CN105281985B - The querying method of electric energy quality monitoring net state inquiry system - Google Patents

The querying method of electric energy quality monitoring net state inquiry system Download PDF

Info

Publication number
CN105281985B
CN105281985B CN201510856400.7A CN201510856400A CN105281985B CN 105281985 B CN105281985 B CN 105281985B CN 201510856400 A CN201510856400 A CN 201510856400A CN 105281985 B CN105281985 B CN 105281985B
Authority
CN
China
Prior art keywords
electric energy
energy quality
quality monitoring
monitoring node
electric
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510856400.7A
Other languages
Chinese (zh)
Other versions
CN105281985A (en
Inventor
曾正扬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Chengdu Power Technology Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510856400.7A priority Critical patent/CN105281985B/en
Publication of CN105281985A publication Critical patent/CN105281985A/en
Application granted granted Critical
Publication of CN105281985B publication Critical patent/CN105281985B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of querying method of electric energy quality monitoring net state inquiry system of the present invention, comprises the concrete steps that:By the initiation parameter typing configuration file of each electric company's electric energy quality monitoring terminal;Inquiry system reads configuration file, and the initiation parameter in configuration file is loaded into the query interface of inquiry system.The present invention can be quickly obtained electric energy quality monitoring net state data and exist, it is ensured that whole unimpeded of electric energy quality monitoring net greatly improves work efficiency.

Description

The querying method of electric energy quality monitoring net state inquiry system
Technical field
The invention belongs to electric energy quality monitoring fields, in particular to a kind of looking into for electric energy quality monitoring net state inquiry system Inquiry method.
Background technology
Electric energy quality monitoring net is to rely on computer technology, database technology, network communication technology, in conjunction with each in power grid A monitoring point is built into a complete electric energy quality monitoring network system, to realize to power grid items power quality index On-line monitoring and statistical analysis.
Currently, electric energy quality monitoring net is using Centralizing inspection and control technology, it is the brain of electric energy quality monitoring Maincenter can realize statistics, analysis and the assessment of Power Quality in Regional Power Grid index, be power grid power quality problem improvement and Improve and data supporting is provided.Staff needs to check in each electric company's electric energy quality monitoring terminal and electric energy quality monitoring Communication between the heart and the entire electric energy quality monitoring net state of inquiry.For the electric energy quality monitoring net being abnormal, if It cannot restore abnormal as early as possible, the communication between electric energy quality monitoring terminal and electric energy quality monitoring center cannot be repaired, will be influenced The stable operation of electric energy quality monitoring net.
Invention content
A kind of electric energy quality monitoring net state inquiry system is provided the purpose of the invention is to overcome above-mentioned insufficient Querying method.
A kind of querying method of electric energy quality monitoring net state inquiry system, comprises the concrete steps that:
Step 1:By the initiation parameter typing electric energy quality monitoring center of each electric company's electric energy quality monitoring node Configuration file;
Step 2:Each electric company's electric energy quality monitoring node is subjected to networking, while inquiry system is supervised with power quality Measured center is networked;
Step 3:Judge whether the networking of above-mentioned electric energy quality monitoring node succeeds, if it is, turn in next step, if It is no, then return to the step of previous step continues networking;
Step 4:Inquiry system read the electric energy quality monitoring node in the configuration file stable state power index and temporarily State power index, and stable state power index and transient power index are parsed, by the data parsed and the mark to prestore Accurate stable state power index and transient power index is compared, and determines stable state power index grade and transient power index etc. Grade judges the power quality of current electric energy quality monitoring net so that it is determined that the power quality of current electric energy quality monitoring net is horizontal Whether include protection act in horizontal information, such as comprising going to step 5, as gone to step 6 not comprising if;
Step 5:Electric energy quality monitoring net state data include protection act, illustrate electric energy quality monitoring net there are failure, Inquiry system external trigger analysis record, completes the instantaneous of the power quality index of each electric company's electric energy quality monitoring node Record realizes that the instantaneous storage recording function to power quality index, easy access personnel supervise in power quality when breaking down Current power quality index is judged and learnt after survey grid reparation;
Step 6:Electric energy quality monitoring net state data do not include protection act, illustrate that electric energy quality monitoring net is normal, wrap Presentation of information containing power quality index is on the interface of inquiry system.
Multichannel configuration is carried out to inquiry system and monitoring center in step 2, and reduces each electric company's electric energy matter It is logical to switch to other when inquiry system cannot normally be connected to electric energy quality monitoring center for the screen position setting for measuring monitoring node Road is inquired.
While carrying out multichannel configuration, synchronous triggering is taken to input signal, ensures that the signal on same channel is same When triggering collection, substantially increase input signal analysis record safety and electric energy quality monitoring net smoothness.
Information in the step 6 on the interface of inquiry system includes text, rod figure and the tendency chart of data.
The configuration file is encrypted in electric energy quality monitoring center in the step 4, matches described in inquiry system reading It needs to decrypt when the stable state power index and transient power index of setting the electric energy quality monitoring node in file.
The progress networking of each electric company's electric energy quality monitoring node is included the following steps in the step 2:
011, determine the frequency point information of each electric company's electric energy quality monitoring node;
012, each electric company's electric energy quality monitoring node is arranged can acquire the signal of multiple frequency points simultaneously, and only Signal is sent in a frequency point;
013, main monitoring node constantly to from monitoring node transmission time information, receives from monitoring node and the deadline is same After step, temporal information is handed down to one of remaining monitoring node, and so on, complete the time synchronization of the whole network;
014, adjacent electric company's electric energy quality monitoring node is searched for, and record adjacent electric company's electric energy quality monitoring section The frequency point information of point, and frequency point information is handed down to adjacent electric company's electric energy quality monitoring node;
015, if it is public will to send data to adjacent power supply in certain business time-slot by electric company electric energy quality monitoring node T1 Electric energy quality monitoring node T2 is taken charge of, then electric company electric energy quality monitoring node T1 is output state in the business time-slot, this Shi Buneng arranges other purposes node again, can only be handed down to adjacent electric company's electric energy quality monitoring node T2 in a frequency point; Assuming that electric company electric energy quality monitoring node T1 will receive adjacent electric company's electric energy quality monitoring node in certain business time-slot The data of T2 can receive different then electric company electric energy quality monitoring node T1 is input state in the business time-slot The data of frequency point, so this time slot can also receive the data that other different frequent points are sent.
The step 013 is specially:Main monitoring node sends signal using omnidirectional antenna, receives the letter that multiple frequency points are sent Number, until covering all frequency points;If not receiving the signal of main monitoring node from monitoring node, multiple frequencies are received every time The signal that point is sent, until all frequency points are covered, if receiving the signal of main monitoring node from monitoring node, from monitoring node Into thick synchronous regime, temporal information is handed down to one of remaining electric company's electric energy quality monitoring node, has been received (n+1)th electric company's electric energy quality monitoring node of n-th of electric company's electric energy quality monitoring node time information is n-th A electric company's electric energy quality monitoring node n jumps the node of range, will be established with n-th of electric company's electric energy quality monitoring node Topological network hierarchical structure, and so on, n+1 jumps will be sequentially formed, n+2 is jumped, n+3 jumps ... wait nodes, ultimately form more The level electric company electric energy quality monitoring node networking and time for completing each level electric company electric energy quality monitoring node is same Step.
The querying method of the electric energy quality monitoring net state inquiry system, specifically includes following steps:
051, personnel query logs in Cloud Server using the browser in inquiry system by hypertext transfer protocol, will solve The call request of close function is sent to Cloud Server;
052, electric energy quality monitoring center logs in Cloud Server, and Cloud Server sends inquiry to electric energy quality monitoring center and asks It asks password, electric energy quality monitoring center input inquiry that password is asked to receive call request, then completes the calling of decryption function Processing, feeds back to Cloud Server by handling result later;
053, personnel query logs in Cloud Server, cloud clothes using the browser in inquiry system by hypertext transfer protocol Device of being engaged in feeds back the inquiry request password to inquiry system, inquiry system input the inquiry request password query processing as a result, And inquiry electric energy quality monitoring center is selected according to handling result;
054, after completing inquiry, the inquiry request password is temporarily stored in Cloud Server, and call request is received when next time When, electric energy quality monitoring center first logs in whether Cloud Server retrieval preserves the identical inquiry request password, if not having, Then return to step 052, if so, then return to step 053, if the inquiry request password kept in Cloud Server is in one minute Once all without called, though after one minute electric energy quality monitoring center log in Cloud Server retrieval preserve it is identical described Inquiry request password, Cloud Server are also refused to send the inquiry request password to electric energy quality monitoring center.
The present invention can be quickly obtained electric energy quality monitoring net state data and exist, it is ensured that whole smooth of electric energy quality monitoring net It is logical, it greatly improves work efficiency, saves the recovery time after electric energy quality monitoring net failure, and in electric energy quality monitoring Net completes the power quality index of each electric company's electric energy quality monitoring terminal there are energy external trigger analysis record when failure Instantaneous record, easy access personnel judge and learn to current power quality index after electric energy quality monitoring net reparation It practises.
Description of the drawings
Fig. 1 is flow diagram of the present invention.
Specific implementation mode
It further illustrates the present invention with reference to the accompanying drawings and embodiments.
Embodiment:The present invention is that a kind of querying method of electric energy quality monitoring net state inquiry system includes the following steps:
Step 1:By the initiation parameter typing electric energy quality monitoring center of each electric company's electric energy quality monitoring node Configuration file;
Step 2:Each electric company's electric energy quality monitoring node is subjected to networking, while inquiry system is supervised with power quality Measured center is networked;
Step 3:Judge whether the networking of above-mentioned electric energy quality monitoring node succeeds, if it is, turn in next step, if It is no, then return to the step of previous step continues networking;
Step 4:Inquiry system read the electric energy quality monitoring node in the configuration file stable state power index and temporarily State power index, and stable state power index and transient power index are parsed, by the data parsed and the mark to prestore Accurate stable state power index and transient power index is compared, and determines stable state power index grade and transient power index etc. Grade judges the power quality of current electric energy quality monitoring net so that it is determined that the power quality of current electric energy quality monitoring net is horizontal Whether include protection act in horizontal information, such as comprising going to step 5, as gone to step 6 not comprising if;
Step 5:Electric energy quality monitoring net state data include protection act, illustrate electric energy quality monitoring net there are failure, Inquiry system external trigger analysis record, completes the instantaneous of the power quality index of each electric company's electric energy quality monitoring node Record realizes that the instantaneous storage recording function to power quality index, easy access personnel supervise in power quality when breaking down Current power quality index is judged and learnt after survey grid reparation;
Step 6:Electric energy quality monitoring net state data do not include protection act, illustrate that electric energy quality monitoring net is normal, wrap Presentation of information containing power quality index is on the interface of inquiry system.
Multichannel configuration is carried out to inquiry system and monitoring center in step 2, and reduces each electric company's electric energy matter It is logical to switch to other when inquiry system cannot normally be connected to electric energy quality monitoring center for the screen position setting for measuring monitoring node Road is inquired.
While carrying out multichannel configuration, synchronous triggering is taken to input signal, ensures that the signal on same channel is same When triggering collection, substantially increase input signal analysis record safety and electric energy quality monitoring net smoothness.
Information in the step 6 on the interface of inquiry system includes text, rod figure and the tendency chart of data.
The configuration file is encrypted in electric energy quality monitoring center in the step 4, matches described in inquiry system reading It needs to decrypt when the stable state power index and transient power index of setting the electric energy quality monitoring node in file.
The progress networking of each electric company's electric energy quality monitoring node is included the following steps in the step 2:
011, determine the frequency point information of each electric company's electric energy quality monitoring node;
012, each electric company's electric energy quality monitoring node is arranged can acquire the signal of multiple frequency points simultaneously, and only Signal is sent in a frequency point;
013, main monitoring node constantly to from monitoring node transmission time information, receives from monitoring node and the deadline is same After step, temporal information is handed down to one of remaining monitoring node, and so on, complete the time synchronization of the whole network;
014, adjacent electric company's electric energy quality monitoring node is searched for, and record adjacent electric company's electric energy quality monitoring section The frequency point information of point, and frequency point information is handed down to adjacent electric company's electric energy quality monitoring node;
015, if it is public will to send data to adjacent power supply in certain business time-slot by electric company electric energy quality monitoring node T1 Electric energy quality monitoring node T2 is taken charge of, then electric company electric energy quality monitoring node T1 is output state in the business time-slot, this Shi Buneng arranges other purposes node again, can only be handed down to adjacent electric company's electric energy quality monitoring node T2 in a frequency point; Assuming that electric company electric energy quality monitoring node T1 will receive adjacent electric company's electric energy quality monitoring node in certain business time-slot The data of T2 can receive different then electric company electric energy quality monitoring node T1 is input state in the business time-slot The data of frequency point, so this time slot can also receive the data that other different frequent points are sent.
The step 013 is specially:Main monitoring node sends signal using omnidirectional antenna, receives the letter that multiple frequency points are sent Number, until covering all frequency points;If not receiving the signal of main monitoring node from monitoring node, multiple frequencies are received every time The signal that point is sent, until all frequency points are covered, if receiving the signal of main monitoring node from monitoring node, from monitoring node Into thick synchronous regime, temporal information is handed down to one of remaining electric company's electric energy quality monitoring node, has been received (n+1)th electric company's electric energy quality monitoring node of n-th of electric company's electric energy quality monitoring node time information is n-th A electric company's electric energy quality monitoring node n jumps the node of range, will be established with n-th of electric company's electric energy quality monitoring node Topological network hierarchical structure, and so on, n+1 jumps will be sequentially formed, n+2 is jumped, n+3 jumps ... wait nodes, ultimately form more The level electric company electric energy quality monitoring node networking and time for completing each level electric company electric energy quality monitoring node is same Step.
The querying method of the electric energy quality monitoring net state inquiry system, specifically includes following steps:
051, personnel query logs in Cloud Server using the browser in inquiry system by hypertext transfer protocol, will solve The call request of close function is sent to Cloud Server;
052, electric energy quality monitoring center logs in Cloud Server, and Cloud Server sends inquiry to electric energy quality monitoring center and asks It asks password, electric energy quality monitoring center input inquiry that password is asked to receive call request, then completes the calling of decryption function Processing, feeds back to Cloud Server by handling result later;
053, personnel query logs in Cloud Server, cloud clothes using the browser in inquiry system by hypertext transfer protocol Device of being engaged in feeds back the inquiry request password to inquiry system, inquiry system input the inquiry request password query processing as a result, And inquiry electric energy quality monitoring center is selected according to handling result;
054, after completing inquiry, the inquiry request password is temporarily stored in Cloud Server, and call request is received when next time When, electric energy quality monitoring center first logs in whether Cloud Server retrieval preserves the identical inquiry request password, if not having, Then return to step 052, if so, then return to step 053, if the inquiry request password kept in Cloud Server is in one minute Once all without called, though after one minute electric energy quality monitoring center log in Cloud Server retrieval preserve it is identical described Inquiry request password, Cloud Server are also refused to send the inquiry request password to electric energy quality monitoring center.

Claims (2)

1. a kind of querying method of electric energy quality monitoring net state inquiry system, it is characterised in that include the following steps:
Step 1:By matching for the initiation parameter typing electric energy quality monitoring center of each electric company's electric energy quality monitoring node Set file;
Step 2:Each electric company's electric energy quality monitoring node is subjected to networking, while in inquiry system and electric energy quality monitoring The heart is networked;
Step 3:Judge whether the networking of above-mentioned electric energy quality monitoring node succeeds, if it is, turn in next step, if it is not, then Return to the step of previous step continues networking;
Step 4:Inquiry system reads the stable state power index and transient state electricity of the electric energy quality monitoring node in the configuration file Can index, and stable state power index and transient power index are parsed, by the data parsed and the standard to prestore Stable state power index and transient power index are compared, and determine stable state power index grade and transient power index grade, from And determine that the power quality of current electric energy quality monitoring net is horizontal, judge the power quality level of current electric energy quality monitoring net Whether include protection act in information, such as comprising going to step 5, as gone to step 6 not comprising if;
Step 5:Electric energy quality monitoring net state data include protection act, and illustrating electric energy quality monitoring net, there are failure, inquiries Exterior triggering analysis record, completes the instantaneous note of the power quality index of each electric company's electric energy quality monitoring node The instantaneous storage recording function to power quality index when breaking down is realized in record, and easy access personnel are in electric energy quality monitoring Net is judged and is learnt to current power quality index after repairing;
Step 6:Electric energy quality monitoring net state data do not include protection act, illustrate that electric energy quality monitoring net is normal, including electricity The presentation of information of energy quality index is on the interface of inquiry system;
Multichannel configuration is carried out to inquiry system and monitoring center in step 2, and reduces each electric company's power quality prison Survey node screen position setting, when inquiry system cannot normally be connected to electric energy quality monitoring center, switch to other channels into Row inquiry;
While carrying out multichannel configuration, synchronous triggering is taken to input signal, ensures that the signal on same channel is while touching Hair acquisition substantially increases the smoothness of the safety and electric energy quality monitoring net of the analysis record of input signal;
Information in the step 6 on the interface of inquiry system includes text, rod figure and the tendency chart of data;
The configuration file is encrypted in electric energy quality monitoring center in the step 4, and inquiry system reads the configuration text It needs to decrypt when the stable state power index and transient power index of the electric energy quality monitoring node in part;
The progress networking of each electric company's electric energy quality monitoring node is included the following steps in the step 2:
011, determine the frequency point information of each electric company's electric energy quality monitoring node;
012, each electric company's electric energy quality monitoring node is arranged can acquire the signal of multiple frequency points simultaneously, and only one A frequency point sends signal;
013, main monitoring node from monitoring node constantly to from monitoring node transmission time information, receiving and the deadline synchronizes it Afterwards, temporal information is handed down to one of remaining monitoring node, and so on, complete the time synchronization of the whole network;
014, adjacent electric company's electric energy quality monitoring node is searched for, and record adjacent electric company's electric energy quality monitoring node Frequency point information, and frequency point information is handed down to adjacent electric company's electric energy quality monitoring node;
015, if electric company electric energy quality monitoring node T1 will send data to adjacent electric company's electricity in certain business time-slot Energy quality-monitoring node T2, then electric company electric energy quality monitoring node T1 is output state in the business time-slot, at this time not Other purposes node can be arranged again, can only be handed down to adjacent electric company's electric energy quality monitoring node T2 in a frequency point;Assuming that Electric company electric energy quality monitoring node T1 will receive adjacent electric company's electric energy quality monitoring node T2's in certain business time-slot Data can receive different frequency points then electric company electric energy quality monitoring node T1 is input state in the business time-slot Data, so this time slot can also receive the data that other different frequent points are sent.
2. the querying method of electric energy quality monitoring net state inquiry system according to claim 1, it is characterised in that the step Rapid 013 is specially:Main monitoring node sends signal using omnidirectional antenna, receives the signal that multiple frequency points are sent, until covering All frequency points;If not receiving the signal of main monitoring node from monitoring node, the signal that multiple frequency points are sent is received every time, Until covering all frequency points, if receiving the signal of main monitoring node from monitoring node, enter thick synchronous shape from monitoring node Temporal information is handed down to one of remaining electric company's electric energy quality monitoring node, has received n-th of electric company by state (n+1)th electric company's electric energy quality monitoring node of electric energy quality monitoring node time information is n-th of electric company's electric energy Quality-monitoring node n jumps the node of range, will establish topological network level knot with n-th of electric company's electric energy quality monitoring node Structure, and so on, it will sequentially form that n+1, which is jumped, n+2 is jumped, n+3 is jumped ... waits nodes, ultimately form multi-level electric company electricity Energy quality-monitoring node networking and the time synchronization for completing each level electric company electric energy quality monitoring node.
CN201510856400.7A 2015-11-30 2015-11-30 The querying method of electric energy quality monitoring net state inquiry system Active CN105281985B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510856400.7A CN105281985B (en) 2015-11-30 2015-11-30 The querying method of electric energy quality monitoring net state inquiry system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510856400.7A CN105281985B (en) 2015-11-30 2015-11-30 The querying method of electric energy quality monitoring net state inquiry system

Publications (2)

Publication Number Publication Date
CN105281985A CN105281985A (en) 2016-01-27
CN105281985B true CN105281985B (en) 2018-10-16

Family

ID=55150354

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510856400.7A Active CN105281985B (en) 2015-11-30 2015-11-30 The querying method of electric energy quality monitoring net state inquiry system

Country Status (1)

Country Link
CN (1) CN105281985B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108872881B (en) * 2018-06-26 2021-04-13 台州市黄岩智正信息科技有限公司 Method for monitoring electric energy quality of distributed power supply

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101713801A (en) * 2009-10-30 2010-05-26 珠海泰坦自动化技术有限公司 Electric energy quality monitoring system
CN102901899A (en) * 2012-10-23 2013-01-30 江苏省电力公司扬州供电公司 Electric energy quality monitoring and analysis system in power distribution automatic system
CN103824129A (en) * 2014-02-26 2014-05-28 国家电网公司 High-speed rail power quality abnormal condition prewarning method based on dynamic threshold
CN103839196A (en) * 2014-03-14 2014-06-04 深圳市康必达控制技术有限公司 Power quality management client side system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101713801A (en) * 2009-10-30 2010-05-26 珠海泰坦自动化技术有限公司 Electric energy quality monitoring system
CN102901899A (en) * 2012-10-23 2013-01-30 江苏省电力公司扬州供电公司 Electric energy quality monitoring and analysis system in power distribution automatic system
CN103824129A (en) * 2014-02-26 2014-05-28 国家电网公司 High-speed rail power quality abnormal condition prewarning method based on dynamic threshold
CN103839196A (en) * 2014-03-14 2014-06-04 深圳市康必达控制技术有限公司 Power quality management client side system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《Web技术的电能质量监测系统的设计与实现》;张正书;《中国优秀硕士学位论文全文数据库工程科技II辑》;20050615;C042-166 *

Also Published As

Publication number Publication date
CN105281985A (en) 2016-01-27

Similar Documents

Publication Publication Date Title
CN102158355B (en) Log event correlation analysis method and device capable of concurrent and interrupted analysis
CN105301416B (en) Equipment for monitoring power quality and its monitoring method
CN110413441A (en) Active and standby storage volume synchrodata method of calibration, device, equipment and storage medium
CN107315952A (en) Method and apparatus for determining application program suspicious actions
KR102061833B1 (en) Apparatus and method for investigating cyber incidents
CN105406976A (en) Weak password checking method and system
CN106465175A (en) Method for collecting and aggregating network quality data
CN104506351A (en) Method and system for performing online full-automatic configuration of compliance safety audit
CN110245145A (en) Structure synchronization method and apparatus of the relevant database to Hadoop database
US20150227577A1 (en) Method and device for guaranteeing consistency of planning data
CN109391624A (en) A kind of terminal access data exception detection method and device based on machine learning
CN105472412A (en) Big data processing method capable of distinguishing state of intelligent television
CN104572978A (en) User behavior counting method for power scheduling automatic system based on log
CN109451486A (en) WiFi acquisition system and WiFi terminal detection method based on probe request
CN109376880A (en) Failure feedback method, device and access control equipment
CN105281985B (en) The querying method of electric energy quality monitoring net state inquiry system
CN101199162B (en) Method, system and device for controlling communication network
CN106331060B (en) WIFI-based deployment and control method and system
CN105516277B (en) Monitoring method for power grid electrical equipment temperature monitoring device
CN109309535A (en) AP equipment wireless automatic detection system and method
CN110457351B (en) Government financing platform data information-based management system and management method
CN117221088A (en) Computer network intensity detection system and device
CN106649814A (en) Method for consistency checking of distribution automation cross-domain database
CN110032586A (en) Storage method, querying method and the acquisition and memory system of energy storage battery core data
US10447807B1 (en) Dynamic middleware source selection for optimizing data retrieval from network nodes

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 315111 No. 45, Jing Da Road, five Township, Yinzhou District, Ningbo, Zhejiang.

Applicant after: Zeng Zhengyang

Address before: 315113 58 Town South Road, Yinzhou District, Ningbo, Zhejiang

Applicant before: Zeng Zhengyang

GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: 317610 salt pan industrial area of Ganjiang Town, Yuhuan City, Taizhou, Zhejiang

Patentee after: Zeng Zhengyang

Address before: 315111 No. 45 Jingda Road, Five Townships, Yinzhou District, Ningbo City, Zhejiang Province

Patentee before: Zeng Zhengyang

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20211229

Address after: 314500 01, No. 4, South Zaoqiang street, No. 1, Nanmen Gongnong Road, Chongfu Town, Tongxiang City, Jiaxing City, Zhejiang Province

Patentee after: Jiaxing Qiyuan Network Information Technology Co.,Ltd.

Address before: 317610 salt pan Industrial Zone, Ganjiang Town, Yuhuan City, Taizhou, Zhejiang

Patentee before: Zeng Zhengyang

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220803

Address after: No. 12-2-501, SME Incubation Park, No. 319 Qingpi Avenue, Chengdu cross strait science and Technology Industrial Development Park, Wenjiang District, Chengdu, Sichuan 610000

Patentee after: CHENGDU CHENGDU POWER TECHNOLOGY Co.,Ltd.

Address before: 314500 01, No. 4, South Zaoqiang street, No. 1, Nanmen Gongnong Road, Chongfu Town, Tongxiang City, Jiaxing City, Zhejiang Province

Patentee before: Jiaxing Qiyuan Network Information Technology Co.,Ltd.