplicate measurements information occurred in the same sampling period base station is needed to be opened up additionally for each user Memory headroom for store these data, cause the waste of base station memory source the problem of.
The content of the invention
In view of the above problems, it is proposed that the embodiment of the present application overcomes the above problem or at least partly in order to provide one kind Solve the above problems it is a kind of using do data reporting method that data processing network element TDPNE is processing node and corresponding one kind with Dry data processing network element TDPNE is the data reporting device of processing node.
To solve the above-mentioned problems, the embodiment of the present application discloses a kind of using dry data processing network element TDPNE as processing section The data reporting method of point, including:
Receive at least one measurement report that base station is sent;The measurement report be base station start statistics task after, Acquired according to the period measurement report that terminal is sent by base station;
At least one measurement report is handled accordingly, obtains reported data file;
The reported data file is reported into data collection end.
Optionally, it is described that at least one measurement report is handled accordingly, obtain the step of reported data file Suddenly, including:
The data of extraction instruction data functional characteristic from single measurement report;
At least one measurement task of data creation according to extraction;
It is extracted according to default sampling rule from single measurement task and specifies data;
The specified data are picked out in sampling window and/or merging treatment;The sampling window is according to institute State what default sampling rule was delimited;
In the file generated format module addition treated specify data, generate reported data file.
Optionally, the measurement report carries and the one-to-one Base Station Identification of the measurement task;In the foundation After the step of at least one measurement task of the data creation of extraction, further include:
According to the Base Station Identification, at least one measurement task is stored in specified memory.
Optionally, the measurement report carries timestamp information;Described regular from single measurement according to default sampling Before extracting the step of specifying data in task, further include:
Data in each measurement task are ranked up according to timestamp information.
Optionally, the default sampling rule includes:Prefixed time interval;It is described regular from single survey according to default sampling The step of specifying data is extracted in amount task, including:
According to prefixed time interval segment data is extracted from the single measurement task that sequence is completed.
Optionally, the default sampling rule includes:Preset data type;It is described regular from single survey according to default sampling The step of specifying data is extracted in amount task, including:
The data of same data category are extracted from the single measurement task according to preset data type.
Optionally, the time of the TDPNE and the time synchronization of the base station are set;The time synchronization is opened in base station After dynamic statistics task, the time synchronization with the TDPNE that is created by BTS management platform.
Optionally, the described the step of reported data file is reported into data collection end, including:
According to avoiding the peak hour, the reported data file is reported to the data collection end by rule.
On the other hand, the embodiment of the invention also discloses a kind of to do numbers of the data processing network element TDPNE as processing node According to reporting device, including:
Measurement report receiving module, for receiving at least one measurement report of base station transmission;The measurement report be The period measurement sent after base station startup statistics task, by base station foundation terminal is reported acquired;
Processing module for being handled accordingly at least one measurement report, obtains reported data file;
Reporting module, for the reported data file to be reported to data collection end.
Optionally, the processing module includes:
Data extracting sub-module, for the data of the extraction instruction data functional characteristic from single measurement report;
Measurement task creates submodule, at least one measurement task of data creation according to extraction;
Data extracting sub-module is specified, data are specified for being extracted according to default sampling rule from single measurement task;
Data processing submodule, for being picked out in sampling window to the specified data and/or merging treatment;Institute Stating sampling window delimited according to the default sampling rule;
Reported data file generated submodule, for being added in the file generated format module, treated specifies number According to generation reported data file.
Optionally, the measurement report carries and the one-to-one Base Station Identification of the measurement task;In the measurement After task creation submodule, further include:
Sub-module stored, for according to the Base Station Identification, at least one measurement task to be stored in specified memory In.
Optionally, the measurement report carries timestamp information;Before the specified data extracting sub-module, also wrap It includes:
Sorting sub-module, for the data in each measurement task to be ranked up according to timestamp information.
Optionally, the default sampling rule includes:Prefixed time interval;The specified data extracting sub-module includes:
Segment data extracting sub-module, for being extracted according to prefixed time interval from the single measurement task that sequence is completed Segment data.
Optionally, the default sampling rule includes:Preset data type;The specified data extracting sub-module includes:
The data extracting sub-module of same data category, for according to preset data type from the single measurement task Extract the data of same data category.
Optionally, the time of the TDPNE and the time synchronization of the base station are set;The time synchronization is opened in base station After dynamic statistics task, the time synchronization with the TDPNE that is created by BTS management platform.
Optionally, the reporting module includes:
Rule of avoiding the peak hour reports submodule, is received for the reported data file to be reported to the data according to rule of avoiding the peak hour Collect end.
Compared with prior art, the embodiment of the present application includes advantages below:
First, the embodiment of the present invention is receiving at least one survey of base station transmission by TDPNE (dry data processing network element) After amount report, at least one measurement report is handled accordingly, obtains reported data file, and will be on reported data file Report is also maintained at base station side and end side to data collection end, by measurement report configuration and acquisition operations, and by metrical information It the functions such as handles, report to be transferred on TDPNE, so as to reduce the occupancy to base station memory, can base station be connect Enter more users, improve the caps abilities of base station, base station is made to obtain the business datum handling capacity of bigger.
Secondly, base station according to the measurement report of period measurement report acquisition is cached in the memory of base station, is incited somebody to action by base station Measurement report is reported to after TDPNE, then is deleted the measurement report cached in base station, thus is reduced in base station The occupancy deposited, so as to improve ability of the base station in terms of main business.
Again, TDPNE is to specify data according to the data extraction of functional characteristic for indicated number in each measurement report, and is put Picking out and/or merging for the repeated data conducted in sampling window is placed in, process is reported in terminal compared in first technology The middle operation for carrying out cycle merging, the embodiment of the present invention may insure data accuracy.
Further, the operation of reported data of embodiment of the present invention file generated is completed by TDPNE, so as to reduce The operating writing-file of base station OM, further reduces consumption of the written document to base station CPU, adds base station and is accessed for terminal The ability kept with business.
Description of the drawings
Fig. 1 is the schematic diagram that a kind of existing data statistics of one embodiment of the present of invention reports;
Fig. 2 is a kind of to do data of the data processing network element TDPNE as processing node of an alternative embodiment of the invention The step flow chart of report method;
Fig. 3 is a kind of to do in data of the data processing network element TDPNE as processing node of one embodiment of the present of invention The structure diagram of report;
Fig. 4 is the kind of an alternative embodiment of the invention to do in data of the data processing network element TDPNE as processing node The step flow chart of reporting method;And
Fig. 5 is a kind of to do in data of the data processing network element TDPNE as processing node of one embodiment of the present of invention The structure diagram of reporting device.
Specific embodiment
It is below in conjunction with the accompanying drawings and specific real to enable the above-mentioned purpose of the application, feature and advantage more obvious understandable Mode is applied to be described in further detail the application.
In order to which those skilled in the art is made to further appreciate that the embodiment of the present invention, below in conjunction with the flow pair of MR data statistics The embodiment of the present invention illustrates.
MR refer to information on a traffic channel, signaling channel at regular intervals (such as 480ms) send a data, this A little data can be used for network evaluation and optimization.For the angle of the network optimization, operator needs to gather MR data, tracking Content in the measurement report that NodeB and UE are reported, these contents include the RSRP (Reference of uplink and downlink Radio Link Signal Receiving Power, Reference Signal Received Power)/RSRQ (ReferenceSignalReceivingQuality, Reference Signal Received Quality), CQI (Channel Quality Indicator, channel quality instruction), the information such as BLER (Block Error Rate, bLock error rate) generation data sheet is used for The guidance analysis network coverage, capacity and structure simultaneously position network problem, these MR data are operator to network performance It evaluates and optimizes and provides foundation.
With reference to the schematic diagram that a kind of existing data statistics shown in FIG. 1 reports, data of the prior art report whole Body framework is made of terminal, base station, data collection end, during realizing that data statistics reports in base station, generally by OMC (Operation Maintenance Center, operation maintenance center) or LMT-B (Local Maintainance Terminal, local terminal are safeguarded) control startup, closing, the parameter information configuration of data statistics task, safeguard etc..
In first technical solution, realize MR data statistics and report to data collection end process can specifically include it is following Step:
Step S1, base station receive data statistics task, start the data statistics task by OMC or base station LMT-B;
Step S2, OMC or base station LMT-B send the instruction of data statistics task start, base station control to base station control plane It reads relevant configuration parameter information in data statistics task and preserves in face;
The configuration parameter information of reading is issued to base station bottom by step S3, base station control plane, and indicate base station bottom according to Start measurement operation according to configuration parameter information, configure relevant period measurement configuration information;
Step S4, after in base station, control plane receives the startup instruction of data statistics task, base station control plane passes through logical Letter agreement issues period measurement configuration information to end side, from end side according to period measurement configuration information to base station report cycle Measurement report;
Step S5, base station control plane receive the period measurement report of end side, and are reported according to period measurement according to configuration Period measurement configuration information start measurement operation, obtain corresponding measurement report, and the measurement report of acquisition be stored in base In the specified memory stood;
The measurement report that period measurement is reported and obtained is sent to OMC or base station LMT-B by step S6, base station control plane, Measurement report is handled by OMC or base station LMT-B, obtains corresponding data reporting file;
Data reporting file is reported to data collection end by step S7, OMC or base station LMT-B, to carry out statistical analysis.
As can be seen that first, during data statistics reports, the configuration of measurement report, the receipts of measurement result information The operations such as collection, the processing of metrical information and statistics are completed in base station side, and the measurement gathered according to measurement report Information is stored in base station side, and the main business of base station is the higher caps abilities in order to support more accessing users, The business datum handling capacity of bigger, however substantial amounts of data statistics and storage leverage base station in terms of main business instead Ability limits the extension of base station functions.
Secondly, receive on the period measurement of end side and give the correct time in base station, using this measurement report cycle as the sampling period, adopt A period measurement is removed to report the push mode that previous cycle content reports or report by the way of cycle timer triggering, All measurement reports that current period is collected by call format are sent to data collection after being reported to OM as initial data End, if there is excessively a plurality of metrical information, it is necessary to be merged by base station by certain rule within the same sampling period.And it uses The mode or the measurement carried out by the way of cycle timer triggering that next periodic report push previous cycle content reports Information reports, may be due to the difference of different terminals timing mechanism or measurement realization mechanism in the metrical information of same period And it reports repeatedly, it is necessary to which additional memory headroom is opened up for storing the measurement letter that these needs merge in base station for each user Breath causes the occupancy of base station memory.
Again, measured according to the sampling period in the merging process of information, be only the repetition survey for current period The merging that amount information is carried out, and then can cause to duplicate metrical information in different cycles, influence the correctness of data statistics.
To solve the above-mentioned problems, one of the core concepts of the embodiments of the present invention is, sets TDPNE (Trunk Data Processing Network Element do data processing network element) processing node, TDPNE processing node receptions base station is sent At least one measurement report, at least one measurement report is handled in TDPNE processing nodes, and reported data will be obtained File reports to data collection end, and therefore, the embodiment of the present invention proposes a kind of new treatment mechanism, by measurement report configuration and Acquisition operations are also maintained at base station side and end side, and by the processing of metrical information, the functions such as report to be transferred on TDPNE, from And the occupancy to base station memory can be reduced, it can so that base station has access to more users, improve the caps abilities of base station, Base station is made to obtain the business datum handling capacity of bigger.
Embodiment one
With reference to Fig. 2, a kind of to do data of the data processing network element TDPNE as processing node of the embodiment of the present invention is shown The step flow chart of report method, specifically may include steps of:
Step 201, at least one measurement report that base station is sent is received;
Step 202, at least one measurement report is handled accordingly, obtains reported data file;
Step 203, the reported data file is reported into data collection end.
In embodiments of the present invention, measurement report is after starting statistics task in base station, is sent by base station according to terminal Period measurement report it is acquired.Measurement report can including RSRP/RSRQ, CQI, BLER etc. metrical informations.
Certainly, in practical applications, those skilled in the art can voluntarily configure specific measurement report according to actual needs Type is accused, the present invention is not any limitation as this.
The idiographic flow of the embodiment of the present invention is described with MR data instances below.
With reference to Fig. 3, a kind of to do data of the data processing network element TDPNE as processing node of the embodiment of the present invention is shown The schematic diagram reported in embodiments of the present invention, adds TDPNE, and the week being collected into is used for handling MR and other needs Phase statistics simultaneously reports to data collection end, mainly includes the following steps that flow:
Step N1, base station receive data statistics task, start the data statistics task by OMC or base station LMT-B;
Step N2, OMC or base station LMT-B send the instruction of data statistics task start, base station control to base station control plane Read relevant configuration parameter information in data statistics task in face;
The configuration parameter information of reading is issued to base station bottom by step N3, base station control plane, and indicate base station bottom according to Start measuring configuration operation according to configuration parameter information, configure relevant period measurement configuration information;
Step N4, after in base station, control plane receives the startup instruction of data statistics task, base station control plane passes through logical Letter agreement issues period measurement configuration information to end side, from end side according to period measurement configuration information to base station report cycle Measurement report;
Step N5, base station control plane receives the period measurement report of end side, corresponding according to period measurement report acquisition Measurement report is simultaneously cached in the correspondence memory of base station, and passes through OMC or base station LMT-B by the measurement report and period measurement of acquisition Report reporting is to TDPNE;
Step N6, TDPNE handle measurement report accordingly, obtain reported data file, and are reported what is obtained Data file is stored in TDPNE specified memories space, and reported data file is reported to data collection end.
The processing that TDPNE does measurement report will be described in detail in the examples below, no longer be subject to herein It repeats.
In the embodiment of the present invention, it is proposed that it is a kind of using TDPNE as the data reporting method of processing node, it receives base station and sends At least one measurement report, at least one measurement report is handled accordingly by TDPNE, and by handle obtain report Data file reports to data collection end, therefore, in the embodiment of the present invention by the processing of metrical information, store, the functions such as report It is transferred on TDPNE, so as to reduce the occupancy to base station memory, base station can be caused to have access to more users, carried The caps abilities of high base station make base station obtain the business datum handling capacity of bigger.
Embodiment two
With reference to Fig. 4, a kind of to do data of the data processing network element TDPNE as processing node of the embodiment of the present invention is shown The step flow chart of report method, the method specifically may include steps of:
Step 401, at least one measurement report that base station is sent is received.
Base station can generate phase after log-on data statistics task according to the configuration parameter information in data statistics task The period measurement configuration information answered, which can be the foundation for obtaining measurement report, for example, period measurement Configuration information can be RSRP/RSRQ, CQI, BLER etc..
In practical applications, those skilled in the art can voluntarily set the period measurement of required measurement according to actual needs Configuration information, the embodiment of the present invention are not any limitation as this.
In embodiments of the present invention, after having configured period measurement configuration information according to configuration parameter information in base station, i.e., The period measurement configuration information is issued to the end side of access.End side is after period measurement configuration information is received, Ke Yigen According to the information of measurement required for itself, corresponding period measurement report is generated, and by the period measurement report reporting to corresponding Base station is operated in next step by base station according to the period measurement report executing.
It can include the period measurement configuration information of required measurement, such as RSRP/ in the period measurement report that end side reports RSRQ, CQI, BLER etc. period measurement configuration information, corresponding to different end sides, the period measurement configuration of required measurement Information may be different, for example, the period measurement configuration information of measurement needed for terminal A can be RSRP/RSRQ, CQI, eventually The period measurement configuration information of measurement needed for the B of end can be CQI, BLER, and the period measurement configuration information of measurement can needed for terminal C It, specifically can be as shown in table 1 below to be RSRP/RSRQ, BLER:
Table 1:
It is to be appreciated that the above-mentioned cited period measurement configuration information corresponding to different terminals side is only intended to more preferably Ground understands technical solution of the embodiment of the present invention, and not as the sole limitation to the present invention, in practical applications, art technology Personnel can voluntarily set the period measurement configuration information of required measurement as needed, and the present invention is not any limitation as this.
Base station is controlled towards base station bottom layer by base station after the period measurement report that end side reports is received and issues number The indication information of task start according to statistics, and indicate that base station bottom obtains corresponding measurement report according to period measurement report and returns Base station control plane is back to, it will be acquisition by BTS management platform (such as OMC or base station LMT-B) by acquisition by base station control plane Measurement report reports to TDPNE, so that TDPNE handles measurement report accordingly.
, it is necessary to which the data reported can be included by the specification of MR for MR data:MRO (MR Original, measurement Report sample data file), MRE (MR Statistics, the measurement report sample data of event triggering), MRS (MR Statistics, measurement report statistics file) and IOT (Interoperability Test, interoperation test) information Deng, wherein, the content of MRO and MRS can include a variety of measurement configuration informations, these data can all be reported to as initial data Dry data processing network element is handled.
Correspondingly, in embodiments of the present invention, the measurement report that base station is obtained is cached in the specified memory of base station, After measurement report is reported to TDPNE, measurement report is then removed from base station, is no longer preserved.
Preferably, the time of the TDPNE and the time synchronization of the base station are set;The time synchronization is opened in base station After dynamic statistics task, the time synchronization with the TDPNE that is created by BTS management platform.
In the embodiment of the present invention, after the log-on data statistics task of base station, by BTS management platform (OMC or base station LMT-B the time of TDPNE and the time synchronization of base station) are created.During the measurement report reported needed for being got in base station, TDPNE The acquisition that corresponding measurement report is issued to base station is asked, and from base station to TDPNE reporting measurement reports, and then measurement report is slow Base station memory headroom is stored in, thus occupancy of the measurement report to base station memory can be greatly reduced.
Step 402, the data of instruction data functional characteristic are extracted from single measurement report.
Step 403, at least one measurement task of data creation according to extraction.
In the embodiment of the present invention, data function characteristic refer to refer to measurement report in difference in functionality data, such as MDT, MR, signaling be soft to adopt etc., for single measurement report, can carry out data according to the difference in functionality of each data in measurement report Classify and extract.
For the data of the different data functional characteristic extracted in same measurement report, corresponding measurement task is created, For example, being directed to measurement report A, the targeted data function characteristic of the performance data extracted is MDT, MR respectively, then for number According to the corresponding data creation measurement task M of functional characteristic MDT, for the corresponding data creation measurement tasks of data function characteristic MR N。
Certainly, in practical applications, those skilled in the art can be according to the data corresponding to different data functional characteristic Corresponding measurement task is respectively created, the present invention is not repeated here herein.
Preferably, the measurement report carries and the one-to-one Base Station Identification of the measurement task;Step 403 it Afterwards, can also include:
According to the Base Station Identification, at least one measurement task is stored in specified memory for sub-step 4032.
TDPNE is received to be carried and the one-to-one Base Station Identification of measurement task, base station in the measurement report that base station reports Mark can be used for distinguishing each measurement task is subordinated to which specific base station.For example, measurement task A, B and C, measurement task A, B Correspond to Base Station Identification S corresponding to Base Station Identification N, measurement task C, then can determine that measurement task A and B correspond to same base It stands, and measurement task C is then to correspond to different base stations from measurement task A and B.
TDPNE is that the measurement task of different base station is assigned with the memory specified, can be by measurement task according to Base Station Identification It is respectively stored into the specified memory corresponding to Base Station Identification.
In embodiments of the present invention, base station can also to TDPNE reported event class measurement reports, to related data into Row processing, the embodiment of the present invention are no longer described in detail herein.
Step 404, extracted according to default sampling rule from single measurement task and specify data.
In the embodiment of the present invention, specified data can be with time segment data, data that can also be according to same type, etc.. In the data of the correspondence different data functional characteristic extracted for single measurement report, be respectively created corresponding measurement task it Afterwards, can choosing single measurement task, therefrom data are specified in extraction according to default sampling rule, and default sampling rule can include: Prefixed time interval, preset data type etc..
In practical applications, those skilled in the art can voluntarily set extraction to specify the default of data according to actual needs Sampling rule, the present invention are not any limitation as this.
Below in conjunction with prefixed time interval and the default sampling rule of two kinds of preset data type the detailed of data is specified to extracting Thin process is described.
Preferably, the measurement report carries timestamp information;Before step 404, it can also include:
Data in each measurement task are ranked up by sub-step 4038 according to timestamp information.
Preferably, the default sampling rule includes:Prefixed time interval, step 404 can include:
Sub-step 4042 extracts segment data according to prefixed time interval from the single measurement task that sequence is completed.
In embodiments of the present invention, it can be prefixed time interval to preset sampling rule, in the measurement report that TDPNE is received In can also carry timestamp information, the data in single measurement task are ranked up according to timestamp information, for example, by Time is ranked up the data in single measurement task by the order after arriving first or temporally by rear right to first order Data in single measurement task are ranked up.
After being completed to the data sorting in single measurement task, carried according to prefixed time interval from the measurement task Take the segment data being temporally segmented.For example, prefixed time interval is arranged to 5min, 10min etc..
In practical applications, those skilled in the art can voluntarily set interval according to actual needs, and the present invention is right This is not any limitation as.
Preferably, the default sampling rule includes:Preset data type;Step 404 can include:
Sub-step 4044 extracts the number of same data category according to preset data type from the single measurement task According to.
In embodiments of the present invention, preset sampling rule and can also be preset data type, in single measurement task Data can according to different data type classifications you can well imagine take.
Step 405, in sampling window the specified data are picked out and/or merging treatment.
In the embodiment of the present invention, sampling window delimited according to default sampling rule, for example, when default sampling rule is During prefixed time interval, then the sampling window corresponding to time interval delimited;When default sampling rule is preset data type, Then delimit the sampling window corresponding to data type.The sampling window can be used for picking out and/or merge repeat data, by After going out specified data according to default sampling Rule Extraction, obtained using sampling window as scope and specify data, to the weight in the window The operation that complex data execution is picked out and/or merged, to remove the repeated data in the specified data of the segmentation, ensures data just True property.
It correspondingly, in embodiments of the present invention, can also be with this sampling window when increasing expansion scheme in subsequent schedule The key parameter needed for some other functions is obtained for scope, is picked out for the execution of these key parameters and/or union operation, with Ensure the correctness of the key parameter needed for other functions.
It is to be appreciated that in addition to the above-mentioned example cited by the embodiment of the present invention, those skilled in the art can foundation The sampling window extends other functions, and the present invention is not any limitation as this.
Step 406, in the file generated format module addition treated specify data, generation reported data text Part.
In the embodiment of the present invention, the data of different data functional characteristic correspond to different file generated templates, and foundation carries The data decimation file generated template corresponding with the data function characteristic of the instruction data functional characteristic taken, and will perform and pick Go out and/or the specified data of merging treatment after obtain segment data be added to this document generation template in, generation reported data text Part.
Step 407, the reported data file is reported into data collection end.
The reported data file of generation is reported to data collection end by TDPNE.
Preferably, the step 407 can include:
Sub-step 4071, according to avoiding the peak hour, the reported data file is reported to the data collection end by rule.
It in one preferred embodiment of the invention, can will be upper according to rule of avoiding the peak hour according to the data function characteristic of data Report data file reports to data collection end, for example, (such as 09 within certain period:00-09:30) by MDT reported data files Data collection end is reported to, (such as 11 within another period:00-12:30) MR reported data files are reported into data collection End etc..
In practical applications, those skilled in the art can perform according to actual needs setting specifically avoid the peak hour rule will be upper Report data file reports to data collection end, and the present invention is not any limitation as this.
Compared with the prior art, the embodiment of the present invention has the advantages that:
First, the embodiment of the present invention is receiving at least one survey of base station transmission by TDPNE (dry data processing network element) After amount report, at least one measurement report is handled accordingly, obtains reported data file, and will be on reported data file Report is also maintained at base station side and end side to data collection end, by measurement report configuration and acquisition operations, and by metrical information It the functions such as handles, report to be transferred on TDPNE, so as to reduce the occupancy to base station memory, can base station be connect Enter more users, improve the caps abilities of base station, base station is made to obtain the business datum handling capacity of bigger.
Secondly, the measurement report acquired in base station is cached in the memory of base station, is being reported to measurement report by base station After TDPNE, then the measurement report cached in base station is deleted, thus reduce the occupancy to base station memory, so as to Improve ability of the base station in terms of main business.
Again, TDPNE is to specify data according to the data extraction of functional characteristic for indicated number in each measurement report, and is put Picking out and/or merging for the repeated data conducted in sampling window is placed in, process is reported in terminal compared in first technology The middle operation for carrying out cycle merging, the embodiment of the present invention may insure data correctness.
Further, the operation of reported data of embodiment of the present invention file generated is completed by TDPNE, so as to reduce The operating writing-file of base station OM, further reduces consumption of the written document to base station CPU, adds base station and is accessed for terminal The ability kept with business.
Embodiment three
With reference to Fig. 5, a kind of to do data of the data processing network element TDPNE as processing node of the embodiment of the present invention is shown The structure diagram of reporting device can specifically include following module:
Measurement report receiving module 501, for receiving at least one measurement report of base station transmission;The measurement report is The period measurement sent after base station startup statistics task, by base station foundation terminal is reported acquired.
Preferably, the time of the TDPNE and the time synchronization of the base station are set;The time synchronization is opened in base station After dynamic statistics task, the time synchronization with the TDPNE that is created by BTS management platform.
Processing module 502 for being handled accordingly at least one measurement report, obtains reported data text Part.
Preferably, the processing module 502 can include:
Data extracting sub-module 5021, for the data of the extraction instruction data functional characteristic from single measurement report;
Measurement task creates submodule 5022, at least one measurement task of data creation according to extraction;
Preferably, the measurement report carries and the one-to-one Base Station Identification of the measurement task;In the measurement After task creation submodule 5022, it can also include:
Sub-module stored, for according to the Base Station Identification, at least one measurement task to be stored in specified memory In.
Data extracting sub-module 5023 is specified, number is specified for being extracted according to default sampling rule from single measurement task According to;
Preferably, the measurement report carries timestamp information;Before the specified data extracting sub-module 5023, It can also include:
Sorting sub-module, for the data in each measurement task to be ranked up according to timestamp information.
Preferably, the default sampling rule includes:Prefixed time interval;The specified data extracting sub-module 5023 is wrapped It includes:
Segment data extraction unit, for the extraction point from the single measurement task that sequence is completed according to prefixed time interval Segment data.
Preferably, the default sampling rule includes:Preset data type;The specified data extracting sub-module 5023 is wrapped It includes:
The data extracting unit of same data category, for being carried according to preset data type from the single measurement task Take the data of same data category.
Data processing submodule 5024, for the specified data are picked out in sampling window and/or merging at Reason;The sampling window delimited according to the default sampling rule;
Reported data file generated submodule 5025, for being added in the file generated format module, treated refers to Fixed number evidence generates reported data file.
Reporting module 503, for the reported data file to be reported to data collection end
Preferably, the reporting module 503 can include:
Rule of avoiding the peak hour reports submodule 5031, for the reported data file to be reported to the number according to rule of avoiding the peak hour According to collecting terminal.
For device embodiment, since it is basicly similar to embodiment of the method, so description is fairly simple, it is related Part illustrates referring to the part of embodiment of the method.
Each embodiment in this specification is described by the way of progressive, the highlights of each of the examples are with The difference of other embodiment, just to refer each other for identical similar part between each embodiment.
It should be understood by those skilled in the art that, the embodiment of the embodiment of the present application can be provided as method, apparatus or calculate Machine program product.Therefore, the embodiment of the present application can be used complete hardware embodiment, complete software embodiment or combine software and The form of the embodiment of hardware aspect.Moreover, the embodiment of the present application can be used one or more wherein include computer can With in the computer-usable storage medium (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.) of program code The form of the computer program product of implementation.
The embodiment of the present application is with reference to according to the method for the embodiment of the present application, terminal device (system) and computer program The flowchart and/or the block diagram of product describes.It should be understood that it can realize flowchart and/or the block diagram by computer program instructions In each flow and/or block and flowchart and/or the block diagram in flow and/or box combination.These can be provided Computer program instructions are set to all-purpose computer, special purpose computer, Embedded Processor or other programmable data processing terminals Standby processor is to generate a machine so that is held by the processor of computer or other programmable data processing terminal equipments Capable instruction generation is used to implement in one flow of flow chart or multiple flows and/or one box of block diagram or multiple boxes The device for the function of specifying.
These computer program instructions, which may also be stored in, can guide computer or other programmable data processing terminal equipments In the computer-readable memory to work in a specific way so that the instruction being stored in the computer-readable memory generates bag The manufacture of command device is included, which realizes in one flow of flow chart or multiple flows and/or one side of block diagram The function of being specified in frame or multiple boxes.
These computer program instructions can be also loaded into computer or other programmable data processing terminal equipments so that Series of operation steps is performed on computer or other programmable terminal equipments to generate computer implemented processing, thus The instruction offer performed on computer or other programmable terminal equipments is used to implement in one flow of flow chart or multiple flows And/or specified in one box of block diagram or multiple boxes function the step of.
Although the preferred embodiment of the embodiment of the present application has been described, those skilled in the art once know base This creative concept can then make these embodiments other change and modification.So appended claims are intended to be construed to Including preferred embodiment and fall into all change and modification of the embodiment of the present application scope.
Finally, it is to be noted that, herein, relational terms such as first and second and the like be used merely to by One entity or operation are distinguished with another entity or operation, without necessarily requiring or implying these entities or operation Between there are any actual relationship or orders.Moreover, term " comprising ", "comprising" or its any other variant meaning Covering non-exclusive inclusion, so that process, method, article or terminal device including a series of elements are not only wrapped Those elements are included, but also including other elements that are not explicitly listed or are further included as this process, method, article Or the element that terminal device is intrinsic.In the absence of more restrictions, it is wanted by what sentence "including a ..." limited Element, it is not excluded that also there are other identical elements in the process including the element, method, article or terminal device.
Above to it is provided herein it is a kind of to do data processing network element TDPNE be the data reporting method that handles node It is described in detail with a kind of using dry data processing network element TDPNE as the data reporting device of processing node, it is used herein The principle and implementation of this application are described for specific case, to understand the explanation of above example is only intended to helping The present processes and its core concept;Meanwhile for those of ordinary skill in the art, according to the thought of the application, having There will be changes in body embodiment and application range, in conclusion this specification content should not be construed as to the application Limitation.

Claims (16)

  1. A kind of 1. method reported using doing data of the data processing network element TDPNE as processing node, which is characterized in that including:
    Receive at least one measurement report that base station is sent;The measurement report is after base station startup statistics task, by base It stands acquired in the period measurement report sent according to terminal;
    At least one measurement report is handled accordingly, obtains reported data file;
    The reported data file is reported into data collection end.
  2. 2. according to the method described in claim 1, it is characterized in that, described carry out accordingly at least one measurement report The step of handling, obtaining reported data file, including:
    The data of extraction instruction data functional characteristic from single measurement report;
    At least one measurement task of data creation according to extraction;
    It is extracted according to default sampling rule from single measurement task and specifies data;
    The specified data are picked out in sampling window and/or merging treatment;The sampling window is according to described pre- If sampling rule delimited;
    In the file generated format module addition treated specify data, generate reported data file.
  3. 3. according to the method described in claim 2, it is characterized in that, the measurement report is carried with the measurement task one by one Corresponding Base Station Identification;After the step of at least one measurement task of the data creation according to extraction, further include:
    According to the Base Station Identification, at least one measurement task is stored in specified memory.
  4. 4. according to the method described in claim 2, it is characterized in that, the measurement report carries timestamp information;Described Before extracting the step of specifying data from single measurement task according to default sampling rule, further include:
    Data in each measurement task are ranked up according to timestamp information.
  5. 5. according to the method described in claim 4, it is characterized in that, the default sampling rule includes:Prefixed time interval;Institute It states and the step of specifying data is extracted from single measurement task according to default sampling rule, including:
    According to prefixed time interval segment data is extracted from the single measurement task that sequence is completed.
  6. 6. according to the method described in claim 2, it is characterized in that, the default sampling rule includes:Preset data type;Institute It states and the step of specifying data is extracted from single measurement task according to default sampling rule, including:
    The data of same data category are extracted from the single measurement task according to preset data type.
  7. 7. according to the method described in claim 1, it is characterized in that, the time of the TDPNE and the time of the base station are set It is synchronous;The time synchronization be base station start statistics task after, created by BTS management platform with the TDPNE when Between it is synchronous.
  8. 8. according to the method described in claim 1, it is characterized in that, described report to data collection by the reported data file The step of end, including:
    According to avoiding the peak hour, the reported data file is reported to the data collection end by rule.
  9. 9. a kind of device that data using TDPNE as processing node report, which is characterized in that including:
    Measurement report receiving module, for receiving at least one measurement report of base station transmission;The measurement report is in base station The period measurement sent after startup statistics task, by base station foundation terminal is reported acquired;
    Processing module for being handled accordingly at least one measurement report, obtains reported data file;
    Reporting module, for the reported data file to be reported to data collection end.
  10. 10. device according to claim 9, which is characterized in that the processing module includes:
    Data extracting sub-module, for the data of the extraction instruction data functional characteristic from single measurement report;
    Measurement task creates submodule, at least one measurement task of data creation according to extraction;
    Data extracting sub-module is specified, data are specified for being extracted according to default sampling rule from single measurement task;
    Data processing submodule, for being picked out in sampling window to the specified data and/or merging treatment;It is described to adopt Sample window delimited according to the default sampling rule;
    Reported data file generated submodule, in the file generated format module addition treated specify data, Generate reported data file.
  11. 11. device according to claim 10, which is characterized in that the measurement report carries and the measurement task one One corresponding Base Station Identification;After the measurement task creates submodule, further include:
    Sub-module stored, for according to the Base Station Identification, at least one measurement task to be stored in specified memory.
  12. 12. device according to claim 10, which is characterized in that the measurement report carries timestamp information;Institute Before stating specified data extracting sub-module, further include:
    Sorting sub-module, for the data in each measurement task to be ranked up according to timestamp information.
  13. 13. device according to claim 12, which is characterized in that the default sampling rule includes:Prefixed time interval; The specified data extracting sub-module includes:
    Segment data extracting sub-module is segmented for being extracted according to prefixed time interval from the single measurement task that sequence is completed Data.
  14. 14. device according to claim 10, which is characterized in that the default sampling rule includes:Preset data type; The specified data extracting sub-module includes:
    The data extracting sub-module of same data category, for being extracted according to preset data type from the single measurement task The data of same data category.
  15. 15. device according to claim 9, which is characterized in that the time of the TDPNE and the time of the base station are set It is synchronous;The time synchronization be base station start statistics task after, created by BTS management platform with the TDPNE when Between it is synchronous.
  16. 16. device according to claim 9, which is characterized in that the reporting module includes:
    Rule of avoiding the peak hour reports submodule, for the reported data file to be reported to the data collection according to rule of avoiding the peak hour End.
CN201611039439.0A 2016-11-21 2016-11-21 Data reporting method and device with dry data processing network element TDPNE as processing node Active CN108093431B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611039439.0A CN108093431B (en) 2016-11-21 2016-11-21 Data reporting method and device with dry data processing network element TDPNE as processing node

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611039439.0A CN108093431B (en) 2016-11-21 2016-11-21 Data reporting method and device with dry data processing network element TDPNE as processing node

Publications (2)

Publication Number Publication Date
CN108093431A true CN108093431A (en) 2018-05-29
CN108093431B CN108093431B (en) 2020-11-13

Family

ID=62170789

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611039439.0A Active CN108093431B (en) 2016-11-21 2016-11-21 Data reporting method and device with dry data processing network element TDPNE as processing node

Country Status (1)

Country Link
CN (1) CN108093431B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020191674A1 (en) * 2019-03-27 2020-10-01 Oppo广东移动通信有限公司 Measurement report reporting method, and related product
CN113950095A (en) * 2020-07-16 2022-01-18 大唐移动通信设备有限公司 Measurement report processing method and device, electronic equipment and storage medium

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1997195A (en) * 2006-01-06 2007-07-11 中兴通讯股份有限公司 Cellular mobile communication system and special processing method for measurement report for same
CN101536579A (en) * 2006-10-31 2009-09-16 高通股份有限公司 Inter-enode B handover procedure
CN102571451A (en) * 2012-02-16 2012-07-11 大唐移动通信设备有限公司 Network element and method for uploading MR (Measure Report) messages by network element
CN103607731A (en) * 2013-11-28 2014-02-26 大唐移动通信设备有限公司 Method and device for processing measurement reports
US20150118968A1 (en) * 2013-10-31 2015-04-30 Motorola Mobility Llc Measurement management in small-cell systems

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1997195A (en) * 2006-01-06 2007-07-11 中兴通讯股份有限公司 Cellular mobile communication system and special processing method for measurement report for same
CN101536579A (en) * 2006-10-31 2009-09-16 高通股份有限公司 Inter-enode B handover procedure
CN102571451A (en) * 2012-02-16 2012-07-11 大唐移动通信设备有限公司 Network element and method for uploading MR (Measure Report) messages by network element
US20150118968A1 (en) * 2013-10-31 2015-04-30 Motorola Mobility Llc Measurement management in small-cell systems
CN103607731A (en) * 2013-11-28 2014-02-26 大唐移动通信设备有限公司 Method and device for processing measurement reports

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020191674A1 (en) * 2019-03-27 2020-10-01 Oppo广东移动通信有限公司 Measurement report reporting method, and related product
CN113950095A (en) * 2020-07-16 2022-01-18 大唐移动通信设备有限公司 Measurement report processing method and device, electronic equipment and storage medium

Also Published As

Publication number Publication date
CN108093431B (en) 2020-11-13

Similar Documents

Publication Publication Date Title
CN105264859B (en) For generating the method and apparatus known clearly to the customer experience of the application based on web
Laner et al. Traffic models for machine-to-machine (M2M) communications: types and applications
US20230140836A9 (en) Anomaly detection method and device, terminal and storage medium
Jiang et al. Autonomic network management for software-defined and virtualized 5G systems
CN105357699A (en) Wireless network quality monitoring system and method
CN111163482A (en) Data processing method, device and storage medium
CN107211300A (en) Analysis and classification signaling set or calling
CN108093431A (en) It is a kind of using do data processing network element TDPNE be handle node data reporting method and device
US9392472B2 (en) Technique for evaluating events in a telecommunication network
CN103607731A (en) Method and device for processing measurement reports
CN102612058B (en) Method and device for determining performance index statistical result
CN105636097A (en) Method and device for verifying network performance statistic data
CN105577462B (en) The flow statistical method and device of mobile device
CN109963301B (en) Method and device for analyzing network structure interference
CN109450103A (en) Condition detection method, device and the intelligent terminal of pressing plate
US20210367831A1 (en) Multi-dimensional impact detect and diagnosis in cellular networks
CN109996253A (en) A kind of rational appraisal procedure of cell signal coverage area and device
CN114501486B (en) Cell parameter configuration method and device under high-speed mobile scene and computing equipment
CN108874646A (en) The method and apparatus for analyzing data
CN107517474A (en) A kind of network analysis optimization method and device
Raffeck et al. Data usage in iot: A characterization of gtp tunnels in m2m mobile networks
JP6276240B2 (en) Quality degradation area identification system, quality degradation area identification method, and program
CN106533715A (en) Data analysis method and system
CN106851604B (en) A kind of Traffic prediction method and device of mobile communications network
CN105281985B (en) The querying method of electric energy quality monitoring net state inquiry system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant