CN108093194A - A kind of marine wind electric field O&M process monitoring manages system - Google Patents
A kind of marine wind electric field O&M process monitoring manages system Download PDFInfo
- Publication number
- CN108093194A CN108093194A CN201711386220.2A CN201711386220A CN108093194A CN 108093194 A CN108093194 A CN 108093194A CN 201711386220 A CN201711386220 A CN 201711386220A CN 108093194 A CN108093194 A CN 108093194A
- Authority
- CN
- China
- Prior art keywords
- monitoring
- electric field
- wind farm
- offshore wind
- land
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 37
- 238000012544 monitoring process Methods 0.000 title claims abstract description 35
- 230000005684 electric field Effects 0.000 title claims abstract description 17
- 238000012423 maintenance Methods 0.000 claims abstract description 25
- 238000004891 communication Methods 0.000 claims abstract description 20
- 238000007689 inspection Methods 0.000 claims description 3
- 238000004080 punching Methods 0.000 claims description 3
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 230000005611 electricity Effects 0.000 description 3
- 230000009172 bursting Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04N—PICTORIAL COMMUNICATION, e.g. TELEVISION
- H04N7/00—Television systems
- H04N7/18—Closed-circuit television [CCTV] systems, i.e. systems in which the video signal is not broadcast
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01S—RADIO DIRECTION-FINDING; RADIO NAVIGATION; DETERMINING DISTANCE OR VELOCITY BY USE OF RADIO WAVES; LOCATING OR PRESENCE-DETECTING BY USE OF THE REFLECTION OR RERADIATION OF RADIO WAVES; ANALOGOUS ARRANGEMENTS USING OTHER WAVES
- G01S19/00—Satellite radio beacon positioning systems; Determining position, velocity or attitude using signals transmitted by such systems
- G01S19/38—Determining a navigation solution using signals transmitted by a satellite radio beacon positioning system
- G01S19/39—Determining a navigation solution using signals transmitted by a satellite radio beacon positioning system the satellite radio beacon positioning system transmitting time-stamped messages, e.g. GPS [Global Positioning System], GLONASS [Global Orbiting Navigation Satellite System] or GALILEO
- G01S19/42—Determining position
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04N—PICTORIAL COMMUNICATION, e.g. TELEVISION
- H04N7/00—Television systems
- H04N7/14—Systems for two-way working
- H04N7/141—Systems for two-way working between two video terminals, e.g. videophone
- H04N7/147—Communication arrangements, e.g. identifying the communication as a video-communication, intermediate storage of the signals
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W4/00—Services specially adapted for wireless communication networks; Facilities therefor
- H04W4/02—Services making use of location information
- H04W4/025—Services making use of location information using location based information parameters
Abstract
A kind of marine wind electric field O&M process monitoring manages system, including O&M end system and land monitoring center;O&M end system is for the monitoring of offshore wind farm Site for Unit and the command information of the land monitoring center of reception, including video monitoring center, alignment system, the first audio communication system and O&M course management system;Land monitoring center is for monitoring offshore wind farm O&M process and O&M process being commanded, including video display system and the second audio communication system;The beneficial effects of the invention are as follows:Real-time video monitoring is carried out to marine wind electric field O&M process, the position of operation maintenance personnel is positioned in real time simultaneously, and realize voice call function, pass through the combination of video and voice, live maintenance work is instructed, meanwhile, the use of operation management system can specification offshore wind farm O&M flow, increase the security of O&M process, promote O&M efficiency.
Description
Technical field
The present invention relates to offshore wind farm fields, and specifically, the present invention is more particularly directed to a kind of marine wind electric field O&M processes
Management system for monitoring.
Background technology
Compared with land wind-powered electricity generation, offshore wind farm is big there is wind speed, and turbulivity is low, and wind direction is stablized, and effect on environment is small, no
The features such as land occupation, therefore, Devoting Major Efforts To Developing offshore wind farm, become the new trend of wind-powered electricity generation industry development.However, due to being subject to sea
The limitation of the reliability and natural conditions of upper Wind turbines in itself, the operation of marine wind electric field and maintenance difficulties bigger, it is desirable that
Higher.The features such as accessibility of marine wind electric field is poor, and O&M cost is high, and technical difficulty is big also gives operation and the dimension of marine wind electric field
Shield brings very big difficulty.
The content of the invention
In order to ensure that offshore wind farm O&M process safety successfully carries out, the present invention provides a kind of marine wind electric field O&Ms
Process monitoring manages system.
To achieve the above object, the present invention adopts the following technical scheme that:
A kind of marine wind electric field O&M process monitoring manages system, including O&M end system 1 and land monitoring center 2, institute
O&M end system 1 is stated for the monitoring of offshore wind farm Site for Unit and the command information of the land monitoring center of reception;It is described land
Monitoring center 2 is used to monitor offshore wind farm O&M process and command O&M process;
The O&M end system 1 includes video monitoring system 3, alignment system 4, the first audio communication system 5 and O&M mistake
Thread management system 6;
The video monitoring system 3, for monitoring offshore wind farm O&M process and offshore wind farm operation maintenance personnel;
The alignment system 4, for monitoring the position of offshore wind farm operation maintenance personnel in real time;
First audio communication system 5, for the voice communication between offshore wind farm operation maintenance personnel and offshore wind farm
Operation maintenance personnel and the voice communication of land monitoring center personnel receive the O&M Operating Guideline of land monitoring center personnel;
The O&M course management system 6, the O&M course management system are mounted in portable terminal, main
The equipment to O&M process, flow and safety is used to be managed;
The land monitoring center 2 includes what is be connected with the video monitoring system 3 in O&M end system 1 and alignment system 4
Video display system 10 and the second audio communication system 11 being connected with the first audio communication system 5 in O&M end system 1;
The video display system 10, for displaying scene O&M process, and the position of real-time display difference operation maintenance personnel;
Second audio communication system 11 for being contacted with live operation maintenance personnel, instructs live O&M process.
The O&M course management system 6 includes O&M device management module 7, O&M workflow management module 8 and bursting tube
Manage module 9;
The O&M device management module 7 needs the wind turbine component device for carrying out O&M for showing to go to sea every time, with
And need the O&M Work tool list carried;
The O&M workflow management module 8 for showing the flow of sea-freight dimension, and is realized laggard in a flow completion
Row punching operation;
The safety management module 9, for showing that sea-freight dimension needs the managing security tools and instruments carried and safety notice,
Operation maintenance personnel is facilitated to carry out safety inspection before going to sea.
The video monitoring system 3 include video camera, the camera arrangements at sea wind power plant per Fans difference
At position.
The alignment system 4 includes GPS positioning device.
First audio communication system 5 includes satellite phone.
The beneficial effects of the invention are as follows:Real-time video monitoring is carried out to marine wind electric field O&M process, while to O&M people
The position of member is positioned in real time, and realizes voice call function, by the combination of video and voice, to live maintenance work into
Row guidance, meanwhile, the use of operation management system can specification offshore wind farm O&M flow, increase the security of O&M process, carry
Elevator ties up efficiency.
Description of the drawings
Fig. 1 is apparatus of the present invention block diagram.
Specific embodiment
The embodiment that the present invention will be described in detail with reference to the accompanying drawings and examples.
Referring to Fig. 1, marine wind electric field O&M process monitoring management system.The system is by O&M end system 1 and land monitoring
Center 2 forms, and O&M end system 1 includes video monitoring system 3, alignment system 4, the first audio communication system 5 and O&M process
Management system 6.Land monitoring center is made of 10 and second audio communication system 11 of video display system.Video monitoring system 3
It is mainly used for monitoring offshore wind farm O&M process and offshore wind farm operation maintenance personnel, alignment system 4 is for monitoring sea turn in real time
The position of electric operation maintenance personnel, land monitoring center pass through 10 observation site O&M situation of video display system and the reality of operation maintenance personnel
When position, and pass through the second audio communication system 11 and converse with live operation maintenance personnel, O&M process is instructed.O&M process
Management system 6 can be mounted on the portable terminals such as tablet or mobile phone, by O&M device management module 7, O&M workflow management
Module 8 and 9 three parts of safety management module composition, wherein, O&M device management module 7, which shows to go to sea every time, to be needed to carry out O&M
Wind turbine component device and need the O&M Work tool list that carries, operation maintenance personnel is facilitated to check O&M work before going to sea
Utensil grasps the information of O&M parts;O&M workflow management module 8 shows the idiographic flow of sea-freight dimension, instructs O&M people
The maintenance work of member carries out in an orderly manner, and may be implemented in a flow and carry out punching operation after finishing;It is shown in safety management module 9
It shows that sea-freight dimension needs the managing security tools and instruments carried and safety notice, operation maintenance personnel is facilitated to carry out safe inspection before going to sea
It looks into.
The operation principle of the present invention is as follows:O&M end system is transported by video monitoring system 3 and 4 monitoring field of alignment system
Dimension situation, land monitoring center 2 grasps live O&M situation by video display system 10, and passes through the second audio communication system
11 instruct work on the spot.Live operation maintenance personnel carrying is equipped with the portable terminal of O&M course management system 6, O&M mistake
Thread management system 6 includes O&M device management module 7, O&M workflow management module 8, and safety management module 9 goes to sea for showing
Need to carry out the wind turbine component device of O&M, O&M Work tool, managing security tools and instruments, O&M operating process etc., specification sea
Wind-powered electricity generation O&M flow adds the security of O&M process, improves O&M efficiency.
Claims (5)
1. a kind of marine wind electric field O&M process monitoring manages system, which is characterized in that including O&M end system (1) and land prison
Measured center (2), the O&M end system (1) is for the monitoring of offshore wind farm Site for Unit and the instruction of the land monitoring center of reception
Information;The land monitoring center (2) is used to monitor offshore wind farm O&M process and command O&M process;
The O&M end system (1) includes video monitoring system (3), alignment system (4), the first audio communication system (5) and fortune
Tie up course management system (6);
The video monitoring system (3), for monitoring offshore wind farm O&M process and offshore wind farm operation maintenance personnel;
The alignment system (4), for monitoring the position of offshore wind farm operation maintenance personnel in real time;
First audio communication system (5) is transported for the voice communication between offshore wind farm operation maintenance personnel and offshore wind farm
The voice communication of dimension personnel and land monitoring center personnel receive the O&M Operating Guideline of land monitoring center personnel;
The O&M course management system (6), the O&M course management system are mounted in portable terminal, mainly
For being managed to the equipment of O&M process, flow and safety;
The land monitoring center (2) includes connecting with the video monitoring system (3) in O&M end system (1) and alignment system (4)
The video display system (10) connect and the second voice being connected with the first audio communication system (5) in O&M end system (1)
Phone system (11);
The video display system (10), for displaying scene O&M process, and the position of real-time display difference operation maintenance personnel;
Second audio communication system (11) for being contacted with live operation maintenance personnel, instructs live O&M process.
2. marine wind electric field O&M process monitoring according to claim 1 manages system, it is characterised in that:The O&M mistake
Thread management system (6) includes O&M device management module (7), O&M workflow management module (8) and safety management module (9);
The O&M device management module (7), for show every time go to sea need carry out O&M wind turbine component device and
Need the O&M Work tool list carried;
The O&M workflow management module (8) for showing the flow of sea-freight dimension, and is realized and is carried out after the completion of a flow
Punching operation;
The safety management module (9), for showing that sea-freight dimension needs the managing security tools and instruments carried and safety notice, side
Just operation maintenance personnel carries out safety inspection before going to sea.
3. marine wind electric field O&M process monitoring according to claim 1 manages system, it is characterised in that:The video prison
Control system includes video camera, and the camera arrangements are at sea at different position of the wind power plant per Fans.
4. marine wind electric field O&M process monitoring according to claim 1 manages system, it is characterised in that:The positioning system
System includes GPS positioning device.
5. marine wind electric field O&M process monitoring according to claim 1 manages system, it is characterised in that:First language
Sound phone system includes satellite phone.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711386220.2A CN108093194A (en) | 2017-12-20 | 2017-12-20 | A kind of marine wind electric field O&M process monitoring manages system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711386220.2A CN108093194A (en) | 2017-12-20 | 2017-12-20 | A kind of marine wind electric field O&M process monitoring manages system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108093194A true CN108093194A (en) | 2018-05-29 |
Family
ID=62176272
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711386220.2A Pending CN108093194A (en) | 2017-12-20 | 2017-12-20 | A kind of marine wind electric field O&M process monitoring manages system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108093194A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113125884A (en) * | 2021-04-06 | 2021-07-16 | 江苏丰能海服科技有限公司 | Operation and maintenance monitoring system for offshore wind power equipment |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104166938A (en) * | 2014-06-17 | 2014-11-26 | 北京能高自动化技术股份有限公司 | Wind power operation and maintenance command system based on mobile phone APP |
CN104329120A (en) * | 2014-10-17 | 2015-02-04 | 成都四为电子信息股份有限公司 | Tunnel construction safety monitoring and management system and tunnel construction safety monitoring and management method |
CN104850816A (en) * | 2015-06-05 | 2015-08-19 | 中国电力科学研究院 | IPv6-based video monitoring and radio frequency identification two-dimensional code system in transformer station inspection |
CN105005861A (en) * | 2015-07-17 | 2015-10-28 | 中国能源建设集团广东省电力设计研究院有限公司 | Operation regulation and control system for offshore wind farm |
CN106097148A (en) * | 2016-06-21 | 2016-11-09 | 国家电网公司 | A kind of Utilities Electric Co.'s emergency command and on-site examination system and checking method |
US20170026893A1 (en) * | 2004-11-03 | 2017-01-26 | The Wilfred J. And Louisette G. Lagassey Irrevocable Trust, Roger J. Morgan, Trustee | Modular intelligent transportation system |
CN207732874U (en) * | 2017-12-20 | 2018-08-14 | 华能国际电力股份有限公司 | A kind of marine wind electric field O&M process monitoring managing device |
-
2017
- 2017-12-20 CN CN201711386220.2A patent/CN108093194A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20170026893A1 (en) * | 2004-11-03 | 2017-01-26 | The Wilfred J. And Louisette G. Lagassey Irrevocable Trust, Roger J. Morgan, Trustee | Modular intelligent transportation system |
CN104166938A (en) * | 2014-06-17 | 2014-11-26 | 北京能高自动化技术股份有限公司 | Wind power operation and maintenance command system based on mobile phone APP |
CN104329120A (en) * | 2014-10-17 | 2015-02-04 | 成都四为电子信息股份有限公司 | Tunnel construction safety monitoring and management system and tunnel construction safety monitoring and management method |
CN104850816A (en) * | 2015-06-05 | 2015-08-19 | 中国电力科学研究院 | IPv6-based video monitoring and radio frequency identification two-dimensional code system in transformer station inspection |
CN105005861A (en) * | 2015-07-17 | 2015-10-28 | 中国能源建设集团广东省电力设计研究院有限公司 | Operation regulation and control system for offshore wind farm |
CN106097148A (en) * | 2016-06-21 | 2016-11-09 | 国家电网公司 | A kind of Utilities Electric Co.'s emergency command and on-site examination system and checking method |
CN207732874U (en) * | 2017-12-20 | 2018-08-14 | 华能国际电力股份有限公司 | A kind of marine wind electric field O&M process monitoring managing device |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113125884A (en) * | 2021-04-06 | 2021-07-16 | 江苏丰能海服科技有限公司 | Operation and maintenance monitoring system for offshore wind power equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103729737B (en) | A kind of wind power plant O&M based on image stream treatment technology supports system | |
CN106547814A (en) | A kind of power transmission line unmanned machine patrols and examines the structuring automatic archiving method of image | |
CN103488160B (en) | Transformer station's real-time monitoring system | |
CN104065163A (en) | Intelligent substation warning message delivering method | |
CN102665067A (en) | Equipment area and equipment object oriented substation video monitoring method and system | |
CN111105049A (en) | Distribution network emergency repair system and method based on intelligent Internet of things | |
CN106771874B (en) | Power transmission line lightning shielding fault location monitoring system and monitoring method | |
CN104966140B (en) | The mobile engineer station of power grid work compound | |
CN103901866A (en) | Wind power plant operation and maintenance supporting system | |
CN110568310A (en) | Visual online monitoring system for power transmission line | |
CN113625748A (en) | Substation unmanned aerial vehicle inspection route planning method | |
CN108093194A (en) | A kind of marine wind electric field O&M process monitoring manages system | |
CN207732874U (en) | A kind of marine wind electric field O&M process monitoring managing device | |
CN108649695A (en) | A kind of intelligent inspection system based on intelligent robot | |
CN207573539U (en) | A kind of on-line monitoring equipment in current conversion station valve hall | |
CN102572394A (en) | System and method for patrolling track of electric power circuit | |
CN103559652A (en) | Communication work-ticket management system based on unattended substation and operation method of communication work-ticket management system | |
CN105611247B (en) | Visualized operation whole process supervision method | |
CN112130732A (en) | Remote guidance method for frozen screen annotation in instant messaging process | |
CN203120063U (en) | Wireless mobile video monitoring device for cage guide of vertical shaft hoist | |
CN203204157U (en) | Distribution network fault emergency repair positioning system of electrical power system | |
CN107527082A (en) | A kind of electric power tunnel management system based on Cloud Server and mobile terminal | |
CN102828622A (en) | Visual device of concrete pump truck | |
CN102495898A (en) | state online detection data template generation association method and device for power grid device | |
KR20180000182A (en) | Mobile Terminal for Maintaining Wind Power Generator and Maintaining Method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20180529 |
|
WD01 | Invention patent application deemed withdrawn after publication |