CN108060747A - A kind of construction and production method of New Thin-walled steel core concrete column with ribbing - Google Patents
A kind of construction and production method of New Thin-walled steel core concrete column with ribbing Download PDFInfo
- Publication number
- CN108060747A CN108060747A CN201711188409.0A CN201711188409A CN108060747A CN 108060747 A CN108060747 A CN 108060747A CN 201711188409 A CN201711188409 A CN 201711188409A CN 108060747 A CN108060747 A CN 108060747A
- Authority
- CN
- China
- Prior art keywords
- steel
- ribbing
- steel pipe
- plate
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/30—Columns; Pillars; Struts
- E04C3/34—Columns; Pillars; Struts of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/30—Columns; Pillars; Struts
- E04C3/32—Columns; Pillars; Struts of metal
Abstract
The present invention announces a kind of construction and production method of New Thin-walled steel core concrete column with ribbing, including the lattice steel pipe skeleton that the batten plate by cold bending thin wall steel and with hanging hole is welded to form, the precast slab and cylinder inner concrete that are hung up on batten plate.With 4 blocks of cold-pressing quality steels by being bent to form equal leg angle with ribbing three times, and it is arranged in 4 corners of pillar, then along the batten plate of angle steel longitudinal direction interval welded bands pear-shaped hole, precast slab (PC plate) with buckle is placed on batten plate, as exterior sheathing and fireprotection layer, formed and closed in rectangular steel pipe skeleton surrounding.Inner rib construction of the present invention can prevent steel pipe buckling, improve steel concrete cooperative work performance, and eliminate the cost of manufacture of ribbed stiffener inside welded still pipe, and manufacture difficulty is lower compared with framework of steel reinforcement;The prefabricated assembled technology of the design cooperation steel pipe steel skeleton of plug-in prefabricated PC plate can save formwork, form removal flow, greatly improve production work efficiency.
Description
Technical field
The invention belongs to the technical field of Structural Engineering, be related to a kind of New Thin-walled steel core concrete column with ribbing construction and
Production method.
Background technology
The vertical supporting member that steel core concrete column refers to the fill concrete in steel pipe and formed, using steel pipe to core
Compression concrete in area's applies sidewise restraint, is at the stress state of three dimension stress, delay its longitudinal microcrack generation and
Development improves its compression strength and compression deformation ability, therefore has the characteristics of large carrying capacity, plasticity and good anti-seismic performance.
But conventional steel concrete column section is mostly circle, and the column of circular cross-section and the beam connection of rectangular section are more complicated, and in beam column
Steel pipe needs to penetrate through at connecting node, and which increases the difficulty of construction at bean column node.In addition the steel pipe continuously penetrated through also makes
Obtaining vibrating for steel duct concrete becomes difficult, so as to influence construction quality.Steel core concrete column also exists in actual use
The problems such as steel using amount is larger, and steel pipe needs to carry out anti-corrosion fire prevention maintenance.
For problem present in above-mentioned existing engineering, the present invention proposes a kind of New Thin-walled steel core concrete column with ribbing
Construction and production method, including the lattice steel pipe skeleton that the batten plate by cold-pressing quality steel and with hanging hole is welded to form, hung on batten plate
The precast slab and cylinder inner concrete put.The Novel steel pipe concrete pole remains the excellent of conventional steel concrete column
Point, by lattice rectangular steel pipe skeleton to core concrete generate cuff effect of contraction, make core concrete be in three-dimensional by
The characteristics of pressure condition makes it have intensity height, and plasticity is good;In addition the steel duct ribbed stiffener formed by bending steel plate can be carried effectively
The vertical rigidity and bearing capacity of Gao Zhu, and increase the adhesive property of steel pipe and inner concrete.Simultaneously because novel steel tube coagulation
The cross section of earth pillar is rectangle, and there are certain spacing between batten plate on facade, this just effectively solves the company of bean column node
Problem is connect, but also the enhanced convenience of vibrating of inner concrete.Precast slab (PC plate) with buckle, which is placed in, to be sewed
It on plate, is formed and closed in rectangular steel pipe skeleton surrounding, such PC plate can have both been served as when rectangular steel pipe inner concrete pours
Exterior sheathing, moreover it is possible to fire prevention and the Anticorrosion of steel construction are effectively solved as protective layer.New Thin-walled proposed by the present invention is with ribbing
Steel core concrete column is constructed and made simply, is suitable for being factory produced, is met the demand of building industrialization.
The content of the invention
In order to solve the problems in the prior art, the purpose of the present invention is to provide a kind of New Thin-walled steel core concrete column with ribbing
Construction and production method.
The present invention is achieved through the following technical solutions:
Equal leg angle with ribbing is bent to form with 4 pieces of cold-pressing quality steels processes three times and steel batten plate welds and to form cross section zonula occludens
The rectangular steel pipe skeleton of rib;Precast slab (PC plate) with buckle is placed on batten plate, in rectangular steel pipe skeleton four
Week forms closing;Casting concrete in spatial domain is segmented into steel pipe skeleton, forms rectangular steel-tube concrete column with ribbing;Steel pipe skeleton
Apply sidewise restraint to core space concrete, while ribbed stiffener can increase the vertical rigidity and bearing capacity of steel pipe, steel pipe and inside
Concrete forms vertical bearing system together.
The rectangular steel pipe skeleton with ribbing is bent to form equal leg angle with ribbing three times by being passed through with 4 blocks of clod wash steel plates
It is welded with steel batten plate.Steel pipe skeleton forms closed system on cross section, and the equal leg angle length of side is 90mm, thickness 6mm,
Batten plate is formed using the steel plate cutting of 6mm thickness and is opened Pear-Shaped hole.Along 4 pieces of angle steel longitudinal directions one of batten plate, shape are welded every 1 meter
Rectangular lattice steel pipe skeleton.
The prefabricated PC plate length is 1m, and thickness 30mm, it is empty for being hung on batten plate Pear-Shaped that inner surface leaves bayonet
It is interior, together with rectangular steel pipe skeleton there is resistance to pressure measurement template, while play and to form concrete cover on the outside of steel pipe
Effect.
New Thin-walled steel core concrete column with ribbing, when steel pipe skeleton with ribbing is hung with peripheral PC plate and fixes completion
Afterwards, the spatial domain in rectangular steel pipe is filled up with pump concrete and vibration compacting, maintenance waits intensity to reach requirement, nothing
Need striking job.
It is an advantage of the invention that:Lattice rectangular steel pipe to core concrete apply sidewise restraint, be at three-dimensional by
The stress state of pressure, the setting of internal ribbed stiffener can improve the rigidity and bearing capacity of column, while increase steel pipe and inner concrete
Cohesive force so that pillar have large carrying capacity, plasticity and good anti-seismic performance the characteristics of.By bending steel plate and welding shape
Into steel core concrete column with ribbing, the processing cost and process of the welding of pipe stiffener rib are eliminated.This external enwergy pillar cross-section is
Rectangle, there are certain spacing between batten plate on facade so that the connection of bean column node is relatively simple.Lattice rectangle steel cannon born
Frame plug-in prefabricated PC plate with steel pipe together as the template of resistance to pressure measurement, thus during placing concrete, can save formwork, form removal
Work and material, and it is suitable for advanced pumping grouted-aggregate concrete technique.Lattice rectangular steel pipe cost of manufacture with ribbing is compared with framework of steel reinforcement
It is lower and convenient for placing concrete, more applicable factory industryization processing.Lattice rectangular steel pipe skeleton with ribbing is again in itself stiffness
Load-bearing skeleton, in the construction stage, it can play stiff skeleton, and welding job amount is few, lifting more than normal section steel skeleton
Lighter weight so as to simplify installation technology, improves work efficiency.
Description of the drawings
Fig. 1 is the cross section face schematic diagram of the present invention;
Fig. 2 is the vertical elevational schematic view of the present invention;
In figure, 1-angle steel;2-batten plate;3-prefabricated PC plate;4-concrete.
Specific embodiment
Shown in Fig. 1, Fig. 2, a kind of construction and production method of New Thin-walled steel core concrete column with ribbing.The present invention's is specific
Implementation steps are as follows.
1st, 4 blocks of clod wash steel plates are 90mm by being bent to form equal leg angle 1 with ribbing, the angle steel length of side three times, and thickness is
Angle steel is welded to form lattice rectangular steel pipe skeleton two-by-two by 6mm, the high 40mm of rib with batten plate 2;
2nd, for batten plate 2 with the steel plate cutting of 6mm thickness into Pear-Shaped hole is opened, batten plate size and hole size can be according to pillars
Requirement from main modulation;
3rd, the prefabricated PC plate 3 with buckle is placed on batten plate 2, closed system is formed in rectangular steel pipe skeleton surrounding;
After the 4th, prefabricated PC plate is installed and fixed, poured by pump concrete to rectangular steel pipe inner region,
Fill it is closely knit after vibrated, conserved, intensity reaches after requirement;
5th, lattice steel core concrete column with ribbing of the invention can be integral prefabricated in factory, also first can make square in factory
Then shape steel frame carries out cast-in-place concrete after assembly at the construction field (site).
6th, prefabricated PC plate 3 with bayonet of the invention carries out prefabricated in factory, then carries out hanging assembly at the construction field (site).
Claims (9)
1. claim 1:A kind of construction and production method of New Thin-walled steel core concrete column with ribbing, it is characterised in that:By curved
The angle steel and batten plate with ribbing formed is rolled over to weld to form lattice rectangular steel pipe skeleton structure with ribbing;Prefabricated PC is hung on the outside of batten plate
Plate, the casting concrete in spatial domain into rectangular steel pipe, forms the Novel steel collectively constituted by rectangular steel pipe with ribbing, cast-in-place concrete
Pipe concrete column.
2. claim 2:A kind of construction and production method of New Thin-walled steel core concrete column with ribbing, it is characterised in that:By curved
It rolls over the angle steel and batten plate with ribbing formed to weld to form lattice rectangular steel pipe skeleton structure with ribbing, eliminates welding in steel pipe and put more energy into
The process of rib.
3. claim 3:A kind of construction and production method of New Thin-walled steel core concrete column with ribbing, it is characterised in that:Batten plate
On open Pear-Shaped hole, prefabricated PC plate is hung on the outside of batten plate, pours exterior sheathing as concrete filled steel tube, concreting is completed
Afterwards without form removal, while it is used as steel core concrete column fire retardant anticorrosion protective layer.
4. New Thin-walled concrete filled steel tube rod structure with ribbing as described in claim 1, it is characterised in that:Select 4 pieces bending and
Into angle steel with ribbing, angle steel is welded two-by-two with steel batten plate, formed lattice rectangular steel pipe skeleton with ribbing, steel pipe skeleton is transversal
Face forms the structural system being closed.
5. New Thin-walled concrete filled steel tube rod structure with ribbing as claimed in claim 2, it is characterised in that:Pass through bent steel three times
Plate and batten plate weld to form inner rib rectangular steel pipe system.
6. New Thin-walled concrete filled steel tube rod structure with ribbing as claimed in claim 3, it is characterised in that:On the outside of rectangular steel pipe
Spliced by batten plate hole and prefabricated PC plate with bayonet, prefabricated PC plate forms closed system on cross section, becomes and pours
Building mould, and fire prevention and corrosion-resistant effect are erected to steel framework.
7. New Thin-walled concrete filled steel tube rod structure with ribbing as described in claim 1, it is characterised in that:Lattice rectangle with ribbing
Steel pipe skeleton and prefabricated PC plate form a transverse seal space, pour space in pipe using pump concrete and vibrate after filling up
It is closely knit.
8. New Thin-walled concrete filled steel tube rod structure with ribbing as described in claim 1, it is characterised in that:Lattice rectangular steel pipe
Sidewise restraint is applied to core concrete, the stress state of three dimension stress is at, so as to improve its compression strength and deformation
Ability.
9. New Thin-walled concrete filled steel tube rod structure with ribbing as described in claim 1, it is characterised in that:Lattice rectangular steel pipe
Interior ribbed stiffener can increase the steel pipe and bearing capacity of steel core concrete column, moreover it is possible to improve the caking property of steel pipe and inner concrete
Energy.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711188409.0A CN108060747A (en) | 2017-11-24 | 2017-11-24 | A kind of construction and production method of New Thin-walled steel core concrete column with ribbing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711188409.0A CN108060747A (en) | 2017-11-24 | 2017-11-24 | A kind of construction and production method of New Thin-walled steel core concrete column with ribbing |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108060747A true CN108060747A (en) | 2018-05-22 |
Family
ID=62135741
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711188409.0A Pending CN108060747A (en) | 2017-11-24 | 2017-11-24 | A kind of construction and production method of New Thin-walled steel core concrete column with ribbing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108060747A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110863610A (en) * | 2019-11-20 | 2020-03-06 | 河北水利电力学院 | H-shaped steel and channel steel assembled straight-line-shaped special-shaped column connected by latch hook |
CN110863609A (en) * | 2019-11-20 | 2020-03-06 | 河北水利电力学院 | Latch hook connected H-shaped steel and channel steel assembled cross-shaped special-shaped column |
CN111395754A (en) * | 2020-04-09 | 2020-07-10 | 晏幸福 | Method for implementing formwork supporting system |
CN112084696A (en) * | 2020-09-29 | 2020-12-15 | 江南大学 | Method for designing lattice type steel reinforced concrete column based on axial bearing capacity |
CN113482240A (en) * | 2021-07-02 | 2021-10-08 | 哈尔滨理工大学 | Concrete column adopting prefabricated angle steel lattice permanent formwork and manufacturing method thereof |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202187598U (en) * | 2011-07-11 | 2012-04-11 | 昆明有色冶金设计研究院股份公司 | Composite steel rib concrete buttress |
CN103615072A (en) * | 2013-11-25 | 2014-03-05 | 广西大学 | Steel-encased concrete steel column with built-in spiral stirrup |
CN204491999U (en) * | 2015-02-14 | 2015-07-22 | 福州大学 | The compound Concrete-Filled Square Steel Tube coupled column of New Thin-walled |
CN107227822A (en) * | 2017-07-24 | 2017-10-03 | 上海欧本钢结构有限公司 | Building post and its construction technology that a kind of steel pipe is combined with batten plate |
-
2017
- 2017-11-24 CN CN201711188409.0A patent/CN108060747A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202187598U (en) * | 2011-07-11 | 2012-04-11 | 昆明有色冶金设计研究院股份公司 | Composite steel rib concrete buttress |
CN103615072A (en) * | 2013-11-25 | 2014-03-05 | 广西大学 | Steel-encased concrete steel column with built-in spiral stirrup |
CN204491999U (en) * | 2015-02-14 | 2015-07-22 | 福州大学 | The compound Concrete-Filled Square Steel Tube coupled column of New Thin-walled |
CN107227822A (en) * | 2017-07-24 | 2017-10-03 | 上海欧本钢结构有限公司 | Building post and its construction technology that a kind of steel pipe is combined with batten plate |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110863610A (en) * | 2019-11-20 | 2020-03-06 | 河北水利电力学院 | H-shaped steel and channel steel assembled straight-line-shaped special-shaped column connected by latch hook |
CN110863609A (en) * | 2019-11-20 | 2020-03-06 | 河北水利电力学院 | Latch hook connected H-shaped steel and channel steel assembled cross-shaped special-shaped column |
CN111395754A (en) * | 2020-04-09 | 2020-07-10 | 晏幸福 | Method for implementing formwork supporting system |
CN112084696A (en) * | 2020-09-29 | 2020-12-15 | 江南大学 | Method for designing lattice type steel reinforced concrete column based on axial bearing capacity |
CN112084696B (en) * | 2020-09-29 | 2023-11-28 | 江南大学 | Method for designing lattice type steel reinforced concrete column based on axial bearing capacity |
CN113482240A (en) * | 2021-07-02 | 2021-10-08 | 哈尔滨理工大学 | Concrete column adopting prefabricated angle steel lattice permanent formwork and manufacturing method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108060747A (en) | A kind of construction and production method of New Thin-walled steel core concrete column with ribbing | |
CN105569224A (en) | Concrete-filled steel tube edge restraint overlapping integrated shear wall and preparing and installation methods thereof | |
WO2021023245A1 (en) | Pile slab-type soil retaining wall integral casting formwork structure and construction method therefor | |
CN108252457A (en) | A kind of steel core concrete column and manufacturing method | |
CN207419711U (en) | Steel plate shear force wall and the connection structure of steel bar girder floor plates | |
CN109372130A (en) | The novel full assembly concrete shaped section steel frame node of one kind and its construction method | |
CN106760053A (en) | Resettable rigid connection assembly type steel frame infilled wall system and construction method thereof | |
CN102071747A (en) | Joint of square steel tube concrete column and reinforced concrete floor and production method thereof | |
CN108797791B (en) | A kind of assembly method of upper and lower self-heat conserving external wall and floor | |
CN108951840B (en) | Method for constructing arc-shaped outer wall of basement based on single-side formwork support of shaped support | |
CN201406767Y (en) | Node for connecting circular concrete-filled tubular column and reinforced concrete floor | |
CN206337676U (en) | Rigidly connected assembled steel frame wall filled with masonry system can be resetted | |
CN107724540A (en) | Steel plate shear force wall and the attachment structure and its construction method of steel bar girder floor plates | |
CN208430661U (en) | A kind of vertical piece construction of line-styled self-heat conserving overlapped shear wall | |
CN106759858A (en) | The connecting node and preparation method of a kind of H profile steel beam and rectangular steel-tube concrete column | |
CN206418643U (en) | A kind of assembling type steel net cage obturator | |
CN108316150A (en) | The construction system and construction method of Cable stayed Bridge Main Tower and steel anchor beam | |
CN208105474U (en) | A kind of assembly node of upper and lower interior wall and floor | |
CN208152311U (en) | A kind of two-sided folded type steel shear wall | |
CN108412036B (en) | Assembled H profile steel column-isolated footing-concrete collar tie beam cross connecting node | |
CN108930406A (en) | Construction method for large-formwork narrow-space wall based on integral assembly | |
CN112523503B (en) | Disassembly-free supporting system for concrete box girder inner mold and construction method | |
CN113136946B (en) | Self-supporting assembly type seawater sea sand concrete frame structure and construction method | |
CN103437349A (en) | Method for constructing reinforced-concrete-poured irregular-shaped pile | |
CN108625491A (en) | Assembled H profile steel column-isolated footing-concrete collar tie beam L-shaped connecting node |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180522 |