CN108054832A - Project of transmitting and converting electricity environmental monitoring early warning integrated system - Google Patents

Project of transmitting and converting electricity environmental monitoring early warning integrated system Download PDF

Info

Publication number
CN108054832A
CN108054832A CN201711291238.4A CN201711291238A CN108054832A CN 108054832 A CN108054832 A CN 108054832A CN 201711291238 A CN201711291238 A CN 201711291238A CN 108054832 A CN108054832 A CN 108054832A
Authority
CN
China
Prior art keywords
module
monitoring
mobile terminal
environmental monitoring
project
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711291238.4A
Other languages
Chinese (zh)
Inventor
王文兵
吴少华
胡建伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Suzhou Nuclear Radiation Technology Co Ltd
Original Assignee
Jiangsu Suzhou Nuclear Radiation Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Suzhou Nuclear Radiation Technology Co Ltd filed Critical Jiangsu Suzhou Nuclear Radiation Technology Co Ltd
Priority to CN201711291238.4A priority Critical patent/CN108054832A/en
Publication of CN108054832A publication Critical patent/CN108054832A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00001Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by the display of information or by user interaction, e.g. supervisory control and data acquisition systems [SCADA] or graphical user interfaces [GUI]
    • GPHYSICS
    • G08SIGNALLING
    • G08CTRANSMISSION SYSTEMS FOR MEASURED VALUES, CONTROL OR SIMILAR SIGNALS
    • G08C17/00Arrangements for transmitting signals characterised by the use of a wireless electrical link
    • G08C17/02Arrangements for transmitting signals characterised by the use of a wireless electrical link using a radio link
    • H02J13/0013
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N7/00Television systems
    • H04N7/18Closed-circuit television [CCTV] systems, i.e. systems in which the video signal is not broadcast
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/16Electric power substations

Landscapes

  • Engineering & Computer Science (AREA)
  • Human Computer Interaction (AREA)
  • Power Engineering (AREA)
  • Multimedia (AREA)
  • Signal Processing (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Alarm Systems (AREA)

Abstract

The invention discloses project of transmitting and converting electricity environmental monitoring early warning integrated systems, it is related to power transmission and transformation net environmental monitoring technology field, aiming to solve the problem that be difficult to accurately search needs to overhaul, the problem of geographical location of the substation of maintenance, its key points of the technical solution are that after the electromagnetic field intensity information of acquisition module acquisition and the geographical location information of GPS module acquisition are handled by central processing module, mobile terminal is sent to by communication module, the information that mobile terminal receives is after the processing of geography information module analysis, it is shown by display module in electronic map, achieve the effect that be capable of the geographical location of the multiple substations of real-time display and corresponding monitoring data.

Description

Project of transmitting and converting electricity environmental monitoring early warning integrated system
Technical field
The present invention relates to power transmission and transformation net environmental monitoring technology field, more specifically, it relates to a kind of project of transmitting and converting electricity ring Border monitoring and warning integrated system.
Background technology
Project of transmitting and converting electricity refers to the characteristic of electric energy(Voltage, alternating current and direct current etc.)It is converted, and by electrical energy transportation to electricity The engineering project on energy demand ground.Substation in existing project of transmitting and converting electricity has covered all parts of the country, still, due to China It is area, big across natural environment, so not allowing the relevant parameter of substation readily apparent.Detect the electromagnetic field intensity letter around substation Number when, it is existing most using manually and by the way of electronic visiting, it is impossible to realize and remotely monitor, thus power transformation cannot be effectively ensured The normal use stood.
The Chinese patent of existing Authorization Notice No. CN104732746A discloses a kind of electromagnetism for being used to monitor power transmission and transformation net Field intensity EW system, including power transmission and transformation net and grid support, the grid support is equipped with remote electromagnetic field intensity prison Survey device and the radio receiving terminal for receiving alarm signal.The program realizes when power transmission and transformation net intersects and severe thunder and lightning day The function of the distant early warning of electromagnetic field intensity mutual interference during gas.
But when radio receiving terminal receives pre-warning signal, it is necessary to browse, inquire about related data and could accurately look into Find the position of corresponding electromagnetic field intensity monitoring device.Behind the position to be checked for finding electromagnetic field intensity monitoring device, Cai Nengan Row related personnel look into repairing to the corresponding power transmission and transformation net of the electromagnetic field intensity monitoring device or substation.And search electromagnetic field intensity The process of degree monitoring device position, which compares, expends the time, and therefore, this problem has to be solved.
The content of the invention
In view of the deficiencies of the prior art, the present invention intends to provide a kind of project of transmitting and converting electricity environmental monitoring early warning Integrated system, having being capable of the geographical location of the multiple substations of real-time display and the advantage of corresponding monitoring data.
To achieve the above object, the present invention provides following technical solutions:
A kind of project of transmitting and converting electricity environmental monitoring early warning integrated system, including mobile terminal and the power frequency electric for being arranged on each substation Magnetic field on-line monitoring equipment, each power frequency electromagnetic field on-line monitoring equipment are connected by being wirelessly transferred with mobile terminal, The power frequency electromagnetic field on-line monitoring equipment includes gathering the data acquisition module of electromagnetic field intensity information and for gathering The GPS module of geographical location information;The GPS module and data acquisition module are connected with central processing module jointly, in described Centre processing module is connected with communication module;Electromagnetic field intensity information and the GPS module acquisition of the data collecting module collected Geographical location information is sent to mobile terminal after central processing module is handled, by the communication module;The mobile terminal Including data analysis system, the data analysis system is connected with alarm module and display module;The data analysis system is also Including being used for the geography information module to display module transmission electronic map data, the geographical location that the mobile terminal receives Information through geography information module analysis processing after, by the display module shown in electronic map different environmental monitoring sites with And the monitoring numerical value of respective environment monitoring point.
By using above-mentioned technical proposal, electromagnetic field intensity information and the GPS module acquisition of data collecting module collected Geographical location information can be sent to by communication module on mobile terminal after central processing module is handled.Mobile terminal receives To after information, data analysis system can analyze and process the information received, then by mobile terminal in electronic map In show the environmental monitoring sites for representing substation geographical location, can also be shown by environmental monitoring sites corresponding substation environment prison Survey numerical value.After multiple substations have been respectively mounted electromagnetic field intensity monitoring device, it can be shown in the electronic map of mobile terminal The environmental monitoring sites of each substation and environmental monitoring numerical value are represented, forms a substation monitoring map net.Pass through Substation monitors map net, it may be convenient to watch the monitoring situation of each substation, having can be to each power transformation The geographical location stood carries out real-time display, and the corresponding electromagnetic field intensity of substation is carried out to monitor in real time, is shown, the effect of analysis Fruit.
Further, the display module includes for monitoring numerical value being divided into the taxon of different range, described Display module is shown the monitoring numerical value of different range by different colours.
By using above-mentioned technical proposal, it may be convenient to view the monitoring numerical value scope feelings of varying environment monitoring point Condition for the substation close to predetermined monitoring numerical value scope, timely can carry out it Emergency Preparedness and look into and repair, safeguard.
Further, the display module further includes to record the threshold value of the environmental monitoring sites more than predetermined monitoring numerical value Unit, the display module will be more than the environmental monitoring sites flickering displays of predetermined monitoring numerical value.
By using above-mentioned technical proposal, when the monitoring numerical value of substation is more than predetermined monitoring numerical value, alarm module meeting Send alarm, corresponding environmental monitoring sites also can flickering display on mobile terminals so that related personnel can accurately navigate to Power transformation station location, and repair is arranged rapidly.
Further, the data analysis system is connected with warning module, and the warning module is included based on timing Shi Danyuan, when amount of increase of the monitoring numerical value in the range of the predetermined time is more than predetermined value, the warning module sends precaution alarm.
By using above-mentioned technical proposal, in the range of the predetermined time, the amount of increase of the corresponding monitoring numerical value of substation is more than In timing unit during default predetermined value, warning module can be triggered, and send precaution alarm, and related personnel is reminded to carry out emergent standard It is standby.
Further, the data analysis system is also associated with storing the database of Historical Monitoring data, the number Include recording module, statistic of classification module and memory module according to storehouse, data in memory module can be read simultaneously in the mobile terminal It is managed.
By using above-mentioned technical proposal, typing and Historical Monitoring data can be stored into database.Statistic of classification module Taxonomic revision is carried out for integral data and to data, the data after taxonomic revision are stored in memory module.Classification is needed to look into When seeing Historical Monitoring data, easily data can be recalled by mobile terminal.
Further, the central processing module is also associated with screen monitoring system, and the screen monitoring system is used to clap It takes the photograph substation information and photographing information is shown on mobile terminal.
By using above-mentioned technical proposal, substation's image of screen monitoring system photographs can easily be sent to movement Terminal checks there is the effect that can conveniently, accurately understand situation in substation for related personnel.
Further, the screen monitoring system includes filming image module, frequency control module and signal amplification module, The frequency control module is used to control the filming frequency of filming image module, and the signal amplification module is used for the shadow that will be shot As signal enhanced processing.
By using above-mentioned technical proposal, frequency control module can easily adjust required filming frequency, to adapt to The observation for building the substation under different regions, different natural environments is needed.The image that filming image module photograph is formed Signal can be sent to central processing module and be analyzed and processed, and be sent to by communication module after the amplification of signal amplification module Mobile terminal is simultaneously shown on mobile terminals.
Further, the mobile terminal is mobile phone or personal computer.
By using above-mentioned technical proposal, it may be convenient to real-time display is carried out to the geographical location of each substation, it is right The corresponding electromagnetic field intensity of substation monitor, show and analyze in real time, facilitates pipe of the maintenance personnel to each substation Reason, greatly improves work efficiency.
In conclusion the invention has the advantages that:
1st, by setting taxon, monitoring numerical value is divided into different scopes by taxon by size, and display module can incite somebody to action The monitoring numerical value of different range is shown that having can be in time to the power transformation close to predetermined monitoring numerical value scope by different colours Carry out the effect of Emergency Preparedness in station;
2nd, by setting threshold cell, threshold cell will be recorded more than the environmental monitoring sites of predetermined monitoring numerical value, marked, shows Module can will carry out flickering display more than the environmental monitoring sites of predetermined monitoring numerical value so that related personnel can quickly navigate to different The position of normal substation, and rapidly maintenance personnel is arranged to carry out maintenance it;
3rd, by setting warning module, when the amount of increase of the corresponding monitoring numerical value of substation is more than default predetermined number in timing unit During value, warning module can be triggered, and send precaution alarm, so that related personnel can rapidly carry out Emergency Preparedness;
4th, by the way that screen is set to monitor system, it is the real-time imaging that can observe substation using mobile terminals such as mobile phones, has The effect that personnel understand concrete condition in substation in time can be maintained easily.
Description of the drawings
Fig. 1 is the overall structure diagram of project of transmitting and converting electricity environmental monitoring early warning integrated system in embodiment;
Fig. 2 is display module in embodiment, database, the structure diagram of screen monitoring system.
Specific embodiment
The present invention is described in further detail below in conjunction with attached drawing.
This specific embodiment is only explanation of the invention, is not limitation of the present invention, people in the art Member can as needed make the present embodiment the modification of no creative contribution after this specification is read, but as long as at this It is all protected in the right of invention be subject to Patent Law.
Embodiment:
A kind of project of transmitting and converting electricity environmental monitoring early warning integrated system, it is online including mobile terminal and power frequency electromagnetic field with reference to Fig. 1 Monitoring device, power frequency electromagnetic field on-line monitoring equipment are arranged in each substation.Each power frequency electromagnetic field on-line monitoring equipment It is connected by being wirelessly transferred with mobile terminal, mobile terminal is mobile phone or personal computer in the present embodiment, convenient for safeguarding people Member is managed each substation, effectively increases work efficiency.
With reference to Fig. 1, power frequency electromagnetic field on-line monitoring equipment includes data acquisition module and GPS module, data acquisition module For gathering electromagnetic field intensity information, GPS module is used for gathering geographic position information.GPS module and data acquisition module are common Central processing module is connected with, central processing module is connected with communication module.The electromagnetic field intensity letter of data collecting module collected Breath and the geographical location information of GPS module acquisition can be sent to mobile whole after central processing module is handled by communication module End.
With reference to Fig. 1, mobile terminal includes data analysis system, and data analysis system is connected with alarm module and display mould Block.Data analysis system further includes geography information module, for transmitting electronic map data to display module.Mobile terminal receives To after electromagnetic field intensity information and geographical location information, data analysis system can analyze and process the information received, so The environmental monitoring sites for representing substation geographical location and the monitoring number of respective environment monitoring point are shown in electronic map afterwards Value forms a substation monitoring map net.Map net is monitored by substation, can be facilitated to each substation Electromagnetic field environment monitored in real time.
Referring to Figures 1 and 2, display module includes taxon, and taxon is different for monitoring numerical value to be divided into Scope, display module can be shown the monitoring numerical value of different range by different colours.By observing the monitoring numerical value of different colours, It can easily recognize the environmental monitoring situation of substation.For the substation close to predetermined monitoring numerical value scope, Neng Gouji When carry out Emergency Preparedness.Display module further includes threshold cell, and threshold cell is more than predetermined monitoring numerical value for recording, marking Environmental monitoring sites.When the monitoring numerical value of substation is more than predetermined monitoring numerical value, alarm module can send alarm, and substation Corresponding environmental monitoring sites can flicker always on the electronic map of mobile terminal so that related personnel can accurately navigate to change The position in power station arranges to repair to facilitate.
Referring to Figures 1 and 2, data analysis system is connected with warning module, and warning module includes the timing list for timing Member, when amount of increase of the monitoring numerical value in the range of the predetermined time is more than predetermined value, warning module can send precaution alarm, to remind Related personnel carries out emergency maintenance preparation.
Referring to Figures 1 and 2, data analysis system is also associated with storing the database of Historical Monitoring data, database Including recording module, statistic of classification module and memory module.It can typing monitoring data, typing into database by recording module The categorized statistical module taxonomic revision of monitoring data after, be stored in memory module.Classification is needed to check Historical Monitoring data When, Historical Monitoring data are recalled by mobile terminal.
Referring to Figures 1 and 2, central processing module is also associated with screen monitoring system, and screen monitors system and clapped including image Take the photograph module, frequency control module and signal amplification module.Filming image module can easily be adjusted by frequency control module Filming frequency, to meet the observation needs for building the substation under different regions, different natural environment.Signal amplification module For the video signal of shooting to be amplified processing, amplified signal can be transferred into central processing module and carry out at analysis Reason.Signal after central processing module analyzes and processes can be sent to by communication module on mobile terminal, and in mobile terminal On shown, maintenance personnel to be helped timely to understand the concrete condition in substation.
Operation principle is as follows:
During original state, power frequency electromagnetic field on-line monitoring equipment is both provided in each substation.Communication module can be by acquisition Electromagnetic field intensity information and geographical location information are sent to mobile terminal, after mobile terminal receives information, can pass through data point Analysis system analyzes and processes the information received, and the ring for representing substation geographical location is then shown in electronic map Border monitoring point, environmental monitoring sites side can show environmental monitoring numerical value corresponding with substation.Multiple rings for representing different substation Border monitoring point is shown in electronic map simultaneously, is formed a substation monitoring map net.Pass through substation Monitor map net, it may be convenient to watch the monitoring situation of each substation.
On electronic map, display module can be shown the monitoring numerical value of different range by different colours, so as to safeguard Personnel can be timely to carrying out Emergency Preparedness close to the substation of predetermined monitoring numerical value scope.When the monitoring numerical value of substation surpasses When crossing predetermined monitoring numerical value, alarm module sends alarm, and display module also can will be more than the environmental monitoring sites of predetermined monitoring numerical value Flickering display is carried out, to help related personnel that can quickly navigate to the position of the substation more than predetermined monitoring numerical value, and it is fast Speed arranges maintenance personnel to carry out maintenance it.
When the amount of increase of the corresponding monitoring numerical value of substation is more than default predetermined value, warning module can be triggered, hair Go out precaution alarm, so that related personnel can rapidly carry out Emergency Preparedness.It should be understood that in substation during concrete condition, profit It is the substation's real-time imaging that can observe screen monitoring system photographs with mobile terminals such as mobile phones.

Claims (8)

1. a kind of project of transmitting and converting electricity environmental monitoring early warning integrated system, including mobile terminal and the power frequency for being arranged on each substation Electromagnetic field on-line monitoring equipment, each power frequency electromagnetic field on-line monitoring equipment are connected by wireless transmission and mobile terminal It connects, it is characterised in that:The power frequency electromagnetic field on-line monitoring equipment includes gathering the data acquisition of electromagnetic field intensity information Module and the GPS module for gathering geographic position information;The GPS module and data acquisition module are connected with centre jointly Module is managed, the central processing module is connected with communication module;The electromagnetic field intensity information of the data collecting module collected and The geographical location information of GPS module acquisition is sent to mobile terminal after central processing module is handled by the communication module;
The mobile terminal includes data analysis system, and the data analysis system is connected with alarm module and display module;Institute Data analysis system is stated to further include to transmit the geography information module of electronic map data, the mobile terminal to display module The geographical location information received is shown not after the processing of geography information module analysis by the display module in electronic map Same environmental monitoring sites and the monitoring numerical value of respective environment monitoring point.
2. project of transmitting and converting electricity environmental monitoring early warning integrated system according to claim 1, it is characterised in that:The display mould Block includes for monitoring numerical value being divided into the taxon of different range, and the display module is by the monitoring numerical value of different range It is shown by different colours.
3. project of transmitting and converting electricity environmental monitoring early warning integrated system according to claim 2, it is characterised in that:The display mould Block further includes to record the threshold cell of the environmental monitoring sites more than predetermined monitoring numerical value, and the display module will be more than predetermined The environmental monitoring sites flickering display of monitoring numerical value.
4. project of transmitting and converting electricity environmental monitoring early warning integrated system according to claim 1, it is characterised in that:The data point Analysis system is connected with warning module, and the warning module includes the timing unit for timing, when monitoring numerical value is in the predetermined time In the range of amount of increase be more than predetermined value when, the warning module sends precaution alarm.
5. project of transmitting and converting electricity environmental monitoring early warning integrated system according to claim 4, it is characterised in that:The data point Analysis system is also associated with storing the database of Historical Monitoring data, and the database includes recording module, statistic of classification mould Block and memory module, the mobile terminal can be read the data in memory module and it are managed.
6. project of transmitting and converting electricity environmental monitoring early warning integrated system according to claim 1, it is characterised in that:The centre Reason module is also associated with screen monitoring system, and the screen monitoring system is used to shoot substation information and show photographing information In on mobile terminal.
7. project of transmitting and converting electricity environmental monitoring early warning integrated system according to claim 6, it is characterised in that:The screen prison Examining system includes filming image module, frequency control module and signal amplification module, and the frequency control module is used to control shadow As the filming frequency of taking module, the signal amplification module is used for the video signal enhanced processing that will be shot.
8. the project of transmitting and converting electricity environmental monitoring early warning integrated system according to any one of claim 1-7, it is characterised in that: The mobile terminal is mobile phone or personal computer.
CN201711291238.4A 2017-12-08 2017-12-08 Project of transmitting and converting electricity environmental monitoring early warning integrated system Pending CN108054832A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711291238.4A CN108054832A (en) 2017-12-08 2017-12-08 Project of transmitting and converting electricity environmental monitoring early warning integrated system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711291238.4A CN108054832A (en) 2017-12-08 2017-12-08 Project of transmitting and converting electricity environmental monitoring early warning integrated system

Publications (1)

Publication Number Publication Date
CN108054832A true CN108054832A (en) 2018-05-18

Family

ID=62123501

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711291238.4A Pending CN108054832A (en) 2017-12-08 2017-12-08 Project of transmitting and converting electricity environmental monitoring early warning integrated system

Country Status (1)

Country Link
CN (1) CN108054832A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109325881A (en) * 2018-09-28 2019-02-12 盛隆电气集团有限公司 A kind of intelligent distribution system based on big data platform
CN112782360A (en) * 2020-12-28 2021-05-11 安徽仕联电气有限公司 Quantum environmental protection check out test set
CN114485796A (en) * 2022-01-26 2022-05-13 中煤科工集团重庆智慧城市科技研究院有限公司 Online state monitoring self-diagnosis system of box-type substation

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202172306U (en) * 2011-06-14 2012-03-21 广东电网公司江门供电局 Power distribution network transformer running state graphical supervision system
CN103151771A (en) * 2011-12-06 2013-06-12 国家电网公司 Monitoring system and method for operation of power transmission network
CN104732746A (en) * 2013-12-20 2015-06-24 西安欣东源电气有限公司 Remote pre-warning system for monitoring electromagnetic field intensity of power transmission and transformation grid
CN105259456A (en) * 2015-11-23 2016-01-20 重庆安迈科技有限公司 Power transmission and transformation equipment monitoring system
CN105321284A (en) * 2015-11-23 2016-02-10 重庆安迈科技有限公司 Power transmission and transformation apparatus antitheft monitoring system
CN106569445A (en) * 2016-11-10 2017-04-19 国网江苏省电力公司泰州供电公司 Electronic transmission and transformation equipment monitoring system based on grid distribution diagram

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202172306U (en) * 2011-06-14 2012-03-21 广东电网公司江门供电局 Power distribution network transformer running state graphical supervision system
CN103151771A (en) * 2011-12-06 2013-06-12 国家电网公司 Monitoring system and method for operation of power transmission network
CN104732746A (en) * 2013-12-20 2015-06-24 西安欣东源电气有限公司 Remote pre-warning system for monitoring electromagnetic field intensity of power transmission and transformation grid
CN105259456A (en) * 2015-11-23 2016-01-20 重庆安迈科技有限公司 Power transmission and transformation equipment monitoring system
CN105321284A (en) * 2015-11-23 2016-02-10 重庆安迈科技有限公司 Power transmission and transformation apparatus antitheft monitoring system
CN106569445A (en) * 2016-11-10 2017-04-19 国网江苏省电力公司泰州供电公司 Electronic transmission and transformation equipment monitoring system based on grid distribution diagram

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109325881A (en) * 2018-09-28 2019-02-12 盛隆电气集团有限公司 A kind of intelligent distribution system based on big data platform
CN112782360A (en) * 2020-12-28 2021-05-11 安徽仕联电气有限公司 Quantum environmental protection check out test set
CN114485796A (en) * 2022-01-26 2022-05-13 中煤科工集团重庆智慧城市科技研究院有限公司 Online state monitoring self-diagnosis system of box-type substation

Similar Documents

Publication Publication Date Title
CN104581087B (en) A kind of power transmission line intelligent remote monitoring system based on Internet of Things
CN203720889U (en) Handheld polling terminal
CN204465736U (en) A kind of power transmission line intelligent long distance control system based on Internet of Things
CN203720890U (en) Wearable polling terminal
CN110517429A (en) A kind of Intelligent electronic fence system and processing method
CN112288984A (en) Three-dimensional visual unattended substation intelligent linkage system based on video fusion
CN102376147A (en) Electric power security monitoring and commanding system
CN109193462B (en) Three-dimensional power grid operation inspection system
CN108054832A (en) Project of transmitting and converting electricity environmental monitoring early warning integrated system
CN107590764A (en) A kind of municipal things safe early warning and emergency scheduling platform
CN104765307A (en) Aerial photography system of unmanned aerial vehicle
CN202167063U (en) Onsite operation safety control system
CN207268846U (en) Electric inspection process robot
CN211509189U (en) Electric power operation field supervision equipment and system
CN112001310A (en) Transformer substation operation field safety control system based on visual perception and space positioning
CN110492616A (en) A kind of intelligent patrol auxiliary system and inspection method for substation
CN203759160U (en) Integrated intelligent monitoring system of transformer station
CN104537786A (en) Infrared remote image identification and alarm device for transformer station
KR100771985B1 (en) Movable and installable type control tower
CN108833574A (en) A kind of transmission line long-distance monitoring system suitable for Internet of Things
CN107730806A (en) Preventing damage to power transmission line caused by external force laser-correlation monitoring warning device
CN112185121A (en) Traffic accurate law enforcement method and equipment based on 5G
CN104966329A (en) System for intelligent scheduling and polling of photovoltaic power station
CN108847985A (en) Power transmission line intelligent remote monitoring system suitable for Internet of Things
CN106572336A (en) Intelligent power grid video linkage system and intelligent power grid video linkage method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180518

RJ01 Rejection of invention patent application after publication