Prior art keywords
plate
stile
hanging
metope
furred ceiling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711490392.4A
Other languages
Chinese (zh)
Other versions
CN108049550A (en
Inventor
丁泽成
庄惟敏
王文广
周东珊
侯建群
任宝双
余文钊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Yasha Decoration Co Ltd
Original Assignee
Zhejiang Yasha Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Yasha Decoration Co Ltd filed Critical Zhejiang Yasha Decoration Co Ltd
Priority to CN201711490392.4A priority Critical patent/CN108049550B/en
Publication of CN108049550A publication Critical patent/CN108049550A/en
Priority to PCT/CN2018/088941 priority patent/WO2019128090A1/en
Application granted granted Critical
Publication of CN108049550B publication Critical patent/CN108049550B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/06Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/30Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by edge details of the ceiling; e.g. securing to an adjacent wall

Abstract

The invention discloses a kind of furred ceiling integral module and installation methods.Furred ceiling integral module includes the first metope and the second metope, and stile includes at least three stile board group parts, and stile board group part includes the first plate, vertical plate and the second plate, and the first plate, vertical plate and the second plate are stripe board and extend in the same direction;Each locating piece includes the first support plate, the second support plate and the first sliding plate;First sliding plate is slippingly arranged in the second support plate;Two the first support plates are separately fixed on the first metope and the second metope;Hanging keel is connected with vertical plate;The both ends of hanging keel are connected with two the first sliding plates respectively.The installation method of furred ceiling integral module is for installing furred ceiling integral module.Furred ceiling integral module and installation method provided by the invention reduce the quantity of hanging bar, and the stability after improving central location mounting increases the bending resistance of stile, improves construction quality, increase the cleaning of construction environment.

Description

Furred ceiling integral module and installation method
Technical field
The present invention relates to furred ceiling technical field more particularly to a kind of furred ceiling integral modules and installation method.
Background technique
Furred ceiling is the indispensable part of interior decoration to decoration is played the role of at the top of interior architecture.
In the prior art, furred ceiling includes central location and hanging unit, and wherein hanging unit includes multiple hanging bars, is hung One end of hanging rod is fixed on top surface, and the other end for hanging bar is mounted on the keel of central location, and central location passes through multiple Bar hanging is hung on top surface.Inventor has found that furred ceiling described above has the disadvantage that the during realizing invention One, the weight of central location is larger, larger to the destruction of the original concrete on top surface using hanging bar hanging central location; The stability of central location mounting is reduced, construction quality not can guarantee;Second, it needs at the construction field (site) according to hitch bar Top surface is punched in position, reduces the cleaning of construction environment, extends construction period;Third, once the position of hanging bar It sets after determining, the position of central location can not be adjusted, and central location installation need to dismantle lower adjustment position when going wrong again It postpones and installs again, increase labor intensity;4th, the length for hanging bar needs to be processed according to the height scene of central location, It is time-consuming and laborious;5th, the stile plate in central location is assembled using vertical plate, and the intensity of vertical plate is small, and multiple vertical plates enclose Intensity is smaller after stile, and the structural stability of stile is poor, and bending resistance is weak.
Therefore, it is necessary to solve above-mentioned technical problem.
Summary of the invention
The present invention provides a kind of furred ceiling integral module and installation method, to solve problems of the prior art, reduces The quantity of bar is hung, the stability after improving central location mounting increases the bending resistance of stile, improves construction quality, increases Add the cleaning of construction environment, improve construction efficiency, shorten construction period, reduces labor intensity.
The present invention provides a kind of furred ceiling integral modules also to wrap including the first metope and the second metope being oppositely arranged Include: stile, the stile include at least three stile board group parts, and each stile board group part includes: sequentially connected first Plate, vertical plate and the second plate, first plate are oppositely arranged with second plate, first plate, described Vertical plate and second plate are stripe board and extend in the same direction;At least three vertical plate head and the tail, which are sequentially connected with, to be limited The main body of the stile of enclosing type, at least three first plate head and the tail, which are sequentially connected with, limits turning over for the stile Side, at least three second plate head and the tail are sequentially connected with the lower flange for limiting the stile;At least two locating pieces, often A locating piece includes the first sliding plate and the first support plate connected vertically and the second support plate;Described first is sliding Plate is moved slippingly to be arranged in second support plate;Two first support plates are separately fixed at first metope On second metope;Hanging keel, the hanging keel are connected with the vertical plate;The both ends of the hanging keel point It is not connected with two first sliding plates.
Optionally, the furred ceiling integral module further includes suspender member, and the suspender member includes connecting plate and slip setting Hanging plate on the connecting plate is connected with sunpender on the connecting plate, and the sunpender is perpendicular to the hanging plate;It is described Hanging keel is overlapped on the hanging plate.
Optionally, each locating piece further includes the second sliding plate that slip is arranged in second support plate, First sliding plate and second sliding plate are oppositely arranged, first sliding plate, second sliding plate, Yi Jisuo It states the second support plate and limits supporting and space, the both ends of the hanging keel are respectively defined in two supporting and spaces.
Optionally, the furred ceiling integral module further includes top plate, and the front of the top plate is bonded company with the lower flange It connects, support keel is installed on the front of the top plate.
Optionally, the furred ceiling integral module further includes two supporting parts, and each supporting part includes vertically connecting Positioning plate and bearing plate;Two positioning plates are bonded respectively to be fixed on first metope and second metope, institute Support keel is stated to be overlapped on the bearing plate.
Optionally, the furred ceiling integral module further includes connector, the connector include connecting column, be connected to it is described Revolving fragment and connection sheet and the first elastic strip on connecting column;The revolving fragment and connecting column rotation connect, described The rotation axis of revolving fragment is the central axis of the connecting column;The first crimping, the connection sheet are provided on the revolving fragment On be provided with the second crimping;First crimping and second crimping are set on first elastic strip;The connection Piece is fixed on the support keel;The first volume edge lap is on the bearing plate.
Optionally, first plate and second plate are trapezoidal plate;Any one of stile board group part In, the upper bottom edge of first plate is connected with the vertical plate, and the upper bottom edge of second plate is connected with the vertical plate It connects.
Optionally, two interior angles of the bottom of first plate are 45° angle;The bottom of second plate Two interior angles be 45° angle.
Optionally, the stile further includes interfacing part, and the interfacing part includes the first buttcover plate being connected and second pair Fishplate bar, first buttcover plate are bonded respectively with second buttcover plate and are fixed on the vertical plate that any two are mutually spliced.
Based on the same inventive concept, the present invention also provides a kind of installation method of furred ceiling integral module, feature exists In for installing above-described furred ceiling integral module, comprising: determine the first metope and the second metope being oppositely arranged;Assembling Stile, making the stile includes at least three stile board group parts, and each stile board group part includes: sequentially connected first Plate, vertical plate and the second plate, first plate are oppositely arranged with second plate, first plate, described Vertical plate and second plate are stripe board and extend in the same direction;At least three vertical plate head and the tail are sequentially connected with restriction The stile of enclosing type out, at least three first plate head and the tail are sequentially connected with the upper overturning for limiting the stile, at least three A second plate head and the tail are sequentially connected with the lower flange for limiting the stile;Two locating pieces are separately mounted to described On first metope and second metope, each locating piece includes the first support plate, the second support plate and first Sliding plate;First sliding plate is slippingly arranged in second support plate;Two the first support plate difference It is fixed on first metope and second metope;The stile is fixed on first metope by hanging keel On second metope, the hanging keel is connected with the upper overturning;The both ends of the hanging keel respectively with two First sliding plate is connected.
Furred ceiling integral module and installation method provided by the invention, two locating pieces pass through respective first support plate point It is not mounted on the first metope on the second metope, after two locating pieces install, stile is mounted on hanging keel, and The both ends of hanging keel are connected on two the first sliding plates, the quantity of suspender member can be reduced, improve stile mounting Stability afterwards improves construction quality, increases the cleaning of construction environment, improve construction efficiency, shorten construction period. And slid in the second support plate by the first sliding plate, the position at hanging keel both ends can be adjusted, stile is not necessarily to Disassembly can carry out position adjustment, reduce labor intensity.First plate and the second plate can increase the intensity of vertical plate, mention The bending resistance of high vertical plate improves the stability of furred ceiling.When adjacent stile board group part splices, the first adjacent plate pair After neat splicing, adjacent the second plate alignment splicing, the upper edge of adjacent vertical plate and lower edge are defined in alignment and spelled The state connect improves the precision of splicing, realizes the seamless spliced of stile.
Detailed description of the invention
Preferred embodiment in attached drawing the present invention is described in detail will be passed through below, it will help understand the purpose of the present invention and Advantage, in which:
Fig. 1 is the structural schematic diagram for the furred ceiling integral module that alternative embodiment of the present invention provides.
Fig. 2 is the structural schematic diagram for the stile that alternative embodiment of the present invention provides.
Fig. 3 is the partial enlarged view of A in Fig. 2.
Fig. 4 is the structural schematic diagram for the stile board group part that alternative embodiment of the present invention provides.
Fig. 5 is the structural schematic diagram for the suspender member that alternative embodiment of the present invention provides.
Fig. 6 is the partial enlarged view of B in Fig. 1.
Fig. 7 is the structural schematic diagram for the locating piece that alternative embodiment of the present invention provides.
Fig. 8 is that the connector that alternative embodiment of the present invention provides is shown by the structure that supporting part is mounted on the first metope It is intended to.
Fig. 9 is the structural schematic diagram for the connector that alternative embodiment of the present invention provides.
Figure 10 is the flow chart of the installation method for the furred ceiling integral module that alternative embodiment of the present invention provides.
Specific embodiment
Mention in the present specification or may mention up, down, left, right, before and after, front, the back side, top, bottom Etc. positional terms be relative to it is each it is shown in the drawings construction be defined, word "inner" and "outside" refer respectively to direction Or far from geometric center of specific component direction they be opposite concept, it is therefore possible to can different location according to locating for it, Different use states and correspondingly changed.So also these or the explanation of other positional terms should not be limited Property term processed.
Fig. 1 is the structural schematic diagram for the furred ceiling integral module that alternative embodiment of the present invention provides, and Fig. 2 is that the present invention is optional The structural schematic diagram for the stile that embodiment provides, Fig. 3 are the partial enlarged view of A in Fig. 2, and Fig. 4 is that alternative embodiment of the present invention mentions The structural schematic diagram of the stile board group part of confession, Fig. 5 are the structural schematic diagram for the suspender member that alternative embodiment of the present invention provides, Fig. 6 For the partial enlarged view of B in Fig. 1, Fig. 7 is the structural schematic diagram for the locating piece that alternative embodiment of the present invention provides.
As shown in Figures 1 to 7, the embodiment of the invention provides a kind of furred ceiling integral module, including be oppositely arranged first Metope 11, the second metope 12,2, two locating pieces 3 of stile and hanging keel 4.
Referring to Fig. 1 to Fig. 7, the stile 2 includes at least three stile board group parts, each stile board group Part includes: sequentially connected first plate 21, vertical plate 23 and the second plate 22, first plate 21 and described second flat Plate 22 is oppositely arranged, and first plate 21, the vertical plate 23 and second plate 22 are stripe board and prolong in the same direction It stretches;At least three 23 head and the tail of vertical plate are sequentially connected with the main body for limiting the stile 2 of enclosing type, described at least three First plate, 21 head and the tail are sequentially connected with the upper overturning for limiting the stile 2, and at least three second plate, 22 head and the tail are sequentially Connection limits the lower flange of the stile 2;Each locating piece 3 include the first support plate 31, the second support plate 32, And first sliding plate 33;First sliding plate 33 is slippingly arranged in second support plate 32;Two described One support plate 31 is separately fixed on first metope 11 and second metope 12;The hanging keel 4 is stood with described Plate 23 is connected;The both ends of the hanging keel 4 are connected with two first sliding plates 33 respectively.
When furred ceiling integral module is installed, it is first determined the height of stile 2, according to the height of stile 2, in the first metope 11 Snap the line on upper and the second metope 12;According to snap the line position, two locating pieces 3 are installed respectively by respective first support plate 31 On the first metope 11 and on the second metope 12.Secondly, assembling stile 2, in the present embodiment, the quantity of stile board group part can be with It is arranged to four, four 23 head and the tail of vertical plate are sequentially connected with the rectangular-shaped stile 2 for limiting enclosing type, and four described One plate, 21 head and the tail are sequentially connected with the upper overturning for limiting the stile 2, and four 22 head and the tail of the second plate are sequentially connected with limit Make the lower flange of the stile 2.Finally, stile 2 is mounted on hanging keel 4, and the both ends of hanging keel 4 are distinguished It is connected on two the first sliding plates 33, improves the stability after stile 2 mounts, improve construction quality, increase construction The cleaning of environment, improves construction efficiency, shortens construction period.And by the first sliding plate 33 in the second support plate 32 Upper sliding can be adjusted the position at 4 both ends of hanging keel, without dismantling stile 2, reduce labor intensity.
First plate 21 and the second plate 22 can increase the intensity of vertical plate 23, improve the bending resistance of vertical plate 23, mention The stability of high stile 2.Upper overturning herein refers to that is formed after the splicing of four the first plates 21 routs up outside stile 2 Structure, the structure are located at the top after stile 2 mounts;Lower flange herein is formed after referring to four the second plate 22 splicings The structure routed up outside stile 2, the structure be located at stile 2 mount after bottom.When adjacent stile board group part splices, phase After adjacent the first plate 21 alignment splicing, adjacent the second plate 22 alignment splicing, limit adjacent vertical plate 23 upper edge and Lower edge is similarly in the state of alignment splicing, improves the precision of splicing, realizes the seamless spliced of stile 2.Compared to existing Technology reduces the difficulty docked between adjacent vertical plate 23, simplifies the splicing of stile 2 without being adjusted alignment to vertical plate 23 Operating procedure, accelerate construction efficiency.
It should be noted that the quantity of stile board group part is not limited only to four, the vertical of shape is enclosed meeting to be spliced into Under the premise of frame 2, the quantity of stile board group part can acording to the requirement of user or execution conditions are specifically set.
Furred ceiling integral module provided in an embodiment of the present invention, two locating pieces 3 are distinguished by respective first support plate 31 It is mounted on the first metope 11 on the second metope 12, after two locating pieces 3 install, stile 2 is mounted on hanging keel 4 On, and the both ends of hanging keel 4 are connected on two the first sliding plates 33, the quantity of suspender member 5 can be reduced, is mentioned Stability after the high mounting of stile 2, improves construction quality, increases the cleaning of construction environment, improve construction efficiency, shorten Construction period.And slid in the second support plate 32 by the first sliding plate 33, can position to 4 both ends of hanging keel into Row adjustment, stile 2 can carry out position adjustment without disassembly, reduce labor intensity.First plate 21 and the second plate 22 can To increase the intensity of vertical plate 23, the bending resistance of vertical plate 23 is improved, the stability of furred ceiling is improved.Adjacent stile board group part When splicing, after adjacent the first plate 21 alignment splicing, adjacent the second plate 22 alignment splicing, by adjacent vertical plate 23 Upper edge and lower edge are defined in the state of alignment splicing, improve the precision of splicing, realize the seamless spliced of stile 2.
As shown in figure 5, optionally, the furred ceiling integral module further includes suspender member 5, the suspender member 5 includes connecting plate 51 and slip the hanging plate 52 on the connecting plate 51 is set, be connected with sunpender 512 on the connecting plate 51, it is described to hang Bar 512 is perpendicular to the hanging plate 52;The hanging keel 4 is overlapped on the hanging plate 52.Hanging keel 4 is located at first Part between metope 11 and the second metope 12 is hung on top surface by suspender member 5, can reduce the quantity of suspender member 5, The slip on connecting plate 51 of hanging plate 52 can not only play hanging keel 4 and effectively support, can also adjust hanging The entire length of part 5, to adapt to the different height of stile 2.In addition, being finely adjusted by the height to stile 2, also improve The precision that stile 2 is installed realizes the seamless spliced of stile 2.
Further, the suspender member 5 further includes the hanging board 53 that slip is arranged on the connecting plate 51, described Hanging board 53 is oppositely arranged with the hanging plate 52, and the sunpender 512 is mounted on the hanging board 53.Hanging board 53 increases The bending resistance of suspender member 5 and tensile characteristics, it is easier to control installation quality, it is possible to reduce to the original concrete where top surface Destruction.After hanging keel 4 is overlapped on hanging plate 52, the distance between hanging plate 52 and hanging board 53 are adjusted The level height of hanging keel 4 is finely tuned, the difficulty of installation and the debugging of stile 2 is reduced, shortens construction period, be conducive to mark Standardization rapid construction.
Optionally, hanging board 53 and hanging plate 52 are each perpendicular to connecting plate 51, it is ensured that hanging board 53 and hanging plate 52 Levelness.It should be noted that the distance between hanging plate 52 and hanging board 53 are adjustable, it can be hanging board 53 and be fixed on On connecting plate 51, hanging plate 52 is arranged along the direction slip far from or close to the hanging board 53, makes hanging plate 52 and hangs The distance between hanging plate 53 is adjustable.After stile 2 is articulated on top surface by suspender member 5, hanging keel 4 is parallel to top surface, Sunpender 512 can further increase the stability of the mounting of stile 2 perpendicular to top surface.
The embodiment of the present invention supports stile 2 by hanging keel 4, by improving between hanging keel 4 and hanging plate 52 Weight is dispersed on hanging plate 52 by contact area, reduces the deformation of hanging keel 4, improves the stability that stile 2 is installed, and The combination of hanging plate 52 and connecting plate 51 has biggish bending resistance and tensile characteristics, it is easier to control installation quality, reduce pair The destruction of original concrete where top surface.After hanging keel 4 is overlapped on hanging plate 52, hanging board 53 and hanging plate are adjusted The distance between 52, the level height of hanging keel 4 can be adjusted, reduce the installation and debugging difficulty of stile 2, shorten and apply The work period is conducive to standardize rapid construction.
Optionally, the suspender member 5 further includes third sliding plate 531 and the 4th sliding plate 521, the third sliding plate 531 it is vertical with the hanging board 53 connect, the 4th sliding plate 521 is vertical with the hanging plate 52 to be connect;The hanging board 53 are connected on the connecting plate 51 by the third sliding plate 531, and the hanging plate 52 passes through the 4th sliding plate 521 are connected on the connecting plate 51.Third sliding plate 531 can increase the contact surface between hanging board 53 and connecting plate 51 Product, improves the stability connected between hanging board 53 and connecting plate 51;4th sliding plate 521 can increase hanging plate 52 with Contact area between connecting plate 51 improves the stability connected between hanging plate 52 and connecting plate 51.
Preferably, the first connecting hole 513 and the second connecting hole 514 are offered on the connecting plate 51, the third sliding Third slip hole is offered on plate 531, offers the 4th slip hole on the 4th sliding plate 521;First connecting hole 513 be aligned with the third slip hole after be bolted;Second connecting hole 514 is aligned with the 4th slip hole After be bolted.It is bolted with advantage easy to disassemble and install, it is existing convenient for transporting construction after factory forms Field assembled formation, shortens construction period.
Further, second connecting hole 514 is strip-shaped hole.When the position of hanging keel 4 needs to adjust, by Connection bolt between two connecting holes 514 and the 4th slip hole unscrews;Make hanging plate 52 along the extension of the second connecting hole 514 Direction sliding fastens the company between the second connecting hole 514 and the 4th slip hole when hanging plate 52 moves to scheduled position Connecting bolt.
Optionally, the hanging board 53 is parallel to the hanging plate 52.So as to be overlapped on the hanging keel on hanging plate 52 4 have good stationarity, and then guarantee the smoothness of stile 2.As an optional implementation process, second connection Hole 514 extends perpendicularly to the hanging plate 52, it is possible to reduce hanging board 53 and 52 position of hanging plate required cunning when adjusting The distance of shifting reduces the difficulty of adjusting.
Further, the connecting plate 51 includes reinforcing side, and the reinforcement side is parallel to second connecting hole 514 Extending direction;Stiffening plate 511 is connected on the reinforcement side.Stiffening plate 511 increases the bending resistance of connecting plate 51 and the spy of tension Property, improve the stability of connection.On the basis of the above embodiments, the stiffening plate 511 distinguishes position with the hanging plate 52 In the two sides of the connecting plate 51.Stiffening plate 511 can balance the stress of connecting plate 51, be overlapped on mounting in hanging keel 4 After plate 52, be conducive to the horizontality for keeping hanging keel 4.
Preferably, the suspender member 5 further includes fastening stud, location hole, the hanging are offered on the hanging plate 52 Hanging hole is offered on keel 4, one end of the fastening stud is fixed after being successively fed through the location hole and the hanging hole In the hanging keel 4.Hanging keel 4 can be not only mounted on hanging plate 52 by above-mentioned set-up mode, can also be adjusted Position of the hanging keel 4 on hanging plate 52.
Optionally, the adjustment hole of bar shaped is offered on the hanging board 53, the second end of the sunpender 512 is fed through institute Extend after stating adjustment hole towards the direction far from the hanging plate 52.The first end of the sunpender 512 can prolonging along adjustment hole It stretches direction to be slid, adjusts position of the hanging keel 4 on hanging plate 52 after the level height of hanging keel 4 determines, just It is prompt effective.
Optionally, the stile 2 further includes mounting plate 25, and the front of the mounting plate 25 is bonded company with the upper overturning It connects, the back side of the mounting plate 25 is equipped with the installation keel 26.Upper overturning is mounted on stile 2 for mounting plate 25 and provides Biggish mounting area, ensure that the stability connected between mounting plate 25 and stile 2.
Preferably, the quantity of the mounting plate 25 is at least one, at least one described mounting plate 25 is in the upper overturning On be arranged, be respectively mounted on each mounting plate 25 there are two the installation keel 26.The both ends of each installation keel 26 It can be separately mounted on two metopes by two locating pieces 3.Multiple mounting plates 25 can cover stile 2, ensure that vertical The integrality of frame 2, two installation keel 26 can effectively hang mounting plate 25, ensure that the stabilization after stile 2 is hung Property.Optionally, two installation keel 26 are located at the both sides being oppositely arranged on the mounting plate 25 and along the mounting plate 25 length direction extends in the same direction, and can further increase installation keel 26 to the support effect of mounting plate 25.Mounting plate 25 Convex block fluted and compatible with the groove is respectively set in the both sides being oppositely arranged, when the quantity of mounting plate 25 is greater than one When a, the convex block on a mounting plate 25 is clamped the groove into another mounting plate 25, is conducive to improve two spellings of mounting plates 25 The stability connect.
Further, in any one of stile board group part, first plate 21 is parallel with second plate 22 It is arranged and is each perpendicular to the vertical plate 23.Between vertical plate 23 and the first plate 21, between vertical plate 23 and the second plate 22 be straight Angle can increase the supporting role of the first plate 21, the second plate 22 to vertical plate 23, improve the bending resistance of vertical plate 23.
As an optional implementation process, first plate 21 and second plate 22 are trapezoidal plate;Arbitrarily In one stile board group part, the upper bottom edge of first plate 21 is connected with the vertical plate 23, second plate 22 Upper bottom edge be connected with the vertical plate 23.The present embodiment can make on the first plate 21 be oppositely arranged on along its length two On the distance between side and the second plate 22 along its length on the distance between the both sides that are oppositely arranged along far from vertical The direction of plate 23 gradually increases, and the first plate 21 and the second plate 22 protrude from vertical plate 23.So that two neighboring stile plate When component docks, two the first plates 21 can preferably splice, two the second plates 22 can preferably splice.
Optionally, two interior angles of the bottom of first plate 21 are 45° angle;Under second plate 22 Two interior angles on bottom edge are 45° angle.45 ° of oblique angle splicings are more accurate, when two neighboring stile board group part can be made to dock, two First plate, 21 seamless interfacing;Two 21 seamless interfacings of the first plate;Two same seamless interfacings of vertical plate 23 increase edge joint position Stability, make to splice more accurate, ensure that the stability of furred ceiling.
Preferably, the stile 2 further includes interfacing part 24, the interfacing part 24 includes the first buttcover plate 241 being connected With the second buttcover plate 242, first buttcover plate 241 and second buttcover plate 242 are bonded are fixed on any two phase respectively On the vertical plate 23 of splicing.When two adjacent stile board group parts dock, two vertical plates 23 are connected to each other, at this time the first docking Plate 241 and the second buttcover plate 242 are separately fixed on two vertical plates 23 being connected to each other, and improve the stabilization after vertical plate 23 docks Property, guarantee that ceiling structure is firm.
As an optional implementation process, any one of stile board group part further includes that first to be connected is fixed Plate 28 and the second fixed plate 29, first fixed plate 28 are fixed on the vertical plate 23, and second fixed plate 29 is fixed on On second plate 22.First fixed plate 28 and the second fixed plate 29 increase to be connected between vertical plate 23 and the second plate 22 Stability.
Optionally, the stile 2 further include reinforce keel, the reinforcement keel installation on the vertical plate 23 and with institute Vertical plate 23 is stated to extend in the same direction.The stability of vertical plate 23 can further be increased by reinforcing keel, prevent vertical plate 23 from bending.
Further, the reinforcement keel include sequentially connected first keel plate 271, the second keel plate 272 and Third keel plate 273, first keel plate 271 are oppositely arranged with the third keel plate 273, second keel plate 272 It is fitted on the vertical plate 23.The first keel plate 271 and third keel plate 273 can be made to be located remotely from the position of vertical plate 23, be convenient for Subsequent fixed hanging keel 4.Part on the hanging keel 4 between 4 both ends of hanging keel is fed through described The supporting and space that one keel plate 271, second keel plate 272 and the third keel plate 273 limit.Pass through hanging dragon The supporting role of bone 4, stile 2 are not necessarily to through the hanging of sunpender 512 on top surface, realize no sunpender 512 and mount, simplify vertical The mounting process of frame 2.
Stile 2 can be completed on ground, and be reduced adjacent vertical when assembling without being adjusted alignment to vertical plate 23 The difficulty docked between plate 23 simplifies the operating procedure of the splicing of stile 2, accelerates the efficiency of construction.Support keel 6 can be with Directly stile 2 is hung, the mounting of 2 integrated combination of stile simplifies stile without using the hanging of sunpender 512 on top surface 2 hanging process.
As shown in Figure 6 to 7, optionally, first support plate 31 can make perpendicular to second support plate 32 After one support plate 31 is fixed on the first metope 11 or the second metope 12, the second support plate 32 perpendicular to the first metope 11 or The second metope of person 12 is conducive to the levelness for keeping hanging keel 4.And first support plate 31 and the second support plate 32 connection after Structure it is identical as steel angle structure, have good anti-bending strength, the stability of support can be increased.
Preferably, each locating piece 3 further includes the second sliding that slip is arranged in second support plate 32 Plate 34, first sliding plate 33 and second sliding plate 34 are oppositely arranged, and first sliding plate 33, described second are slided It moves plate 34 and second support plate 32 limits supporting and space, the both ends of the hanging keel 4 are respectively defined in two In a supporting and space.Hanging keel 4 is fixed in supporting and space, and the stile 2 being connected with hanging keel 4 is in hanging State, the pressure for the stile 2 that hanging keel 4 is subject to can be dispersed to the second support plate 32, the first sliding plate 33 and the second sliding Plate 34 can reduce 4 stress of hanging keel, increase the stability of hanging keel 4.First sliding plate 33 and the second sliding plate 34 divide Not Wei Yu hanging keel 4 two sides, sliding can drive hanging keel 4 the jointly for the first sliding plate 33 and the second sliding plate 34 The enterprising line slip of two support plate 32, the position of hanging keel 4 is adjustable, thereby reduces the difficulty of 2 installation and adjustment of stile, and Stile 2 is hung without using hanging bar, construction period is shortened, is conducive to standardized construction.
The surface of hanging keel 4 is overlapped in second support plate 32 backwards to first support plate 31, hanging keel 4 After being overlapped in the second support plate 32, the pressure that the second support plate 32 is subject to can be to protect on rapid dispersion to the first support plate 31 It demonstrate,proves the second support plate 32 and support is stablized to hanging keel 4.It is simultaneously hanging keel 4 in the direction perpendicular to the first support plate 31 Upper sliding leaves biggish space, increases the adjusting range of hanging keel 4.
Preferably, the first sliding plate 33 is parallel to the second sliding plate 34.First sliding plate 33, the second support plate 32 and Two sliding plates 34 define the installation space of rectangle jointly, are adapted with the hanging keel 4 of rectangle, so that hanging keel 4 is opposite The two sides of setting are fitted in respectively on the first sliding plate 33 and the second sliding plate 34, the first sliding plate 33 and the second sliding plate 34 More easily hanging keel 4 can also be pushed mobile jointly.
Optionally, the locating piece 3 further includes the first driving plate 35 being fitted in second support plate 32 and Two driving plates 36;First sliding plate 33 is connected with first driving plate 35, second sliding plate 34 and described the Two driving plates 36 are connected.It is arranged by the first driving plate 35 along 32 slip of the second support plate, realizes the first sliding plate 33 Slip;It is arranged by the second driving plate 36 along 32 slip of the second support plate, realizes 34 slip of the second sliding plate, adjust Section is easy.
Further, first driving plate 35 is backwards to second sliding plate 34, and second driving plate 36 is backwards to institute State the first sliding plate 33, above-mentioned set-up mode can make the first sliding plate 33 inner surface and the second sliding plate 34 inner surface it is tight The two sides of the hanging keel 4 are attached to, hanging keel 4 is effectively fastened.
As an optional implementation process, the first supported hole and item of bar shaped are offered in second support plate 32 Second supported hole of shape;The first drive hole 37 is offered in first driving plate 35, is offered in second driving plate 36 Second drive hole 38;First drive hole 37 is bolted after being aligned with first supported hole, second driving Hole 38 is bolted after being aligned with second supported hole.By the connection bolt of the first drive hole 37 and the first supported hole It unscrews, the bolt of the second drive hole 38 and the second supported hole is unscrewed, the first driving plate 35 is driven along the first supported hole, second Movable plate 36 drives hanging keel 4 to slide jointly along the second supported hole, again by bolt fastening after being slid onto specified position , adjustment process simplicity is easy to implement.
Further, the extending direction of the extending direction of first supported hole and second supported hole is parallel In first support plate 31.By adjusting the first driving plate 35 along the first supported hole, the second driving plate 36 along second Support hole is slid, so that hanging keel 4 is adjustable along the direction position for being parallel to the first support plate 31.
Preferably, offering the first slip hole 331 of bar shaped, second sliding plate 34 on first sliding plate 33 On offer the second slip hole 341 of bar shaped;Third slip hole, first slip hole are installed on the hanging keel 4 331, it is bolted after the third slip hole and second slip hole 341 alignment.Above-mentioned set-up mode is tight Gu hanging keel 4 provides structure basis, it is also convenient for adjusting the position of hanging keel 4, bolt is unscrewed, by bolt Stud drives hanging keel 4 to be moved along the first slip hole 331 and the second slip hole 341, easy to adjust.
Optionally, the locating piece 3 further includes expansion bolt 39, and the first end of the expansion bolt 39 is connected to described In first support plate 31, the second end of the expansion bolt 39 extends towards the direction far from second support plate 32.Expanding screw First support plate 31 can be fixed on the first metope 11 or the second metope 12 by bolt 39, and expansion bolt 39 has connection steady Solid advantage, the stability connected between the first support plate 31 and the first metope 11 or the second metope 12 can be increased.
Further, the quantity of the expansion bolt 39 is two, and third support is offered in first support plate 31 Hole and the 4th supported hole.Two expansion bolts 39 are fed through the third supported hole and described correspondingly respectively Four supported holes.First support plate 31 can be more firmly secured to the first metope 11 or second by two expansion bolts 39 On metope 12.Specifically, in two expansion bolts 39, an expansion bolt 39 is fed through third supported hole and fixes On the first metope 11 or the second metope 12, another described expansion bolt 39 is fixed on after being fed through the 4th supported hole On one metope 11 or the second metope 12.Line between the third supported hole and the 4th supported hole is parallel to described The extending direction of first supported hole can make 31 force balance of the first support plate.
Fig. 8 is that the connector that alternative embodiment of the present invention provides is shown by the structure that supporting part is mounted on the first metope It is intended to, Fig. 9 is the structural schematic diagram for the connector that alternative embodiment of the present invention provides.
As shown in Figures 1 to 9, the furred ceiling integral module further includes top plate 61, the top plate 61 front with it is described under Flange is fitted and connected, and is equipped with support keel 6 on the front of the top plate 61.
The furred ceiling integral module further includes two supporting parts, and each supporting part includes positioning connected vertically Plate 81 and bearing plate 82;Two positioning plates 81 are bonded respectively is fixed on first metope 11 and second metope 12 On, the support keel 6 is overlapped on the bearing plate 82, reduces the quantity of sunpender 512.It is fixed below with supporting part It is illustrated on first metope 11.
The connector 7 include connecting column 71, the revolving fragment 72 that is connected on the connecting column 71 and connection sheet 73, with And first elastic strip 74;The revolving fragment 72 is connected with the connecting column 71 rotation, and the rotation axis of the revolving fragment 72 is institute State the central axis of connecting column 71;It is provided with the first crimping 721 on the revolving fragment 72, is provided in the connection sheet 73 Two crimpings 731;First crimping 721 and second crimping 731 are set on first elastic strip 74.The branch Support keel 6 include the connecting pin being oppositely arranged and positive stop end;The connection sheet 73 is fixed on the connecting pin, the first volume The distance between the end face of one end on side 721 far from the connecting column 71 and the positive stop end are greater than the connecting pin and institute State the distance between positive stop end;First crimping 721 is overlapped on bearing plate 82;Wherein the first crimping 721 is towards described There are gaps between one top plate 61 and first crimping 721 and first top plate 61, are overlapped on convenient for the first crimping 721 On bearing plate 82.
First crimping 721 enhances the intensity of revolving fragment 72, and the second crimping 731 enhances the intensity of connection sheet 73, when even When fitting 7 is overlapped on bearing plate 82 by the first crimping 721 or the second crimping 731, it can effectively increase connector 7 With bearing plate 82 in the structural strength of lap-joint, be conducive to improve the stability that the first top plate 61 is overlapped on bearing plate 82.
First elastic strip 74 has elasticity, so that the central axis of the central axis of the first crimping 721 and the second crimping 731 Line is located on the same line.First elastic strip 74 keeps strip structure in a free state, can produce after being under pressure Deformation, and restore after pressure relief the structure of strip again.First crimping 721 is that the edge turnup of revolving fragment 72 plays shape At bead structure, first crimping 721 defines the first limit hole, and the first elastic strip 74 can be worn into the first limit In the hole of position;Second crimping 731 is that the edge turnup of connection sheet 73 acts the bead structure formed, and second crimping 731 limits The second limit hole is gone out, the first elastic strip 74 can be worn into the second limit hole.Connection sheet 73 is connected to first when installation It on top plate 61, need to only exert a force to the first elastic strip 74, be bent the first elastic strip 74, make revolving fragment 72 is opposite with connection sheet 73 to set It sets, connector 7 is in the state of closure, and the length of connector 7 shortens.The first top plate 61 with connector 7 can be from holding The lower part of weight plate 82 be moved to it is in the same plane with bearing plate 82, then discharge the first elastic strip 74, make the first elastic strip 74 restore original state, and connector 7 is in the state opened at this time, and the stretching of revolving fragment 72 is overlapped on bearing plate 82, operates Simplicity, reduces the difficulty that connector 7 is overlapped on bearing plate 82, and the support lower revolving 72 of the first elastic strip 74 with Angle between connection sheet 73 remains unchanged, and prevents the first top plate 61 from sliding from bearing plate 82.
In the embodiment of the present invention, perpendicular to bearing plate 82, positioning plate 81 is fitted on the first metope 11 positioning plate 81, can Make bearing plate 82 perpendicular to the first metope 11, bearing plate 82 is in horizontality, ensure that and be fitted and connected on bearing plate 82 The flatness of top plate 61, connector 7 are mounted on support keel 6 by connection sheet 73, and top plate 61 is mounted on by connector 7 On bearing plate 82, it is opposite with connection sheet 73 that the first elastic strip 74 can drive revolving fragment 72 to be folded to therewith in the bent state The state of setting, connector 7 are in the state of closure, and the length of connector 7 shortens, so that the top plate 61 with connector 7 can It is in the same plane with bearing plate 82 to be moved to from the lower part of bearing plate 82, the first elastic strip 74 is then discharged, so that the One elastic strip 74 restores original state, and connector 7 is in the state opened at this time, and the stretching of revolving fragment 72 is overlapped on bearing plate It is easy to operate on 82, the difficulty that connector 7 is overlapped on bearing plate 82 is reduced, and under the support of the first elastic strip 74 Angle between revolving fragment 72 and connection sheet 73 remains unchanged, and prevents top plate 61 from sliding from bearing plate 82.
Optionally, the support keel 6 connection is there are two the connector 7, in two connectors 7, a connection Part 7 is connected to connecting pin, another connector 7 is connected to positive stop end.For being connected to the connector 7 of the positive stop end: The connection sheet 73 is fixed on the positive stop end, the end face of one end on first crimping 721 far from the connecting column 71 with The distance between described connecting pin is greater than the distance between the positive stop end and the connecting pin;First crimping 721 is flat For row there are gap between the top plate 61 and first crimping 721 and the top plate 61, above structure can make support keel 6 both ends pass through connector 7 and are overlapped on bearing plate 82 according to above-mentioned steps, simplify the installation process of support keel 6.
Optionally, it further includes installation part and levelling part, the installation part packet that the embodiment of the present invention, which provides furred ceiling integral module, Positioning surface and joint face are included, the angle between the positioning surface and the joint face is acute angle, and the positioning surface is fitted in described On first metope 11.The levelling part includes interface and levelling face, and the angle between the interface and the levelling face is Acute angle, the interface are slippingly arranged on the joint face, and the levelling face is parallel to first metope 11.Institute It states the fitting of positioning plate 81 and is fixed on the levelling face.
Slippingly it is arranged on joint face by interface, between adjustable positioning plate 81 and the first metope 11 Distance guarantees the distance needed for top plate 61 is overlapped on bearing plate 82, avoids the problem that top plate 61 leaks outside, improves and receive the complete of side Whole property, top plate 61 can adjust position in the enterprising line slip of bearing plate 82, improve the convenience of furred ceiling position adjustment, favorably In rapid construction.
Wherein, interface is slippingly arranged on joint face, can be and is provided with sliding block on interface, on joint face It is provided with sliding rail, sliding block is fixed along sliding rail slip, and after being slid onto specific position.
Optionally, multiple mounting items being parallel to each other, two mountings of arbitrary neighborhood are provided on the joint face Item limits a mounting slot;Multiple butt straps compatible with the mounting slot are provided on the interface, it is each described Butt strap is removably worn into a mounting slot.Interface is present embodiments provided to be slided on joint face A kind of mode moved may be implemented interface and carry out on joint face by wearing multiple butt straps into different mounting slots Sliding.One of interface is adapted with a mounting slot.
On the basis of the above embodiments, furred ceiling integral module further includes the lapping plate being connected to each other with the top plate 61, institute It states and offers clamping interface on the end face of one end on top plate 61 far from first metope 11, be provided on the lapping plate Shackle member compatible with the clamping interface.The distance between top plate 61 and lapping plate after clamping are fixed, ensure that top plate 61 and lapping plate docking after flatness, furred ceiling is mounted on the first metope 11 by bearing plate 82, without using sunpender 512 Hanging reduces the extent of the destruction to concrete on top surface on top surface, reduces the difficulty of scene hanging furred ceiling, shortens construction week Phase is conducive to rapid construction.
Further, the shackle member includes the caulking strip of bar shaped;Towards the end face of the top plate 61 on the lapping plate On be connected with the caulking strip, be embedded in the clamping interface on one side far from the lapping plate on the caulking strip.Top plate 61 and lapping plate may be implemented quickly to splice by caulking strip, improve spliced flatness;And caulking strip, top plate 61, with And lapping plate can transport Modularized splice at the construction field (site) after factory process molding, accelerate the progress of construction.
Preferably, the caulking strip further includes filleting protrusion, the filleting protrusion is located on the top plate 61 described in Towards between the end face of the top plate 61 on the end face of lapping plate and the lapping plate.The width of filleting protrusion is top plate 61 The width in the gap between lapping plate, filleting protrusion is definite value, ensure that top plate 61 and lapping plate are kept fixed in stitching portion Gap, further increase furred ceiling in stitching portion flatness.
Optionally, the furred ceiling integral module further includes air gun nail, and one end of the air gun nail is successively fed through described look for It is fixed on after horizontal member and the installation part in first metope 11.Air gun nail can directly by electric nail gun wear into In first metope 11, stable connection is time saving and energy saving.
Optionally, the furred ceiling integral module locating pin, one end of the locating pin are fed through after the positioning plate 81 admittedly It is scheduled on the levelling part.Positioning plate 81 is mounted on levelling part by locating pin, provides support force for 82 load-bearing of bearing plate.
Optionally, the angle between the positioning surface and the joint face is 30 °, the interface and the levelling face Between angle be 30 °.Interface can guarantee that levelling face is parallel to the first metope 11 after being docked on joint face.
Optionally, the positioning plate 81 and the bearing plate 82 are wood-plastic board.Wood-plastic board has waterproof and dampproof and epipodium The characteristics of guarantor, improves the structural stability of furred ceiling integral module.
Preferably, the top plate 61 and the lapping plate are wood-plastic board.Wood-plastic board have it is waterproof and dampproof, the feature of environmental protection is good The characteristics of, be conducive to the stability and the feature of environmental protection that increase furred ceiling.
Preferably, the positioning plate 81 is connected with the front of the bearing plate 82, the level height of the positioning plate 81 Greater than the level height of the bearing plate 82.L-shaped structure is fixed on the first metope 11 between positioning plate 81 and bearing plate 82 On, positioning plate 81 is the vertical edge of " L ", and positioning plate 81 is fitted on the first metope 11, provides pulling force for bearing plate 82.
Further, the top plate 61 is overlapped on the front of bearing plate 82.Positioning plate 81 provides pulling force to bearing plate 82, Top plate 61 generates the pressure for squeezing positioning plate 81 to bearing plate 82, and bearing plate 82 can be made effectively to be connected on levelling part, prevented Bearing plate 82 is mobile towards the direction far from levelling part.
Optionally, one end on the top plate 61 far from the lapping plate can also be fitted in the back of the bearing plate 82 Face, during installation, construction personnel is conducive to adjust in time top plate 61 convenient for observation the distance between top plate 61 and the first metope 11 Speed of application is accelerated in the position of whole top plate 61.
Optionally, the top plate 61 by screw is bonded fixation with the bearing plate 82.After the position of top plate 61 determines Directly nail is on bearing plate 82, easy for construction, stable connection.
As an optional implementation process, the furred ceiling further includes splice plate, the top plate 61 and the lapping plate pair Fitting is fixed on the splice plate after connecing.Splice plate can further increase to be connected between top plate 61 and lapping plate Stability guarantees that top plate 61 is in the same plane with lapping plate, is conducive to the flatness for further improving furred ceiling entirety.
Further, the top plate 61 and the splice bar bolting, the lapping plate and the splicing crab bolt connect It connects.It is directly bolted after top plate 61 and lapping plate docking, prevents top plate 61 and lapping plate from relative displacement occurs, guarantee Stability between top plate 61 and lapping plate.
On the basis of the above embodiments, the quantity of the support keel 6 be two, two support keels 6 along The length direction of the top plate 61 extends in the same direction, and two can increase the stability of hanging top plate 61 in support keel 6.
Optionally, the shape of first elastic strip 74 is cylindric.Columned structure and the first crimping 721, second The first limit hole and the second limit hole that crimping 731 is formed are adapted, can be improved the first elastic strip 74 and the first crimping 721, The stability of second crimping 731 connection.
Preferably, first elastic strip 74 is made of spring steel, spring steel has good elasticity, in stress Quick deformation down, and quickly restore to the original state after releasing stress, be conducive to the rotation angle for controlling revolving fragment 72.
Optionally, it is provided with third crimping 722 on the revolving fragment 72, is provided with Volume Four side in the connection sheet 73 732, the third crimping 722 is oppositely arranged with first crimping 721, the Volume Four side 732 and second crimping 731 are oppositely arranged.Third crimping 722 can effectively increase the intensity of revolving fragment 72, and Volume Four side 732 can effectively increase Add the intensity of connection sheet 73, increases the stability of 7 structure of connector.
Further, the connector 7 further includes the second elastic strip 75, the third crimping 722 and the Volume Four side 732 are set on second elastic strip 75.Second elastic strip 75 is extended in the same direction with the first elastic strip 74, can be more accurate Ground controls the rotation angle of revolving fragment 72, prevents revolving fragment 72 from falling off from bearing plate 82.
Further, on first crimping 721 far from the third crimping 722 on one side on any point, with On second crimping 731 far from the Volume Four side 732 on one side on any point between line be parallel to it is described First elastic strip 74.Above-mentioned set-up mode can make the side for contacting bearing plate 82 on the first crimping 721 or the second crimping 731 equal Perpendicular to connecting column 71.It, can after revolving fragment 72 is overlapped on bearing plate 82 when connecting column 71 is vertically mounted on top plate 61 To guarantee the levelness of top plate 61.
Optionally, the connection sheet 73 is connected with the connecting column 71 rotation, and the rotation axis of the connection sheet 73 is institute The central axis of connecting column 71 is stated, above-mentioned set-up mode can increase the flexibility of connector 7, in actual installation process, even Contact pin 73 and the optional one of revolving fragment 72 are mounted on support keel 6, simplify installation, connection sheet 73 and revolving fragment 72 are settable At identical structure, simplify production.It should be noted that hinged mode can be used in connection sheet 73 and revolving fragment 72 It is connected on connecting column 71.
Preferably, offering the first opening 723, the company on one side backwards to the connecting column 71 on the revolving fragment 72 The second opening 733 is offered on one side backwards to the connecting column 71 in contact pin 73.First opening 723 and second opening 733 it is upper Edge can be overlapped on bearing plate 82, increase the application range of connector 7.
Optionally, the inner surface of the outer axial face of first elastic strip 74 and first crimping 721 and described the The outer axial face of one elastic strip 74 and the inner surface of second crimping 731 are interference fitted, can be improved the first elastic strip 74 with The stability connected between first crimping 721, the first elastic strip 74 and the second crimping 731.
Further, the furred ceiling integral module further includes fixing screws, offers mounting hole in the connection sheet 73 76, the fixing screws are fixed on the support keel 6 after being fed through the mounting hole 76, and above-mentioned connection type is conducive to The stability for keeping top plate 61 to connect with connection sheet 73.Further, the second crimping 731 and Volume Four in connection sheet 73 Side 732 is located at the same side of connection sheet 73, and the surface in connection sheet 73 backwards to the second crimping 731 and Volume Four side 732 is bonded It is fixed on support keel 6, connection sheet 73 can be made more to be firmly mounted on support keel 6.
Figure 10 is the flow chart of the installation method for the furred ceiling integral module that alternative embodiment of the present invention provides.
As shown in Figures 1 to 10, the embodiment of the invention provides a kind of installation methods of furred ceiling integral module to install furred ceiling Integral module, comprising: S1: the first metope 11 and the second metope 12 being oppositely arranged are determined;S2: assembling stile 2 makes described vertical Frame 2 includes at least three stile board group parts, and each stile board group part includes: sequentially connected first plate 21, vertical plate 23 and second plate 22, first plate 21 be oppositely arranged with second plate 22, first plate 21, institute It states vertical plate 23 and second plate 22 is stripe board and extends in the same direction;At least three 23 head and the tail of vertical plate sequentially connect The stile 2 for limiting enclosing type is connect, at least three first plate, 21 head and the tail, which are sequentially connected with, limits the upper of the stile 2 Flange, at least three second plate, 22 head and the tail are sequentially connected with the lower flange for limiting the stile 2;S3: two are installed Part is separately mounted on first metope 11 and second metope 12, and each installation part includes the first support plate 31, the second support plate 32 and the first sliding plate 33;Second support is slippingly arranged in first sliding plate 33 On plate 32;Two first support plates 31 are separately fixed on first metope 11 and second metope 12;S4: logical Cross hanging keel 4 stile 2 is fixed on first metope 11 and second metope 12, the hanging keel 4 with The upper overturning is connected;The both ends of the hanging keel 4 are connected with two first sliding plates 33 respectively.
Furred ceiling integral module and installation method provided in an embodiment of the present invention, two locating pieces 3 pass through respective first Fagging 31 is separately mounted on the first metope 11 that after two locating pieces 3 install, stile 2 is mounted on on the second metope 12 On hanging keel 4, and the both ends of hanging keel 4 are connected on two the first sliding plates 33, suspender member 5 can be reduced Quantity, improve stile 2 mount after stability, improve construction quality, increase the cleaning of construction environment, improve construction Efficiency shortens construction period.And slid in the second support plate 32 by the first sliding plate 33, it can be to 4 both ends of hanging keel Position be adjusted, stile 2 without disassembly can carry out position adjustment, reduce labor intensity.First plate 21 and second Plate 22 can increase the intensity of vertical plate 23, improve the bending resistance of vertical plate 23, improve the stability of furred ceiling.Adjacent is vertical It, will be adjacent after adjacent the first plate 21 alignment splicing, adjacent the second plate 22 alignment splicing when deckle board component splices The upper edge and lower edge of vertical plate 23 are defined in the state of alignment splicing, improve the precision of splicing, realize stile 2 It is seamless spliced.
Finally, it should be noted that the above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;To the greatest extent Present invention has been described in detail with reference to the aforementioned embodiments for pipe, those skilled in the art should understand that: it is still It is possible to modify the technical solutions described in the foregoing embodiments, or part of technical characteristic is equally replaced It changes;And these are modified or replaceed, the model for technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution It encloses.

Claims (10)

1. a kind of furred ceiling integral module, including the first metope and the second metope being oppositely arranged, which is characterized in that further include:
Stile, the stile include at least three stile board group parts, and each stile board group part includes: sequentially connected first Plate, vertical plate and the second plate, first plate are oppositely arranged with second plate, first plate, described vertical Plate and second plate are stripe board and extend in the same direction;At least three vertical plate head and the tail, which are sequentially connected with to limit, to be enclosed The main body of the box-like stile, at least three first plate head and the tail are sequentially connected with the upper overturning for limiting the stile, At least three second plate head and the tail are sequentially connected with the lower flange for limiting the stile;
At least two locating pieces, each locating piece include the first sliding plate and the first support plate connected vertically and Second support plate;First sliding plate is slippingly arranged in second support plate;Two first support plates point It is not fixed on first metope and second metope;
Hanging keel, the hanging keel are connected with the vertical plate;The both ends of the hanging keel respectively with two described One sliding plate is connected.
2. furred ceiling integral module according to claim 1, which is characterized in that the furred ceiling integral module further includes hanging Part, the suspender member includes connecting plate and the hanging plate on the connecting plate is arranged in slip, is connected on the connecting plate Sunpender, the sunpender is perpendicular to the hanging plate;The hanging keel is overlapped on the hanging plate.
3. furred ceiling integral module according to claim 2, which is characterized in that each locating piece further includes that slip is set The second sliding plate in second support plate is set, first sliding plate and second sliding plate are oppositely arranged, described First sliding plate, second sliding plate and second support plate limit supporting and space, the both ends of the hanging keel It is respectively defined in two supporting and spaces.
4. furred ceiling integral module according to claim 3, which is characterized in that the furred ceiling integral module further includes top plate, The front of the top plate is fitted and connected with the lower flange, is equipped with support keel on the front of the top plate.
5. furred ceiling integral module according to claim 4, which is characterized in that the furred ceiling integral module further includes two and holds Heavy mail, each supporting part include positioning plate and bearing plate connected vertically;Two positioning plates are bonded fixation respectively On first metope and second metope, the support keel is overlapped on the bearing plate.
6. furred ceiling integral module according to claim 5, which is characterized in that the furred ceiling integral module further includes connection Part, the connector include connecting column, the revolving fragment being connected on the connecting column and connection sheet and the first elastic strip;Institute It states revolving fragment and connecting column rotation connects, the rotation axis of the revolving fragment is the central axis of the connecting column;It is described It is provided with the first crimping on revolving fragment, the second crimping is provided in the connection sheet;First crimping and second crimping It is set on first elastic strip;The connection sheet is fixed on the support keel;The first volume edge lap is in institute It states on bearing plate.
7. furred ceiling integral module according to claim 6, which is characterized in that first plate and second plate are equal For trapezoidal plate;In any one of stile board group part, the upper bottom edge of first plate is connected with the vertical plate, and described The upper bottom edge of two plates is connected with the vertical plate.
8. furred ceiling integral module according to claim 7, which is characterized in that in two of the bottom of first plate Angle is 45° angle;Two interior angles of the bottom of second plate are 45° angle.
9. furred ceiling integral module according to any one of claims 1 to 8, which is characterized in that the stile further includes docking Part, the interfacing part include the first buttcover plate and the second buttcover plate being connected, first buttcover plate and second docking Plate is bonded respectively to be fixed on the vertical plate that any two are mutually spliced.
10. a kind of installation method of furred ceiling integral module, which is characterized in that for installing described in claim 1-9 any one Furred ceiling integral module, comprising:
Determine the first metope and the second metope being oppositely arranged;
Stile is assembled, making the stile includes at least three stile board group parts, and each stile board group part includes: to be sequentially connected The first plate, vertical plate and the second plate, first plate is oppositely arranged with second plate, first plate, The vertical plate and second plate are stripe board and extend in the same direction;At least three vertical plate head and the tail are sequentially connected with limit The stile of enclosing type is made, at least three first plate head and the tail are sequentially connected with the upper overturning for limiting the stile, at least Three the second plate head and the tail are sequentially connected with the lower flange for limiting the stile;
Two locating pieces are separately mounted on first metope and second metope, each locating piece includes One support plate, the second support plate and the first sliding plate;Second support plate is slippingly arranged in first sliding plate On;Two first support plates are separately fixed on first metope and second metope;
The stile is fixed on first metope and second metope by hanging keel, the hanging keel and institute Upper overturning is stated to be connected;The both ends of the hanging keel are connected with two first sliding plates respectively.
CN201711490392.4A 2017-12-30 2017-12-30 Furred ceiling integral module and installation method Active CN108049550B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201711490392.4A CN108049550B (en) 2017-12-30 2017-12-30 Furred ceiling integral module and installation method
PCT/CN2018/088941 WO2019128090A1 (en) 2017-12-30 2018-05-30 Integral ceiling module and installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711490392.4A CN108049550B (en) 2017-12-30 2017-12-30 Furred ceiling integral module and installation method

Publications (2)

Publication Number Publication Date
CN108049550A CN108049550A (en) 2018-05-18
CN108049550B true CN108049550B (en) 2018-12-11

Family

ID=62129926

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711490392.4A Active CN108049550B (en) 2017-12-30 2017-12-30 Furred ceiling integral module and installation method

Country Status (2)

Country Link
CN (1) CN108049550B (en)
WO (1) WO2019128090A1 (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108049550B (en) * 2017-12-30 2018-12-11 浙江亚厦装饰股份有限公司 Furred ceiling integral module and installation method
CN109025029B (en) * 2018-07-31 2023-12-26 浙江亚厦装饰股份有限公司 Plane suspended ceiling and installation method
CN108951990A (en) * 2018-08-14 2018-12-07 天津达因建材有限公司 A kind of assembled furred ceiling
CN109372176B (en) * 2018-10-12 2024-02-06 浙江亚厦装饰股份有限公司 Suspended ceiling and suspended ceiling mounting method
CN109594704A (en) * 2018-12-04 2019-04-09 浙江亚厦装饰股份有限公司 A kind of hanging beam and its assemble method
CN110258894B (en) * 2019-06-05 2021-09-10 浙江亚厦装饰股份有限公司 Mounting structure and mounting method of ceiling board
CN114856073A (en) * 2022-04-21 2022-08-05 苏州工业园区国发国际建筑装饰工程有限公司 Unit assembly type aluminum plate ceiling structure and installation method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104088390A (en) * 2014-07-29 2014-10-08 上海圣峰建材科技有限公司 Integral roof suspended ceiling component
CN204059702U (en) * 2014-07-23 2014-12-31 北京四方继保自动化股份有限公司 A kind of can modularization install Integral ceiling
CN106013581A (en) * 2016-06-29 2016-10-12 浙江亚厦装饰股份有限公司 Integrated ceiling and installing method thereof
CN106013579A (en) * 2016-06-29 2016-10-12 浙江亚厦装饰股份有限公司 Integrated ceiling device and mounting method thereof
CN107268859A (en) * 2017-06-26 2017-10-20 浙江亚厦装饰股份有限公司 A kind of attachment structure of frame top plate and stile
CN107268865A (en) * 2017-06-26 2017-10-20 浙江亚厦装饰股份有限公司 A kind of modularization falls grade suspended ceiling device and installation method

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090094924A1 (en) * 2005-07-29 2009-04-16 William Paul Sectioning scheme applied to two or four foot cross tee members associated with a ceiling grid system and for resizing both the cross tee and associated ceiling tile for installation at a border cut location between a main tee and parallel extending wall angle
CN2825810Y (en) * 2005-08-31 2006-10-11 亨特道格拉斯工业(中国)有限公司 Composite board mounting structure
US9217247B2 (en) * 2014-02-07 2015-12-22 Apple Inc. Ceiling system
KR101554674B1 (en) * 2014-09-02 2015-09-22 김백현 Ceiling frame system
CN106013584B (en) * 2016-06-29 2017-10-03 浙江亚厦装饰股份有限公司 Modularization furred ceiling falls stage arrangement and installation method
CN205917959U (en) * 2016-06-29 2017-02-01 浙江亚厦装饰股份有限公司 Furred ceiling falls a grade device
CN107268866B (en) * 2017-06-26 2022-12-09 浙江亚厦装饰股份有限公司 Combined type grade-falling suspended ceiling and installation method
CN108049554B (en) * 2017-12-30 2019-01-22 浙江亚厦装饰股份有限公司 The double-deck drop level furred ceiling and installation method
CN108049550B (en) * 2017-12-30 2018-12-11 浙江亚厦装饰股份有限公司 Furred ceiling integral module and installation method
CN108086564A (en) * 2017-12-30 2018-05-29 浙江亚厦装饰股份有限公司 Furred ceiling stile module and installation method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204059702U (en) * 2014-07-23 2014-12-31 北京四方继保自动化股份有限公司 A kind of can modularization install Integral ceiling
CN104088390A (en) * 2014-07-29 2014-10-08 上海圣峰建材科技有限公司 Integral roof suspended ceiling component
CN106013581A (en) * 2016-06-29 2016-10-12 浙江亚厦装饰股份有限公司 Integrated ceiling and installing method thereof
CN106013579A (en) * 2016-06-29 2016-10-12 浙江亚厦装饰股份有限公司 Integrated ceiling device and mounting method thereof
CN107268859A (en) * 2017-06-26 2017-10-20 浙江亚厦装饰股份有限公司 A kind of attachment structure of frame top plate and stile
CN107268865A (en) * 2017-06-26 2017-10-20 浙江亚厦装饰股份有限公司 A kind of modularization falls grade suspended ceiling device and installation method

Also Published As

Publication number Publication date
WO2019128090A1 (en) 2019-07-04
CN108049550A (en) 2018-05-18

Similar Documents

Publication Publication Date Title
CN108049550B (en) Furred ceiling integral module and installation method
CN108049552A (en) Top hangs drop level furred ceiling and installation method
CN108049554B (en) The double-deck drop level furred ceiling and installation method
EP1413914A2 (en) Flat display monitor and flat display panel fixing apparatus and method
DE102008001084A1 (en) Carrier and wall mounting with the same
US20170291193A1 (en) Side Tensioning System for Retaining Screen Media in a Vibrating-Type Screening Machine
CN105971167A (en) Curtain wall and mounting adjustment device
CN103526907A (en) Inclined stone material dry-hanging structure and construction method thereof
CN208122075U (en) Top hangs drop level furred ceiling
CN214839593U (en) Split type liquid crystal splicing screen convenient to disassemble
CN209499430U (en) Modularization blind box cover
CN108049555A (en) Cantilever furred ceiling and installation method
CN109239962B (en) Front maintenance device for spliced LCD display screen
CN209509277U (en) A kind of adjustable curtain-wall adapter
CN108125535A (en) Modularization blind box cover and installation method
CN110453911A (en) Shutdown formula installs formwork system and its construction method
CN207998976U (en) Cantilever furred ceiling
CN207228447U (en) Metal plates install supporting arrangement
CN207974345U (en) Single layer drop level furred ceiling
KR20120118093A (en) Jig adjusting gap to hull block assembly
CN108301551A (en) Building ceiling industrializes decorative system and installation method
CN109914738A (en) A kind of ceiling type dry hanging plate material metope
CN209408258U (en) Hanger and its general hanging branch
CN209188915U (en) The suspension strut structure of raymond mill grinding roller
US5709808A (en) Formwork to be used with a wall form assembly for forming a door opening in a concrete wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Ding Zecheng

Inventor after: Zhuang Weimin

Inventor after: Wang Wenguang

Inventor after: Zhou Dongshan

Inventor after: Hou Jianqun

Inventor after: Ren Baoshuang

Inventor after: Yu Wenzhao

Inventor before: Zhou Dongshan

Inventor before: Yu Wenzhao

Inventor before: Zhong Cheng

Inventor before: Bu Ting

Inventor before: Xue Meng

Inventor before: Wang Jin

Inventor before: Zheng Bobo

Inventor before: Yan Lingyun