CN108060748A - A kind of efficiently locking Fixed Tube-sheet Reboiler of novel sewer - Google Patents
A kind of efficiently locking Fixed Tube-sheet Reboiler of novel sewer Download PDFInfo
- Publication number
- CN108060748A CN108060748A CN201711145372.3A CN201711145372A CN108060748A CN 108060748 A CN108060748 A CN 108060748A CN 201711145372 A CN201711145372 A CN 201711145372A CN 108060748 A CN108060748 A CN 108060748A
- Authority
- CN
- China
- Prior art keywords
- fixed
- bolt
- push rod
- upper half
- ring body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D13/00—Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage; Sky-lights
- E04D13/04—Roof drainage; Drainage fittings in flat roofs, balconies or the like
- E04D13/08—Down pipes; Special clamping means therefor
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D13/00—Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage; Sky-lights
- E04D13/04—Roof drainage; Drainage fittings in flat roofs, balconies or the like
- E04D13/08—Down pipes; Special clamping means therefor
- E04D2013/084—Means for fixing down pipes to structure
Abstract
The invention discloses a kind of efficiently locking Fixed Tube-sheet Reboiler of novel sewer, including wall, upper half ring body, lower hemizonid, fixing bolt, fixing nut, fixed pipe sleeve, installation cavity, first baffle, embeded slot, annular groove, gag lever post, second baffle, fixed bolt, fastening stud, auxiliary connect band, auxiliary connection band edge and spring.The present invention is reasonable in design, change the fixed form that original screw is contacted directly with metope, it is installed in a manner that fixed bolt is mutually spirally connected with fixed pipe sleeve, improve the stability of entire mounting structure, gag lever post on fixed casing surface engages with the annular groove on embeded slot ensure that fixed pipe sleeve and the fixed stability of wall, so as to provide relatively stable mounting platform for entire pipe bundle mounting structure, further promote the stability of pipe bundle mounting structure, auxiliary connect band can be used to carry out further /V to sewer pipe during fixed sewer pipe to fix.The anti-loosening property of the Fixed Tube-sheet Reboiler is improved using check bolt.
Description
Technical field
The present invention relates to a kind of tube banks, are specifically a kind of efficiently locking Fixed Tube-sheet Reboiler of novel sewer, belong to tube bank application
Technical field.
Background technology
Tube bank is a kind of fixing piece for fixed -piping, in median low structure, in order to discharge the water of roof in time,
The external sewer pipe of generally use discharges the water of roof, needs to pass through pipe in order to which sewer pipe is made to be bonded installation with metope
Sewer pipe is fixed on metope by beam.
Traditional tube bank directly will be socketed in lower water when installing this sewer pipe by the part of screw, bolt etc
The tube bank of pipe surface is directly anchored on metope, and this fixed form stability is poor.Therefore, one is proposed regarding to the issue above
The kind efficiently locking Fixed Tube-sheet Reboiler of novel sewer.
The content of the invention
The purpose of the present invention is that solve the above-mentioned problems and provides a kind of novel sewer efficiently locking fixing pipe
Beam.
The present invention is achieved through the following technical solutions above-mentioned purpose, a kind of efficiently locking Fixed Tube-sheet Reboiler of novel sewer,
Including wall and surface of wall is arranged on for fixing the tube bank body of sewer pipe, and the tube bank body may make up by two
The upper half ring body of cyclic structure and lower hemizonid composition, the junction of the upper half ring body and lower hemizonid by fixing bolt and
Fixing nut is fixed, and the tube bank chamber body sets auxiliary connect band, and the auxiliary connection band edge at connect band both ends is aided in pass through
It is through at upper half ring body surface and extends to upper half ring body both ends and lower hemizonid both ends junction, on the upper half ring body centre
Through having the fastening stud that is vertically arranged, and the affixed fixed bolt in fastening stud end;
The fixed bolt is threaded io the fixation pipe sleeve for being embedded in surface of wall, and the fixed pipe sleeve passes through embeded slot
It is chimeric to be installed on surface of wall, and embeded slot axial surface is equipped with to accommodate the annular groove of gag lever post, the fixed pipe sleeve side
Pars intramuralis is equipped with several gag lever posts for circularizing distribution, and the fixation pipe sleeve interior of gag lever post one side is equipped with installation cavity, institute
It states and the first baffle vertical with gag lever post is installed on installation cavity, and first baffle is connected to by horizontally disposed spring and is located at
The second baffle on gag lever post surface;
The fixing bolt is check bolt, and the check bolt includes nut and screw rod, the center at the top of the nut
Place is provided with the first push rod, and one end of first push rod through nut and extends to the inside of screw rod, first push rod
Bottom is fixedly connected with extrusion ball, and the front of first push rod is provided with slide, and the front of the slide slidably connects cunning
Block is fixedly connected with the second push rod at the top of the sliding block, and the both sides of the sliding block are connected with linking arm, the connection
One end of arm is fixedly connected with the first nail tip, and the outer surface of the screw rod offers first through hole, and the first nail tip passes through screw rod
And extend to outside it, the bottom of the screw rod is fixedly connected with punch, and the inner wall of the punch is fixedly connected with supporting rod, institute
The one end for stating supporting rod is fixedly connected with elastic piece, and the one side of the elastic piece is fixedly connected with the second nail tip, the punch
Outer surface offers the second through hole, and the second nail tip through punch and is extended to outside it.
Preferably, the fastening stud and fixed bolt coaxial arrangement, and fastening stud diameter is less than fixed bolt, it is described
A side end face of the fastening stud away from fixed bolt is equipped with nut.
Preferably, the length of the fixed bolt is consistent with the length of fixed pipe sleeve inner cavity.
Preferably, the first baffle and second baffle are arranged in parallel, and first baffle and second baffle are respectively positioned on
Inside installation cavity.
Preferably, the auxiliary connection band edge is embedded in upper half ring body and lower hemizonid junction, and aids in connection band edge
It is fitted closely respectively with upper half ring body and lower hemizonid end.
Preferably, two auxiliary connection band edges at the auxiliary connect band both ends and two junction straight lines of upper half ring body
Distance is less than upper half ring body diameter.
Preferably, the inner wall of the screw rod is socketed with protective jacket, and the protective jacket is disposed with the first suction from the inside to surface
Water layer, rubber layer and the second water accepting layer.
Preferably, one end of second push rod and the front of the first push rod have been fixedly connected with the first magnet, and second
Push rod is flexibly connected by the first magnet with the first push rod.
Preferably, the both sides at the top of the both sides of first push rod and nut have been fixedly connected with the second magnet, and first
Push rod is flexibly connected by the second magnet with nut.
Preferably, the quantity of the supporting rod is four, and two supporting rods are one group.
Preferably, the linking arm and the angle of the second nail tip and horizontal level are 30 degree.
The beneficial effects of the invention are as follows:The present invention is reasonable in design, changes original screw and is contacted directly with metope
Fixed form, installed in a manner that fixed bolt is mutually spirally connected with fixed pipe sleeve, improve the steady of entire mounting structure
Qualitative property, the gag lever post fixed on casing surface engages with the annular groove on embeded slot ensure that fixed pipe sleeve and wall are fixed
Stability so as to provide relatively stable mounting platform for entire pipe bundle mounting structure, further promotes pipe bundle mounting structure
Stability can be used auxiliary connect band to carry out further /V to sewer pipe during fixed sewer pipe and fix.
The present invention passes through matching somebody with somebody for the first push rod, extrusion ball, supporting rod, elastic piece, the second nail tip and the second through hole using check bolt
It closes and uses, very easily elastic piece can be squeezed using extrusion ball, the second nail tip is from the under the active force of elastic piece
It is extruded out in two through holes, facilitates the second nail tip and the bolt is fixed, improve the anti-loosening property of the bolt.The tool
There is the bolt of locking functions, by being used cooperatively for slide, sliding block, the second push rod, linking arm, the first nail tip and first through hole,
Very easily linking arm can be moved in first through hole, and linking arm is expressed to it is parallel with first through hole, so as to fulfill
Secondary fixation of first nail tip to the bolt improves the anti-loosening property of the bolt again.
Description of the drawings
Fig. 1 is overall structure diagram of the present invention;
Fig. 2 is partial enlargement structural representation at I of the present invention.
In figure:1st, wall, 2, upper half ring body, 3, lower hemizonid, 4, fixing bolt, 41, fixing nut, 5, fixed pipe sleeve,
51st, installation cavity, 52, first baffle, 6, embeded slot, 61, annular groove, 7, gag lever post, 71, second baffle, 8, fixed bolt, 9, tight
Gu stud, 10, auxiliary connect band, 101, auxiliary connection band edge, 11, spring.
Fig. 3 is the structure diagram of check bolt of the present invention;
Fig. 4 is schematic enlarged-scale view at the A of check bolt of the present invention;
Fig. 5 is the protecting jacket structure schematic diagram of check bolt of the present invention.
In figure:2001 nuts, 2002 screw rods, 2,003 first push rods, 2004 extrusion balls, 2005 slides, 2006 sliding blocks, 2007
Second push rod, 2008 linking arms, 2,009 first nail tips, 2010 first through hole, 2011 punches, 2012 supporting rods, 2013 elastic pieces,
2014 second nail tips, 2,015 second through holes, 2016 protective jackets, 2,017 first water accepting layers, 2018 rubber layers, 2,019 second water suctions
Layer, 2,020 first magnet, 2,021 second magnet.
Specific embodiment
Below in conjunction with the attached drawing in the embodiment of the present invention, the technical solution in the embodiment of the present invention is carried out clear, complete
Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, those of ordinary skill in the art are obtained every other without making creative work
Embodiment belongs to the scope of protection of the invention.
It please refers to Fig.1 shown in -2, a kind of efficiently locking Fixed Tube-sheet Reboiler of novel sewer including wall 1 and is arranged on wall
1 surface of body is used to fix the tube bank body of sewer pipe, the upper half ring body 2 that the tube bank body may make up cyclic structure by two
It is formed with lower hemizonid 3, the junction of the upper half ring body 2 and lower hemizonid 3 is solid by fixing bolt 4 and fixing nut 41
It is fixed, sewer pipe is placed between upper half ring body 2 and lower hemizonid 3, upper half is fixed by fixing bolt 4 and fixing nut 41
The fixation to sewer pipe is realized at ring body 2 and lower 3 both ends of hemizonid, and the tube bank chamber body sets auxiliary connect band 10, and
The auxiliary connection band edge 101 at 10 both ends of auxiliary connect band extends to 2 both ends of upper half ring body and lower half through 2 surface of upper half ring body
3 both ends junction of ring body tenses auxiliary connect band 10, auxiliary connect band 10 is made to fit closely in sewer pipe surface, will be tensed
Later the auxiliary connection band edge 101 at 10 both ends of connect band is aided in be used uniformly fixation with upper half ring body 2 and lower 3 junction of hemizonid
Bolt 4 and fixing nut 41 are fixed, and the fastening stud 9 for having and being vertically arranged is run through on 2 centre of upper half ring body, and is fastened
The affixed fixed bolt 8 in 9 end of stud;
The fixed bolt 8 is threaded io the fixation pipe sleeve 5 for being embedded in 1 surface of wall, by fixed bolt 8 with fixing
The Fixed Tube-sheet Reboiler body that is spirally connected between pipe sleeve 5, the fixed pipe sleeve 5 are installed on 1 surface of wall by the way that embeded slot 6 is chimeric, and embedding
It closes 6 axial surface of slot to be equipped with to accommodate the annular groove 61 of gag lever post 7, fixed 5 interior of pipe sleeve is equipped with several cyclization
The gag lever post 7 of shape distribution, and 5 interior of fixation pipe sleeve of 7 one side of gag lever post is equipped with installation cavity 51, pacifies on the installation cavity 51
Equipped with the first baffle 52 vertical with gag lever post 7, and first baffle 52 is connected to by horizontally disposed spring 11 positioned at /V
The second baffle 71 on 7 surface of bar, the gag lever post 7 fixed when horizontally disposed spring 11 would sit idle on pipe sleeve 5 are accommodated in fixing pipe
5 interiors are covered, do not influence the installation of fixed pipe sleeve 5.
As a kind of technical optimization scheme of the present invention, the fastening stud 9 and fixed bolt 8 are coaxially disposed, and are fastened
9 diameter of stud is less than fixed bolt 8, and a side end face of the fastening stud 9 away from fixed bolt 8 is equipped with nut, avoids fastening
9 diameter of stud is excessive, and the intensity of 2 structure of upper half ring body is influenced during through upper half ring body 2.
As a kind of technical optimization scheme of the present invention, the length of the fixed bolt 8 and the length of fixed 5 inner cavity of pipe sleeve
Unanimously, convenient for the fixation of fixed bolt 8.
As a kind of technical optimization scheme of the present invention, the first baffle 52 and second baffle 71 are arranged in parallel,
And first baffle 52 and second baffle 71 are respectively positioned on inside installation cavity 51, pass through 71 fixed spring of first baffle 52 and second baffle
11, the gag lever post 7 for ensureing to fix on pipe sleeve 5 when leaving unused using horizontally disposed spring 11 is accommodated in fixed 5 side wall of pipe sleeve
Portion.
As a kind of technical optimization scheme of the present invention, the auxiliary connection band edge 101 is embedded in upper half ring body 2 and lower half
3 junction of ring body, and connection band edge 101 is aided in be fitted closely respectively with upper half ring body 2 and lower 3 end of hemizonid, it realizes to auxiliary
Help the fixation of connection band edge 101.
As a kind of technical optimization scheme of the present invention, two auxiliary connection band edges at 10 both ends of the auxiliary connect band
101 are less than 2 diameter of upper half ring body with two junction air line distances of upper half ring body 2, make auxiliary connect band 10 and sewer pipe
Contact area bigger.
In the use of the present invention, digging embeded slot 6 on 1 surface of wall, fixed pipe sleeve 5 is put into inside embeded slot 6, is made solid
Fixed tube covers the annular groove 61 on the 7 face embeded slot 6 of gag lever post on 5 surfaces, turns fastening stud 9, and fastening stud 9 drives fixed spiral shell
Column 8 rotates, and fixed bolt 8 is screwed into inside fixed pipe sleeve 5, as fixed bolt 8 is into fixed 5 inner cavity of pipe sleeve, fixes spiral shell
Column 8 squeezes one end of gag lever post 7, and fixed 5 surface of pipe sleeve of the ejection of gag lever post 7 is made to enter in annular groove 61, is realized to fixed pipe sleeve 5
Fixation, so as to fulfill the fixation to upper half ring body 2, sewer pipe is placed inside upper half ring body 2, make auxiliary connect band 10 with
Sewer pipe surface fits closely, and it is solid respectively by fixing bolt 4 and fixing nut 41 that two auxiliary then are connected band edge 101
Upper half ring body 2 and lower 3 junction of hemizonid are scheduled on, is repeated the above steps, tube bank is installed successively on sewer pipe surface.
In the present invention when spring 11 is under normal condition, gag lever post 7 is accommodated in fixed 5 interior of pipe sleeve completely,
And one end of gag lever post 7 is extended to away from fixed 5 inner cavity center of circle 2mm-5mm of pipe sleeve.
Fig. 3-5 are referred to, fixing bolt 4 is check bolt, and check bolt includes nut 2001 and screw rod 2002, screw rod
2002 inner wall is socketed with protective jacket 2016, and protective jacket 2016 is disposed with the first water accepting layer 2017, rubber layer from the inside to surface
2018 and second water accepting layer 2019, the first water accepting layer 2017 and the second water accepting layer 2019 are that absorbing resin material is made, rubber
Layer 2018 is made of rubber material, is used cooperatively by the first water accepting layer 2017,2018 and second water accepting layer 2019 of rubber layer,
It can be very good to carry out waterproof to the bolt, improve the water resistance of the bolt, be provided at the center at 2001 top of nut
First push rod 2003, the both sides at 2001 top of both sides and nut of the first push rod 2003 have been fixedly connected with the second magnet 2021,
And first push rod 2003 be flexibly connected by the second magnet 2021 with nut 2001, one end of the first push rod 2003 passes through nut
2001 and the inside of screw rod 2002 is extended to, the bottom of the first push rod 2003 is fixedly connected with extrusion ball 2004, the first push rod
2003 front is provided with slide 2005, and the front of slide 2005 slidably connects sliding block 2006, and the top of sliding block 2006 is fixed
It is connected with the second push rod 2007, the front of one end of the second push rod 2007 and the first push rod 2003 has been fixedly connected with the first magnet
2020, and the second push rod 2007 is flexibly connected by the first magnet 2020 with the first push rod 2003, the both sides of sliding block 2006 are living
Dynamic to be connected with linking arm 2008, one end of linking arm 2008 is fixedly connected with the first nail tip 2009, and the outer surface of screw rod 2002 is opened
Equipped with first through hole 2010, and the first nail tip 2009 through screw rod 2002 and is extended to outside it, passes through slide 2005, sliding block
2006th, the second push rod 2007, linking arm 2008, the first nail tip 2009 and first through hole 2010 are used cooperatively, can be very convenient
Linking arm 2008 is moved in first through hole 2010, and linking arm 2008 is expressed to it is parallel with first through hole 2010, from
And secondary fixation of first nail tip 2009 to the bolt is realized, the anti-loosening property of the bolt is improved again, screw rod 2002
Bottom is fixedly connected with punch 2011, and the inner wall of punch 2011 is fixedly connected with supporting rod 2012, and the quantity of supporting rod 2012 is
Four, and two supporting rods 2012 are one group, one end of supporting rod 2012 is fixedly connected with elastic piece 2013, elastic piece 2013
One side is fixedly connected with the second nail tip 2014, and 2008 and second nail tip 2014 of linking arm and the angle of horizontal level are 30 degree,
The outer surface of punch 2011 offers the second through hole 2015, and the second nail tip 2014 through punch 2011 and is extended to outside it,
Pass through the first push rod 2003, extrusion ball 2004, supporting rod 2012, elastic piece 2013, the second nail tip 2014 and the second through hole 2015
Be used cooperatively, very easily elastic piece 2013 can be squeezed using extrusion ball 2004, in the effect of elastic piece 2013
The second nail tip 2014 is extruded out from the second through hole 2015 under power, facilitates the second nail tip 2014 and the bolt is consolidated
It is fixed, improve the anti-loosening property of the bolt.
When in use, the first push rod 2003 is pushed down on first, the first push rod 2003 promotes extrusion ball 2004 to move downward,
Then extrusion ball 2004 squeezes elastic piece 2013, and under the action of elastic piece 2013, the second nail tip 2014 is squeezed out
The bolt is fixed, then by the second push rod 2007 sliding block 2006 is promoted to move in slide 2005, in sliding block
Linking arm 2008 is pushed into first through hole 2010 under the action of 2006, then continues to promote sliding block 2006, linking arm 2008
Start to rotate, when linking arm 2008 turns to horizontal level, stop promoting sliding block 2006, be can be completed at this time to the bolt
Secondary fixation.
In conclusion the check bolt, passes through the first push rod 2003, extrusion ball 2004, supporting rod 2012, elastic piece
2013rd, the second nail tip 2014 and the second through hole 2015 are used cooperatively, can very easily using extrusion ball 2004 to elastic piece
2013 are squeezed, and second nail tip 2014 is extruded out from the second through hole 2015 under the active force of elastic piece 2013, side
The second nail tip 2014 bolt is fixed, improve the anti-loosening property of the bolt, pass through slide 2005, sliding block
2006th, the second push rod 2007, linking arm 2008, the first nail tip 2009 and first through hole 2010 are used cooperatively, can be very convenient
Linking arm 2008 is moved in first through hole 2010, and linking arm 2008 is expressed to it is parallel with first through hole 2010, from
And secondary fixation of first nail tip 2009 to the bolt is realized, the anti-loosening property of the bolt is improved again.
It is obvious to a person skilled in the art that the invention is not restricted to the details of above-mentioned exemplary embodiment, Er Qie
In the case of without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter
From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power
Profit requirement rather than above description limit, it is intended that all in the meaning and scope obtained with important document of claim by falling
Variation is included within the present invention.Any reference numeral in claim should not be considered as to the involved claim of limitation.
Moreover, it will be appreciated that although this specification is described in terms of embodiments, but not each embodiment is only wrapped
Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should
Using specification as an entirety, the technical solutions in each embodiment can also be properly combined, forms those skilled in the art
It is appreciated that other embodiment.
Claims (10)
1. a kind of efficiently locking Fixed Tube-sheet Reboiler of novel sewer, including wall (1) and wall (1) surface is arranged on for fixing
The tube bank body of sewer pipe, it is characterised in that:The tube bank body upper half ring body (2) that may make up cyclic structure by two and
The junction of lower hemizonid (3) composition, the upper half ring body (2) and lower hemizonid (3) passes through fixing bolt (4) and fixing nut
(41) fixed, the tube bank chamber body sets auxiliary connect band (10), and aids in the auxiliary connect band at connect band (10) both ends
End (101) extends to upper half ring body (2) both ends and lower hemizonid (3) both ends junction through upper half ring body (2) surface, described
Run through the fastening stud (9) for having and being vertically arranged, and the affixed fixed spiral shell in fastening stud (9) end on upper half ring body (2) centre
Column (8);
The fixed bolt (8) is threaded io the fixation pipe sleeve (5) for being embedded in wall (1) surface, and the fixed pipe sleeve (5) is logical
Cross that embeded slot (6) is chimeric to be installed on wall (1) surface, and embeded slot (6) axial surface is equipped with to accommodate the ring of gag lever post (7)
Shape slot (61), fixed pipe sleeve (5) interior are equipped with several gag lever posts (7) for circularizing distribution, and gag lever post (7) one side
Fixation pipe sleeve (5) interior be equipped with installation cavity (51), vertical with gag lever post (7) the is equipped on the installation cavity (51)
One baffle (52), and first baffle (52) is connected to second positioned at gag lever post (7) surface by horizontally disposed spring (11)
Baffle (71);
The fixing bolt (4) is check bolt, and the check bolt includes nut (2001) and screw rod (2002), the nut
(2001) the first push rod (2003) is provided at the center at the top of, one end of first push rod (2003) passes through nut (2001)
And the inside of screw rod (2002) is extended to, the bottom of first push rod (2003) is fixedly connected with extrusion ball (2004), described
The front of first push rod (2003) is provided with slide (2005), and the front of the slide (2005) slidably connects sliding block
(2006), the second push rod (2007) is fixedly connected at the top of the sliding block (2006), the both sides of the sliding block (2006) are living
Dynamic to be connected with linking arm (2008), one end of the linking arm (2008) is fixedly connected with the first nail tip (2009), the screw rod
(2002) outer surface offers first through hole (2010), and the first nail tip (2009) through screw rod (2002) and is extended to outside it
Portion, the bottom of the screw rod (2002) are fixedly connected with punch (2011), and the inner wall of the punch (2011) is fixedly connected with branch
Strut (2012), one end of the supporting rod (2012) are fixedly connected with elastic piece (2013), and the one of the elastic piece (2013)
Side is fixedly connected with the second nail tip (2014), and the outer surface of the punch (2011) offers the second through hole (2015), and second
Nail tip (2014) is through punch (2011) and extends to outside it.
2. a kind of efficiently locking Fixed Tube-sheet Reboiler of novel sewer according to claim 1, it is characterised in that:The fastening spiral shell
Column (9) and fixed bolt (8) coaxial arrangement, and fastening stud (9) diameter is less than fixed bolt (8), the fastening stud (9) is remote
A side end face from fixed bolt (8) is equipped with nut.
3. a kind of efficiently locking Fixed Tube-sheet Reboiler of novel sewer according to claim 1, it is characterised in that:The fixed spiral shell
The length of column (8) is consistent with the length of fixed pipe sleeve (5) inner cavity.
4. a kind of efficiently locking Fixed Tube-sheet Reboiler of novel sewer according to claim 1, it is characterised in that:The first gear
Plate (52) and second baffle (71) are arranged in parallel, and first baffle (52) and second baffle (71) are respectively positioned on installation cavity (51)
It is internal.
5. a kind of efficiently locking Fixed Tube-sheet Reboiler of novel sewer according to claim 1, it is characterised in that:The auxiliary connects
Tape splicing end (101) is embedded in upper half ring body (2) and lower hemizonid (3) junction, and aid in connection band edge (101) respectively with upper half
Ring body (2) and lower hemizonid (3) end fit closely.
6. a kind of efficiently locking Fixed Tube-sheet Reboiler of novel sewer according to claim 1, it is characterised in that:The auxiliary connects
Two auxiliary connection band edges (101) at tape splicing (10) both ends and two junction air line distances of upper half ring body (2) are less than upper half
Ring body (2) diameter.
7. a kind of efficiently locking Fixed Tube-sheet Reboiler of novel sewer according to claim 1, it is characterised in that:The screw rod
(2002) inner wall is socketed with protective jacket (2016), and the protective jacket (2016) is disposed with the first water accepting layer from the inside to surface
(2017), rubber layer (2018) and the second water accepting layer (2019).
8. a kind of efficient locking suspension and support for tube body installation according to claim 1, it is characterised in that:Described second
One end of push rod (2007) and the front of the first push rod (2003) have been fixedly connected with the first magnet (2020), and the second push rod
(2007) it is flexibly connected by the first magnet (2020) with the first push rod (2003).
9. a kind of efficiently locking Fixed Tube-sheet Reboiler of novel sewer according to claim 1, it is characterised in that:Described first pushes away
Both sides at the top of the both sides of bar (2003) and nut (2001) have been fixedly connected with the second magnet (2021), and the first push rod
(2003) it is flexibly connected by the second magnet (2021) with nut (2001).
10. a kind of efficiently locking Fixed Tube-sheet Reboiler of novel sewer according to claim 1, it is characterised in that:The connection
Arm (2008) and the second nail tip (2014) and the angle of horizontal level are 30 degree.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711145372.3A CN108060748A (en) | 2017-11-17 | 2017-11-17 | A kind of efficiently locking Fixed Tube-sheet Reboiler of novel sewer |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711145372.3A CN108060748A (en) | 2017-11-17 | 2017-11-17 | A kind of efficiently locking Fixed Tube-sheet Reboiler of novel sewer |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108060748A true CN108060748A (en) | 2018-05-22 |
Family
ID=62135872
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711145372.3A Withdrawn CN108060748A (en) | 2017-11-17 | 2017-11-17 | A kind of efficiently locking Fixed Tube-sheet Reboiler of novel sewer |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108060748A (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2014118983A (en) * | 2012-12-13 | 2014-06-30 | Kito Koatsu:Kk | Threaded metal fitting desorption prevention tool and clamp device |
CN204004811U (en) * | 2014-08-08 | 2014-12-10 | 上海宝鹿车业有限公司 | A kind of pipe clamp |
CN204254033U (en) * | 2014-09-30 | 2015-04-08 | 广州广船国际股份有限公司 | A kind of marine water pipe hanger structure |
CN106122597A (en) * | 2016-08-19 | 2016-11-16 | 中国船舶重工集团公司第七〇九研究所 | A kind of adjustable pipeline elasticity with limit function is propped up and is hung |
CN106224644A (en) * | 2016-07-25 | 2016-12-14 | 华北水利水电大学 | A kind of pipe-hanger support coupling arrangement of fast assembling-disassembling |
CN106561404A (en) * | 2016-11-02 | 2017-04-19 | 贵州省施秉县万富农业科技发展有限公司 | Adjustable straightening device for fruit tree planting in agriculture and forestry |
CN107091370A (en) * | 2017-06-28 | 2017-08-25 | 安徽奥睿德科技发展有限公司 | A kind of modified tube bank |
-
2017
- 2017-11-17 CN CN201711145372.3A patent/CN108060748A/en not_active Withdrawn
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2014118983A (en) * | 2012-12-13 | 2014-06-30 | Kito Koatsu:Kk | Threaded metal fitting desorption prevention tool and clamp device |
CN204004811U (en) * | 2014-08-08 | 2014-12-10 | 上海宝鹿车业有限公司 | A kind of pipe clamp |
CN204254033U (en) * | 2014-09-30 | 2015-04-08 | 广州广船国际股份有限公司 | A kind of marine water pipe hanger structure |
CN106224644A (en) * | 2016-07-25 | 2016-12-14 | 华北水利水电大学 | A kind of pipe-hanger support coupling arrangement of fast assembling-disassembling |
CN106122597A (en) * | 2016-08-19 | 2016-11-16 | 中国船舶重工集团公司第七〇九研究所 | A kind of adjustable pipeline elasticity with limit function is propped up and is hung |
CN106561404A (en) * | 2016-11-02 | 2017-04-19 | 贵州省施秉县万富农业科技发展有限公司 | Adjustable straightening device for fruit tree planting in agriculture and forestry |
CN107091370A (en) * | 2017-06-28 | 2017-08-25 | 安徽奥睿德科技发展有限公司 | A kind of modified tube bank |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108167533A (en) | A kind of novel sewer Fixed Tube-sheet Reboiler | |
CN205717000U (en) | A kind of construction site illuminating lamp | |
CN203613817U (en) | Base device for steel-structured safety protection fence | |
CN108060748A (en) | A kind of efficiently locking Fixed Tube-sheet Reboiler of novel sewer | |
CN201310226Y (en) | Base part stationary type multilevel flexible safe fence pile | |
CN108149862A (en) | A kind of locking Fixed Tube-sheet Reboiler of novel sewer | |
CN207879040U (en) | A kind of warning fence for electrical urgent repair | |
CN208149399U (en) | A kind of material clamping and fixing device | |
CN209152101U (en) | A kind of solar photovoltaic assembly scarer | |
CN206049388U (en) | A kind of electric automobile charging pile with heat sinking function | |
CN205300586U (en) | Portable GPS -RTK centering rod connector | |
CN207144052U (en) | A kind of rain collecting reutilization system applied to park | |
CN205991249U (en) | A kind of MPP corrugated tube | |
CN208347809U (en) | A kind of combined anchor | |
CN206432943U (en) | A kind of angle adjusting mechanism of solar panel | |
CN201460311U (en) | Combined ladder of swimming pool | |
CN213683921U (en) | Assembled steel cat ladder | |
CN218061221U (en) | Floating plate spring vibration isolator with thread jacking function | |
CN208735525U (en) | A kind of municipal road lamp | |
CN109090091A (en) | A kind of solar photovoltaic assembly scarer | |
CN206247157U (en) | It is a kind of the garden lamp of the dual fixation of lamp stand to be inserted | |
CN207436000U (en) | A kind of water conservancy greening soil blocking device | |
CN201404139Y (en) | Shower bar | |
CN217974492U (en) | Novel theftproof gardens inspection shaft lid | |
CN203499235U (en) | Structure for locating scaffold |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: 210000 288 Qinhuai Road, Yung Yang Street, Lishui District, Nanjing, Jiangsu Applicant after: JIANGSU YIDINGGU ELECTROMECHANICAL TECHNOLOGY Co.,Ltd. Address before: 210000 Yuhuatai District, Nanjing City, Jiangsu Province, China (Nanjing) Software Guke Chuangcheng C3 Building 7 floors Applicant before: JIANGSU YIDINGGU ELECTROMECHANICAL TECHNOLOGY Co.,Ltd. |
|
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20180522 |