CN108086138A - It is a kind of to prevent device of the bridge pier by current erosion - Google Patents
It is a kind of to prevent device of the bridge pier by current erosion Download PDFInfo
- Publication number
- CN108086138A CN108086138A CN201711192832.8A CN201711192832A CN108086138A CN 108086138 A CN108086138 A CN 108086138A CN 201711192832 A CN201711192832 A CN 201711192832A CN 108086138 A CN108086138 A CN 108086138A
- Authority
- CN
- China
- Prior art keywords
- bridge pier
- retainer ring
- plate
- erosion
- vortex
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/02—Piers; Abutments ; Protecting same against drifting ice
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/20—Equipment for shipping on coasts, in harbours or on other fixed marine structures, e.g. bollards
- E02B3/26—Fenders
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/30—Adapting or protecting infrastructure or their operation in transportation, e.g. on roads, waterways or railways
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Ocean & Marine Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Mechanical Engineering (AREA)
- Architecture (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Prevent device of the bridge pier by current erosion the present invention relates to a kind of, including whirlpool plate and the retainer ring of disappearing, the Fixing shrink ring is located at bridge pier root, the retainer ring is fixed on by the connector of bridge pier lee side on bridge pier, said vortex reducing plate is fixedly connected in retainer ring, said vortex reducing plate is towards upper river, and the whirlpool plate that disappears is parallel with water (flow) direction, said vortex reducing plate and retainer ring bottom are located on the silt in riverbed, the prevention bridge pier is eliminated vortex system non-stationarity by the device of current erosion using the whirlpool plate that disappears, weaken vortex system intensity, fundamentally prevent bridge pier erosion attack, it is and simple in structure, it is easy for installation, it is at low cost.
Description
Technical field
The present invention relates to bridge safeguard more particularly to it is a kind of prevent bridge pier by current erosion device.
Background technology
Bridge pier is by current erosion attack, and all very prominent in the whole world, according to statistics, the U.S. 383 is risen in bridge collapse case, and 75%
It is related to bridge pier destruction;Department of scientific and Industrial Research of New Zealand repairs for bridge and accounts for its total funds 50% with the expense safeguarded,
Wherein bridge pier erosion repair expenses accounts for 70%;And the root that bridge pier erosion attack generates is unsteady for bridge pier root shape of a hoof vortex system
It washes away, takes away silt and bridge pier structure object;At present, China has become global first bridge construction with using big country, bridge pier erosion
Destruction problem is more acute, and maintaining demand is more urgent, and existing bridge pier is safeguarded mainly through bridge pier reinforcing etc. both at home and abroad
Measure carries out preventive maintenance, fails fundamentally to solve the problems, such as that bridge pier destroys, and it is of high cost, protection period is short.
The content of the invention
The applicant is directed to disadvantage mentioned above, has carried out Improvement, provides a kind of device of prevention bridge pier by current erosion.
The technical solution adopted in the present invention is as follows:
A kind of prevention bridge pier is by the device of current erosion, and including whirlpool plate and the retainer ring of disappearing, the Fixing shrink ring is located at bridge pier
Root, the retainer ring are fixed on by the connector of bridge pier lee side on bridge pier, and said vortex reducing plate is fixedly connected on retainer ring
On, said vortex reducing plate is towards upper river, and the whirlpool plate that disappears is parallel with water (flow) direction, and said vortex reducing plate and retainer ring bottom are located at river
On the silt of bed.
As being further improved for above-mentioned technical proposal:
The connector is setscrew, is fixed between the retainer ring and bridge pier at least through two setscrews.
Free end of the said vortex reducing plate away from retainer ring sets the tip for breaking current.
Beneficial effects of the present invention are as follows:It is described to prevent device of the bridge pier by current erosion, by retainer ring in bridge pier root
The whirlpool plate that disappears is fixed in portion, is eliminated vortex system non-stationarity using the whirlpool plate that disappears, is weakened vortex system intensity, fundamentally prevents bridge pier erosion and break
It is bad and simple in structure, it is easy for installation, it is at low cost.
Description of the drawings
Fig. 1 is top view of the prevention bridge pier provided by the invention by the device of current erosion.
Fig. 2 is side view of the prevention bridge pier provided by the invention by the device of current erosion.
In figure:1st, disappear whirlpool plate;11st, tip;2nd, retainer ring;3rd, bridge pier;4th, setscrew.
Specific embodiment
Below in conjunction with the accompanying drawings, the specific embodiment of the present invention is illustrated.
As shown in Figure 1 and Figure 2, the present embodiment prevention bridge pier by current erosion device, including whirlpool plate 1 and the retainer ring of disappearing
2, retainer ring 2 is set in 3 root of bridge pier, and retainer ring 2 is fixed on by two setscrews 4 of 3 lee side of bridge pier on bridge pier 3,
1 one end of whirlpool plate that disappears is fixedly connected in retainer ring 2, and towards upper river, free end sets and breaks current for 1 free end of whirlpool plate that disappears
Tip 11, and the whirlpool plate 1 that disappears is parallel with water (flow) direction, disappears whirlpool plate 1 and 2 bottom of retainer ring is located on the silt in riverbed.
When the prevention bridge pier is installed by the device of current erosion, 3 root of bridge pier is sleeved on by retainer ring 2, makes retainer ring 2
Bottom is located on the silt in riverbed, adjusts the direction of retainer ring 2, and the whirlpool plate 1 that disappears for making to connect in retainer ring 2 is directed toward on river
Trip, and it is parallel with water (flow) direction, behind the orientation for determining the whirlpool plate 1 that disappears, retainer ring 2 is tensed and is passed through in 3 lee side of bridge pier
Retainer ring 2 is fixed on bridge pier 3 by setscrew 4, you can and vortex system non-stationarity is eliminated by the whirlpool plate 1 that disappears, weakens vortex system intensity,
Fundamentally prevent bridge pier 3 by erosion attack.
Above description is explanation of the invention, is not the restriction to invention, limited range of the present invention is referring to right
It is required that in the case of the basic structure without prejudice to the present invention, the present invention can make any type of modification.
Claims (3)
1. a kind of prevent device of the bridge pier by current erosion, it is characterised in that:It is described solid including whirlpool plate (1) and the retainer ring (2) of disappearing
Determine ring (2) and be set in bridge pier (3) root, the retainer ring (2) is fixed on bridge pier (1) by the connector of bridge pier (3) lee side
On, said vortex reducing plate (1) is fixedly connected in retainer ring (2), said vortex reducing plate (1) towards upper river, and disappear whirlpool plate (1) with
Water (flow) direction is parallel, and said vortex reducing plate (1) and retainer ring (2) bottom are located on the silt in riverbed.
2. prevention bridge pier according to claim 1 is by the device of current erosion, it is characterised in that:The connector is expansion
Screw (4), it is fixed at least through two setscrews (4) between the retainer ring (2) and bridge pier (3).
3. prevention bridge pier according to claim 1 is by the device of current erosion, it is characterised in that:Said vortex reducing plate (1) is remote
Free end from retainer ring (2) sets the tip (11) for breaking current.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711192832.8A CN108086138A (en) | 2017-11-24 | 2017-11-24 | It is a kind of to prevent device of the bridge pier by current erosion |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711192832.8A CN108086138A (en) | 2017-11-24 | 2017-11-24 | It is a kind of to prevent device of the bridge pier by current erosion |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108086138A true CN108086138A (en) | 2018-05-29 |
Family
ID=62172964
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711192832.8A Pending CN108086138A (en) | 2017-11-24 | 2017-11-24 | It is a kind of to prevent device of the bridge pier by current erosion |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108086138A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112853942A (en) * | 2021-01-11 | 2021-05-28 | 大连理工大学 | Hinged rectifying plate for reducing water resistance of pier |
CN114622513A (en) * | 2022-01-21 | 2022-06-14 | 郑州大学 | Flow guiding device for bridge pier for reducing resistance and vortex and earthquake |
CN115162394A (en) * | 2022-08-18 | 2022-10-11 | 水利部交通运输部国家能源局南京水利科学研究院 | Subsection vortex-eliminating pre-protection system and vortex-eliminating method suitable for pile group foundation |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100642334B1 (en) * | 2006-08-04 | 2006-11-10 | 주식회사 도화종합기술공사 | The pier collapse prevention infrastructure |
KR100642873B1 (en) * | 2006-08-08 | 2006-11-10 | (주)진영이엔씨 | Safety materials for protection of bridge pier |
TW200928051A (en) * | 2007-12-21 | 2009-07-01 | Sheng-Huei Jou | Apparatus for preventing foundation from being excavated |
CN202031016U (en) * | 2011-01-25 | 2011-11-09 | 任增成 | Bridge pier of bridge |
KR20130090070A (en) * | 2012-02-03 | 2013-08-13 | 주식회사신화기공 | Reinforcing structure of hydraulic structures |
CN203487448U (en) * | 2013-08-21 | 2014-03-19 | 杭州远山食品科技有限公司 | Pier protection device capable of transferring impact |
CN204174524U (en) * | 2014-09-30 | 2015-02-25 | 南宁市第一中学 | Bridge flood fighting buffering triangle watch box |
CN205474803U (en) * | 2016-01-14 | 2016-08-17 | 中铁大桥勘测设计院集团有限公司 | Anticollision roof beam and have buffer stop of crashproof roof beam |
CN205874962U (en) * | 2016-06-25 | 2017-01-11 | 张雯 | A water pressure dispersion devices for pier |
-
2017
- 2017-11-24 CN CN201711192832.8A patent/CN108086138A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100642334B1 (en) * | 2006-08-04 | 2006-11-10 | 주식회사 도화종합기술공사 | The pier collapse prevention infrastructure |
KR100642873B1 (en) * | 2006-08-08 | 2006-11-10 | (주)진영이엔씨 | Safety materials for protection of bridge pier |
TW200928051A (en) * | 2007-12-21 | 2009-07-01 | Sheng-Huei Jou | Apparatus for preventing foundation from being excavated |
CN202031016U (en) * | 2011-01-25 | 2011-11-09 | 任增成 | Bridge pier of bridge |
KR20130090070A (en) * | 2012-02-03 | 2013-08-13 | 주식회사신화기공 | Reinforcing structure of hydraulic structures |
CN203487448U (en) * | 2013-08-21 | 2014-03-19 | 杭州远山食品科技有限公司 | Pier protection device capable of transferring impact |
CN204174524U (en) * | 2014-09-30 | 2015-02-25 | 南宁市第一中学 | Bridge flood fighting buffering triangle watch box |
CN205474803U (en) * | 2016-01-14 | 2016-08-17 | 中铁大桥勘测设计院集团有限公司 | Anticollision roof beam and have buffer stop of crashproof roof beam |
CN205874962U (en) * | 2016-06-25 | 2017-01-11 | 张雯 | A water pressure dispersion devices for pier |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112853942A (en) * | 2021-01-11 | 2021-05-28 | 大连理工大学 | Hinged rectifying plate for reducing water resistance of pier |
CN114622513A (en) * | 2022-01-21 | 2022-06-14 | 郑州大学 | Flow guiding device for bridge pier for reducing resistance and vortex and earthquake |
CN114622513B (en) * | 2022-01-21 | 2024-01-19 | 郑州大学 | Pier guiding device is shaken in vortex reduction that reduces drag |
CN115162394A (en) * | 2022-08-18 | 2022-10-11 | 水利部交通运输部国家能源局南京水利科学研究院 | Subsection vortex-eliminating pre-protection system and vortex-eliminating method suitable for pile group foundation |
CN115162394B (en) * | 2022-08-18 | 2023-09-01 | 水利部交通运输部国家能源局南京水利科学研究院 | Fractional vortex eliminating prevention protection system and vortex eliminating method suitable for pile group foundation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108086138A (en) | It is a kind of to prevent device of the bridge pier by current erosion | |
CN205077506U (en) | Can reduce street lamp basis of spoilage | |
CN203923914U (en) | Solely stub bent cap support | |
CN206052548U (en) | A kind of highway bridge construction prestressed anchor | |
CN106869090B (en) | Dreg-blocking board sub-assembly and diversion tunnel debris retaining Slagoff method | |
CN204282851U (en) | The protective guard that a kind of building operations is provisional | |
CN204928032U (en) | Two strings of some strutting arrangement of drainage wire jumper | |
CN205475088U (en) | Dykes and dams bank protection structure for hydraulic engineering | |
CN203145027U (en) | Anti-impact structure used for earth-rock cofferdam | |
CN203594006U (en) | Sealing structure arranged in gate shaft body of diversion tunnel chamber | |
CN101377073A (en) | Preposition oblique post apparatus for alleviating bridge abutment base dredging and erosion | |
CN206680951U (en) | A kind of channel protection structure of hydraulic engineering | |
CN204662396U (en) | A kind of tilting for high slope blocks dirty drift structure | |
CN204590427U (en) | Metal roofing board Wind-proof fixture | |
CN205662844U (en) | Bridge outlet catchment deconcentrator | |
CN211498767U (en) | Prevent table hole arc gate door top structure that gushes damp | |
CN203878546U (en) | Culvert with energy dissipation function | |
CN208545676U (en) | A kind of U-shaped steel plate structure | |
CN201367554Y (en) | Anti-theft water discharging pipe for bridge | |
CN209458669U (en) | A kind of protective device of the hanging super-large diameter high-pressure gas pipeline of large span | |
CN205077470U (en) | Block dirty reinforced structure that floats | |
CN203247500U (en) | Anti-collision washing-prevention diameter-variable combined type pier column structure | |
CN205580546U (en) | Water gauge filter | |
CN205128905U (en) | Package strikes bucket in middle of continuous casting | |
CN204590737U (en) | A kind of antidetonation steel reinforced concrete structure side coal bunker |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180529 |