- CN108086547B CN108086547B CN201711106177.XA CN201711106177A CN108086547B CN 108086547 B CN108086547 B CN 108086547B CN 201711106177 A CN201711106177 A CN 201711106177A CN 108086547 B CN108086547 B CN 108086547B
- Authority
- CN
- China
- Prior art keywords
- hanging piece
- pendant
- firmware
- mounting groove
- stone
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/88—Curtain walls
- E04B2/96—Curtain walls comprising panels attached to the structure through mullions or transoms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/88—Curtain walls
- E04B2/90—Curtain walls comprising panels directly attached to the structure
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/24—Structural elements or technologies for improving thermal insulation
- Y02A30/244—Structural elements or technologies for improving thermal insulation using natural or recycled building materials, e.g. straw, wool, clay or used tires
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Load-Bearing And Curtain Walls (AREA)
- Finishing Walls (AREA)
Abstract
The invention discloses a stone curtain wall combined pendant which comprises combined fixing pieces arranged on a transverse keel and a pendant arranged on the edge of a stone veneer, wherein a pendant connecting part is arranged on the combined fixing pieces, a mounting groove is formed in the edge of the stone veneer, a reinforcing steel sheet is fixedly arranged in the mounting groove, one end of the pendant is arranged in the mounting groove, and the other end of the pendant is connected with the pendant connecting part. The invention omits the mechanical opening of the transverse keel, can ensure that the strength of the transverse keel is not affected, and is reliable in fixation; the mounting groove internal fixation at the stone material decorative board sets up the reinforcement steel sheet, effectively solves the stone material decorative board and at the problem that the mounting groove damaged of transportation and transportation in-process, simultaneously, the setting method of reinforcement steel sheet and pendant can be when the stone material face needs to be changed, and change wantonly and do not receive each other to influence, has reduced the requirement to workman's technical during the stone material decorative board installation, has also reduced the dependence to climatic factor when the stone material decorative board is installed, raises the efficiency and shock resistance.
Description
Technical Field
The invention relates to the technical field of building materials, in particular to a stone curtain wall combined pendant.
Background
Most of the existing stone curtain wall dry-hanging metal hanging pieces are mechanically perforated on a curtain wall auxiliary keel (transverse keel) and fixed by bolts; for example, a conventional T-shaped pendant, a steel pin pendant, a SE-shaped pendant, etc. The construction process of mechanically punching the curtain wall auxiliary keel (transverse keel) and fixing by bolts has higher technical requirements on workers, and has more complicated procedures when the stone veneer needs to be manually grooved, and is easy to cause engineering quality difference due to the quality of the workers. The stone veneer is grooved and installed on site, and the used adhesive is easily affected by weather, especially in rainy days and cold winter. If the stone veneer is grooved in the factory, the stone veneer is easy to damage in the transportation and transfer processes.
Disclosure of Invention
The invention provides a stone curtain wall combined pendant for solving the problems in the prior art.
The aim of the invention is realized by the following technical scheme:
the utility model provides a stone material curtain combination pendant, includes the combination firmware and the pendant of setting at stone material decorative board edge of setting on the horizontal fossil fragments, the combination firmware includes first firmware and second firmware, first firmware with the second firmware constitutes the enclosed construction cladding all around and is in the horizontal fossil fragments outside be provided with pendant connecting portion on the combination firmware stone material decorative board edge is provided with the mounting groove internal fixation is provided with the reinforcement steel sheet, pendant one end sets up in the mounting groove, the other end is connected with pendant connecting portion.
Further, the mounting groove comprises an upper mounting groove and a lower mounting groove, the upper edge of the stone veneer is provided with the upper mounting groove, and the lower edge of the stone veneer is provided with the lower mounting groove.
Further, the reinforcing steel sheet is attached to the side wall of the mounting groove and the edge end portion of the stone veneer through marble glue.
Further, the pendant includes pendant and lower pendant, go up pendant one end and set up go up the mounting groove, the other end with the pendant connecting portion is connected, lower pendant one end sets up in the mounting groove down, the other end is established on the pendant connecting portion.
Further, the device also comprises a pressing plate, one end of the pressing plate is in compression connection with the upper hanging piece, the other end of the pressing plate is in contact with the connecting part of the connecting piece, and the pressing plate is connected with the connecting part of the hanging piece through a self-tapping screw.
Further, the hanging piece connecting portion is provided with a free end, and the lower hanging piece is hung at the free end of the hanging piece connecting portion and is adjusted and fixed through a screw.
Further, the cross sections of the first fixing piece and the second fixing piece are U-shaped with an opening at the upper end, and the second fixing piece is arranged in the first fixing piece to seal the opening at the upper end of the first fixing piece.
Further, the first firmware is connected with the second firmware through a connecting screw.
Further, an auxiliary fixing screw rod is arranged on the first fixing piece, and the auxiliary fixing screw rod penetrates through the first fixing piece to be in contact with the transverse keel.
Further, a flexible spacer is provided between the pendant and the stone veneer.
The beneficial effects of the invention are as follows:
the stone curtain wall combined pendant disclosed by the invention has the advantages that the structural design is simple and reasonable, the whole of the transverse keels is covered and fixed through a plurality of combined fixing pieces, the mechanical opening of the transverse keels is avoided, the strength of the transverse keels can be ensured not to be influenced, and the positions of the transverse keels are fixed at will; the stone veneer can be grooved in a centralized manner in a factory or on site, so that the construction progress can be accelerated, and the grooving standard and position of the stone veneer mounting groove are unified; meanwhile, the problem that the mounting groove of the stone veneer is damaged in the transportation and transfer processes is effectively solved by fixedly arranging the reinforcing steel sheet in the mounting groove of the stone veneer, and meanwhile, the setting of the reinforcing steel sheet can be changed randomly without being influenced when the stone veneer surface needs to be changed, so that the technical requirements of workers during the mounting of the stone veneer are reduced, the dependence on climate factors during the mounting of the stone veneer is also reduced to a certain extent, and the earthquake resistance is improved.
Drawings
The following describes the embodiments of the present invention in further detail with reference to the accompanying drawings.
FIG. 1 is a perspective view of a stone curtain wall assembly hanger according to the present invention;
FIG. 2 is a front view of a stone curtain wall assembly hanger according to the present invention;
FIG. 3 is a right side cross-sectional view of a stone curtain wall assembly hanger according to the present invention;
FIG. 4 is an isometric view of a reinforcing steel sheet of a stone curtain wall composite hanger of the present invention;
the device comprises a first fixing piece, a second fixing piece, a lower hanging piece, an upper hanging piece, a pressing plate, a reinforcing steel piece, a connecting screw, a horizontal auxiliary fixing screw, a vertical adjusting screw and a self-tapping screw, wherein the fixing screw comprises the first fixing piece, the second fixing piece, the lower hanging piece, the upper hanging piece, the pressing plate, the reinforcing steel piece, the connecting screw, the horizontal auxiliary fixing screw, the fastening screw, the vertical adjusting screw and the self-tapping screw, and the vertical adjusting screw are arranged in sequence, and the self-tapping screw is arranged in sequence; 12-transverse keels, 13-stone veneer, 14-pendant connecting parts, 15-upper mounting grooves and 16-lower mounting grooves.
Detailed Description
The following describes the embodiments of the present invention in detail with reference to specific examples.
As shown in fig. 1-3, the invention discloses a stone curtain wall combined pendant, which comprises combined firmware arranged on a transverse keel 12 and a pendant arranged at the edge of a stone veneer 13, wherein the combined firmware comprises a first firmware 1 and a second firmware 2, the cross sections of the first firmware 1 and the second firmware 2 are U-shaped with open upper ends, the second firmware 2 is arranged in the first firmware 1, the first firmware 1 and the second firmware 2 are connected at the side wall positions of the first firmware 1 and the second firmware 2 which are mutually overlapped through four connecting screws 7 of M6, and then the opening at the upper end of the first firmware 1 is closed through the second firmware 2, so that the first firmware 1 and the second firmware 2 form a four-side closed structure to be wrapped outside the transverse keel 12.
The combined firmware is provided with a pendant connecting portion 14, in this embodiment, the pendant connecting portion 14 is disposed on the outer side of the side wall corresponding to the cross keel 12 of the first firmware 1, one end of the pendant connecting portion 14 is flush with the bottom surface of the first firmware 1, the other end is an upward free end, and a reinforcing rib is further horizontally disposed between the pendant connecting portion 14 and the side wall of the first firmware 1.
And an M8 component fastening screw rod 9 is further vertically arranged between the first fixing piece 1 and the second fixing piece 2, and the component fastening screw rod 9 penetrates through the bottom surface of the first fixing piece 1 and tightly abuts against the lower surface of the transverse keel 12 to fix the position of the combined fixing piece. The first fixing piece 1 is also horizontally provided with an M6 auxiliary fixing screw rod 8, and the auxiliary fixing screw rod 8 passes through the first fixing piece 1 to be contacted with the transverse keel 12, so that the combined fixing piece is prevented from shifting and unstably under the action of vertical gravity.
The stone veneer 13 edge is provided with the mounting groove, specifically, the mounting groove includes mounting groove 15 and lower mounting groove 16, stone veneer 13 upper edge is provided with mounting groove 15 stone veneer 13 lower edge is provided with lower mounting groove 16. The steel reinforcement sheet 6 is fixedly arranged in the mounting groove, as shown in fig. 4, the steel reinforcement sheet 6 is of a U-shaped structure, and the side wall marble glue is mounted on the side wall of the groove in a bonding manner and is fixedly adhered to the edge horizontal plane of the stone veneer 13. The reinforcing steel sheet 6 is fixedly connected with the mounting groove through bonding by marble adhesive, and is attached to the side wall of the mounting groove and the edge end part of the stone veneer 13. The mounting groove is effectively protected and reinforced through the reinforced steel sheet 6.
As shown in fig. 3, one end of the hanging piece is arranged in the mounting groove, and the other end of the hanging piece is connected with the hanging piece connecting part. Further, the hanging member includes an upper hanging member 4 and a lower hanging member 3, one end of the upper hanging member 4 is disposed in the upper mounting groove 15, the other end of the upper hanging member is connected with the hanging member connecting portion 14, one end of the lower hanging member 3 is disposed in the lower mounting groove 16, and the other end of the lower hanging member is pressed on the hanging member connecting portion 14.
Specifically, the self-tapping device further comprises a pressing plate 5, one end of the pressing plate 5 is connected with the upper hanging piece 4 in a pressing mode, the other end of the pressing plate is in contact with the hanging piece connecting portion 14, and the pressing plate 5 is connected with the hanging piece connecting portion 14 through an M5 self-tapping screw 11. The lower hanging piece 3 is hung at the free end of the hanging piece connecting part 14, and the vertical height of the stone veneer 13 is adjusted and fixed through the M4 screw rod 10. A flexible spacer is provided between the pendant and the stone veneer 13. In this embodiment, the flexible spacer is a soft thin rubber pad or an injected rubber.
In the construction process, the combined fixing piece is fixed at any proper position of the curtain wall transverse keel 12 through four M6 connecting screws 7 and one M8 component fastening screw 9, and one M6 horizontal auxiliary fixing screw 8 is used for adjusting the front and rear horizontal positions of the combined fixing piece. The stone veneer 15, 16 is centrally grooved in a factory or on site, the U-shaped reinforced steel sheet 6 is fixed by marble glue, after solidification, the stone veneer is transported to the installation position of the stone veneer 13, the lower hanging piece 3 is added with a soft thin rubber mat or glue injection for installation, the M4 screw 10 on the lower hanging piece 3 is used for adjusting the vertical height of the stone veneer 13, and the upper hanging piece 4 is added with the soft thin rubber mat or glue injection and is fixed on the first firmware 1 by the M5 self-arch screw 11 through the hanging piece pressing plate 5.
The invention adopts the combined fixing piece to avoid punching the transverse keel 12, centralizedly grooving the stone veneer 13 in a factory or on site, and placing the U-shaped reinforced steel sheet 6 at the notch of the stone veneer 13, thereby reducing the damage rate in the transferring process, being capable of being independently disassembled, reducing the construction difficulty, accelerating the construction progress and improving the construction quality.
Finally, it should be noted that: the foregoing description is only a preferred embodiment of the present invention, and the present invention is not limited thereto, but it is to be understood that modifications and equivalents of some of the technical features described in the foregoing embodiments may be made by those skilled in the art, although the present invention has been described in detail with reference to the foregoing embodiments. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (3)
1. The utility model provides a stone material curtain combination pendant, includes the combination firmware of setting on the horizontal fossil fragments and sets up the pendant at stone material decorative board edge, its characterized in that: the combined firmware comprises a first firmware and a second firmware, the first firmware and the second firmware form a peripheral closed structure and are coated on the outer side of the transverse keel, a hanging piece connecting part is arranged on the combined firmware, an installation groove is formed in the edge of the stone veneer, a reinforcing steel sheet is fixedly arranged in the installation groove, one end of a hanging piece is arranged in the installation groove, and the other end of the hanging piece is connected with the hanging piece connecting part; the mounting groove comprises an upper mounting groove and a lower mounting groove, the upper edge of the stone veneer is provided with the upper mounting groove, and the lower edge of the stone veneer is provided with the lower mounting groove; the reinforced steel sheet is attached to the side wall of the mounting groove and the edge end part of the stone veneer; the hanging piece comprises an upper hanging piece and a lower hanging piece, one end of the upper hanging piece is arranged in the upper mounting groove, the other end of the upper hanging piece is connected with the hanging piece connecting part, one end of the lower hanging piece is arranged in the lower mounting groove, and the other end of the lower hanging piece is hooked on the hanging piece connecting part; the device comprises a hanging piece, a hanging piece connecting part, a pressing plate and a self-tapping screw, wherein the hanging piece connecting part is connected with the hanging piece connecting part through the self-tapping screw; the hanging piece connecting part is provided with a free end, and the lower hanging piece is hung at the free end of the hanging piece connecting part and is adjusted and fixed through a screw rod; the cross sections of the first fixing piece and the second fixing piece are U-shaped with an opening at the upper end, and the second fixing piece is arranged in the first fixing piece to seal the opening at the upper end of the first fixing piece; the first firmware is connected with the second firmware through a connecting screw rod; the pendant connecting portion sets up in the lateral wall outside that first firmware and horizontal fossil fragments correspond, and pendant connecting portion one end and first firmware bottom surface parallel and level, the other end be the free end up, and still the level is provided with the stiffening rib between pendant connecting portion and first firmware lateral wall.
2. The stone curtain wall combination pendant of claim 1, wherein: an auxiliary fixing screw rod is arranged on the first fixing piece, and penetrates through the first fixing piece to be in contact with the transverse keel.
3. The stone curtain wall combination pendant of claim 1, wherein: a flexible spacer is arranged between the hanging piece and the stone veneer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711106177.XA CN108086547B (en) | 2017-11-10 | 2017-11-10 | Stone curtain wall combined hanging piece |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711106177.XA CN108086547B (en) | 2017-11-10 | 2017-11-10 | Stone curtain wall combined hanging piece |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108086547A CN108086547A (en) | 2018-05-29 |
CN108086547B true CN108086547B (en) | 2023-08-18 |
Family
ID=62170715
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711106177.XA Active CN108086547B (en) | 2017-11-10 | 2017-11-10 | Stone curtain wall combined hanging piece |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108086547B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111075042A (en) * | 2020-01-06 | 2020-04-28 | 洪斯衍 | Installation method and installation structure of heat-insulation decorative composite board |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202500243U (en) * | 2012-01-12 | 2012-10-24 | 周永军 | Stone pendant and stone curtain wall |
US20130318905A1 (en) * | 2012-06-05 | 2013-12-05 | Usg Interiors, Llc | Two-piece modular yoke |
CN103806577A (en) * | 2012-11-06 | 2014-05-21 | 南通四建装饰工程有限公司 | Installation method for super-large-area unit type slabstone curtain wall |
CN204139406U (en) * | 2014-10-16 | 2015-02-04 | 中国建筑西南设计研究院有限公司 | A kind of wedge adjustment type mounting stone curtain wall system |
CN204385984U (en) * | 2014-12-23 | 2015-06-10 | 江河创建集团股份有限公司 | Back of the body bolt suspension member group formula shaped steel keel stone curtain wall |
CN204435637U (en) * | 2015-02-05 | 2015-07-01 | 山东美达建工集团股份有限公司 | A kind of curtain wall of high-tensile structural steel |
CN206477582U (en) * | 2017-02-09 | 2017-09-08 | 曹立英 | Formwork reinforcement keel fastener constructions |
CN206545297U (en) * | 2016-12-06 | 2017-10-10 | 天津三建建筑工程有限公司 | Dry-hanging component for back bolt type dry-hang stone curtain wall |
-
2017
- 2017-11-10 CN CN201711106177.XA patent/CN108086547B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202500243U (en) * | 2012-01-12 | 2012-10-24 | 周永军 | Stone pendant and stone curtain wall |
US20130318905A1 (en) * | 2012-06-05 | 2013-12-05 | Usg Interiors, Llc | Two-piece modular yoke |
CN103806577A (en) * | 2012-11-06 | 2014-05-21 | 南通四建装饰工程有限公司 | Installation method for super-large-area unit type slabstone curtain wall |
CN204139406U (en) * | 2014-10-16 | 2015-02-04 | 中国建筑西南设计研究院有限公司 | A kind of wedge adjustment type mounting stone curtain wall system |
CN204385984U (en) * | 2014-12-23 | 2015-06-10 | 江河创建集团股份有限公司 | Back of the body bolt suspension member group formula shaped steel keel stone curtain wall |
CN204435637U (en) * | 2015-02-05 | 2015-07-01 | 山东美达建工集团股份有限公司 | A kind of curtain wall of high-tensile structural steel |
CN206545297U (en) * | 2016-12-06 | 2017-10-10 | 天津三建建筑工程有限公司 | Dry-hanging component for back bolt type dry-hang stone curtain wall |
CN206477582U (en) * | 2017-02-09 | 2017-09-08 | 曹立英 | Formwork reinforcement keel fastener constructions |
Also Published As
Publication number | Publication date |
---|---|
CN108086547A (en) | 2018-05-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR20140049413A (en) | A facing apparatus of outer wall | |
CN103243890A (en) | Hanging and buckling assembly of heat-insulating decorating plate and installation process of buckle assembly | |
CN108086547B (en) | Stone curtain wall combined hanging piece | |
CN111236486A (en) | Construction method of assembled bamboo energy-saving composite outer wall | |
CN205314449U (en) | Building decorative board dogging formula connecting device | |
CN205206191U (en) | Thin stone material heat preservation decorative board system | |
CN208473060U (en) | A kind of metal curtain wall | |
KR20090055805A (en) | Insulated stone panel method | |
CN204212266U (en) | Light steel house anti-pulling connector system | |
KR101204208B1 (en) | A Wall Panel Assembly | |
CN104895204A (en) | Connecting structure of insertion connection type thermal insulation plate | |
CN209053358U (en) | A kind of mounting structure of elevator hall's metope slabstone | |
CN213449589U (en) | Building structure reinforcing apparatus | |
CN210397336U (en) | Glass fiber board mounting structure | |
CN106836702B (en) | Inorganic light aggregate heat-insulation veneer system combining bonding and anchoring parts thereof | |
CN109138255B (en) | Hidden frame toughened sandwich glass ceiling assembly system | |
CN207749696U (en) | A kind of stone curtain wall Combined hanger | |
CN205348653U (en) | A compound battenboard installation connection structure for outer wall wall | |
CN204876435U (en) | Marble heat preservation decorative board with hang device futilely | |
CN203213465U (en) | Heat preservation and decoration integrated board | |
CN103266703B (en) | Terracotta panel curtain wall installation structure | |
CN109868960A (en) | A kind of plate brick paving structure | |
CN219491471U (en) | Assembled custom-assembled inner partition wall structure | |
CN211229285U (en) | Foamed ceramic sintered glaze decoration and heat preservation integrated plate connecting structure | |
CN216075803U (en) | Connecting structure of exposed frame glass curtain wall and indoor upright post |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |