CN108049274A - Widening subgrade splicing construction - Google Patents

Widening subgrade splicing construction Download PDF

Info

Publication number
CN108049274A
CN108049274A CN201810073343.9A CN201810073343A CN108049274A CN 108049274 A CN108049274 A CN 108049274A CN 201810073343 A CN201810073343 A CN 201810073343A CN 108049274 A CN108049274 A CN 108049274A
Authority
CN
China
Prior art keywords
widening subgrade
base
subgrade
widening
splicing construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201810073343.9A
Other languages
Chinese (zh)
Inventor
蒋希雁
黄前龙
何春晓
王皓宇
于海
左新颖
左江涛
于川情
王奥运
仉健
赵晓玉
赵倩
刘桓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei University of Architecture
Original Assignee
Hebei University of Architecture
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei University of Architecture filed Critical Hebei University of Architecture
Priority to CN201810073343.9A priority Critical patent/CN108049274A/en
Publication of CN108049274A publication Critical patent/CN108049274A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/04Foundations produced by soil stabilisation
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/76Anchorings for bulkheads or sections thereof in as much as specially adapted therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses a kind of widening subgrade splicing constructions, belong to road construction technical field, for widening subgrade to be spliced to former roadbed, set in the both sides of former roadbed and be equipped with the gradient towards inclined widening subgrade on the inside of highway, former roadbed and widening subgrade entirety cross section are trapezoidal;The side slope being connected with widening subgrade of former roadbed is arranged to stepped and is provided with the gradient on the inside of highway;Widening subgrade includes surface layer, base's group and bed course successively from top to bottom, base's group includes at least about two layers base being arranged in parallel, pull rod is equipped in every layer of base, from the middle part of base's group to being equipped with the anchor pole that tilts and go deep into inside the former roadbed between the bed course bottom.The present invention can solve easy generation Slope Sliding in the prior art, road surface hovering and unsafe technical problem, can reach that side slope protection is strong, improve the technique effect of the globality of splicing widening subgrade.

Description

Widening subgrade splicing construction
Technical field
The invention belongs to road construction technical fields, are to be related to a kind of widening subgrade splicing construction more specifically.
Background technology
With economic development, traffic transport industry is also rapidly developed, important set of the highway transportation as communications and transportation It is more and more stringenter to the construction requirements of highway transportation into part.In present engineering Reformed and expanded plan design, roadbed is inevitably run into Widen, carried out step excavation, direct splicing, but the road structure so spliced for the splicing of roadbed is simply simple in the past In the presence of very serious security risk, especially on soft soil foundation, the globality that can not ensure roadbed is so done, it is easy to generate Slope Sliding generates road surface hovering, serious threat traffic safety.How to ensure the globality of seam-line removal, ensure traffic safety Degree, so as to improve the bearing capacity of highway subgrade and performance, the service life for extending highway is road work for a long time Person's problem to be solved.
The content of the invention
It is an object of the invention to provide a kind of widening subgrade splicing construction, to solve easy production in the prior art Raw Slope Sliding, road surface hovering and unsafe technical problem, can reach that side slope protection is strong, improve splicing widening subgrade Globality ensures traffic safety degree, so as to improve the bearing capacity of highway subgrade and performance, extends the service life of highway Technique effect.
To achieve the above object, the technical solution adopted by the present invention is:A kind of widening subgrade splicing construction is provided, in Yuan Lu The both sides of base, which are set, is equipped with the gradient towards inclined widening subgrade on the inside of highway, and the original roadbed is whole horizontal with the widening subgrade Section is trapezoidal;
The side slope being connected with the widening subgrade of the original roadbed is arranged to stepped and is provided on the inside of highway The gradient;
The widening subgrade includes surface layer, base's group and bed course successively from top to bottom, and base's group includes at least two layers The base being arranged in parallel up and down is equipped with pull rod in every layer of base, is set from the middle part of base's group between the bed course bottom There is the anchor pole for tilting and going deep into inside the former roadbed.
Further, the side slope prepared by concrete is set in the outside portion of the surface layer, base's group and bed course.
Further, the both ends of the pull rod are equipped with hangnail, and the centre of the pull rod is connected using steel strand wires.
Further, the stepped side slope of the former roadbed and the faying surface of the widening subgrade are equipped with TGXG.
Further, the anchor pole is prepared using I or II grade of reinforcing bar.
Further, the outside of the reinforcing bar is equipped with the cement mortar wrapping layer of thickness >=8mm.
Further, the half of distance≤rock-bolt length between the anchor pole, and≤1.5m.
Further, the gradient of the side slope being connected with the widening subgrade of the former roadbed is 2%.
Further, the arrangement of the anchor pole is in plum blossom-shaped.
The advantageous effect of widening subgrade splicing construction provided by the invention is:With widening subgrade structure of the prior art Globality poor is also easy to produce the sliding situation hanging with road surface and compares, and the present invention is set in the both sides of former roadbed towards on the inside of highway The widening subgrade of the gradient, the side slope of former roadbed are arranged to stepped and are provided with the gradient on the inside of highway;Widening subgrade includes Surface layer, base and bed course set pull rod in every layer of base, are equipped with from the middle part of base's group between the bed course bottom It tilts and gos deep into the anchor pole inside the former roadbed.This structure side slope protective is strong, improves the globality of splicing widening subgrade, protects Traffic safety degree is demonstrate,proved, so as to improve the bearing capacity of highway subgrade and performance, extends the service life of highway.
Description of the drawings
It to describe the technical solutions in the embodiments of the present invention more clearly, below will be to embodiment or description of the prior art Needed in attached drawing be briefly described, it should be apparent that, the accompanying drawings in the following description be only the present invention some Embodiment, for those of ordinary skill in the art, without having to pay creative labor, can also be according to these Attached drawing obtains other attached drawings.
Fig. 1 is the structure diagram of widening subgrade splicing construction provided in an embodiment of the present invention;
Fig. 2 is the layout drawing of anchor pole provided in an embodiment of the present invention.
Wherein, each reference numeral in figure:
1-surface layer, 2-base, 3-bed course, 4-pull rod, 5-TGXG, 6-anchor pole, 7-side slope, 8-original road Base.
Specific embodiment
In order to which technical problems, technical solutions and advantages to be solved are more clearly understood, tie below Accompanying drawings and embodiments are closed, the present invention will be described in further detail.It should be appreciated that specific embodiment described herein is only To explain the present invention, it is not intended to limit the present invention.
It should be noted that when element is referred to as " being fixed on " or " being arranged at " another element, it can be directly another On one element or it is connected on another element.When an element is known as " being connected to " another element, it can To be directly to another element or be indirectly connected on another element.
It is to be appreciated that term " length ", " width ", " on ", " under ", "front", "rear", "left", "right", " vertical ", The orientation or position relationship of the instructions such as " level ", " top ", " bottom " " interior ", " outer " are to be closed based on orientation shown in the drawings or position System is for only for ease of the description present invention and simplifies description rather than instruction or imply that signified device or element must have Specific orientation, with specific azimuth configuration and operation, therefore be not considered as limiting the invention.
In addition, term " first ", " second " are only used for description purpose, and it is not intended that instruction or hint relative importance Or the implicit quantity for indicating indicated technical characteristic.Define " first " as a result, the feature of " second " can be expressed or Implicitly include one or more this feature.In the description of the present invention, " multiple ", " several " be meant that two or Two or more, unless otherwise specifically defined.
It refer to shown in Fig. 1, the present invention is used to widening subgrade being spliced to former roadbed 8, is set in the both sides of former roadbed 8 The gradient is towards (roadbed center position) inclined widening subgrade on the inside of highway, i.e. the inclined direction on the top of widening subgrade is towards road Base center position, the original roadbed 8 and the widening subgrade entirety cross section are trapezoidal;The original roadbed 8 is widened with described The side slope of roadbed connection is arranged to stepped and is provided with the gradient on the inside of highway, and above-mentioned value of slope is 2%;It is described to widen road Base includes surface layer 1, base's group and bed course 3 successively from top to bottom, and base's group includes at least about two layers base being arranged in parallel Layer 2 is equipped with pull rod 4 in every layer of base 2, is tilted and deeply from the middle part of base's group to being equipped between 3 bottom of bed course Anchor pole 6 inside the original roadbed 8.
The Slope Design of former roadbed is with a slope stepped and widened with both sides by above-mentioned widening subgrade splicing construction Roadbed connects, and widening subgrade includes surface layer 1, base's group and bed course 3 successively from top to bottom, and base's group is included at least two layers Under the base 2 that is arranged in parallel, be equipped with pull rod 4 in every layer of base 2, pull rod 4 can enhance former roadbed 8 and the widening subgrade of both sides Bonding strength, and add anchor pole 6, anchor pole 6 tilt and deep from the middle part of base's group to being equipped between 3 bottom of bed course Enter inside the former roadbed 8, on the one hand above-mentioned anchor pole with reinforcing side slope, on the other hand can ensure the entirety of pavement structure Property improves the bearing capacity of roadbed.
Side slope protection of the present invention is strong, improves the globality of splicing widening subgrade, ensures traffic safety degree, so as to improve public affairs The bearing capacity and performance of road roadbed extend the service life of highway.
Further, refer to shown in Fig. 1, a kind of specific implementation as widening subgrade splicing construction provided by the invention Mode sets the side slope 7 prepared by concrete in the outside portion of the surface layer 1, base's group and bed course 3.Above-mentioned concrete system Standby side slope 7 can be further ensured that the overall stability of widening subgrade.
Further, refer to shown in Fig. 1, a kind of specific implementation as widening subgrade splicing construction provided by the invention Mode, the both ends of the pull rod 4 are equipped with hangnail, and the centre of the pull rod 4 is connected using steel strand wires.Falling on above-mentioned pull rod 4 Thorn structure can enhance bonding strength, prevent landslide phenomenon and occur, and can enhance widening subgrade by steel strand wires connection Overall stability.
Further, refer to shown in Fig. 1, a kind of specific implementation as widening subgrade splicing construction provided by the invention Mode, the stepped side slope and the faying surface of the widening subgrade of the original roadbed 8 are equipped with TGXG 5.Above-mentioned geotechnique's lattice Grid 5 can effectively enhance the globality of splicing widening subgrade, ensure traffic safety.
Further, a kind of specific embodiment as widening subgrade splicing construction provided by the invention, the anchor pole 6 It is prepared using I or II grade of reinforcing bar;The outside of the reinforcing bar is equipped with the cement mortar wrapping layer of thickness >=8mm;Cement mortar it is strong Degree grade does not answer low M20.The design of above-mentioned anchor pole 6, tensile capacity is stronger, can ensure the globality of pavement structure, improves road The bearing capacity of base.
Further, refer to shown in Fig. 2, a kind of specific implementation as widening subgrade splicing construction provided by the invention Mode, the anchor pole 6 arrangement is in plum blossom-shaped, the half of distance≤rock-bolt length between anchor pole 6, and≤1.5m, above-mentioned cloth Meter is installed, tensile capacity is stronger, can ensure the globality of pavement structure, improves the bearing capacity of roadbed.
Specific case used herein is set forth the principle of the present invention and embodiment, and above example is said It is bright to be only intended to help the method and its core concept for understanding the present invention.It should be pointed out that the ordinary skill for the art For personnel, without departing from the principle of the present invention, can also to the present invention some improvement and modification can also be carried out, these improvement It is also fallen into modification in the protection domain of the claims in the present invention.

Claims (9)

1. widening subgrade splicing construction, for widening subgrade to be spliced to former roadbed (8), it is characterised in that:In former roadbed (8) Both sides set and be equipped with the gradient towards inclined widening subgrade on the inside of highway, the original roadbed (8) and the widening subgrade are whole Cross section is trapezoidal;
The side slope being connected with the widening subgrade of the original roadbed (8) is arranged to stepped and is provided with the slope on the inside of highway Degree;
The widening subgrade includes surface layer (1), base's group and bed course (3) successively from top to bottom, and base's group includes at least two The base (2) that layer is arranged in parallel up and down, every layer of base (2) is interior to be equipped with pull rod (4), from the middle part of base's group to the bed course (3) it is equipped between bottom and tilts and go deep into the internal anchor pole (6) of the former roadbed (8).
2. widening subgrade splicing construction according to claim 1, it is characterised in that:In the surface layer (1), base's group and pad The outside portion of layer (3) sets the side slope (7) prepared by concrete.
3. widening subgrade splicing construction according to claim 1, it is characterised in that:The both ends of the pull rod (4) are equipped with Thorn, and the centre of the pull rod (4) is connected using steel strand wires.
4. widening subgrade splicing construction according to claim 1, it is characterised in that:The stepped side of the original roadbed (8) Slope and the faying surface of the widening subgrade are equipped with TGXG (5).
5. widening subgrade splicing construction according to claim 1, it is characterised in that:The anchor pole (6) uses I or II grade of steel It is prepared by muscle.
6. widening subgrade splicing construction according to claim 5, it is characterised in that:The outside of the reinforcing bar be equipped with thickness >= The cement mortar wrapping layer of 8mm.
7. widening subgrade splicing construction according to claim 1, it is characterised in that:Distance≤anchor between the anchor pole (6) The half of pole length, and≤1.5m.
8. widening subgrade splicing construction according to claim 1, it is characterised in that:Original roadbed (8) is opened up with described The gradient of the side slope of broad way base connection is 2%.
9. widening subgrade splicing construction according to claim 1, it is characterised in that:The arrangement of the anchor pole (6) is in plum blossom Shape.
CN201810073343.9A 2018-01-25 2018-01-25 Widening subgrade splicing construction Withdrawn CN108049274A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810073343.9A CN108049274A (en) 2018-01-25 2018-01-25 Widening subgrade splicing construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810073343.9A CN108049274A (en) 2018-01-25 2018-01-25 Widening subgrade splicing construction

Publications (1)

Publication Number Publication Date
CN108049274A true CN108049274A (en) 2018-05-18

Family

ID=62124834

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810073343.9A Withdrawn CN108049274A (en) 2018-01-25 2018-01-25 Widening subgrade splicing construction

Country Status (1)

Country Link
CN (1) CN108049274A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108755320A (en) * 2018-08-27 2018-11-06 山东大学 A kind of reinforcement Foam lightweight soil Widening Embankment structure and its construction method
CN110144767A (en) * 2019-04-03 2019-08-20 中铁第四勘察设计院集团有限公司 Help broad way based structures and construction method
CN111005278A (en) * 2019-12-23 2020-04-14 重庆交通大学 Local reinforced embankment, construction method and rapid repairing and reinforcing method thereof
CN112921727A (en) * 2021-01-28 2021-06-08 攀钢集团工程技术有限公司 High and steep slope road widening construction method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108755320A (en) * 2018-08-27 2018-11-06 山东大学 A kind of reinforcement Foam lightweight soil Widening Embankment structure and its construction method
CN110144767A (en) * 2019-04-03 2019-08-20 中铁第四勘察设计院集团有限公司 Help broad way based structures and construction method
CN110144767B (en) * 2019-04-03 2024-06-07 中铁第四勘察设计院集团有限公司 Side-width roadbed structure and construction method
CN111005278A (en) * 2019-12-23 2020-04-14 重庆交通大学 Local reinforced embankment, construction method and rapid repairing and reinforcing method thereof
CN112921727A (en) * 2021-01-28 2021-06-08 攀钢集团工程技术有限公司 High and steep slope road widening construction method

Similar Documents

Publication Publication Date Title
CN108049274A (en) Widening subgrade splicing construction
CN105421235B (en) Lateral prestress application method for paving reinforcing bar concrete on bridge floor of assembled type bridge
CN105887586A (en) Low implantation line double-wire section terminal spine type bearing rail beam limiting structure in medium and low speed magnetic levitation transportation engineering
CN206581091U (en) A kind of Anti-settling device of highway subgrade
CN110258221A (en) A kind of box frame roadbed
CN106088131A (en) Armored concrete cross tower crane and construction method thereof
CN210262769U (en) Hollow slab bridge reinforcing and widening structure
CN206553924U (en) A kind of many crossbeam combined bridge guardrails
CN215444085U (en) High-strength flexible stainless steel part
CN207828724U (en) Widening subgrade splicing construction
CN106498977B (en) Outrigger formula retaining wall structure
CN102852279B (en) A kind of prestressed reinforced concrete composite beam of convex-concave superposed surfaces
CN205804237U (en) A kind of recycling roadbed concrete guardrail
CN208455502U (en) A kind of bridge mini pile ruggedized construction
CN107476209A (en) A kind of culvert structure in grade separation traffic
CN110016866A (en) Cast-in-situ construction method across piping lane in a kind of Urban Bridge
CN205617160U (en) Low distributed switch foundation structure of circuit rib post that puts of moderate -low speed magnetic levitation
CN211171571U (en) Approach and road surface lap joint structure for preventing and treating vehicle bump at bridge head
CN211713557U (en) Reinforced concrete crossing plate and level crossing structure
CN211922690U (en) Steel-pipe pile foundation reinforced structure
CN208136828U (en) Narrow river Retaining Wall Reinforcement device
CN107542212A (en) A kind of Prefabricated porous plate being connected and attaching method thereof
CN208577951U (en) For reinforcing the pile frame structure of culvert
CN202831387U (en) Prestressed reinforced concrete composite beam with concavo-convex composite surface
CN205443830U (en) Reinforced structure is widened to weak soil road bed

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20180518

WW01 Invention patent application withdrawn after publication