CN108038613A - A kind of automobile maintenance management system and method - Google Patents
A kind of automobile maintenance management system and method Download PDFInfo
- Publication number
- CN108038613A CN108038613A CN201711295911.1A CN201711295911A CN108038613A CN 108038613 A CN108038613 A CN 108038613A CN 201711295911 A CN201711295911 A CN 201711295911A CN 108038613 A CN108038613 A CN 108038613A
- Authority
- CN
- China
- Prior art keywords
- maintenance
- module
- station
- vehicle
- repaired
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0633—Workflow analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Operations Research (AREA)
- Marketing (AREA)
- Game Theory and Decision Science (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention relates to technical field of automobile maintenance, and in particular to a kind of automobile maintenance management system and method.Including impairment scale setting module, the impairment scale to repair is treated for maintenance personal and is evaluated and vehicle to be repaired the time it takes on each maintenance station is predicted according to impairment scale;Station is repaired, is carried out maintenance for treating to repair, every kind of maintenance mans' potential energy enough realizes a step in maintenance flow;Coordinate and manage module, for selecting maintenance flow according to the impairment scale of vehicle to be repaired for vehicle, it is additionally operable to according to the maintenance station used in each vehicle maintenance flow to be repaired of adjustment of estimated maintenance time of the vehicle to be repaired and vehicle to be repaired on each maintenance station.A kind of automobile maintenance management system provided by the invention and method, it is low can to solve the problems, such as that existing vehicle repairing factory is unable to maintenance efficiency caused by scientific arrangement vehicle maintenance order.
Description
Technical field
The present invention relates to technical field of automobile maintenance, in particular to a kind of automobile maintenance management system and method.
Background technology
With the popularization of vehicle, automobile has been increasingly becoming clan owning cars and has walked parent's visit, the important walking-replacing tool travelled faraway of going out.And
Vehicle also can usually get into an accident because some are unexpected while trip is convenient for people to, automobile is damaged, cause vapour
There is the problem of various big and small in car, thus the demand of auto repair is also more and more.
Such as scratch for less problem, cut, generally can be very fast by metal plate, spray painting and polishing in vehicle repairing factory
Solution, for there occurs larger collision accident, car body deforms larger situation, then the requirements of process of metal plate is very long
Time;Existing vehicle repairing factory, vehicle to be repaired is according to the sequencing carry out order repairing into maintenance shop, the serious car of accident
Need to spend longer time to carry out metal plate maintenance, vehicle thereafter can only wait its to complete metal plate maintenance, repair a thing
Therefore the time of serious vehicle is often also longer than repairing several or even more than ten of minor accident vehicle times, and behind metal plate
Station is then in idle condition, can not be fully utilized, and reduces maintenance speed and efficiency, is also easy to cause substantial amounts of vehicle to be repaired
The problem of delay.
The content of the invention
An object of the present invention is to provide a kind of automobile maintenance management system, and science peace is unable to solve existing vehicle repairing factory
Arrange the problem of maintenance efficiency caused by vehicle maintenance order is low.
In order to solve the above technical problem, the present invention provides following basic technology scheme:
A kind of automobile maintenance management system, including:
Station is repaired, is carried out maintenance for treating to repair, every kind of maintenance mans' potential energy enough realizes one in maintenance flow
Step;
Impairment scale setting module, the impairment scale of vehicle to be repaired is set for maintenance personal;
Module is coordinated and managed, for selecting maintenance flow, coordinating pipe according to the impairment scale of vehicle to be repaired for vehicle to be repaired
When reason module is additionally operable to generate estimated maintenance of the vehicle to be repaired on each maintenance station in maintenance flow according to maintenance flow
Between, coordinated management module is additionally operable to the estimated maintenance time according to the vehicle to be repaired on each maintenance station, adjusts vehicle to be repaired
Maintenance station used in maintenance flow.
In technical solution of the present invention, the impairment scale to repair is treated by impairment scale setting module and is set, is assisted
Adjust management module to select corresponding maintenance flow according to the impairment scale of vehicle to be repaired, avoid major break down vehicle from influencing other slight
The problem of damaging vehicle maintenance, accelerates the slight damage vehicle maintenance time, by coordinating and managing module maintenance time on the estimation
Maintenance station used in the maintenance flow of vehicle is adjusted, ensures that vehicle enters next maintenance process as early as possible, improves whole
The problem of maintenance efficiency of body, the occupation of land of reduction delay vehicle is more, save space.
Further, the coordinated management module includes stand-by period calculating sub module, remaining time calculating sub module and tune
Whole submodule, next target that the stand-by period calculating sub module can calculate vehicle to be repaired into its maintenance flow are repaired
The stand-by period of station, the stand-by period calculating sub module can also calculate vehicle to be repaired and enter and the target maintenance same work(of station
Stand-by period of other non-targeted maintenance stations of energy, before remaining time calculating sub module can calculate non-targeted maintenance station
The remaining maintenance time that one maintenance station is got on the bus, when the adjustment submodule is used for the estimated maintenance according to vehicle to be repaired
Between, into the stand-by period, the stand-by period into non-targeted maintenance parking stall and remaining maintenance time pair of target maintenance station
Next maintenance station that the maintenance flow of vehicle to be repaired uses is adjusted.
By stand-by period calculating sub module and adjustment submodule calculate vehicle to be repaired enter next maintenance station etc.
Treat the time, and the maintenance station of vehicle to be repaired adjusted according to the stand-by period, can make vehicle as soon as possible into it is next repair into
Journey, the remaining maintenance time got on the bus to previous maintenance stations of other maintenance stations by remaining time calculating sub module, prevents
After only current vehicle to be repaired enters other maintenance stations, increase the stand-by period of the vehicle between the station on station.
Further, the maintenance station includes sheet metal module, midway polishing module, dry grinding module, polishing module, quick service work
Position module and Fast Installation station module.
Sheet metal module, midway polishing module, dry grinding module, polishing module, quick service station module and Fast Installation station
Module is respectively used to realize metal plate, polishing, dry grinding, polishing, maintenance and the process of installation.
Further, the sheet metal module is used to carry out metal plate maintenance to automobile, and the sheet metal module is targeted according to its
Impairment scale is divided into major break down sheet metal module, ordinary tin module and quick sheet metal module from high to low;The dry grinding module root
It is divided into major break down dry grinding module, common dry grinding module and module of quickly dry grinding from high to low according to its targeted impairment scale;Institute
Midway polishing module is stated according to its targeted impairment scale is divided into major break down midway polishing module from high to low, commonly midway is beaten
Grind module and quick midway polishing module.
Different modules is divided by targeted impairment scale, handles the vehicle of different damage ranks.
Further, impairment scale shares Pyatyi, and the maintenance flow corresponds to impairment scale and is followed successively by from high to low:Major break down
Metal plate flow, ordinary tin flow, quick metal plate flow, quick service station flow and Fast Installation station flow;The major issue
Therefore major break down sheet metal module, major break down midway polishing module, major break down dry grinding mould are used during metal plate flow maintenance vehicle successively
Block, polishing module;Ordinary tin module, common midway polishing mould are used during the ordinary tin flow maintenance vehicle successively
Block, module of commonly dry grinding, polishing module;Use quick sheet metal module, soon during the quick metal plate flow maintenance vehicle successively
Fast midway polishing module, module of quickly dry grinding, polishing module;Quick service is used during the quick service station flow maintenance vehicle successively
Station module, polishing module, the Fast Installation station flow will use Fast Installation station module when repairing.
Different process flows is divided by impairment scale.
The invention also discloses a kind of administration of vehicle maintenance method for having used above-mentioned automobile maintenance management system, including with
Lower step:
S1:The impairment scale to repair is treated to grade;
S2:The maintenance flow of vehicle to be repaired is selected according to the impairment scale of vehicle to be repaired;
S3:When generating estimated maintenance of the vehicle to be repaired on each maintenance station in maintenance flow according to maintenance flow
Between;
S4:Vehicle to be repaired is repaired in each repair on station according to maintenance flow;
Wherein, S4 is specifically included:
S4-1:Obtain the target to be entered in the current maintenance flow of vehicle to be repaired maintenance station;
S4-2:The estimated maintenance time of existing vehicle on station is repaired according to target, current vehicle is calculated and enters target
Repair the stand-by period needed for station;
S4-3:During according to having the estimated maintenance of vehicle on the non-targeted maintenance station of target maintenance station congenerous
Between, calculate current vehicle and enter the non-targeted stand-by period repaired needed for station;
S4-4:Compare S4-2 and S4-3 obtained two stand-by period, if into target maintenance station needed for etc.
Treat that the time is shorter, then make current vehicle continue waiting for entering target maintenance station;Otherwise, S4-5 is performed;
S4-5:The remaining maintenance time that the non-targeted previous maintenance station of maintenance station is got on the bus is obtained, according to current to be repaired
The estimated maintenance time of vehicle and the remaining maintenance time, judge whether current vehicle to be repaired enters non-targeted maintenance station
The stand-by period that the non-targeted previous maintenance station of maintenance station is got on the bus can be increased, if so, then continuing current vehicle to be repaired
Treat that target repairs station, otherwise, wait current vehicle to be repaired and enter non-targeted maintenance station.
Brief description of the drawings
Fig. 1 is flow chart in a kind of administration of vehicle maintenance embodiment of the method for the present invention;
Fig. 2 is the flow chart of S4 in a kind of administration of vehicle maintenance embodiment of the method for the present invention.
Embodiment
Below by embodiment, the present invention is described in further detail:
A kind of automobile maintenance management system of the present embodiment, including impairment scale setting module, maintenance station and coordinating pipe
Manage module.
Wherein, impairment scale setting module is used for the impairment scale that maintenance personal sets vehicle to be repaired;
Maintenance station is used to treat to repair to carry out maintenance, and every kind of maintenance mans' potential energy enough realizes a step in maintenance flow
Suddenly;
Module is coordinated and managed to be used to select maintenance flow, coordinated management according to the impairment scale of vehicle to be repaired for vehicle to be repaired
Module is additionally operable to generate estimated maintenance time of the vehicle to be repaired on each maintenance station in maintenance flow according to maintenance flow,
Coordinated management module is additionally operable to the estimated maintenance time according to the vehicle to be repaired on each maintenance station, adjusts vehicle maintenance to be repaired
Maintenance station used in flow, coordinates and manages in module and is stored with the corresponding maintenance flow of every kind of impairment scale and maintenance
Average repair time in flow on each maintenance station, coordinated management module can be from being according to the impairment scale of vehicle to be repaired
Corresponding maintenance flow, and the estimated maintenance time using average repair time as corresponding maintenance station are found out in system.
Repair station include sheet metal module, midway polishing module, dry grinding module, polishing module, quick service station module and
Fast Installation station module.
Sheet metal module be used for automobile carry out metal plate maintenance, sheet metal module according to its targeted impairment scale from high to low
It is divided into major break down sheet metal module, ordinary tin module and quick sheet metal module;Module of dry grinding is according to its targeted impairment scale
It is divided into major break down dry grinding module, common dry grinding module and module of quickly dry grinding from high to low;Midway polishing module is according to its pin
To impairment scale be divided into major break down midway polishing module, common midway polishing module and quick midway polishing mould from high to low
Block.
Impairment scale shares Pyatyi in the present embodiment, and maintenance flow corresponds to impairment scale and is followed successively by from high to low:Major break down
Metal plate flow, ordinary tin flow, quick metal plate flow, quick service station flow and Fast Installation station flow;Major break down metal plate
Major break down sheet metal module, major break down midway polishing module, major break down dry grinding module, throwing are used during golden flow maintenance vehicle successively
Optical module;Ordinary tin module, common midway polishing module, common dry grinding are used during ordinary tin flow maintenance vehicle successively
Module, polishing module;Use successively during quick metal plate flow maintenance vehicle quick sheet metal module, quick midway polish module,
Quick dry grinding module, polishing module;Quick service station module, polishing module are used during quick service station flow maintenance vehicle successively,
Fast Installation station flow will use Fast Installation station module when repairing.
The present embodiment also discloses a kind of administration of vehicle maintenance method for having used above-mentioned automobile maintenance management system, such as schemes
Shown in 1 and Fig. 2, comprise the following steps:
S1:The impairment scale to repair is treated to grade;
S2:The maintenance flow of vehicle to be repaired is selected according to the impairment scale of vehicle to be repaired;
S3:When generating estimated maintenance of the vehicle to be repaired on each maintenance station in maintenance flow according to maintenance flow
Between;
S4:Vehicle to be repaired is repaired in each repair on station according to maintenance flow;
Wherein, S4 is specifically included:
S4-1:Obtain the target to be entered in the current maintenance flow of vehicle to be repaired maintenance station;
S4-2:The estimated maintenance time of existing vehicle on station is repaired according to target, current vehicle is calculated and enters target
Repair the stand-by period needed for station;
S4-3:During according to having the estimated maintenance of vehicle on the non-targeted maintenance station of target maintenance station congenerous
Between, calculate current vehicle and enter the non-targeted stand-by period repaired needed for station;
S4-4:Compare S4-2 and S4-3 obtained two stand-by period, if into target maintenance station needed for etc.
Treat that the time is shorter, then make current vehicle continue waiting for entering target maintenance station;Otherwise, S4-5 is performed;
S4-5:The remaining maintenance time that the non-targeted previous maintenance station of maintenance station is got on the bus is obtained, according to current to be repaired
The estimated maintenance time of vehicle and the remaining maintenance time, judge whether current vehicle to be repaired enters non-targeted maintenance station
The stand-by period that the non-targeted previous maintenance station of maintenance station is got on the bus can be increased, if so, then continuing current vehicle to be repaired
Treat that target repairs station, otherwise, wait current vehicle to be repaired and enter non-targeted maintenance station.
By taking ordinary tin flow as an example, it is assumed that current vehicle has completed the maintenance step of ordinary tin module, then current
The target maintenance station of vehicle is exactly common midway polishing module, and coordinated management module calculates in common midway polishing module first
Wait vehicle it is total it is expected spend the time, obtain the stand-by period needed for current vehicle into target maintenance station, coordinate
The expected of wait vehicle that management module calculates major break down midway polishing module respectively again and quickly midway is polished in module spends
Time, obtains the corresponding stand-by period, then by compare current vehicle into target repair station needed for stand-by period, into
Enter the stand-by period of major break down midway polishing module and enter the stand-by period of quick module of polishing halfway, if tieed up into target
The stand-by period repaiied needed for station is most short, then continue waiting for enter target maintenance station, if into major break down midway polishing mould
Stand-by period of block or enter quick midway polish module stand-by period it is most short, then calculate again major break down midway polishing module or
The remaining time that the front module of quick midway polishing module is got on the bus, i.e., vehicle on major break down sheet metal module and quick sheet metal module
Remaining maintenance time, and by more remaining maintenance time and current vehicle in midway polishing module the estimated time spent
Judge, whether current vehicle can influence the maintenance of vehicle on major break down sheet metal module and quick sheet metal module, if so, then making current
Vehicle continues waiting for entering target maintenance station, otherwise selects stand-by period shortest maintenance station.
More than be only the embodiment of the present invention, the general knowledge such as known concrete structure and characteristic is not made excessively herein in scheme
Description, all common of technical field that the present invention belongs to before one skilled in the art know the applying date or priority date
Technological know-how, can know the prior art all in the field, and with using normal experiment means before the date
Ability, one skilled in the art can improve under the enlightenment that the application provides and implement we with reference to self-ability
Case, some typical known features or known method should not become the barrier that one skilled in the art implement the application
Hinder.It should be pointed out that for those skilled in the art, without departing from the structure of the invention, if can also make
Dry modification and improvement, these should also be considered as protection scope of the present invention, these all without influence effect that the present invention implemented and
Practical applicability.The scope of protection required by this application should be based on the content of the claims, the specific reality in specification
Apply the content that the records such as mode can be used for explaining claim.
Claims (6)
1. a kind of automobile maintenance management system, including maintenance station, the maintenance station, which is used to treat to repair, to be carried out maintenance, often
Kind maintenance mans' potential energy enough realizes a step in maintenance flow, it is characterised in that:Further include:
Impairment scale setting module, the impairment scale of vehicle to be repaired is set for maintenance personal;
Module is coordinated and managed, for selecting maintenance flow according to the impairment scale of vehicle to be repaired for vehicle to be repaired, coordinates and manages mould
Block is additionally operable to generate estimated maintenance time of the vehicle to be repaired on each maintenance station in maintenance flow, association according to maintenance flow
Adjust management module to be additionally operable to the estimated maintenance time according to the vehicle to be repaired on each maintenance station, adjust vehicle maintenance stream to be repaired
Maintenance station used in journey.
A kind of 2. automobile maintenance management system according to claim 1, it is characterised in that:The coordinated management module includes
Stand-by period calculating sub module, remaining time calculating sub module and adjustment submodule, the stand-by period calculating sub module can
Vehicle to be repaired is calculated into the stand-by period of next target maintenance station of its maintenance flow, the stand-by period calculating submodule
Block can also calculate stand-by period that vehicle to be repaired enters other non-targeted maintenance stations that station congenerous are repaired with target, remain
Remaining time calculating sub module can calculate the remaining maintenance time that the previous maintenance station of non-targeted maintenance station is got on the bus, institute
State adjustment submodule and be used to repairing the stand-by period of station according to estimated maintenance time of vehicle to be repaired, into target, into non-
The stand-by period and remaining maintenance time of target maintenance parking stall treat next maintenance mans that the maintenance flow to repair uses
Position is adjusted.
A kind of 3. automobile maintenance management system according to claim 2, it is characterised in that:The maintenance station includes metal plate
Module, midway polishing module, dry grinding module, polishing module, quick service station module and Fast Installation station module.
A kind of 4. automobile maintenance management system according to claim 3, it is characterised in that:The sheet metal module is used for vapour
Car carry out metal plate maintenance, the sheet metal module according to its targeted impairment scale be divided into from high to low major break down sheet metal module,
Ordinary tin module and quick sheet metal module;The dry grinding module is divided into major issue from high to low according to its targeted impairment scale
Therefore dry grinding module, common dry grinding module and module of quickly dry grinding;Module polish according to its targeted impairment scale in the midway
It is divided into major break down midway polishing module, common midway polishing module and quick midway polishing module from high to low.
A kind of 5. automobile maintenance management system according to claim 4, it is characterised in that:Impairment scale shares Pyatyi, institute
State maintenance flow and correspond to impairment scale and be followed successively by from high to low:Major break down metal plate flow, ordinary tin flow, quick metal plate stream
Journey, quick service station flow and Fast Installation station flow;Will be successively using big during the major break down metal plate flow maintenance vehicle
Accident sheet metal module, major break down midway polishing module, major break down dry grinding module, polishing module;The ordinary tin flow maintenance
Ordinary tin module, common midway polishing module, module of commonly dry grinding, polishing module are used during vehicle successively;It is described quick
Quick sheet metal module, quick midway polishing module, quickly dry grind module, polished die are used during metal plate flow maintenance vehicle successively
Block;Quick service station module, polishing module, the Fast Installation station are used during the quick service station flow maintenance vehicle successively
Flow will use Fast Installation station module when repairing.
A kind of 6. administration of vehicle maintenance method for having used the automobile maintenance management system described in claim 5, it is characterised in that:
Comprise the following steps:
S1:The impairment scale to repair is treated to grade;
S2:The maintenance flow of vehicle to be repaired is selected according to the impairment scale of vehicle to be repaired;
S3:Estimated maintenance time of the vehicle to be repaired on each maintenance station in maintenance flow is generated according to maintenance flow;
S4:Vehicle to be repaired is repaired in each repair on station according to maintenance flow;
Wherein, S4 is specifically included:
S4-1:Obtain the target to be entered in the current maintenance flow of vehicle to be repaired maintenance station;
S4-2:The estimated maintenance time of existing vehicle on station is repaired according to target, current vehicle is calculated and is repaired into target
Stand-by period needed for station;
S4-3:According to the estimated maintenance time with existing vehicle on the non-targeted maintenance station of target maintenance station congenerous, meter
Calculate current vehicle and enter the non-targeted stand-by period repaired needed for station;
S4-4:Compare S4-2 and S4-3 obtained two stand-by period, if into target maintenance station needed for wait when
Between it is shorter, then make current vehicle continue waiting for enter target maintenance station;Otherwise, S4-5 is performed;
S4-5:The remaining maintenance time that the non-targeted previous maintenance station of maintenance station is got on the bus is obtained, according to current vehicle to be repaired
Estimated maintenance time and the remaining maintenance time, judge that current vehicle to be repaired enters whether non-targeted maintenance station can increase
A stand-by period for adding the non-targeted previous maintenance station of maintenance station to get on the bus, if so, then making current vehicle to be repaired continue waiting for mesh
Mark maintenance station, otherwise, waits current vehicle to be repaired and enters non-targeted maintenance station.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711295911.1A CN108038613A (en) | 2017-12-08 | 2017-12-08 | A kind of automobile maintenance management system and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711295911.1A CN108038613A (en) | 2017-12-08 | 2017-12-08 | A kind of automobile maintenance management system and method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108038613A true CN108038613A (en) | 2018-05-15 |
Family
ID=62101573
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711295911.1A Pending CN108038613A (en) | 2017-12-08 | 2017-12-08 | A kind of automobile maintenance management system and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108038613A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112529220A (en) * | 2020-12-17 | 2021-03-19 | 李明举 | Intelligent automobile maintenance transaction system and method based on block chain |
CN116128484A (en) * | 2023-03-08 | 2023-05-16 | 邦邦汽车销售服务(北京)有限公司 | Method and system for determining remaining maintenance time of automobile based on neural network |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002203003A (en) * | 2000-12-28 | 2002-07-19 | Hitachi Ltd | System for supporting transport railroad construction material using general car |
CN201017352Y (en) * | 2007-03-20 | 2008-02-06 | 姜治斌 | Vehicle maintenance labor hour information acquisition system |
CN106096738A (en) * | 2016-05-31 | 2016-11-09 | 广东电网有限责任公司中山供电局 | One reports processing method and system for repairment |
CN106779109A (en) * | 2017-01-25 | 2017-05-31 | 肖明磊 | A kind of method for allocating tasks and system based on operation |
CN107169576A (en) * | 2017-04-18 | 2017-09-15 | 交通运输部公路科学研究所 | The maintenance decision system and method for a kind of commerial vehicle maintenance period |
-
2017
- 2017-12-08 CN CN201711295911.1A patent/CN108038613A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002203003A (en) * | 2000-12-28 | 2002-07-19 | Hitachi Ltd | System for supporting transport railroad construction material using general car |
CN201017352Y (en) * | 2007-03-20 | 2008-02-06 | 姜治斌 | Vehicle maintenance labor hour information acquisition system |
CN106096738A (en) * | 2016-05-31 | 2016-11-09 | 广东电网有限责任公司中山供电局 | One reports processing method and system for repairment |
CN106779109A (en) * | 2017-01-25 | 2017-05-31 | 肖明磊 | A kind of method for allocating tasks and system based on operation |
CN107169576A (en) * | 2017-04-18 | 2017-09-15 | 交通运输部公路科学研究所 | The maintenance decision system and method for a kind of commerial vehicle maintenance period |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112529220A (en) * | 2020-12-17 | 2021-03-19 | 李明举 | Intelligent automobile maintenance transaction system and method based on block chain |
CN116128484A (en) * | 2023-03-08 | 2023-05-16 | 邦邦汽车销售服务(北京)有限公司 | Method and system for determining remaining maintenance time of automobile based on neural network |
CN116128484B (en) * | 2023-03-08 | 2023-08-04 | 邦邦汽车销售服务(北京)有限公司 | Method and system for determining remaining maintenance time of automobile based on neural network |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104464274B (en) | Rideshare is called a taxi method and server | |
CN102473350B (en) | Vehicular information processing device | |
CN102572134B (en) | Worksheet method, work order set up system and worksheet system | |
CN108038613A (en) | A kind of automobile maintenance management system and method | |
CN107203824B (en) | Car pooling order distribution method and device | |
AU2022279109A1 (en) | Electric-quantity-based path planning method for electric vehicle compatible with energy storage charging pile | |
DE102014214806A1 (en) | Charge to charging stations for range extension | |
CN103072558A (en) | Method, equipment, system and distribution for quickly changing power battery | |
CN104578293A (en) | Electric automobile charging control method and device | |
DE102016212026A1 (en) | Method and control unit for stabilizing a supply network | |
CN111325483A (en) | Electric bus scheduling method based on battery capacity prediction | |
CN104239641A (en) | Matching method for battery electric vehicle power system | |
CN103761371A (en) | Model-reference based adaptive cruise control method of car-following system | |
CN107424226A (en) | Parking lot vehicles management method and system | |
赵治国 et al. | Mode transition control for four wheel drive hybrid electric car | |
CN107719362A (en) | Vehicle automatic stop process, device, shutdown system and parking controller | |
CN107424225A (en) | Parking position accounting management method and system | |
CN102963353A (en) | Hybrid power system energy management method based on neural network | |
CN113205239A (en) | Bus scheduling method and system with priority in task amount configuration | |
CN112026585A (en) | Vehicle energy-saving control method, device, equipment and storage medium | |
CN102176264B (en) | Method and system for realizing car rental business | |
CN103903472A (en) | Real-time BRT vehicle pull-in optimization and platform passenger flow guidance system and method | |
DE102018201472A1 (en) | Control unit and method for conditioning an energy storage of a vehicle | |
CN107480330A (en) | A kind of calculating of the lane side traffic capacity, improved method | |
CN112070361A (en) | Coal ash transport vehicle task allocation method and system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180515 |
|
RJ01 | Rejection of invention patent application after publication |