CN108087030A - A kind of data analysing method of system anchor bolt effect contrast test - Google Patents

A kind of data analysing method of system anchor bolt effect contrast test Download PDF

Info

Publication number
CN108087030A
CN108087030A CN201711137186.5A CN201711137186A CN108087030A CN 108087030 A CN108087030 A CN 108087030A CN 201711137186 A CN201711137186 A CN 201711137186A CN 108087030 A CN108087030 A CN 108087030A
Authority
CN
China
Prior art keywords
anchor bolt
system anchor
data
monitoring project
variable factors
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711137186.5A
Other languages
Chinese (zh)
Inventor
陈建勋
罗彦斌
陈丽俊
刘立明
郭亚龙
杨亚楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changan University
Original Assignee
Changan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changan University filed Critical Changan University
Priority to CN201711137186.5A priority Critical patent/CN108087030A/en
Publication of CN108087030A publication Critical patent/CN108087030A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/18Special adaptations of signalling or alarm devices
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/02Agriculture; Fishing; Forestry; Mining

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Business, Economics & Management (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Economics (AREA)
  • Primary Health Care (AREA)
  • Marine Sciences & Fisheries (AREA)
  • Agronomy & Crop Science (AREA)
  • Health & Medical Sciences (AREA)
  • Structural Engineering (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Animal Husbandry (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Force Measurement Appropriate To Specific Purposes (AREA)

Abstract

The present invention relates to Tunnel Engineering technical field of measurement and test, provide a kind of data analysing method of system anchor bolt effect contrast test, including:Collect corresponding monitoring data respectively by monitoring project;Mathematical statistical model is selected, determines the number of Variable Factors;Monitoring data are calculated successively according to the mathematical statistical model of selection;Influence of the Variable Factors for each monitoring project is analyzed according to result of calculation.The present invention has selected unary variance analysis equation in mathematical statistics to be calculated, and can accurately give expression to the size that anchor pole influences every supporting parameter;Using to all effective monitoring data, influence of the accidentalia for comparing result is avoided, reduces error as much as possible;Effect of the comprehensive analysis anchor pole played in soft stratum tunnel, and the effect size that anchor pole is played in all fields can be obtained.

Description

A kind of data analysing method of system anchor bolt effect contrast test
Technical field
The present invention relates to Tunnel Engineering technical field of measurement and test, more particularly to a kind of system anchor bolt effect contrast test Data analysing method.
Background technology
System anchor bolt is a kind of common preliminary bracing measure in tunnels and underground engineering.In soft stratum tunnel, How is the effect of system anchor bolt, and there are mainly two types of viewpoints at present:A kind of viewpoint thinks the system anchor bolt in soft stratum tunnel It is little to the effect of Tunnel Stability, it can cancel;Another viewpoint thinks that the system anchor bolt in soft stratum tunnel is steady to tunnel It is qualitative serve it is key, it should set.For effect of the exposing system anchor pole in soft stratum tunnel, generally use more The live contrast test of system anchor bolt is whether there is, passes through the effect of test data analyzer checking system anchor pole.
In the data analysis of existing system bolt effect contrast test, pass through the order of magnitude of contrast test data Or average value carrys out the effect of checking system anchor pole.This kind of analysis method is although relatively simple, easy to operate, but can not be objective Ground reflects effect of the system anchor bolt in tunnel in other every supporting parameters, and accidentalia may cause to having a competition It tests result and generates larger error, making the conclusion of contrast test, reliability is insufficient there are certain one-sidedness.
The content of the invention
The purpose of the present invention is exactly to have overcome the deficiencies of the prior art and provide a kind of system anchor bolt effect contrast test Data analysing method, using mathematical statistics mathematical model, the drawing of scientific and precise, the Variable Factors without system anchor bolt for The influence size whether each monitoring project has an impact and generate.
A kind of data analysing method of system anchor bolt effect contrast test of the present invention, includes the following steps:
Step 1: carrying out having system anchor bolt and the live contrast test without system anchor bolt, phase is collected respectively by monitoring project The monitoring data answered;
Step 2: selecting mathematical statistical model, the number of Variable Factors is determined;
Step 3: according to the mathematical statistical model that step 2 selects, the monitoring data of step 1 are counted successively It calculates;
Step 4: according to result of calculation, influence of the Variable Factors for each monitoring project is analyzed;
Step 5: comprehensive analysis has, without the comprehensive function of system anchor bolt this Variable Factors for soft stratum tunnel.
Further, in step 1, when live contrast test, at least selects 2 sections of test sections to be compared;One is had System anchor bolt is tested, another tested without system anchor bolt;In addition to the Variable Factors, other factors condition is identical;
Further, in step 2, when selecting mathematical model, the variable in selected each mathematical model is analyzed first Factor number;It is then determined that the unary variance analysis equation for the mathematical statistics that mathematical model is consistent with contrast test variable.
Further, in step 3, by the monitoring data of contrast test successively according to the unary variance analysis equation point It is not checked, and the F values by the way that each monitoring project is calculated.
Further, in step 4, when analyzing influence of the Variable Factors for specific monitoring project, first against spy Determine monitoring project and select appropriate level of signifiance α, from F distribution upper percentage point table inquiries FαValue;Then the F values that will be calculated With the F of inquiry gainedαValue is compared, and show that influence of the Variable Factors for the specific monitoring project is horizontal.
Further, it is horizontal to influence of the Variable Factors to each monitoring project respectively to assign power, synthesis in step 5 Evaluation have, without anchor pole in soft stratum tunnel generated effect size.
Further, the monitoring project includes pressure from surrounding rock, steelframe medial and lateral stress, gunite concrete strain, longitudinal direction Dowel stress, clearance convergence, internal displacement for surrounding rock, the contact between preliminary bracing and secondary lining, secondary lining mix Solidifying soil medial and lateral stress.
Further, the monitoring project is pressure from surrounding rock, and the mathematical model is;
There are pressure from surrounding rock data measured by system anchor bolt section to be set to parent X1, pressure from surrounding rock number measured by no system anchor bolt section According to being set to parent X2, 2 parent X1、X2Meet normal distribution;
It is assumed that H012, that is, assume that 2 population variances are equal, independently respectively take out an increment in 2 parents, lead to Discrete decomposition method is crossed, is examined with 2 increments and assumes H0It is whether true.
Beneficial effects of the present invention are:
1st, according to the monitoring result of live contrast test, unary variance analysis equation in mathematical statistics has been selected to be counted It calculates, the Method for Checking of such contrast test compares with the prior art, can give expression to tool of the anchor pole for every supporting parameter The size that body influences;
2nd, in control methods shadow of the accidentalia for comparing result is avoided using all effective monitoring data have been arrived It rings, reduces error as much as possible so that comparing result is more convincing;
3rd, effect that can be with comprehensive analysis anchor pole played in soft stratum tunnel, and anchor pole can be obtained each The effect size that aspect is played.
Description of the drawings
Fig. 1 show tunnel test section and is longitudinally arranged figure.
Fig. 2 show the monitoring project that field test is carried out.
Fig. 3 show unary variance analysis F density profiles.
Wherein:1- cancels system anchor bolt test section;2- sets system anchor bolt test section;3- cancels system anchor bolt test section Test section;4- sets the test section of system anchor bolt test section;5- ground lines;6- tests the inbuilt various monitoring elements of section (pressure cell, surface strain meter, Reinforcement Stress-count, concrete strain gauge etc.);7-Fα(r-1, n-r) distributed density curves;8-Fα (r-1, n-r) value.
Specific embodiment
The specific embodiment of the invention is described in detail below in conjunction with specific attached drawing.It should be noted that in following embodiments The combination of the technical characteristic or technical characteristic of description is not construed as isolated, they can be mutually combined to reach To superior technique effect.In the attached drawing of following embodiments, identical label that each attached drawing occurs represent identical feature or Person's component can be applied in different embodiments.
The working mechanism of the present invention is mainly reflected in following three aspect:First, collect monitoring data carrying out field test When, it is necessary to control two test sections, other supporting condition systems are identical in addition to system anchor bolt Variable Factors difference is whether there is; Second is that the applicable equation that selection is appropriate, unary variance analysis equation refers in an experiment, and only the level there are one the factor is changing Become, the level of other factors, which takes, determines, and by the result of dependent variable analyze and compares the effect size for drawing Variable Factors;Third, Generalized analysis is carried out by the obtained each result of calculation of unary variance analysis equation, synthesis draws anchor pole flabbily The size that the effect and each side specifically played in layer tunnel is played a role, so as to solve in soft stratum tunnel on earth Want to set system anchor bolt this technical problem.
A kind of data analysing method of system anchor bolt effect contrast test of the embodiment of the present invention, includes the following steps:
Step 1: carrying out having system anchor bolt and the live contrast test without system anchor bolt, phase is collected respectively by monitoring project The monitoring data answered;The monitoring project includes pressure from surrounding rock, and steelframe medial and lateral stress, gunite concrete strains, longitudinally connected Muscle stress, clearance convergence, internal displacement for surrounding rock, the contact between preliminary bracing and secondary lining, secondary lining concrete Medial and lateral stress etc..
Step 2: selecting mathematical statistical model, the number of Variable Factors is determined;
Step 3: according to the mathematical statistical model that step 2 selects, the monitoring data of step 1 are counted successively It calculates;
Step 4: according to result of calculation, influence of the Variable Factors for each monitoring project is analyzed;
Step 5: comprehensive analysis has, without the comprehensive function of system anchor bolt this Variable Factors for soft stratum tunnel.
Preferably, in step 1, when live contrast test, at least selects 2 sections of test sections to be compared;One carried out be System anchor rod experiment, another tested without system anchor bolt;In addition to the Variable Factors, other factors condition is identical;
Preferably, in step 2, when selecting mathematical model, analyze first variable in selected each mathematical model because Plain number;It is then determined that the unary variance analysis equation for the mathematical statistics that mathematical model is consistent with contrast test variable.
Preferably, in step 3, the monitoring data of contrast test are distinguished successively according to the unary variance analysis equation It is checked, and the F values by the way that each monitoring project is calculated.
Preferably, in step 4, when analyzing influence of the Variable Factors for specific monitoring project, first against specific Monitoring project selects appropriate level of signifiance α, from F distribution upper percentage point table inquiries FαValue;Then by the F values being calculated with Inquire about the F of gainedαValue is compared, and show that influence of the Variable Factors for the specific monitoring project is horizontal.
Preferably, in step 5, horizontal to influence of the Variable Factors to each monitoring project respectively to assign power, synthesis is commented Valency has, without anchor pole in soft stratum tunnel generated effect size.
Hereafter had by taking the tunnel of Liujia Gorge as an example, without system anchor bolt scene contrast test;Specific segmentation as shown in Figure 1, Carrying out monitoring project shown in Fig. 2 respectively, (monitoring project includes pressure from surrounding rock, and steelframe medial and lateral stress, gunite concrete should Become, longitudinally connected muscle stress, clearance convergence, internal displacement for surrounding rock, the contact between preliminary bracing and secondary lining is secondary Lining concrete medial and lateral stress), the monitoring data of field test are collected, and meet following condition:
1st, when field monitoring is tested two sections of test sections is at least selected to be compared;
2nd, strictly to control the other factors condition in addition to Variable Factors identical during field test;
3rd, two contrast test sections need progress one to have system anchor bolt experiment, another tested without system anchor bolt;
Appropriate mathematical model is selected, since live contrast test employs the experiment of single-factor variable, so determining selection Unary variance analysis equation is monitored the comparison checking computations of data.
The test data of each monitoring project is divided into two groups to compare respectively, without loss of generality, using pressure from surrounding rock as Example, has pressure from surrounding rock data measured by system anchor bolt section to be set to parent X1, pressure from surrounding rock data measured by no system anchor bolt section set For parent X2, it is assumed that two parents meet normal distribution, then have 2 normal state parent Xi, i=1,2, XiBe distributed as N (μi2), It is assumed herein that 2 population variances are equal.Make hypothesis H on 2 parents012
An increment is now independently taken out from each parent, arranges into following table:
Above-mentioned hypothesis H is examined with 2 increments0It is whether true.It may also be said that factor A has 2 kinds of horizontal A1,A2, it is located at each The horizontal lower result of the test all Normal Distributions of kind, examine whether the various levels of factors A have a significant impact result of the test:It adopts With deviation decomposition method:Regard each increment as a group,
It is average in note group
Overall averageWherein
Always sum of squares of deviations is:
Order:Sum of squares of deviations in group
Sum of squares of deviations between group
QEReflect X inside each groupijBy σ2Caused sampling error, QABetween reflection group caused by each parent average difference Error adds sampling error.
So as to there is QT=QE+QA (1)
It represents that total deviation (quadratic sum) is equal to deviation (quadratic sum) in group and, plus deviation (quadratic sum) between group, is known as deviation It decomposes.Below by comparing QEAnd QANumerical value carry out null hypothesis H0
First calculate EQEAnd EQA.For this purpose, XijIt is expressed as Xijiij, j=1,2;I=1,2
Wherein εijNormal Distribution N (0, σ2), all εijIndependently of each other.
OrderWhereinδ againii- μ, i=1,2
Thus μi=μ+δi, i=1,2 and
And then XijIt is represented by Xij=μ+δ+εij, j=1,2, L, ni;I=1,2 (3)
Order
Then, QEAnd QAIt can be expressed as:
Thus
Therefore
Obviously have
According to decomposition theorem:In H0During establishment, all δiZero is equal to, (3) formula becomes Xij=μ+εij
Substitute into QT,QEAnd QAExpression formula (1) formula can be write as
Again
Therefore
Above formula both sides divided by σ2, the left sideIt is the χ that degree of freedom is n2Variable, three, the right are respectively:
There are 2 constraintssIts degree of freedom is n-2;
There are one constraintssIts freedom
Degree is 1;Its degree of freedom is 1.
The sum of their degree of freedom (n-2)+(2-1)+1=n.The Q is taken to be in decomposition theoremThen by theorem Adequacy can obtain:
Obey the χ that degree of freedom is n-22Distribution;Obey the χ that degree of freedom is 12Distribution;
AndWithIndependently of each other.
The definition being distributed by F,
Degree of freedom is obeyed to be distributed for the F of (1, n-2).
OrderSA=QAReferred to as SE 2For Mean squares within group deviation, SA 2For Mean squares between groups deviation.Then, Degree of freedom is obeyed to be distributed for the F of (1, n-2).
Given level of signifiance α, makees small probability event:From (4) and (5) formula, when assuming that H0When invalid,And work as H0During establishment,From (6) formula, small probability event is taken in the big one side of the value of F It is relatively reasonable.Thus it is possible to check in F from F distribution upper percentage point tablesαThe value of (1, n-2) makes P { F >=Fα(1, n-2) }=α, such as Shown in Fig. 3.
After single sample by increment value calculate F numerical value:
If F >=Fα(1, n-2) then refuses to assume H0, that is, think that factor has a significant impact experimental result;
If F<Fα(1, n-2), which then receives, assumes H0, that is, think that factor does not make significant difference to experimental result.
Thus can draw whether there is whether system anchor bolt can have an impact for the pressure from surrounding rock in soft stratum tunnel.
Finally, according to above method, the test data of each monitoring project is respectively calculated according to above step, it can To obtain specific influence of the anchor pole for each monitoring project in soft stratum tunnel, (each monitoring item can be used in comprehensive analysis Mesh assigns power) anchor pole generated effect in soft stratum tunnel, so as to it is more rigorous, scientifically evaluation system anchor pole is flabbily Effect in layer tunnel.
Although having been presented for several embodiments of the present invention herein, it will be appreciated by those of skill in the art that Without departing from the spirit of the invention, the embodiments herein can be changed.Above-described embodiment is only exemplary, no It should be using the embodiments herein as the restriction of interest field of the present invention.

Claims (8)

1. a kind of data analysing method of system anchor bolt effect contrast test, which is characterized in that include the following steps:
Step 1: carrying out having system anchor bolt and the live contrast test without system anchor bolt, collected respectively by monitoring project corresponding Monitoring data;
Step 2: selecting mathematical statistical model, the number of Variable Factors is determined;
Step 3: according to the mathematical statistical model that step 2 selects, the monitoring data of step 1 are calculated successively;
Step 4: according to result of calculation, influence of the Variable Factors for each monitoring project is analyzed;
Step 5: comprehensive analysis has, without the comprehensive function of system anchor bolt this Variable Factors for soft stratum tunnel.
2. data analysing method as described in claim 1, which is characterized in that in step 1, when live contrast test is at least selected 2 sections of test sections are selected to be compared;One has carried out system anchor bolt experiment, another tested without system anchor bolt;Except the change Outside amount factor, other factors condition is identical.
3. data analysing method as described in claim 1, which is characterized in that in step 2, when selecting mathematical model, divide first Analyse the Variable Factors number in selected each mathematical model;It is then determined that the number that mathematical model is consistent with contrast test variable Manage the unary variance analysis equation of statistics.
4. data analysing method as claimed in claim 3, which is characterized in that in step 3, by the monitoring data of contrast test It is checked respectively according to the unary variance analysis equation successively, and the F values by the way that each monitoring project is calculated.
5. data analysing method as claimed in claim 4, which is characterized in that in step 4, analyze the Variable Factors for During the influence of specific monitoring project, appropriate level of signifiance α is selected first against specific monitoring project, divides position from F distributions upside Number table inquiry FαValue;Then by the F values being calculated and the F of inquiry gainedαValue is compared, draw the Variable Factors for The influence of the specific monitoring project is horizontal.
6. data analysing method as described in claim 1, which is characterized in that in step 5, respectively to the Variable Factors pair The influence of each monitoring project is horizontal to assign power, overall merit has, without anchor pole in soft stratum tunnel generated effect size.
7. such as claim 1-6 any one of them data analysing methods, which is characterized in that the monitoring project includes country rock pressure Power, steelframe medial and lateral stress, gunite concrete strain, longitudinally connected muscle stress, clearance convergence, internal displacement for surrounding rock, initial stage branch Contact between shield and secondary lining, secondary lining concrete medial and lateral stress.
8. data analysing method as claimed in claim 7, which is characterized in that the monitoring project be pressure from surrounding rock, the number It learns model and uses unary variance analysis mathematical model;
There are pressure from surrounding rock data measured by system anchor bolt section to be set to parent X1, pressure from surrounding rock data measured by no system anchor bolt section set For parent X2, 2 parent X1、X2Meet normal distribution;
It is assumed that H012, that is, assume 2 population variances it is equal, an increment is independently respectively taken out in 2 parents, by from Decomposition method is dissipated, is examined with 2 increments and assumes H0It is whether true.
CN201711137186.5A 2017-11-16 2017-11-16 A kind of data analysing method of system anchor bolt effect contrast test Pending CN108087030A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711137186.5A CN108087030A (en) 2017-11-16 2017-11-16 A kind of data analysing method of system anchor bolt effect contrast test

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711137186.5A CN108087030A (en) 2017-11-16 2017-11-16 A kind of data analysing method of system anchor bolt effect contrast test

Publications (1)

Publication Number Publication Date
CN108087030A true CN108087030A (en) 2018-05-29

Family

ID=62172201

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711137186.5A Pending CN108087030A (en) 2017-11-16 2017-11-16 A kind of data analysing method of system anchor bolt effect contrast test

Country Status (1)

Country Link
CN (1) CN108087030A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108917694A (en) * 2018-07-16 2018-11-30 三峡大学 Deformation monitoring and the device and method of supporting after a kind of tunnel Rock And Soil excavates
CN109184793A (en) * 2018-08-29 2019-01-11 东北大学 A method of the anti-rock burst ability on-the-spot test of anchor pole is carried out in Underground Engineering Excavation process

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050011265A1 (en) * 2003-06-30 2005-01-20 Brink Van Zyl Method and apparatus for testing installation quality in a grouted anchor system
CN101230784A (en) * 2008-01-31 2008-07-30 长安大学 Tunnel steel arch frame lock foot anchoring stock net-spraying composite structure
CN102226408A (en) * 2011-06-21 2011-10-26 北京交通大学 Loess tunnel anchor bar support device
CN102261256A (en) * 2011-08-09 2011-11-30 山东大学 Positioning device and method for system anchor rod application during underground engineering model test

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050011265A1 (en) * 2003-06-30 2005-01-20 Brink Van Zyl Method and apparatus for testing installation quality in a grouted anchor system
CN101230784A (en) * 2008-01-31 2008-07-30 长安大学 Tunnel steel arch frame lock foot anchoring stock net-spraying composite structure
CN102226408A (en) * 2011-06-21 2011-10-26 北京交通大学 Loess tunnel anchor bar support device
CN102261256A (en) * 2011-08-09 2011-11-30 山东大学 Positioning device and method for system anchor rod application during underground engineering model test

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
杨晓梅: "数理统计在压力变送器检定中的应用", 《现代测量与实验室管理》 *
陈建勋等: "软弱围岩隧道取消系统锚杆的现场试验研究", 《岩土力学》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108917694A (en) * 2018-07-16 2018-11-30 三峡大学 Deformation monitoring and the device and method of supporting after a kind of tunnel Rock And Soil excavates
CN109184793A (en) * 2018-08-29 2019-01-11 东北大学 A method of the anti-rock burst ability on-the-spot test of anchor pole is carried out in Underground Engineering Excavation process

Similar Documents

Publication Publication Date Title
CN109034582A (en) Tunnel Passing inrush through faults based on cloud model and combination weighting are dashed forward mud risk evaluating method
US9416630B2 (en) Grid calculation for fluid flow modeling
CN108345049B (en) Underground engineering unfavorable geological detection multi-method constraint inversion and joint interpretation method
US10416339B2 (en) Homogeneous inversion for multi-component induction tools
CN110610285A (en) Underground metal mine goaf risk grading evaluation method
SA04250006B1 (en) neural network training data seelction using memory reduced cluster analysis for field model development tank
Chen et al. Use of an improved ANN model to predict collapse depth of thin and extremely thin layered rock strata during tunnelling
WO2019001025A1 (en) Sensor deployment method for simultaneous acquiring local deformation and overall modal information of structure
CN107092759A (en) Dam body displacement monitoring point optimization method for arranging based on Gravity Dam Foundation parametric inversion
CN108087030A (en) A kind of data analysing method of system anchor bolt effect contrast test
CN108801221B (en) Quick and fine dereferencing method for surface mine slope rock mass joint scale based on digital photogrammetry
CN111460567A (en) BIM-based stair surface layer clear height inspection system, application system-based method and process
CN112529267A (en) Advanced geological prediction method and system based on fuzzy comprehensive evaluation method
CN108830317B (en) Rapid and fine evaluation method for joint attitude of surface mine slope rock mass based on digital photogrammetry
CN109543283A (en) A kind of internal force based on structure convergent deformation and calculating of surrounding rock pressure method
CN115688237A (en) Geostress inversion analysis method and system for tunnel soft rock deformation grade evaluation
CN110688767B (en) Method for evaluating comprehensive difference degree of rock mass fracture network model precision
CN116150854A (en) Tunnel blasting parameter optimizing method based on rock mass structural plane information and related components
CN117092702A (en) Construction method of hole-tunnel induced polarization water detection structure and inversion water detection method
CN114493295B (en) Method for determining tunnel monitoring project under salt rock geology and monitoring system
CN113515840B (en) Method for predicting rock mass excavation disturbance area and related equipment
CN113591371B (en) Bridge cluster structure damage positioning method based on space-time correlation model
CN107015289B (en) Trap evaluation stock number determines method and device
CN114066271A (en) Tunnel water inrush disaster monitoring and management system
KR102594802B1 (en) Apparatus for evaluating state of rock mass and method thereof, computer program

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180529

RJ01 Rejection of invention patent application after publication