CN108060662A - A kind of closed river hydropower station - Google Patents

A kind of closed river hydropower station Download PDF

Info

Publication number
CN108060662A
CN108060662A CN201711167199.7A CN201711167199A CN108060662A CN 108060662 A CN108060662 A CN 108060662A CN 201711167199 A CN201711167199 A CN 201711167199A CN 108060662 A CN108060662 A CN 108060662A
Authority
CN
China
Prior art keywords
water
dam
hydraulic device
stop sheet
hydropower station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711167199.7A
Other languages
Chinese (zh)
Inventor
汤正云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wangcang Kemei Shockproof Technology Co Ltd
Original Assignee
Wangcang Kemei Shockproof Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wangcang Kemei Shockproof Technology Co Ltd filed Critical Wangcang Kemei Shockproof Technology Co Ltd
Priority to CN201711167199.7A priority Critical patent/CN108060662A/en
Publication of CN108060662A publication Critical patent/CN108060662A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B9/00Water-power plants; Layout, construction or equipment, methods of, or apparatus for, making same
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/20Movable barrages; Lock or dry-dock gates
    • E02B7/26Vertical-lift gates
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/20Movable barrages; Lock or dry-dock gates
    • E02B7/26Vertical-lift gates
    • E02B7/36Elevating mechanisms for vertical-lift gates
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B9/00Water-power plants; Layout, construction or equipment, methods of, or apparatus for, making same
    • E02B9/02Water-ways
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B9/00Water-power plants; Layout, construction or equipment, methods of, or apparatus for, making same
    • E02B9/02Water-ways
    • E02B9/022Closures
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Abstract

The present invention relates to power station fields, disclose a kind of closed river hydropower station, including being arranged at the dam carried on the ridge, dam bottom is equipped with elevating control slot, equipped with vertically flexible raise-lower hydraulic device in elevating control slot, raise-lower hydraulic device lower end is connected with water-stop sheet, and water-stop sheet is in sealing contact with carrying the ridge;Dam is respectively equipped with elastic control flume at the riverbank of both sides, is equipped with laterally flexible side hydraulic device in elastic control flume, side hydraulic device is in sealing contact with riverbank by lateralling secure support plate;Water pump rear portion is integrated with valve pipe to be connected, and valve pipe is integrated to be connected with water-energy generating electricity room, and water-energy generating electricity room is in communication with the outside by people's row maintenance channel.The present invention can freely adjust dam height, efficiently using water energy, suitable for the medium or smallsized river construction of hydropower stations.

Description

A kind of closed river hydropower station
Technical field
The present invention relates to power station field, in particular to a kind of closed river hydropower stations.
Background technology
Dam is block rivers ditch water flow with raising of water level or adjusts the water retaining structure of flow, can form reservoir, is lifted High water level, regulated flow concentrate head, available for flood control, water supply, irrigation, hydroelectric generation, improve shipping etc..
Existing dam usually height can not be adjusted significantly, except hydraulic pressure dam can be blocked in addition to fine tune blocks water height Water height is certain or varies less.Therefore the dam that being provided with generator can generate electricity can typically be only used in Large River, no Suitable for the medium or smallsized river construction of hydropower stations.
The content of the invention
Based on problem above, the present invention provides a kind of closed river hydropower stations.The present invention can freely adjust water Height of dam degree, efficiently using water energy, suitable for the medium or smallsized river construction of hydropower stations.
For solution more than technical problem, the technical solution adopted by the present invention is as follows:
A kind of closed river hydropower station, including being arranged at the dam carried on the ridge, dam bottom is equipped with elevating control Slot, elevating control slot is interior equipped with vertically flexible raise-lower hydraulic device, and raise-lower hydraulic device lower end is connected with water-stop sheet, water-stop sheet It is in sealing contact with carrying the ridge;Dam is respectively equipped with elastic control flume at the riverbank of both sides, is equipped in elastic control flume lateral flexible Side hydraulic device, side hydraulic device is in sealing contact with riverbank by lateralling secure support plate;Water pump rear portion and valved tube Trace gather is into connection, and valve pipe is integrated to be connected with water-energy generating electricity room, and water-energy generating electricity room is in communication with the outside by people's row maintenance channel.
In the present invention, dam is arranged in river, and both sides are contacted with riverbank.When water abundance in river, liquid is lifted Pressure device is upheld, and dam is driven to rise, and due to water-stop sheet and carries that the ridge is in sealing contact, can be ensured and effectively be avoided water after rising Leakage.Raise-lower hydraulic device can be hydraulic cylinder, but be not limited to hydraulic cylinder.In dam uphill process, dam both sides and river The contact of bank compresses after loosening first, is specially that side hydraulic device is shunk, laterallys secure the pressure that support plate acts on riverbank Reduce, reduce the resistance that dam rises downwards.When rising to setting height, side hydraulic device is upheld, and is driven lateral solid Determine support plate and compress riverbank, dam is made effectively to be fixed under immense pressure effect.Valve pipe integrate with inside dam Drainage gallery connects, and enters water-energy generating electricity room by valve pipe integrated control water and generates electricity, under water energy generator effect It generates electricity.In order to ensure effect, water-energy generating electricity room is closed waterproof computer room.Water-energy generating electricity room by people's row maintenance channel with External world's connection carries out repair and maintenance in the daily water-energy generating electricity room that can enter by people's row maintenance channel.The present invention can be adjusted freely Dam height, efficiently using water energy, suitable for the medium or smallsized river construction of hydropower stations.The present invention can be kept away by own lifting dam Exempt from flood to destroy by rush of water power station and generating equipment.The present invention can rationally be generated electricity using water storage project, be effectively utilized water energy.In addition, this It is low that the advantages of invention, also resides in construction cost, and waterpower utilization rate is high.
As a preferred mode, water-stop sheet, which is inserted in, carries in the ridge.It is inserted in and is carried in the ridge by water-stop sheet.Water-stop sheet is inserted Enter to carry in the ridge, can effectively fix dam to a certain extent.
As a preferred mode, raise-lower hydraulic device is connected by the lifting push plate in elevating control slot and water-stop sheet It connects, lifts push plate outer rim and elevating control slot is seamless applying, can only be moved along its trend, the quantity of water-stop sheet is multiple, difference It is arranged in parallel.It is connected by raise-lower hydraulic device by the lifting push plate in elevating control slot with water-stop sheet, lifts push plate outer rim It is seamless applying with elevating control slot, it can only be moved along its trend, the quantity of water-stop sheet is multiple, is arranged in parallel respectively, passes through liter Drop push plate can only be moved towards to move along elevating control slot, it can effectively be controlled to lift direction, ensure normal work.
As a preferred mode, side hydraulic device is connected by elastic push plate with lateralling secure support plate, elastic Push plate outer rim and elastic control flume are seamless applying, can only be moved along its trend.By side hydraulic device by elastic push plate with Support plate connection is laterallyd secure, elastic push plate outer rim and elastic control flume are seamless applying, can only be moved along its trend, can ensure side To the accuracy of the fixed support plate direction of motion, normal work is ensured.
As a preferred mode, dam is hydraulic pressure dam.Hydraulic pressure dam is simple in structure, is easy to build, and can further be promoted Maximum blocks water height.
As a preferred mode, people's row maintenance channel is connected with air-supply passage.Pass through people's row maintenance channel and air-supply Passage connects, and before repair and maintenance, enough air is passed through in water-energy generating electricity room by air-supply passage first, ensures follow-up maintenance Personnel influence after entering from asphyxia.
Compared with prior art, the beneficial effects of the invention are as follows:
(1) present invention can freely adjust dam height, efficiently using water energy, suitable for the medium or smallsized river construction of hydropower stations;
(2) present invention is inserted in by water-stop sheet carries in the ridge.Water-stop sheet, which is inserted in, to be carried in the ridge, can to a certain extent effectively Fixed dam;
(3) present invention is connected by raise-lower hydraulic device by the lifting push plate in elevating control slot with water-stop sheet, described It lifts push plate outer rim and elevating control slot is seamless applying, can only be moved along its trend, the quantity of the water-stop sheet is multiple, difference It is arranged in parallel, can only be moved towards to move along elevating control slot by lifting push plate, it can effectively be controlled to lift direction, ensure normal work Make;
(4) present invention is connected by side hydraulic device by elastic push plate with lateralling secure support plate, described elastic to push away Plate outer rim and elastic control flume are seamless applying, can only be moved along its trend, can ensure the standard for lateralling secure the support plate direction of motion True property ensures normal work;
(5) present invention is connected by people's row maintenance channel with air-supply passage, before repair and maintenance, passes through air-supply passage first Enough air is passed through in water-energy generating electricity room, ensures that follow-up maintenance personnel influence after entering from asphyxia.
Description of the drawings
Fig. 1 is the vertical lifting schematic diagram of embodiment 1.
Fig. 2 is the connection diagram of raise-lower hydraulic device and water-stop sheet in Fig. 1.
Fig. 3 laterallys secure schematic diagram for embodiment 1.
Wherein, 1 elevating control slot, 2 carry the ridge, 3 dams, and 4 valve pipes integrate, 5 water-energy generating electricity rooms, 6 water energy generators, and 7 People's row maintenance channel, 8 lifting push plates, 9 raise-lower hydraulic devices, 10 water-stop sheets, 11 laterally secure support plate, 12 side hydraulics dress It puts, 13 elastic push plates, 14 elastic control flumes.
Specific embodiment
The present invention is further illustrated below in conjunction with the accompanying drawings.Embodiments of the present invention include but not limited to following reality Apply example.
Embodiment 1:
Referring to Fig. 1~3, a kind of closed river hydropower station, including being arranged at the dam 3 carried on the ridge 2, the dam 3 bottoms are equipped with elevating control slot 1, and vertically flexible raise-lower hydraulic device 9, the lifting liquid are housed in the elevating control slot 1 9 lower end of pressure device is connected with water-stop sheet 10, and the water-stop sheet 10 is in sealing contact with carrying the ridge 2;The dam 3 is at the riverbank of both sides Elastic control flume 14 is respectively equipped with, laterally flexible side hydraulic device 12 is equipped in the elastic control flume 14, it is described lateral Hydraulic device 12 is in sealing contact with riverbank by lateralling secure support plate 11;The water pump rear portion integrates 4 with valve pipe and connects, The valve pipe integrates 4 and is connected with water-energy generating electricity room 5, and the water-energy generating electricity room 5 is connected by people's row maintenance channel 7 with extraneous It is logical.
In the present invention, dam 3 is arranged in river, and both sides are contacted with riverbank.When water abundance in river, liquid is lifted Pressure device 9 is upheld, and dam 3 is driven to rise, and since water-stop sheet 10 is in sealing contact with carrying the ridge 2, is effectively kept away after can ensureing rising Exempt from the leakage of water.Raise-lower hydraulic device 9 can be hydraulic cylinder, but be not limited to hydraulic cylinder.In 3 uphill process of dam, dam 3 Contact of the both sides with riverbank compresses after loosening first, is specially that side hydraulic device 12 is shunk, laterallys secure support plate 11 and act on Pressure in riverbank reduces, and reduces the resistance that dam 3 rises downwards.When rising to setting height, side hydraulic device 12 It upholds, drive laterallys secure support plate 11 and compresses riverbank, and dam 3 is made effectively to be fixed under immense pressure effect.Valved tube Trace gather is connected into 4 with the drainage gallery inside dam 3, is integrated 4 control water by valve pipe and is entered water-energy generating electricity room 5 and is sent out Electricity generates electricity under the effect of water energy generator 6.In order to ensure effect, water-energy generating electricity room 5 is closed waterproof computer room.Water energy Power compartment 5 is in communication with the outside by people's row maintenance channel 7, it is daily can by people's row maintenance channel 7 into water-energy generating electricity room 5 into Row repair and maintenance.The present invention can freely adjust 3 height of dam, efficiently using water energy, suitable for the medium or smallsized river construction of hydropower stations. The present invention can avoid flood from destroying by rush of water power station and generating equipment by own lifting dam 3.The present invention can rationally utilize water storage project Power generation, is effectively utilized water energy.It is further an advantage of the invention that construction cost is low, waterpower utilization rate is high.
As a preferred mode, the water-stop sheet 10, which is inserted in, carries in the ridge 2.It is inserted in by water-stop sheet 10 and carries the ridge 2 It is interior.Water-stop sheet 10, which is inserted in, to be carried in the ridge 2, can effectively fix dam 3 to a certain extent.
As a preferred mode, the raise-lower hydraulic device 9 by the lifting push plate 8 in elevating control slot 1 with every Water plate 10 connects, and lifting 8 outer rim of push plate and elevating control slot 1 are seamless applying, can only be moved along its trend, the water-stop sheet 10 quantity is multiple, is arranged in parallel respectively.By raise-lower hydraulic device 9 by the lifting push plate 8 in elevating control slot 1 with every Water plate 10 connects, and lifting 8 outer rim of push plate and elevating control slot 1 are seamless applying, can only be moved along its trend, the water-stop sheet 10 quantity is multiple, is arranged in parallel respectively, can only be moved towards to move along elevating control slot 1, can effectively controlled by lifting push plate 8 It lifts direction, ensures normal work.
As a preferred mode, the side hydraulic device 12 by elastic push plate 13 and laterallys secure support plate 11 Connection, elastic 13 outer rim of push plate and elastic control flume 14 are seamless applying, can only be moved along its trend.It is filled by side hydraulic It puts 12 to be connected with lateralling secure support plate 11 by elastic push plate 13, elastic 13 outer rim of push plate and elastic control flume 14 are seamless Fitting, can only move along its trend, can ensure the accuracy for lateralling secure 11 direction of motion of support plate, ensure normal work.
As a preferred mode, the dam 3 is hydraulic pressure dam.Hydraulic pressure dam is simple in structure, is easy to build, can be further Promote maximum blocks water height.
As a preferred mode, people's row maintenance channel 7 is connected with air-supply passage.Pass through people's row maintenance channel 7 It is connected with air-supply passage, before repair and maintenance, enough air is passed through in water-energy generating electricity room 5 by air-supply passage first, ensured Follow-up maintenance personnel influence after entering from asphyxia.
It is the embodiment of the present invention as described above.Design parameter in above-described embodiment and embodiment is merely to clear Chu state inventor invention verification process, not to limit the present invention scope of patent protection, patent protection of the invention Scope is still subject to its claims, and the equivalent structure that every specification and accompanying drawing content with the present invention is made becomes Change, similarly should be included within the scope of the present invention.

Claims (6)

1. a kind of closed river hydropower station, it is characterised in that:Including being arranged at the dam (3) carried on the ridge (2), the water Dam (3) bottom is equipped with elevating control slot (1), and vertically flexible raise-lower hydraulic device (9) is housed in the elevating control slot (1), Raise-lower hydraulic device (9) lower end is connected with water-stop sheet (10), and the water-stop sheet (10) is in sealing contact with carrying the ridge (2);It is described Dam (3) is respectively equipped with elastic control flume (14) at the riverbank of both sides, is equipped in the elastic control flume (14) lateral flexible Side hydraulic device (12), the side hydraulic device (12) is in sealing contact by lateralling secure support plate (11) and riverbank; The water pump rear portion integrates (4) with valve pipe and connects, and the valve pipe integrates (4) and connected with water-energy generating electricity room (5), described Water-energy generating electricity room (5) is in communication with the outside by people's row maintenance channel (7).
2. a kind of closed river hydropower station according to claim 1, it is characterised in that:The water-stop sheet (10) is inserted Enter in Yu Tigeng (2).
3. a kind of closed river hydropower station according to claim 1, it is characterised in that:The raise-lower hydraulic device (9) it is connected by the lifting push plate (8) in elevating control slot (1) with water-stop sheet (10), lifting push plate (8) outer rim and lifting Control flume (1) is seamless applying, can only be moved along its trend, and the quantity of the water-stop sheet (10) is multiple, is arranged in parallel respectively.
4. a kind of closed river hydropower station according to claim 1, it is characterised in that:The side hydraulic device (12) it is connected by elastic push plate (13) with lateralling secure support plate (11), elastic push plate (13) outer rim and elastic control flume (14) it is seamless applying, it can only be moved along its trend.
5. a kind of closed river hydropower station according to claim 1, it is characterised in that:The dam (3) is liquid Press dam.
6. a kind of closed river hydropower station according to claim 1, it is characterised in that:People's row maintenance channel (7) connected with air-supply passage.
CN201711167199.7A 2017-11-21 2017-11-21 A kind of closed river hydropower station Pending CN108060662A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711167199.7A CN108060662A (en) 2017-11-21 2017-11-21 A kind of closed river hydropower station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711167199.7A CN108060662A (en) 2017-11-21 2017-11-21 A kind of closed river hydropower station

Publications (1)

Publication Number Publication Date
CN108060662A true CN108060662A (en) 2018-05-22

Family

ID=62134977

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711167199.7A Pending CN108060662A (en) 2017-11-21 2017-11-21 A kind of closed river hydropower station

Country Status (1)

Country Link
CN (1) CN108060662A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20130064841A (en) * 2011-12-09 2013-06-19 김동현 Water fence for prevention of floods
CN204039997U (en) * 2014-08-29 2014-12-24 薛士成 Water-power plant
CN204572317U (en) * 2015-01-06 2015-08-19 洛阳市四洲水能发电科技有限公司 Power generation box station, movable small stream river
CN105257454A (en) * 2015-10-12 2016-01-20 武汉大学 Diversion type vortex flow power generation system
CN105781856A (en) * 2016-05-04 2016-07-20 旺苍县科美防震科技有限公司 Up-and-down river channel water energy power station
CN205617340U (en) * 2016-04-10 2016-10-05 泉州市中研智能机电研究院有限公司 Power station water inlet rivers control structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20130064841A (en) * 2011-12-09 2013-06-19 김동현 Water fence for prevention of floods
CN204039997U (en) * 2014-08-29 2014-12-24 薛士成 Water-power plant
CN204572317U (en) * 2015-01-06 2015-08-19 洛阳市四洲水能发电科技有限公司 Power generation box station, movable small stream river
CN105257454A (en) * 2015-10-12 2016-01-20 武汉大学 Diversion type vortex flow power generation system
CN205617340U (en) * 2016-04-10 2016-10-05 泉州市中研智能机电研究院有限公司 Power station water inlet rivers control structure
CN105781856A (en) * 2016-05-04 2016-07-20 旺苍县科美防震科技有限公司 Up-and-down river channel water energy power station

Similar Documents

Publication Publication Date Title
CN102817816B (en) Wind-power water pumping system with air bags
CN204811321U (en) Solar energy siphon suction pipe pump
US20130089410A1 (en) Hydro-electric tube generation
WO2020125601A1 (en) Emptying system for high dam
CN108060662A (en) A kind of closed river hydropower station
CN204849708U (en) 200 superelevation dam reservoir unloading hole more than rice
CN111457607A (en) Water source heat pump groundwater recharge system
CN108397340B (en) Sea wave power generation device
CN105641985A (en) Failure-free overhead type sludge lifting reflux system
CN105065178A (en) Waterpower natural circulation energy storage system
CN213235311U (en) Generator air supplement pipe drainage device
CN114908718A (en) Water-storage power station lower water reservoir arrangement structure utilizing existing reservoir
CN112727667B (en) Intelligent regulation type water delivery power generation device and monitoring feedback method thereof
CN208533449U (en) A kind of device for flood retarding project decentralization ecological water
CN110468909B (en) Deep groundwater sealing pumping and filling device for infiltration of unsaturated layer radiant tube
RU132143U1 (en) PNEUMOHYDRO POWER PLANT
CN106759138A (en) Water-gas combined balance waterpower automatic overflow weir
CN208167761U (en) A kind of vacuum-dewatering well device suitable for deep pit digging
CN111945824A (en) Surface water taking device capable of automatically rising and falling along with water level
CN110024662A (en) A kind of high-efficient irrigation machine
CN217580028U (en) Water-storage power station reservoir arrangement structure built in natural river channel
CN210530427U (en) Main power house layout structure of thermal power plant
CN214194403U (en) Intelligent control type flood control and drainage irrigation device
CN217758622U (en) Leakage water collecting and discharging system for improving power generation benefit of hydropower station
CN203441687U (en) Oceanic tidal fall water pumping device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180522

RJ01 Rejection of invention patent application after publication