CN108035473B - More drop level 4D solid stainless steel decorative systems and its installation method - Google Patents

More drop level 4D solid stainless steel decorative systems and its installation method Download PDF

Info

Publication number
CN108035473B
CN108035473B CN201711339709.4A CN201711339709A CN108035473B CN 108035473 B CN108035473 B CN 108035473B CN 201711339709 A CN201711339709 A CN 201711339709A CN 108035473 B CN108035473 B CN 108035473B
Authority
CN
China
Prior art keywords
stainless steel
mirror surface
rose gold
solid stainless
moulding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711339709.4A
Other languages
Chinese (zh)
Other versions
CN108035473A (en
Inventor
徐志强
何立波
孙轮来
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Bureau Decoration Engineering Co Ltd
Original Assignee
China Construction Eighth Bureau Decoration Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Bureau Decoration Engineering Co Ltd filed Critical China Construction Eighth Bureau Decoration Engineering Co Ltd
Priority to CN201711339709.4A priority Critical patent/CN108035473B/en
Publication of CN108035473A publication Critical patent/CN108035473A/en
Application granted granted Critical
Publication of CN108035473B publication Critical patent/CN108035473B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/02Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation having means for ventilation or vapour discharge
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/006Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation with means for hanging lighting fixtures or other appliances to the framework of the ceiling
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/04Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation comprising slabs, panels, sheets or the like
    • E04B9/0471Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation comprising slabs, panels, sheets or the like having a trapezoidal cross section

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Finishing Walls (AREA)
  • Road Signs Or Road Markings (AREA)

Abstract

The present invention provides more drop level 4D solid stainless steel decorative systems and its installation method, it include: that stairstepping side is logical, longitudinal tubule (L tubule) and transverse tube including alternative splicing, it further include decorative panel connecting tube, it is vertically connected on longitudinal tubule (L tubule), moulding component includes: longitudinal cylindric mirror surface rose gold integral frame, lateral water ripples stainless steel plate and armorplate glass, multiple stairstepping sides are logical to be uniformly distributed along scheduled circumferencial direction, stairstepping Fang Tongjun is connected with mirror surface rose gold integral frame in the longitudinal direction, horizontally it is connected with water ripples stainless steel plate, wherein, the upper end of mirror surface rose gold integral frame is fixedly connected with decorative panel connecting tube, the lower end of mirror surface rose gold integral frame is fixedly connected with water ripples stainless steel plate, solid stainless pipe, the longitudinally connected most next stage led in stairstepping side, lower end is connected with lateral steel Change glass plate.The present invention not only has better decorative effect while in turn ensuring safety requirements, improves installation effectiveness and installation quality.

Description

More drop level 4D solid stainless steel decorative systems and its installation method
Technical field
The present invention relates to a kind of more drop level 4D solid stainless steel decorative systems and its installation methods, belong to building decoration neck Domain.
Background technique
Finishing is upper indoors both at home and abroad is largely decorated using colored stainless steel product, and colored stainless steel plate is fashionable for a time. Colored stainless steel had not only had the distinctive gloss of metal and intensity, but also there is color to appear, constant color.Colored stainless steel It not only maintains the physics, chemistry, mechanical performance of primary colors stainless steel to plate, but also has than primary colors stainless steel stronger corrosion-resistant Performance.
More drop level 4D cubic oval shape stainless steel furred ceiling originals are designed as first doing the plank base patch stainless steel decorations on plank base again Face, this way is unable to satisfy the flatness that stainless steel curved surface external corner closes up and more drop level oblique angles dock and close spelling is closed up and required.Knot There is shortcoming, cause entirely to decorate ineffective and not environmentally on structure.
Summary of the invention
The purpose of the present invention is to provide a kind of more drop level 4D solid stainless steel decorative systems and its installation methods, to be promoted The convenient degree of decorative effect and installation.
The present invention provides a kind of more drop level 4D solid stainless steel decorative systems characterized by comprising and stairstepping side is logical, To be ladder-like, longitudinal tubule (L tubule) and transverse tube including multiple alternative splicings further include decorative panel connecting tube, are vertically connected on longitudinal tubule (L tubule), rank Excessively multiple vertical sunpenders are hung in the top of building, moulding component to trapezoidal side all, comprising: longitudinal cylindric mirror surface rose Rare gold integral frame, lateral water ripples stainless steel plate and armorplate glass, each level of moulding component is circle Shape or ellipse, multiple stairstepping sides are logical to be uniformly distributed along scheduled circumferencial direction, and the logical every level-one in stairstepping side is vertical Mirror surface rose gold integral frame has been connected up, water ripples stainless steel plate is horizontally connected with, wherein mirror surface rose gold is whole The upper end of body formula frame is fixedly connected with the decorative panel connecting tube, and the lower end of mirror surface rose gold integral frame and water ripples are not The Interal fixation that becomes rusty connects, solid stainless pipe, the longitudinally connected most next stage led in stairstepping side, in solid stainless pipe Lower end be connected with lateral armorplate glass.
Further, more drop level 4D solid stainless steel decorative systems of the invention, also have a feature in that wherein, are making Around the most upper level of type component, there is the return air inlet for air-conditioner of circumferentially shape distribution.
Further, more drop level 4D solid stainless steel decorative systems of the invention, also have a feature in that wherein, in sky It recalls to around air port, multiple first headlamps is distributed with, and along the circumferential arrangement of return air inlet for air-conditioner.
Further, more drop level 4D solid stainless steel decorative systems of the invention, also have a feature in that wherein, described Sunpender is hung in the middle part of the transverse tube.
Further, more drop level 4D solid stainless steel decorative systems of the invention, also have a feature in that moulding component The height of each level declines step by step, and radius reduces step by step.
Further, more drop level 4D solid stainless steel decorative systems of the invention, also have a feature in that wherein, described Mirror surface rose gold decoration steel bar is circumferentially distributed in the edge of armorplate glass.
Further, more drop level 4D solid stainless steel decorative systems of the invention, also have a feature in that mirror surface rose gold Integral frame includes by multiple arc segments mutually spliced, and the first bolt and the second bolt are located at two sections of adjacent arcs In shape segment, after the first bolt and the second bolt are to inserting, it is welded on the first bolt and the second bolt by reinforcing rib fixed.
The present invention also provides a kind of more drop level circle 4D solid stainless steel moulding constructions, which is characterized in that including such as Lower step:
Step 1: surveying setting-out survives control line in ground pop-up ellipse stainless steel furred ceiling, and has popped up on ground At face, control line and moulding component splicing line,
Step 2: steel joist is lifted on roof using sunpender along oval side length arrangement steelframe by steel keel structure lifting,
Step 3: the positioning of moulding parts assembling, in moulding component and the adjustable insertion of moulding module backside setting when assembled Formula positions pin member, after the splicing of moulding component is smooth, using adding strong Zhu that two positioning pin members are welded and fixed;
Step 4 carries out titanizing processing to the pre-splicing moulding component installed,
Step 5, mirror surface rose gold L-type stainless steel and the installation of water ripples stainless steel plate.
Further, more drop level circle 4D solid stainless steel moulding constructions of the invention, it is characterised in that: wherein, step Antiseptic and rustproof processing also is carried out to special steel joist in rapid four, is uniformly brushed using zero formaldehyde aqueous antirust paint.
Advantageous effect of the invention
More drop level 4D solid stainless steel decorative systems of the invention and its installation method not only have better decorative effect It in turn ensures safety requirements simultaneously, improves installation effectiveness and installation quality.
Further, since the fragment assembly mode of mirror surface rose gold integral frame uses bolt and Jia Qiang Zhu to two pieces Segment is fixed, therefore compared to traditional mode pasted using adhesive, method of the invention is more environmentally-friendly, and makes The surface for obtaining mirror surface rose gold integral frame is very smooth, and visual effect is more preferably.
Detailed description of the invention
Fig. 1 is the sectional view of more drop level 4D solid stainless steel decorative systems;
Fig. 2 is the logical structural schematic diagram in stairstepping side;
Fig. 3 is the bottom view of more drop level 4D solid stainless steel decorative systems;
Fig. 4 is the connecting method partial enlarged view of mirror surface rose gold integral frame;
Fig. 5 is the connecting method partial enlarged view for looking up mirror surface rose gold integral frame under state;
Schematic diagram when Fig. 6 is the non-grafting of bolt on two pieces of mirror surface rose gold integral frames;
Fig. 7 is the schematic diagram when bolt grafting on two pieces of mirror surface rose gold integral frames is completed.
Specific embodiment
Illustrate a specific embodiment of the invention below in conjunction with attached drawing.
As shown in Figure 1, Figure 2 and Figure 3, more drop level 4D solid stainless steel decorative systems include: sunpender 11, and stairstepping side is logical 12, return air inlet for air-conditioner 13, the first headlamp 14, fixed screw 20 and the second headlamp 21 and moulding component.Moulding component Include: mirror surface rose gold integral frame 15, water ripples stainless steel plate 16, solid stainless pipe 17, armorplate glass 18 with And mirror surface rose gold decorates steel bar 19.
Stairstepping side logical 12, for multistage step structure.As shown in Fig. 2, stairstepping side logical 12 includes multiple friendships For the longitudinal tubule (L tubule) 23 and transverse tube 24 of splicing.Further include decorative panel connecting tube 22, is vertically connected on longitudinal tubule (L tubule) 23.Stairstepping side leads to and it The common furred ceiling of surrounding is connected, and common furred ceiling includes the first top plate 25 and the second top plate 26 mutually spliced.First headlamp 14 are mounted on the second top plate 26.
As shown in Figure 1, stairstepping side logical 12, the ceiling of building is hung in by multiple vertical sunpenders 11.Sunpender 11 is hung At the middle part of transverse tube 24.
In the present embodiment, each level of more drop level circle 4D solid stainless steel decorative systems be it is round or Ellipse.Therefore multiple stairstepping sides logical 12, are uniformly distributed along scheduled circumferencial direction.
The height of each level of more drop level circle 4D solid stainless steel decorative systems declines step by step, and radius contracts step by step It is small.
The most next stage of stairstepping side logical 12 is connected with solid stainless pipe 17 in the longitudinal direction, is horizontally connected with steel Change glass plate 18, solid stainless pipe 17 is along the circumferential direction arranged, and the lower end of solid stainless pipe 17 lifts tempered glass Plate 18.At the edge for the circumference that solid stainless pipe 17 is formed, the mirror surface rose gold decoration steel bar 19 of fillet is distributed with.Second Headlamp 21 is arranged at one layer of the upper surface of solid stainless pipe.
Stairstepping side logical 12 is at different levels other than most next stage, is connected with mirror surface rose gold monoblock type frame in the longitudinal direction Frame 15, is horizontally connected with water ripples stainless steel plate 16, and the upper end of mirror surface rose gold integral frame 15 is connect with decorative panel Pipe is fixedly connected, and the lower end of mirror surface rose gold integral frame 15 is fixedly connected with water ripples stainless steel plate 16.To form one A ceiling decoration structure that multistage ladder assembling structure is showed in external observation.Fixed screw 20 is by mirror surface rose gold monoblock type frame Frame 15 and water ripples stainless steel plate 16 are fixed in decorative panel connecting tube 22.
Mirror surface rose gold integral frame 15 as shown in Figure 4 and Figure 5, is spelled as made of the fragment assembly of multiple arcs The structure for meeting place includes the first bolt 31, the second bolt 32 and reinforcing rib 30, and the first bolt 31 and the second bolt 32 distinguish position In in two sections of arc segments.As shown in Figure 6 and Figure 7, after the first bolt 31 and the second bolt 32 are to inserting, two sections of arc segments are adjusted It is allowed to be aligned, then reinforcing rib 30 is welded on the first bolt 31 and the second bolt 32 and is fixed.It is flat to obtain front Whole mirror surface rose gold integral frame 15.
Around the most upper level of moulding component, there is the return air inlet for air-conditioner 13 of circumferentially shape distribution.
Around return air inlet for air-conditioner 13, multiple first headlamps 14 are distributed with, and along the circumferential row of return air inlet for air-conditioner 13 Column.
The construction for installing above-mentioned more drop level circle 4D solid stainless steel moulding is as follows:
Step 1: surveying setting-out pops up oval stainless steel furred ceiling on ground and survives control line, and pops up and complete on ground Face, control line and moulding component splicing line,
Step 2: steel keel structure lifting, along oval side length arrangement steelframe, along elliptical side long spacing 600MM arrangement steelframe. Steel joist is lifted on roof using sunpender 11.
Step 3: the positioning of moulding parts assembling carries out argon arc welding welding assembly to each component being cut by laser out in factory, 3mm thickness mirror face stainless steel mutual-inserting type is fixed, it is ensured that interface flatness, alignment pin, which is welded with board surface, fixes, after the completion to weld part Position carries out sanding and polishing, and the stainless steel moulding and field lofting after guaranteeing assembly coincide.
Step 4 carries out titanizing and antiseptic and rustproof processing to the pre-splicing moulding component installed, prevents special steel joist Rotten antirust treatment is uniformly brushed using zero formaldehyde aqueous antirust paint.It prevents stainless steel is moulded not to be deformed, uses Electroplating processes.
Step 5, mirror surface rose gold L-type stainless steel and water ripples stainless steel plate 16 are installed.Stainless steel finishing material is being installed When, at the marginal position of every block of plate, the logical line that all useful finer wire pulls out, construction personnel by the position of finer wire come it is accurate calmly Position finishing material keeps actual installation consistent with theory to control stainless steel plate coordinate dimension.It is solid with countersunk head self-tapping screw first Surely one section is lived, second block of plate laterally is being installed, is carrying out grafting, and fix another section with countersunk head self-tapping screw.
The present invention solves aesthetic effect while in turn ensuring safety requirements, improves installation effectiveness and installation quality.

Claims (8)

1. a kind of more drop level 4D solid stainless steel decorative systems characterized by comprising
Stairstepping side is logical, be it is ladder-like, longitudinal tubule (L tubule) and transverse tube including multiple alternative splicings further include decorative panel connecting tube, vertically It is connected on longitudinal tubule (L tubule),
Excessively multiple vertical sunpenders are hung in the top of building all for stairstepping side,
Moulding component, comprising: longitudinal cylindric mirror surface rose gold integral frame, lateral water ripples stainless steel plate and Armorplate glass,
Each level of moulding component is round or ellipse, and multiple stairstepping sides are logical uniform along scheduled circumferencial direction Distribution,
The logical every level-one in stairstepping side is connected with mirror surface rose gold integral frame in the longitudinal direction, is horizontally connected with ripples Line stainless steel plate,
Wherein, the upper end of mirror surface rose gold integral frame is fixedly connected with the decorative panel connecting tube, and mirror surface rose gold is whole The lower end of formula frame is fixedly connected with water ripples stainless steel plate,
Solid stainless pipe, the longitudinally connected most next stage led in stairstepping side are connected in the lower end of solid stainless pipe There is lateral armorplate glass,
Mirror surface rose gold integral frame includes by multiple arc segments mutually spliced, and the first bolt and the second bolt distinguish position In in two sections of adjacent arc segments, after the first bolt and the second bolt are to inserting, the first bolt and second are welded on by reinforcing rib It is fixed on bolt.
2. more drop level 4D solid stainless steel decorative systems as described in claim 1, it is characterised in that:
Wherein, around the most upper level of moulding component, there is the return air inlet for air-conditioner of circumferentially shape distribution.
3. more drop level 4D solid stainless steel decorative systems as claimed in claim 2, it is characterised in that:
Wherein, around return air inlet for air-conditioner, multiple first headlamps are distributed with, and along the circumferential arrangement of return air inlet for air-conditioner.
4. more drop level 4D solid stainless steel decorative systems as described in claim 1, it is characterised in that:
Wherein, the sunpender is hung in the middle part of the transverse tube.
5. more drop level 4D solid stainless steel decorative systems as described in claim 1, it is characterised in that:
The height of each level of moulding component declines step by step, and radius reduces step by step.
6. more drop level 4D solid stainless steel decorative systems as described in claim 1, it is characterised in that:
Wherein, mirror surface rose gold decoration steel bar is circumferentially distributed in the edge of the armorplate glass.
7. a kind of more drop level circle 4D solid stainless steel moulding constructions, which comprises the steps of:
Step 1: surveying setting-out pops up the control line that survives of oval stainless steel furred ceiling on ground, and pops up and complete on ground Face, control line and moulding component splicing line,
Step 2: steel joist is lifted on roof using sunpender along oval side length arrangement steelframe by steel keel structure lifting,
Step 3: the positioning of moulding parts assembling is arranged adjustable plug-in type in moulding component and moulding module backside when assembled and determines Position pin member, after the splicing of moulding component is smooth, using adding strong Zhu that two positioning pin members are welded and fixed;
Step 4 carries out titanizing processing to the pre-splicing moulding component installed,
Step 5, mirror surface rose gold L-type stainless steel and the installation of water ripples stainless steel plate.
8. more drop level circle 4D solid stainless steel moulding constructions as claimed in claim 7, it is characterised in that:
Wherein, antiseptic and rustproof processing also is carried out to special steel joist in step 4, is carried out using zero formaldehyde aqueous antirust paint uniform It brushes.
CN201711339709.4A 2017-12-14 2017-12-14 More drop level 4D solid stainless steel decorative systems and its installation method Active CN108035473B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711339709.4A CN108035473B (en) 2017-12-14 2017-12-14 More drop level 4D solid stainless steel decorative systems and its installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711339709.4A CN108035473B (en) 2017-12-14 2017-12-14 More drop level 4D solid stainless steel decorative systems and its installation method

Publications (2)

Publication Number Publication Date
CN108035473A CN108035473A (en) 2018-05-15
CN108035473B true CN108035473B (en) 2019-12-03

Family

ID=62103354

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711339709.4A Active CN108035473B (en) 2017-12-14 2017-12-14 More drop level 4D solid stainless steel decorative systems and its installation method

Country Status (1)

Country Link
CN (1) CN108035473B (en)

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202082763U (en) * 2011-05-27 2011-12-21 骆金根 Framework type ceiling lamp
CN202899387U (en) * 2012-11-10 2013-04-24 苏州金螳螂建筑装饰股份有限公司 Pure light steel keel ceiling
CN203393884U (en) * 2013-07-25 2014-01-15 苏州金螳螂建筑装饰股份有限公司 Modeling gypsum board ceiling
CN204049175U (en) * 2014-07-09 2014-12-31 中建七局建筑装饰工程有限公司 A kind of concealed installation double-layer window curtain box structure
CN205116519U (en) * 2015-10-26 2016-03-30 深圳市建筑装饰(集团)有限公司 Furred ceiling structure that sound is inhaled in illumination

Also Published As

Publication number Publication date
CN108035473A (en) 2018-05-15

Similar Documents

Publication Publication Date Title
CN105464280B (en) A kind of reassembling type corner furred ceiling layer and forming method thereof
CN204898991U (en) Reassembling type corner furred ceiling layer
CN108035473B (en) More drop level 4D solid stainless steel decorative systems and its installation method
KR20160108937A (en) A exterior panels of a building
US20090211011A1 (en) Panel Systems for Spas
CN208650373U (en) A kind of luminous furred ceiling of tower-like moulding that decorating skylight
CN109023487A (en) The electrophoresis hanging tool of high-efficient simple
EP1586724A2 (en) Surround for swimming pools
CN204940655U (en) Ceiling structure
CN102536077A (en) Archaistic aluminum alloy window
CN205421778U (en) Hide arc stone material board of hanging futilely of lamp decoration and decorate square column
CN205025002U (en) Interior wall is decorated in illumination of slope stone cladding process
CN207160487U (en) Can quickly and be precisely controlled wallboard installation gap assembled type bar assembly
CN208563448U (en) High side plate partly hangs integrated top
CN113585597A (en) Stable structure inverted buckle type assembled ceiling and installation mode
CN113585592A (en) Assembled large-plate full-clamping type ceiling and installation method thereof
CN212026903U (en) Stone decoration canopy
CN210439536U (en) Herringbone overlapping suspended ceiling
CN215479076U (en) Prevent fingerprint primary color wire drawing stainless steel veneer subassembly
CN206752798U (en) For being connected the transition connection component of decoration back timber
CN109025035B (en) Ceiling edge-folding method in duplex structure and duplex ceiling edge-folding section bar assembly
CN215888840U (en) Preassembled fixing piece seam-remaining type assembled ceiling
US20090211012A1 (en) Panels for Spas
CN210989430U (en) Photo frame structure of aluminum alloy section
CN211229150U (en) Multifunctional aluminum alloy grid

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant