CN108035425A - Drainage pipeline is connected prefabricated interface construction method with well body - Google Patents

Drainage pipeline is connected prefabricated interface construction method with well body Download PDF

Info

Publication number
CN108035425A
CN108035425A CN201711218152.9A CN201711218152A CN108035425A CN 108035425 A CN108035425 A CN 108035425A CN 201711218152 A CN201711218152 A CN 201711218152A CN 108035425 A CN108035425 A CN 108035425A
Authority
CN
China
Prior art keywords
prefabricated
pipe
prefabricated pipe
construction method
drainage pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711218152.9A
Other languages
Chinese (zh)
Inventor
黄骥
王友涛
王殿涛
王立军
武廷凯
杨沛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201711218152.9A priority Critical patent/CN108035425A/en
Publication of CN108035425A publication Critical patent/CN108035425A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/04Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps
    • E03F5/0401Gullies for use in roads or pavements
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/06Methods of, or installations for, laying sewer pipes

Abstract

The present invention proposes a kind of drainage pipeline and prefabricated interface construction method is connected with well body:Build draining well room frame;Process pipeline prefabricated component, pipe prefabrication part is arranged on the side wall of frame;Draining well room is poured, the draining well room after pouring is put into precalculated position;Drainpipe is inserted among pipe prefabrication part.Pipe prefabrication part sets the first prefabricated pipe, the second prefabricated pipe;First prefabricated pipe is threaded through on frame side wall, the second prefabricated pipe is threaded through in the first prefabricated pipe, and one end that first prefabricated pipe, the second prefabricated pipe are located to lower portion by annular slab links together.Beneficial effects of the present invention are:By setting prefabricated vertical drains room, so that armored concrete well room prefabricated can be poured in batches in works scope, save substantial amounts of duration and labour's input, and by setting pipe prefabrication part, make pipeline connection construction technique simple, speed of application is fast, the significant effect of antiseep, can ensure that subsoil drain service life is longer.

Description

Drainage pipeline is connected prefabricated interface construction method with well body
Technical field
The present invention relates to drainage pipeline technical field, and prefabricated connect is connected with well body in particular to a kind of drainage pipeline Mouth construction method.
Background technology
At present, the construction generally existing of municipal works drainage pipeline and appearance matter after well body link position construction hardly possible, shaping The problem of amount difference and easy to leak, chief reason also reside in the unreasonable of construction technology, Normal practice for pit shaft (room) it is prefabricated after, Pipeline is stretched into pit shaft (room) again, is then blocked, with such method since technologic defect certainly will will produce above-mentioned ask Topic.The leakage problems of drainage pipeline are not yet paid attention to during current engineering quality control, unknown due to leaking in advance Aobvious, closed-water test is in a period of time after, and the infiltration of pipe joint position is since quality is unqualified, and Seepage is with the time Passage progressively aggravate, prolonged leakage can cause different degrees of derivative geological hazards, gently then subgrade settlement, and driving is comfortable Degree declines, heavy then formed extensive empty under road surface, causes even more serious security incident and property damage.
The content of the invention
In consideration of it, the present invention, which proposes a kind of drainage pipeline, is connected prefabricated interface construction method with well body, it is intended to solves pre- The problem of well construction duration processed is longer, the leakage of drainage pipeline.
On one side, the present invention proposes a kind of drainage pipeline and prefabricated interface construction method is connected with well body, including:Structure Draining well room frame;
Process pipeline prefabricated component, the pipe prefabrication part is arranged on the side wall of the frame;
The draining well room is poured, the draining well room after pouring is put into precalculated position;
Drainpipe is inserted among the pipe prefabrication part.
Further, the pipe prefabrication part sets the first prefabricated pipe, the second prefabricated pipe;First prefabricated pipe is worn On the frame side wall, second prefabricated pipe is threaded through in the first prefabricated pipe, by annular slab by first prefabricated pipe, One end that second prefabricated pipe is located at the lower portion links together.
Further, the internal diameter of first prefabricated pipe is more than the outside diameter of second prefabricated pipe, forms one between the two Gap.
Further, first prefabricated pipe, the second prefabricated pipe are located on same central axes.
Further, first prefabricated pipe, the second prefabricated pipe, annular slab are connected as a single entity by welding.
Further, it is located at the position in the draining well room side wall in first prefabricated pipe, a ring seal is set Wing ring.
Further, two injected holes are opened up on the first prefabricated pipe top, is respectively provided at first prefabricated pipe Both ends.
Further, after draining well room after described pour is put into precalculated position, it is prefabricated that pipeline is inserted into described first In pipe, the gap between the second prefabricated pipe, until one end of the pipeline is in contact with the annular slab, and blocked using clay Gap between the pipeline and the first prefabricated pipe, the second prefabricated pipe.
Further, after the pipeline is inserted into the gap, cement grout is injected into the injected hole so that institute Pipeline is stated to be fixed as one with the pipe prefabrication part.
Further, mixed with swelling agent in the cement grout so that expanded naturally after the cement grout solidification.
Compared with prior art, beneficial effects of the present invention are:By setting prefabricated vertical drains room so that in works scope Armored concrete well room prefabricated can be poured in batches, save substantial amounts of duration and labour's input, and by setting pipe prefabrication Part, makes that pipeline connection construction technique is simple, and speed of application is fast, the significant effect of antiseep, can ensure that subsoil drain uses Longer life expectancy.
Brief description of the drawings
By reading the detailed description of hereafter preferred embodiment, it is various other the advantages of and benefit it is common for this area Technical staff will be clear understanding.Attached drawing is only used for showing the purpose of preferred embodiment, and is not considered as to the present invention Limitation.And in whole attached drawing, identical component is denoted by the same reference numerals.In the accompanying drawings:
Fig. 1 is the flow chart that drainage pipeline of the embodiment of the present invention is connected prefabricated interface construction method with well body;
Fig. 2 is the implementation schematic diagram that drainage pipeline of the embodiment of the present invention is connected prefabricated interface construction method with well body;
Embodiment
The exemplary embodiment of the disclosure is more fully described below with reference to accompanying drawings.Although the disclosure is shown in attached drawing Exemplary embodiment, it being understood, however, that may be realized in various forms the disclosure without should be by embodiments set forth here Limited.On the contrary, these embodiments are provided to facilitate a more thoroughly understanding of the present invention, and can be by the scope of the present disclosure Completely it is communicated to those skilled in the art.It should be noted that in the case where there is no conflict, embodiment in the present invention and Feature in embodiment can be mutually combined.Below with reference to the accompanying drawings and the present invention will be described in detail in conjunction with the embodiments.
As shown in fig.1, it is connected the flow of prefabricated interface construction method for drainage pipeline of the embodiment of the present invention with well body Figure.This method comprises the following steps:
Step S101 builds draining well room frame;
Step S102 process pipeline prefabricated components, the pipe prefabrication part is arranged on the side wall of the frame;
Step S103 pours the draining well room, and the draining well room after pouring is put into precalculated position;
Drainpipe is inserted among the pipe prefabrication part by step S104.
Specifically, step S101 builds draining well room frame.In operating area, draining well room frame is built using reinforcing bar Frame structure, and in draining well room frame structure lateral location preserved pipeline prefabricated component reserved place.
Specifically, the pipe prefabrication part, is arranged in the side wall of the frame by step S102 process pipelines prefabricated component On.After draining well room frame structure builds completion, element tunnel prefabricated component, will after pipe prefabrication part structure is completed Prefabricated component is positioned over the side wall 7 of draining well room frame.In 7 position of draining well room frame side wall, setting one is corresponding with prefabricated component Reserved empty position, and prefabricated component is placed on reserved empty position, prefabricated component and draining well room frame are consolidated by binding or welding It is set to one.
With reference to shown in Fig. 2, it is connected the implementation of prefabricated interface construction method for drainage pipeline of the embodiment of the present invention with well body Schematic diagram.Specifically, pipe prefabrication part sets the first prefabricated pipe 1 and the second prefabricated pipe 2.First prefabricated pipe 1 is threaded through frame On frame side wall 7, the second prefabricated pipe 2 is threaded through in the first prefabricated pipe 1, by annular slab 3 by the first prefabricated pipe 1, the second prefabricated pipe 2 Link together positioned at one end of lower portion, another end opening.Wherein, the internal diameter of the first prefabricated pipe 1 is more than the second prefabricated pipe 2 Outside diameter, form a gap between the two, the spacing in gap is slightly larger than the pipe thickness of drainpipe 6, so that drainpipe 6 can be inserted In gap.Also, the first prefabricated pipe 1 and the second prefabricated pipe 2 are located on same central axes, so that gap between the two Section it is circular for one.
Specifically, the size of frame reserved place is slightly larger than the size of the first prefabricated pipe 1, may pass through the first prefabricated pipe 1 Reserved place, and by way of welding or binding, the first prefabricated pipe 1 is fixed as one with frame.Further, when first Prefabricated pipe 1 is fixed after completion, the second prefabricated pipe 2 is arranged in the first prefabricated pipe 1, one end that both are located in frame is located at Same plane, and by annular slab 3, both are fixed as one by welding.Annular slab 3 is a Circular Plate, middle part The unthreaded hole identical with 2 internal diameter of the second prefabricated pipe is opened up, the outside diameter of Circular Plate is identical with the outside diameter of the first prefabricated pipe 1, passes through full weld Mode both are fixed so that form uniform gap between the two, may be such that drainpipe 6 is worn wherein.
Specifically, the first prefabricated pipe 1 is located at the position in draining well room side wall 7, sets a ring seal wing ring, to Prevent water from being leaked from the position of the first prefabricated pipe 1 and draining well room side wall 7.Meanwhile two notes are opened up on 1 top of the first prefabricated pipe Hole 5 is starched, is respectively provided at the both ends of the first prefabricated pipe 1, its one end is in frame, the other end is located on the outside of frame.Injected hole 5 is side Shape hole.The length of first prefabricated pipe 1 may be the same or different in the length of the second prefabricated pipe 2, it need to meet being capable of shape Drainpipe 6 is placed into gap.
Specifically, step step S103 pours the draining well room, and the draining well room after pouring is put into precalculated position. After prefabricated component and draining well room frame are fixed as one, using concreting draining well room, by draining well room with it is prefabricated Part, which pours, to be integrated, and after completion is poured, after the draining well room solidification after pouring, draining well room is positioned over prefabricated position Put.
Specifically, after the completion of pouring, gully conventional maintenance is carried out, after gully reaches design strength, by draining Well is lifted to predetermined installation site.
Specifically, drainpipe 6 is inserted among the pipe prefabrication part by step S104.It is positioned in draining well room pre- Behind position processed, drainpipe 6 is inserted in prefabricated component, and carries out subsequent construction.
Specifically, after draining well room after pouring is put into precalculated position, drainpipe 6 is inserted into 1 He of the first prefabricated pipe In gap between second prefabricated pipe 2, until one end of drainpipe 6 is in contact with annular slab 3, and clay closure drainpipe is used Gap between 6 lateral surfaces and the first prefabricated pipe 1.
Specifically, after in pipeline inserted into gap, cement grout is injected into injected hole 5 so that drainpipe 6 and pipeline Prefabricated component is fixed as one.Mixed with swelling agent in cement grout so that expand, reached preferably naturally after cement grout solidification Fixed effect, and the clay of closure is extruded naturally.
Specifically, the first prefabricated pipe 1 and the second prefabricated pipe 2 use phase same material, same thickness, and the steel that diameter is different Tubulation material makes;Annular slab 3 selects the material identical with the first prefabricated pipe 1 and the second prefabricated pipe 2 to make, the thickness of annular slab 3 It is identical with the thickness of the first prefabricated pipe 1 and the second prefabricated pipe 2.
It is understood that this method is by setting prefabricated vertical drains room so that armored concrete well room in works scope It prefabricated in batches can pour, save substantial amounts of duration and labour's input, and by setting pipe prefabrication part, apply pipeline connection Work technique is simple, and speed of application is fast, the significant effect of antiseep, can ensure that subsoil drain service life is longer.
Obviously, various changes and modifications can be made to the invention without departing from essence of the invention by those skilled in the art God and scope.In this way, if these modifications and changes of the present invention belongs to the scope of the claims in the present invention and its equivalent technologies Within, then the present invention is also intended to comprising including these modification and variations.

Claims (10)

1. a kind of drainage pipeline is connected prefabricated interface construction method with well body, it is characterised in that including:
Build draining well room frame;
Process pipeline prefabricated component, the pipe prefabrication part is arranged on the side wall of the frame;
The draining well room is poured, the draining well room after pouring is put into precalculated position;
Drainpipe is inserted among the pipe prefabrication part.
2. drainage pipeline according to claim 1 is connected prefabricated interface construction method with well body, the pipe prefabrication part is set Put the first prefabricated pipe, the second prefabricated pipe;
First prefabricated pipe is threaded through on the frame side wall, second prefabricated pipe is threaded through in the first prefabricated pipe, is led to Cross annular slab first prefabricated pipe, the second prefabricated pipe are located to one end of the lower portion and link together.
3. drainage pipeline according to claim 2 is connected prefabricated interface construction method with well body, first prefabricated pipe Internal diameter is more than the outside diameter of second prefabricated pipe, forms a gap between the two.
4. drainage pipeline according to claim 3 is connected prefabricated interface construction method with well body, by first prefabricated pipe, Second prefabricated pipe is located on same central axes.
5. drainage pipeline according to claim 4 is connected prefabricated interface construction method with well body, by welding will First prefabricated pipe, the second prefabricated pipe, annular slab are connected as a single entity.
6. drainage pipeline according to claim 5 is connected prefabricated interface construction method with well body, in first prefabricated pipe Position in the draining well room side wall, sets a ring seal wing ring.
7. drainage pipeline according to claim 6 is connected prefabricated interface construction method with well body, in first prefabricated pipe Top opens up two injected holes, is respectively provided at the both ends of first prefabricated pipe.
8. drainage pipeline according to claim 7 is connected prefabricated interface construction method with well body, row after described pour After well room is put into precalculated position, pipeline is inserted into the gap between first prefabricated pipe, the second prefabricated pipe, until described One end of pipeline is in contact with the annular slab, and using clay block the pipeline and the first prefabricated pipe, the second prefabricated pipe it Between gap.
9. drainage pipeline according to claim 8 is connected prefabricated interface construction method with well body, when the pipeline is inserted into institute After stating in gap, cement grout is injected into the injected hole so that the pipeline is fixed as one with the pipe prefabrication part.
10. drainage pipeline according to claim 9 is connected prefabricated interface construction method with well body, mixed in the cement grout There is swelling agent so that expanded naturally after the cement grout solidification.
CN201711218152.9A 2017-11-28 2017-11-28 Drainage pipeline is connected prefabricated interface construction method with well body Pending CN108035425A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711218152.9A CN108035425A (en) 2017-11-28 2017-11-28 Drainage pipeline is connected prefabricated interface construction method with well body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711218152.9A CN108035425A (en) 2017-11-28 2017-11-28 Drainage pipeline is connected prefabricated interface construction method with well body

Publications (1)

Publication Number Publication Date
CN108035425A true CN108035425A (en) 2018-05-15

Family

ID=62094276

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711218152.9A Pending CN108035425A (en) 2017-11-28 2017-11-28 Drainage pipeline is connected prefabricated interface construction method with well body

Country Status (1)

Country Link
CN (1) CN108035425A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2620726Y (en) * 2003-03-21 2004-06-16 王林 Combined manhole structural component
CN202031163U (en) * 2011-04-27 2011-11-09 昆明普尔顿管业有限公司 Inspection well with plug-in sleeve
CN204343330U (en) * 2014-12-19 2015-05-20 沈晓铃 A kind of plastic drain-pipe and manhole sealing and connecting device
KR101663914B1 (en) * 2015-11-04 2016-10-07 주식회사 금성종합기술단 Rainwater infilration structures
CN107269943A (en) * 2017-05-23 2017-10-20 中冶天工集团天津有限公司 Device and construction method of a kind of pipeline through armored concrete pool wall

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2620726Y (en) * 2003-03-21 2004-06-16 王林 Combined manhole structural component
CN202031163U (en) * 2011-04-27 2011-11-09 昆明普尔顿管业有限公司 Inspection well with plug-in sleeve
CN204343330U (en) * 2014-12-19 2015-05-20 沈晓铃 A kind of plastic drain-pipe and manhole sealing and connecting device
KR101663914B1 (en) * 2015-11-04 2016-10-07 주식회사 금성종합기술단 Rainwater infilration structures
CN107269943A (en) * 2017-05-23 2017-10-20 中冶天工集团天津有限公司 Device and construction method of a kind of pipeline through armored concrete pool wall

Similar Documents

Publication Publication Date Title
CN106013471B (en) A kind of construction method of expansion joint antiseep
CN208981531U (en) A kind of prefabricated assembled parapet connection structure
CN105951612A (en) Defect repairing reinforcing structure for underwater pile head of serving bridge and construction method of defect repairing reinforcing structure
CN103498486A (en) Method for blocking post-cast strip downcast pipe well through sleeve pipe
CN207297034U (en) Tunnel double-lining concrete vault backfills grouting device
CN103741949B (en) Treatment of juncture between vertical structure and horizontal structure
CN108443590A (en) Side-type direct-burried part and its construction method
CN207268004U (en) Toilet leakage protective system
CN209429046U (en) Gravity dam transverse joint drainage channel structure
CN109138116A (en) Concrete expires packet drainage pipeline tubine construction method
CN108035425A (en) Drainage pipeline is connected prefabricated interface construction method with well body
CN104534216A (en) Drainage pipeline and inspection well connection water stop structure
CN209397743U (en) New-old concrete works intersection stitches waterproof construction
CN108360573B (en) Device for preventing post-cast strip of basement floor from leaking and construction method thereof
CN103835421B (en) Leakage-proof floor and anti-seepage construction method
CN206752632U (en) Plastic reinforcing steel composite construction municipal drainage inspection shaft
CN207268010U (en) Drainpipe leakage-resistant device
CN108086447A (en) Concrete drain pipeline interface ring-type grouting construction method
CN206539353U (en) A kind of tunnel-liner infiltration punishment is reserved to check aperture apparatus
CN214363658U (en) Seamless waterproof structure of prestressed anchor rod reverse construction method
CN208074294U (en) Side-type direct-burried part
CN204199324U (en) Connecting reinforcement cage i iron in construction of diaphragm wall
CN210113318U (en) Foundation ditch basement gushes water and gushes sand plugging device
CN105780791B (en) Deep-well precipitation well head shut-in well construction method in underground garage foundation pit
CN205776310U (en) A kind of underneath type tower-crane foundation structure setting up water string

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180515