CN108091409A - A kind of nuclear emergency set state diagnosis and the comprehensive estimation method of damage sequence - Google Patents

A kind of nuclear emergency set state diagnosis and the comprehensive estimation method of damage sequence Download PDF

Info

Publication number
CN108091409A
CN108091409A CN201711219056.6A CN201711219056A CN108091409A CN 108091409 A CN108091409 A CN 108091409A CN 201711219056 A CN201711219056 A CN 201711219056A CN 108091409 A CN108091409 A CN 108091409A
Authority
CN
China
Prior art keywords
ring
rings
core
tricyclic
estimation method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711219056.6A
Other languages
Chinese (zh)
Other versions
CN108091409B (en
Inventor
高敬东
刘泽林
刘国华
林加镇
朱晓军
张晓艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China General Nuclear Power Corp
CGN Power Co Ltd
Daya Bay Nuclear Power Operations and Management Co Ltd
Original Assignee
China General Nuclear Power Corp
CGN Power Co Ltd
Daya Bay Nuclear Power Operations and Management Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China General Nuclear Power Corp, CGN Power Co Ltd, Daya Bay Nuclear Power Operations and Management Co Ltd filed Critical China General Nuclear Power Corp
Priority to CN201711219056.6A priority Critical patent/CN108091409B/en
Publication of CN108091409A publication Critical patent/CN108091409A/en
Application granted granted Critical
Publication of CN108091409B publication Critical patent/CN108091409B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21DNUCLEAR POWER PLANT
    • G21D3/00Control of nuclear power plant
    • G21D3/04Safety arrangements
    • G21D3/06Safety arrangements responsive to faults within the plant
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin

Landscapes

  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Plasma & Fusion (AREA)
  • General Engineering & Computer Science (AREA)
  • High Energy & Nuclear Physics (AREA)
  • Monitoring And Testing Of Nuclear Reactors (AREA)

Abstract

The present invention is suitable for the emergence technology field at million kilowatt nuclear power station, provides a kind of diagnosis of nuclear emergency set state and the comprehensive estimation method of damage sequence, and nuclear emergency unit is divided into N rings from inside to outside since the reactor core, the described method comprises the following steps:Judge second ring whether cut, then perform next step in this way, otherwise strengthen monitoring;Judge whether the cut is happened in containment, then perform next step in this way, otherwise judge that Fourth Ring to N rings have exception;Persistently judge whether the tricyclic has abnormal leakage, then directly warning Fourth Ring to N rings have exception in this way, and strengthen monitoring;Otherwise containment pressure parameter is paid close attention to, until pressure reaches preset value, containment leak rate is set, Fourth Ring to N rings is warned to have exception from this moment on, while strengthen monitoring.The present invention realizes polycyclic joint and derives, while realizes energy automatic error-correcting after a ring or polycyclic mistaken diagnosis, has greatly reinforced the analysis and early warning of nuclear accident consequence.

Description

A kind of nuclear emergency set state diagnosis and the comprehensive estimation method of damage sequence
Technical field
The invention belongs to the emergence technology field at million kilowatt nuclear power station, more particularly to a kind of nuclear emergency set state is examined The disconnected comprehensive estimation method with damage sequence.
Background technology
In the prior art, the condition diagnosing of PWR nuclear power plant unit and damage sequence comprehensive assessment only from respective level into The local assessment of row, assessment result is more unilateral, and there are certain limiting, effectively nuclear accident consequence can not be analyzed And early warning, and then can not ensure the safe and stable operation of PWR nuclear power plant unit.
The content of the invention
It is an object of the invention to provide a kind of diagnosis of nuclear emergency set state and the comprehensive estimation method of damage sequence, purport The condition diagnosing of PWR nuclear power plant unit of the prior art and damage sequence comprehensive assessment are being solved because only from respective level It carries out local assessment and there is technical issues that.
The present invention is achieved in that a kind of nuclear emergency set state diagnosis and the comprehensive estimation method of damage sequence, will Nuclear emergency unit is divided into N rings since the reactor core from inside to outside, wherein, N is more than 3 for positive integer and N, and the first ring is reactor core, and second Ring is primary Ioops pressure boundary, and tricyclic is containment;The nuclear emergency set state diagnosis and the comprehensive assessment of damage sequence Method comprises the following steps:
Step A, judge second ring whether cut, then perform next step in this way, otherwise strengthen monitoring;
Step B, judge whether the cut is happened in containment, then perform next step in this way, otherwise judge the 4th Ring to N rings have exception;
Step C, persistently judge whether the tricyclic has abnormal leakage, then directly warning Fourth Ring to N rings have in this way It is abnormal, and strengthen monitoring;Otherwise containment pressure parameter is paid close attention to, until pressure reaches preset value, while containment leak is set Rate warns Fourth Ring to N rings to have exception from this moment on, while strengthens monitoring.
Further, in the step C, persistently judge that first ring is while the lasting monitoring tricyclic It is no to have exception.
Further, if reaching reactor core breakage rank according to core exit temperature and the judgement of containment dosage rate measured value Section, then no matter whether the tricyclic is abnormal, and Fourth Ring is directly warned to strengthen to N rings and is monitored, monitored results and described the Tricyclic linkage judges;If core exit temperature and the judgement of containment dosage rate measured value reach the core meltdown stage, directly set Containment pressure is put as 5bar, and directly early warning Fourth Ring is or at once abnormal to N rings.
Further, if integrated according to break size, primary Ioops injection, dehydrating speed and safety devices operating condition pre- It surveys first ring and reaches dew naked stage, then from this moment to directly predicting that Fourth Ring is normal to N rings from exposed time point, but need Monitoring is need to strengthen, monitored results judge with tricyclic linkage;From exposed time point to future, directly Fourth Ring is predicted extremely N rings are abnormal.
Further, the linkage judgment rule is:If the tricyclic leaks extremely, Fourth Ring to N rings can It can be abnormal;If Fourth Ring to N rings survey exception, the tricyclic must leak.
Further, the linkage judgment rule is:If the tricyclic leaks extremely, Fourth Ring to N rings can It can be abnormal;If Fourth Ring to N rings survey exception, the tricyclic must leak.
Further, using the degree of impairment of the first ring described in rational judgment, determination methods are:If primary Ioops iodine 131 Equivalent activity value is less than 4.4GBq/t, then judges clean primary Ioops;If primary Ioops iodine 131 equivalent activity value is equal to 4.4GBq/ T then judges ten fuel rod breakages;If primary Ioops iodine 131 equivalent activity value is equal to 37GBq/t, 100 fuel are judged Stick is damaged.
Further, the method for judging the reactor core damaged stage according to core exit temperature is:If core exit temperature is small In 700 DEG C, then judge that no reactor core is damaged;If core exit temperature is more than 700 DEG C and less than 1100 DEG C, judge that involucrum is broken Damage;If core exit temperature is more than 1100 DEG C and less than 1200 DEG C, core meltdown is judged.
Further, the method for judging the reactor core damaged stage according to containment dosage rate measured value is:If full shell dosage Rate is less than 0.02Gy/h, then judges that no reactor core is damaged;If full shell dosage rate is more than 0.02Gy/h in 1h and less than 500Gy/ H then judges clad failure;If full shell dosage rate is more than 0.02Gy/h in 1h to 6h and less than 100Gy/h, involucrum is judged It is damaged;If full shell dosage rate is more than 0.02Gy/h in 6h to 5d and less than 50Gy/h, clad failure is judged;If full shell Dosage rate was more than 0.02Gy/h in 5d to one month and less than 10Gy/h, then judged clad failure;If full shell dosage rate exists It is more than 0.02Gy/h after one month and less than 5Gy/h, then judges clad failure;If full shell dosage rate is more than in 1h 500Gy/h then judges core meltdown;If full shell dosage rate is more than 100Gy/h in 1h to 6h, core meltdown is judged;Such as The full shell dosage rate of fruit is more than 50Gy/h in 6h to 5d, then judges core meltdown;If full shell dosage rate is in 5d to one month More than 10Gy/h, then core meltdown is judged;If full shell dosage rate is more than 5Gy/h after one month, core meltdown is judged.
Further, the N is equal to 7.
Further, Fourth Ring is 500 meters of reactor building periphery, by the form of manual measurement, in the reactor 500 meters of workshop periphery monitors its radioactivity, and the journey of the reliability of the tricyclic and radioactive transfer is derived with measurement data Degree.
Further, five rings is 500 meters to 5 kilometers of the reactor building periphery, is popped one's head in by using fixed r, thing Therefore consequences analysis system and the form of on-line monitoring vehicle patrol supplement the deficiency of the Fourth Ring personal monitoring.
Further, the 6th ring is 5 kilometers to 10 kilometers of the reactor building periphery, by the way of fixed r probes And the accident consequence analysis network analysis radiation diffusion process, it is popped one's head in by the fixed r of the five rings and the 6th ring It counter can also push away the tricyclic and the radioactive transfer degree at Fourth Ring.
Further, the 7th ring is outside 10 kilometers of the reactor building periphery, using the accident consequence analysis system System analyzing radiation diffusion process.
Implement a kind of nuclear emergency set state diagnosis of the present invention and the comprehensive estimation method of damage sequence, have with following Beneficial effect:Its by the way that nuclear emergency unit is divided into N rings from inside to outside since the reactor core, wherein, N is more than 3 for positive integer and N, the One ring is reactor core, and the second ring is primary Ioops pressure boundary, and tricyclic is containment;Simultaneously using following steps:Judge described Two rings whether cut, then perform next step in this way, otherwise strengthen monitoring;Judge whether the cut is happened in containment, Next step is then performed in this way, otherwise judges that Fourth Ring to N rings have exception;Persistently judge whether the tricyclic has abnormal let out Leakage, then directly warning Fourth Ring to N rings have exception in this way, and strengthen monitoring;Otherwise containment pressure parameter is paid close attention to, until pressure Power reaches preset value, while sets containment leak rate, and Fourth Ring to N rings is warned to have exception from this moment on, are strengthened simultaneously Monitoring it is thus achieved that polycyclic joint derives, while realizes energy automatic error-correcting after a ring or polycyclic mistaken diagnosis, has greatly reinforced core thing Therefore the analysis of consequence and early warning.
Description of the drawings
It to describe the technical solutions in the embodiments of the present invention more clearly, below will be to needed in the embodiment Attached drawing is briefly described, it should be apparent that, the accompanying drawings in the following description is only some embodiments of the present invention, for ability For the those of ordinary skill of domain, without creative efforts, it can also be obtained according to these attached drawings other attached Figure.
Fig. 1 is nuclear emergency set state diagnosis provided in an embodiment of the present invention and the comprehensive estimation method flow of damage sequence Figure.
Specific embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, with reference to the accompanying drawings and embodiments, it is right The present invention is further elaborated.It should be appreciated that specific embodiment described herein is only to explain the present invention, not For limiting the present invention.
It should be noted that when component is referred to as " being fixed on " or " being arranged at " another component, it can directly or It is connected on another component.When a component is referred to as " being connected to " another component, it can directly or indirectly be connected It is connected on another component.The orientation or position relationship of the instructions such as term " on ", " under ", "left", "right" is based on attached drawing institutes The orientation or position relationship shown is for only for ease of description rather than instruction or implies that signified device or element must have Specific orientation, with specific azimuth configuration and operation, therefore it is not intended that limitation to this patent.Term " first ", " the Two " are used merely to facilitate description purpose, and it is not intended that instruction or implying relative importance or implicit indicating technical characteristic Quantity." multiple " are meant that two or more, unless otherwise specifically defined.
As shown in Figure 1, nuclear emergency set state diagnosis provided in an embodiment of the present invention and the comprehensive assessment side of damage sequence Nuclear emergency unit is divided into N rings since the reactor core by method from inside to outside, wherein, N is more than 3 for positive integer and N, and the first ring is heap Core, the second ring are primary Ioops pressure boundary, and tricyclic is containment.The nuclear emergency set state diagnosis of the embodiment of the present invention and thing Therefore the comprehensive estimation method of consequence comprises the following steps:
S1, judge the second ring whether cut, then perform next step in this way, otherwise strengthen monitoring;
S2, judge whether cut is happened in containment, then perform next step in this way, otherwise judge Fourth Ring to N Ring has exception;
S3, persistently judge whether tricyclic has abnormal leakage, then directly warning Fourth Ring to N rings have exception in this way, and Strengthen monitoring;Otherwise containment pressure parameter is paid close attention to, until pressure reaches preset value, while containment leak rate is set, from this Start at quarter that Fourth Ring to N rings is warned to have exception, while strengthen monitoring.
The embodiment of the present invention analyzes this all need of N rings by the way that nuclear emergency unit is divided into N rings since the reactor core from inside to outside The attribute and data wanted, be divided into can with the data of automatic collection and the data manually gathered, by the attribute of this N ring and data into Row joint assessment realizes that polycyclic joint derives, while realizes energy automatic error-correcting after a ring or polycyclic mistaken diagnosis, has greatly reinforced core thing Therefore the analysis of consequence and early warning.
Preferably, in one embodiment of the invention, N is equal to 7, i.e., by nuclear emergency unit since the reactor core from inside to outside It is divided into 7 rings.Specifically, in the present embodiment, the first ring, the second ring and tricyclic are in the evolution of initial event, usually Triggering cut by the second ring, break location can be in containment, at the top of heat pipe section, cold leg and voltage-stablizer;Cut Outside position or containment, such as steam generator.Wherein, 10 kinds of common initial events of presurized water reactor include:Various dehydrations Accident, the anticipated transient for failing emergency shut-down, reactor coolant loop transient state, secondary coolant circuit system transient state, secondary coolant circuit system pipe Road rupture, steam generator tube rupture lose power source (power supply, compressed air source), lose whole hot traps, total loss Steam generator feeds water and the whole AC powers of forfeiture.
Further, in the present embodiment, first determine whether the second ring whether cut, if it is judge whether cut occurs In containment, otherwise strengthen monitoring.
Further, if the second ring cut is happened in containment, whole process shows radioactive transfer with animation form And prealarming process, while persistently judge whether tricyclic has abnormal leakage.If tricyclic has abnormal leak and directly to air Leakage, then directly warning Fourth Ring, five rings, the 6th ring and the 7th ring have exception, while strengthen monitoring;If tricyclic has different It often leaks and is leaked to auxiliary plant, then monitoring is strengthened in early warning, and directly warns auxiliary plant, Fourth Ring, five rings, the 6th ring There is exception with the 7th ring.Wherein, the feature of the 3rd circumferential auxiliary plant leakage is the second ring cut, and containment pressure is not up to 5bar.If containment pressure parameter is paid close attention in tricyclic leakage without exception, until pressure reaches 5bar, containment is set to let out Leak rate is 0.3%, and Fourth Ring, five rings, the 6th ring and the 7th ring is warned to have exception from this moment on, while strengthens monitoring.
In addition, persistently judge whether the first ring has exception while lasting monitoring tricyclic.If according to core exit Temperature and the judgement of containment dosage rate measured value reach the reactor core damaged stage, then no matter whether tricyclic is abnormal, directly warn the Fourth Ring, five rings, the 6th ring and the 7th ring strengthen monitoring, and monitored results judge with tricyclic linkage.Linkage judgment rule be: If tricyclic leaks extremely, Fourth Ring, five rings, the 6th ring and the 7th ring may be abnormal;If Fourth Ring, five rings, 6th ring and the actual measurement of the 7th ring are abnormal, then tricyclic must leak.If core exit temperature and containment dosage rate measured value are sentenced Disconnected to reach the core meltdown stage, then it is 5bar directly to set containment pressure, and directly early warning Fourth Ring, five rings, the 6th ring It is or at once abnormal with the 7th ring.
If according to integrated forecastings first such as break size, primary Ioops injection, dehydrating speed and safety devices operating conditions Ring reaches dew naked stage, then from directly predicting Fourth Ring, five rings, the 6th ring and the 7th ring just to from exposed time point this moment Often, but need to strengthen monitoring, monitored results judge with tricyclic linkage.Linkage judgment rule be:If tricyclic is let out extremely Leakage, then Fourth Ring, five rings, the 6th ring and the 7th ring may be abnormal;If Fourth Ring, five rings, the 6th ring and the 7th ring are real Exception is surveyed, then tricyclic must leak.From exposed time point to future, Fourth Ring, five rings, the 6th ring and the 7th ring are directly predicted It is abnormal.
Further, if cut is happened at outside containment, whole process shows that radioactivity is moved with animation form in upper figure Shifting and prealarming process.When cut is happened at the auxiliary plant outside containment, direct animation form is shown in auxiliary plant region Monitoring is strengthened in radioactivity disperse and early warning, while directly auxiliary plant, Fourth Ring, five rings, the 6th ring and the 7th ring is warned to have It is abnormal.If cut is happened at steam generator, direct animated show secondary circuit radioactivity disperse, and directly prison is strengthened in warning Control.If steam generator cut and superposition steam line break, direct early warning Fourth Ring, five rings, the 6th ring and the 7th Ring is abnormal.
Further, in the present embodiment, using primary Ioops iodine 131 equivalent activity, which is given by daily chemical sampling Go out, in nuclear accident using the daily sampled data, for the degree of impairment of current first ring of rational judgment, determination methods For:If primary Ioops iodine 131 equivalent activity value is less than 4.4GBq/t, clean primary Ioops are judged;If primary Ioops iodine 131 equivalent Activity value is equal to 4.4GBq/t, then judges ten fuel rod breakages;If primary Ioops iodine 131 equivalent activity value is equal to 37GBq/t, Then judge 100 fuel rod breakages.
Further, in another embodiment of the present invention, when the alarm of equipment level-one and secondary alarm and reactor core temperature Degree is less than 650 degree, can qualitatively judge, fuel begins with breakage, in the case of further rational judgment is by chemical sampling accident Primary Ioops iodine 131 equivalent activity and according to above-described embodiment qualitatively judge degree of injury.
Further, in another embodiment of the present invention, reactor core damaged stage, tool are judged according to core exit temperature Body method is:If core exit temperature is less than 700 DEG C, judge that no reactor core is damaged;If core exit temperature is more than 700 DEG C And less than 1100 DEG C, then judge clad failure;If core exit temperature is more than 1100 DEG C and less than 1200 DEG C, reactor core is judged Fusing.
Further, in another embodiment of the present invention, reactor core breakage is judged according to containment dosage rate measured value Stage, specific method are:If full shell dosage rate is less than 0.02Gy/h, judge that no reactor core is damaged;If full shell dosage rate exists It is more than 0.02Gy/h in 1h and less than 500Gy/h, then judges clad failure;If full shell dosage rate is more than in 1h to 6h 0.02Gy/h and less than 100Gy/h, then judge clad failure;If full shell dosage rate is more than 0.02Gy/h and small in 6h to 5d In 50Gy/h, then clad failure is judged;If full shell dosage rate was more than 0.02Gy/h in 5d to one month and is less than 10Gy/h, Then judge clad failure;If full shell dosage rate is more than 0.02Gy/h and after one month less than 5Gy/h, judge that involucrum is broken Damage;If full shell dosage rate is more than 500Gy/h in 1h, core meltdown is judged;If full shell dosage rate is big in 1h to 6h In 100Gy/h, then core meltdown is judged;If full shell dosage rate is more than 50Gy/h in 6h to 5d, core meltdown is judged;Such as The full shell dosage rate of fruit was more than 10Gy/h in 5d to one month, then judged core meltdown;If full shell dosage rate one month it It is more than 5Gy/h afterwards, then judges core meltdown.
Further, judge that method of the cut in containment is:Reactor coolant loop pressure reduces;Underheat degree subtracts It is small;Voltage-stablizer water level decreasing;Pressure vessel water level may decline;Pressure and temperature increases in reactor building;Reactor building Water level occurs and then increases in melt pit;Reactor Spent Fuel Pool cools down and handles water level in water tank and reduces;In fuel degradation feelings Dosage rate increases in reactor building under condition.
Further, judge that method of the cut in voltage-stablizer discharge line is:The temperature of voltage-stablizer discharge line upstream Rapid rising or the temperature equal to voltage-stablizer (liquid phase or vapour phase).Judge that method of the cut on voltage-stablizer is:It is each in voltage-stablizer The probe of measurement water level may cause water level measurements to occur relatively large deviation between each other because of the interference of vapor.
Further, judge that method of the cut outside containment is:Underheat degree reduces;Voltage-stablizer water level decreasing;Pressure is held Device water level may decline;The ginseng of parameter (pressure, temperature, dosage rate and melt pit water level) or secondary coolant circuit system in reactor building Number does not change;It may the increase of melt pit water level of impacted position (such as fuel plant or nuclear auxiliary building) and the increasing of dosage rate Add, it can be identified that the rupture outside reactor building.
Further, judge that method of the cut on steam generator heat-transfer pipe is:On steam generator steam pipe line Activity increases;Activity increase before reactor building isolation stage 2 in steam generator blowdown system;Condenser vacuum system Activity increases.
Further, in one embodiment of the invention, it is natural leak if containment is complete.If Leak path is directly leaked to environment from reactor building, then not collect leakage, such as reactor building penetration piece (penetration piece Compartment) isolated failure;Or cause being switched to the cooling of recirculation mode reactor Spent Fuel Pool and handling isolated part failure Radioactive substance is discharged by water tank discharge duct;Or in the event of steam generator tube rupture steam generator valve Barrier or possible steam line break.If ventilation and filtration system treated reactor building is interior and reactor around factory Leakage between room, then to collect leakage, such as one penetration piece isolated failure of reactor building;Or it is connected with primary Ioops system A circuit on there is cut.
Further, the assessment of reactor building leakproofness and the definite foundation of leakage paths exist:Reactor building is isolated The 1st stage of system and the 2nd stage isolation signals isolate reactor building penetration piece the detailed analysis of situation;Consider ventilation blower fortune To the analysis of the activity measurement value in relation to system under row operating mode;The systematicness of " sensitive penetration piece " is monitored;It is radiated using plant area Property monitoring system and environment measurement obtain the monitoring data that measured value and related equipment provide.
Further, in one embodiment of the invention, it is right using online probe and thermal-hydraulic parameter determination methods First ring, the second ring and tricyclic use the degree and radioactive transfer mistake of dynamic animation effect real-time exhibition nuclear accident generation Journey.
Wherein, Fourth Ring is 500 meters of reactor building periphery, by the form of manual measurement, on reactor building periphery 500 monitor its radioactivity, and the degree of the reliability of tricyclic and radioactive transfer is derived with measurement data.Five rings is reaction 500 meters to 5 kilometers of heap workshop periphery, by using fixed r probes, accident consequence analysis system and on-line monitoring vehicle patrol Form supplements the deficiency of Fourth Ring personal monitoring.6th ring is 5 kilometers to 10 kilometers of reactor building periphery, using fixed r The mode of probe and accident consequence analysis network analysis radiation diffusion process, are popped one's head in by the fixation r of five rings and the 6th ring It can the anti-radioactive transfer degree for pushing away tricyclic and Fourth Ring.7th ring is outside 10 kilometers of reactor building periphery, is used Accident consequence analysis network analysis radiates diffusion process, belongs to pure prediction content.
The method that the embodiment of the present invention is verified mutually by seven rings can more accurately judge the shape of the preceding tricyclic of nuclear accident State and radioactive transfer process.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention All any modification, equivalent and improvement made within refreshing and principle etc., should all be included in the protection scope of the present invention.

Claims (14)

1. a kind of nuclear emergency set state diagnosis and the comprehensive estimation method of damage sequence, which is characterized in that by nuclear emergency unit It is divided into N rings from inside to outside since the reactor core, wherein, N is more than 3 for positive integer and N, and the first ring is reactor core, and the second ring is primary Ioops Pressure boundary, tricyclic are containment;The comprehensive estimation method of nuclear emergency set state diagnosis and damage sequence include with Lower step:
Step A, judge second ring whether cut, then perform next step in this way, otherwise strengthen monitoring;
Step B, judge whether the cut is happened in containment, then perform next step in this way, otherwise judge Fourth Ring extremely N rings have exception;
Step C, persistently judge whether the tricyclic has abnormal leakage, then directly warning Fourth Ring to N rings have exception in this way, And strengthen monitoring;Otherwise containment pressure parameter is paid close attention to, until pressure reaches preset value, while containment leak rate is set, from Start that Fourth Ring to N rings is warned to have exception this moment, while strengthen monitoring.
2. nuclear emergency set state diagnosis as described in claim 1 and the comprehensive estimation method of damage sequence, which is characterized in that In the step C, persistently judge whether first ring has exception while the lasting monitoring tricyclic.
3. nuclear emergency set state diagnosis as claimed in claim 2 and the comprehensive estimation method of damage sequence, which is characterized in that If reaching the reactor core damaged stage according to core exit temperature and the judgement of containment dosage rate measured value, no matter the tricyclic It is whether abnormal, Fourth Ring is directly warned to strengthen to N rings and is monitored, monitored results judge with tricyclic linkage;If heap Core outlet temperature and the judgement of containment dosage rate measured value reach the core meltdown stage, and it is 5bar directly to set containment pressure, And directly early warning Fourth Ring is or at once abnormal to N rings.
4. nuclear emergency set state diagnosis as claimed in claim 2 and the comprehensive estimation method of damage sequence, which is characterized in that If reached according to the first ring described in break size, primary Ioops injection, dehydrating speed and safety devices operating condition integrated forecasting Reveal the naked stage, then from this moment to directly predicting that Fourth Ring is normal to N rings from exposed time point, but need to strengthen monitoring, prison Result is controlled with tricyclic linkage to judge;From exposed time point to future, directly predict that Fourth Ring is abnormal to N rings.
5. nuclear emergency set state diagnosis as claimed in claim 3 and the comprehensive estimation method of damage sequence, which is characterized in that It is described linkage judgment rule be:If the tricyclic leaks extremely, Fourth Ring to N rings may be abnormal;If Fourth Ring Exception is surveyed to N rings, then the tricyclic must leak.
6. nuclear emergency set state diagnosis as claimed in claim 4 and the comprehensive estimation method of damage sequence, which is characterized in that It is described linkage judgment rule be:If the tricyclic leaks extremely, Fourth Ring to N rings may be abnormal;If Fourth Ring Exception is surveyed to N rings, then the tricyclic must leak.
7. nuclear emergency set state diagnosis as claimed in claim 3 and the comprehensive estimation method of damage sequence, which is characterized in that Using the degree of impairment of the first ring described in rational judgment, determination methods are:If primary Ioops iodine 131 equivalent activity value is less than 4.4GBq/t then judges clean primary Ioops;If primary Ioops iodine 131 equivalent activity value is equal to 4.4GBq/t, ten combustions are judged Charge bar is damaged;If primary Ioops iodine 131 equivalent activity value is equal to 37GBq/t, 100 fuel rod breakages are judged.
8. nuclear emergency set state diagnosis as claimed in claim 3 and the comprehensive estimation method of damage sequence, which is characterized in that The method for judging the reactor core damaged stage according to core exit temperature is:If core exit temperature is less than 700 DEG C, no heap is judged Core is damaged;If core exit temperature is more than 700 DEG C and less than 1100 DEG C, clad failure is judged;If core exit temperature More than 1100 DEG C and less than 1200 DEG C, then core meltdown is judged.
9. nuclear emergency set state diagnosis as claimed in claim 3 and the comprehensive estimation method of damage sequence, which is characterized in that The method for judging the reactor core damaged stage according to containment dosage rate measured value is:If full shell dosage rate is less than 0.02Gy/h, Judge that no reactor core is damaged;If full shell dosage rate is more than 0.02Gy/h in 1h and less than 500Gy/h, clad failure is judged; If full shell dosage rate is more than 0.02Gy/h in 1h to 6h and less than 100Gy/h, clad failure is judged;If full shell dosage Rate is more than 0.02Gy/h in 6h to 5d and less than 50Gy/h, then judges clad failure;If full shell dosage rate is at 5d to one It is more than 0.02Gy/h in month and less than 10Gy/h, then judges clad failure;If full shell dosage rate is more than after one month 0.02Gy/h and less than 5Gy/h, then judge clad failure;If full shell dosage rate is more than 500Gy/h in 1h, reactor core is judged Fusing;If full shell dosage rate is more than 100Gy/h in 1h to 6h, core meltdown is judged;If full shell dosage rate in 6h extremely It is more than 50Gy/h in 5d, then judges core meltdown;If full shell dosage rate was more than 10Gy/h in 5d to one month, heap is judged Core melts;If full shell dosage rate is more than 5Gy/h after one month, core meltdown is judged.
10. nuclear emergency set state diagnosis as described in any one of claim 1 to 9 and the comprehensive estimation method of damage sequence, It is characterized in that, the N is equal to 7.
11. nuclear emergency set state diagnosis as claimed in claim 10 and the comprehensive estimation method of damage sequence, feature exist In Fourth Ring is 500 meters of reactor building periphery, by the form of manual measurement, in described 500 meters of prisons in reactor building periphery Its radioactivity is controlled, the degree of the reliability of the tricyclic and radioactive transfer is derived with measurement data.
12. nuclear emergency set state diagnosis as claimed in claim 11 and the comprehensive estimation method of damage sequence, feature exist In five rings is 500 meters to 5 kilometers of the reactor building periphery, is popped one's head in by using fixed r, accident consequence analysis system The deficiency of the Fourth Ring personal monitoring is supplemented with the form of on-line monitoring vehicle patrol.
13. nuclear emergency set state diagnosis as claimed in claim 12 and the comprehensive estimation method of damage sequence, feature exist In, the 6th ring be 5 kilometers to 10 kilometers of the reactor building periphery, by the way of fixed r probes and the damage sequence Analysis system analyzing radiation diffusion process counter can also be pushed away described by the fixed r probes at the five rings and the 6th ring Tricyclic and the radioactive transfer degree at Fourth Ring.
14. nuclear emergency set state diagnosis as claimed in claim 13 and the comprehensive estimation method of damage sequence, feature exist In the 7th ring is outside 10 kilometers of the reactor building periphery, is radiated and spread using the accident consequence analysis network analysis Process.
CN201711219056.6A 2017-11-28 2017-11-28 A kind of comprehensive estimation method of nuclear emergency set state diagnosis and damage sequence Active CN108091409B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711219056.6A CN108091409B (en) 2017-11-28 2017-11-28 A kind of comprehensive estimation method of nuclear emergency set state diagnosis and damage sequence

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711219056.6A CN108091409B (en) 2017-11-28 2017-11-28 A kind of comprehensive estimation method of nuclear emergency set state diagnosis and damage sequence

Publications (2)

Publication Number Publication Date
CN108091409A true CN108091409A (en) 2018-05-29
CN108091409B CN108091409B (en) 2019-09-27

Family

ID=62173011

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711219056.6A Active CN108091409B (en) 2017-11-28 2017-11-28 A kind of comprehensive estimation method of nuclear emergency set state diagnosis and damage sequence

Country Status (1)

Country Link
CN (1) CN108091409B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108989744A (en) * 2018-06-29 2018-12-11 岭东核电有限公司 Million kilowatt nuclear power station emergency command monitoring method, device and terminal device
CN109215286A (en) * 2018-08-27 2019-01-15 中广核工程有限公司 The fire-disaster monitoring device and its fire hazard monitoring circuit of nuclear power station
CN110689973A (en) * 2019-09-18 2020-01-14 上海电力大学 Nuclear power station primary circuit pressure reduction control method under heat transfer pipe fracture accident
CN110991006A (en) * 2019-11-06 2020-04-10 中国辐射防护研究院 Core damage evaluation method for large LOCA accident of pressurized water reactor based on exposure time
CN112414472A (en) * 2020-12-03 2021-02-26 深圳中广核工程设计有限公司 Safety barrier integrity judging method, device, control equipment and storage medium
CN112652415A (en) * 2020-12-01 2021-04-13 中国辐射防护研究院 Post-processing plant emergency state grading determination method based on characteristic parameter analysis
CN112687410A (en) * 2021-01-26 2021-04-20 三门核电有限公司 Diagnosis method for large-range damage accident of passive pressurized water reactor nuclear power plant

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1881480A (en) * 2005-06-13 2006-12-20 大亚湾核电运营管理有限责任公司 Method for realizing equipment safety monitoring utilizing transient statistic
KR100827567B1 (en) * 2006-10-31 2008-05-07 한국전력공사 Core monitoring methodology for nuclear power plant without reactor vessel level indication system
CN101217064A (en) * 2007-12-27 2008-07-09 大亚湾核电运营管理有限责任公司 A fatal accident disposal for improved type gigawatt-level PWR nuclear power plant

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1881480A (en) * 2005-06-13 2006-12-20 大亚湾核电运营管理有限责任公司 Method for realizing equipment safety monitoring utilizing transient statistic
KR100827567B1 (en) * 2006-10-31 2008-05-07 한국전력공사 Core monitoring methodology for nuclear power plant without reactor vessel level indication system
CN101217064A (en) * 2007-12-27 2008-07-09 大亚湾核电运营管理有限责任公司 A fatal accident disposal for improved type gigawatt-level PWR nuclear power plant

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
《管道完整性管理技术》编委会编: "《管道完整性管理技术》", 31 December 2011, 石油工业出版社 *
杨玲等: "大亚湾核电站应急状态下的事故评价", 《辐射防护》 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108989744A (en) * 2018-06-29 2018-12-11 岭东核电有限公司 Million kilowatt nuclear power station emergency command monitoring method, device and terminal device
CN109215286A (en) * 2018-08-27 2019-01-15 中广核工程有限公司 The fire-disaster monitoring device and its fire hazard monitoring circuit of nuclear power station
CN110689973A (en) * 2019-09-18 2020-01-14 上海电力大学 Nuclear power station primary circuit pressure reduction control method under heat transfer pipe fracture accident
CN110689973B (en) * 2019-09-18 2023-04-28 上海电力大学 Nuclear power station primary loop depressurization control method under heat transfer pipe rupture accident
CN110991006A (en) * 2019-11-06 2020-04-10 中国辐射防护研究院 Core damage evaluation method for large LOCA accident of pressurized water reactor based on exposure time
CN110991006B (en) * 2019-11-06 2024-01-23 中国辐射防护研究院 Pressurized water reactor large LOCA accident reactor core damage evaluation method based on exposure time
CN112652415A (en) * 2020-12-01 2021-04-13 中国辐射防护研究院 Post-processing plant emergency state grading determination method based on characteristic parameter analysis
CN112652415B (en) * 2020-12-01 2022-10-21 中国辐射防护研究院 Post-processing plant emergency state grading determination method based on characteristic parameter analysis
CN112414472A (en) * 2020-12-03 2021-02-26 深圳中广核工程设计有限公司 Safety barrier integrity judging method, device, control equipment and storage medium
CN112687410A (en) * 2021-01-26 2021-04-20 三门核电有限公司 Diagnosis method for large-range damage accident of passive pressurized water reactor nuclear power plant

Also Published As

Publication number Publication date
CN108091409B (en) 2019-09-27

Similar Documents

Publication Publication Date Title
CN108091409B (en) A kind of comprehensive estimation method of nuclear emergency set state diagnosis and damage sequence
FI79199B (en) FOERFARANDE OCH ANORDNING FOER STYRNING AV ETT KOMPLEXT OLINJAERT PROCESSREGLERSYSTEM.
CN106653107B (en) A kind of liquid metal cooling passive accident afterheat discharge system of pool reactor
JPS63250594A (en) On-line monitor and analyzing method of pressure vessel for nuclear reactor
CN207096165U (en) Mixed gas concentration on-line measurement device
CN105303018A (en) Risk assessment method for item of nuclear power plant
KR20130104336A (en) Passive core cooling system
CN109855740A (en) A kind of transformer fault online test method and system
Bae Study on Early Leak Detection of PCS Coolant Using Integrated System by means of Multi-Sensors Technique
JPH0560560B2 (en)
Fei Research on Prognostics and Health Management System Technology in the Field of Nuclear Power Plant
Shanmugavel et al. Operating experience of high temperature sodium loops for material testing
Liang et al. Study on aging management of operating nuclear power plants in China
CN114883021A (en) Method and system for monitoring accident condition of nuclear power plant unit
Xialan et al. Analysis of Impact on Core Level Monitoring System due to Judgement of Main Coolant Pump Status During LOCA
Zhang et al. Difference analysis of in-service hydrostatic test for second and third generation PWR
Slavov et al. Detection of primary coolant leaks in NPP
BARRAU et al. M. ASTY
Kubo et al. ICONE19-43600 STUDY ON IN-SERVICE INSPECTION AND REPAIR PROGRAM AND RELATED PLANT DESIGN FOR JAPAN SODIUM-COOLED FAST REACTOR (JSFR)
Roychowdhury et al. Design approach to local blockages
Jang et al. System design strategies of post-accident monitoring system for a PGSFR in Korea
Smith How UK nuclear power stations are designed to be safe
Chellapandi et al. Assessment of Safety Criteria of Indian SFR with respect to International Scenarios
COOLING James M. Taylor
Beswick Safety Philosophy and Design Principles

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant