CN108035204B - Structure and method for solving problem of uneven settlement quality of junction of urban road underground pipe gallery - Google Patents

Structure and method for solving problem of uneven settlement quality of junction of urban road underground pipe gallery Download PDF

Info

Publication number
CN108035204B
CN108035204B CN201711210030.5A CN201711210030A CN108035204B CN 108035204 B CN108035204 B CN 108035204B CN 201711210030 A CN201711210030 A CN 201711210030A CN 108035204 B CN108035204 B CN 108035204B
Authority
CN
China
Prior art keywords
pipe gallery
underground pipe
road
junction
soft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711210030.5A
Other languages
Chinese (zh)
Other versions
CN108035204A (en
Inventor
吴剑兵
戈祥林
林金隆
许松宜
张永
何震华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201711210030.5A priority Critical patent/CN108035204B/en
Publication of CN108035204A publication Critical patent/CN108035204A/en
Application granted granted Critical
Publication of CN108035204B publication Critical patent/CN108035204B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G17/00Cultivation of hops, vines, fruit trees, or like trees
    • A01G17/005Cultivation methods
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/02Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/10Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental Sciences (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Environmental & Geological Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Botany (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention provides a structure for solving the problem of uneven settlement quality at the junction of an urban road and an underground pipe gallery, wherein the urban road comprises an underground pipe gallery area and two non-underground pipe gallery areas, the underground pipe gallery is positioned on a pipe gallery soft foundation, the underground pipe gallery area is positioned on the underground pipe gallery, the two non-underground pipe gallery areas are respectively positioned on two road soft foundations, the underground pipe gallery area is positioned between the two non-underground pipe gallery areas, the underground pipe gallery and the pipe gallery soft foundation are positioned between the two road soft foundations, the pipe gallery soft foundation and the road soft foundation are formed by adopting different soft foundation treatment methods, the middle part of a green belt is arranged on the underground pipe gallery area, and the two sides of the green belt are respectively arranged on the two non-underground pipe gallery areas. Related methods are also provided. The invention does not need to repair the crack, has simple and easy processing scheme, greatly saves the processing cost, has ingenious design, simple structure and low cost, and is suitable for large-scale popularization and application.

Description

Structure and method for solving problem of uneven settlement quality of junction of urban road underground pipe gallery
Technical Field
The invention relates to the technical field of building construction, in particular to the technical field of underground pipe gallery and urban road construction, and specifically relates to a structure and a method for solving the problem of uneven settlement quality at the junction of an underground pipe gallery of an urban road.
Background
In a soft soil area, the soft soil has strong thixotropy and low bearing capacity, so that the soft soil foundation can meet the bearing capacity requirement of the foundation only by foundation treatment. In construction, different soft foundation treatment technical schemes are adopted according to geological exploration conditions. Generally, in the same engineering project, two different soft foundation treatment forms often exist in consideration of the soft foundation treatment cost or the construction period.
The construction of urban underground pipe galleries is being actively and vigorously carried out nationwide. Many times this practice thrift city construction land and consider, underground pipe gallery all builds under urban road. In the soft soil foundation region, the non-underground pipe gallery region (totally two, do not build the underground pipe gallery under it) of underground pipe gallery and urban road all needs to handle respective soft soil foundation just can satisfy the bearing capacity requirement, and when both foundation treatment methods are different, can produce the difference and subside, causes the road crack when serious, influences driving safety. The conventional crack treatment mode is to completely remove urban roads and re-pave asphalt concrete or concrete pavements, so that the treatment cost is high and traffic jam is caused.
For example, as shown in fig. 1, the underground pipe gallery 1 is built on the soft soil foundation of the silt in a certain south, the urban road 2 is built on the underground pipe gallery 1, namely, the underground pipe gallery 1 is built below the urban road 2, the part of the urban road above the underground pipe gallery 1 becomes the underground pipe gallery area 21, the soft foundation 3 of the pipe gallery under the underground pipe gallery 1 adopts the PHC high-strength prestressed concrete pipe pile foundation, namely, the PHC pile foundation 31, and the soft foundation 4 of the road under the non-underground pipe gallery area 22 of the urban road 2 connected with the underground pipe gallery adopts the plain concrete pile composite foundation 41.
Because between the PHC pile foundation 31 under the utility tunnel 1 and the plain concrete pile composite foundation 41 under the non-utility tunnel region 22 of urban road 2, there is uneven settlement between rigid pile and the composite foundation, the settlement difference is great, can cause the bituminous paving (namely the juncture of the utility tunnel region 21 of urban road 2 and the non-utility tunnel region 22) to produce fore-and-aft crack 5 above the 1 lateral wall of utility tunnel, when the settlement difference is great in fore-and-aft crack 5 both sides, the travelling comfort of driving is directly influenced, under the serious condition, influence driving safety, be the problem that needs focus on and try to solve.
In order to solve the problem of longitudinal cracks, a method for repairing generated cracks is mostly adopted in the past, the method increases construction cost, and cracks are generated again if uneven settlement continues to develop.
Therefore, the structure and the method for solving the problem of uneven settlement quality at the junction of the underground pipe gallery of the urban road are needed, the crack does not need to be repaired, the treatment scheme is simple and feasible, and the treatment cost is greatly saved.
Disclosure of Invention
In order to overcome the defects in the prior art, the invention aims to provide a structure for solving the problem of uneven settlement quality at the junction of an urban road underground pipe gallery, which does not need to repair cracks, has a simple and easy processing scheme, greatly saves the processing cost and is suitable for large-scale popularization and application.
The invention also aims to provide a structure for solving the problem of uneven settlement quality at the junction of the urban road underground pipe gallery, which is ingenious in design, simple in structure, low in cost and suitable for large-scale popularization and application.
The invention also aims to provide a method for solving the problem of uneven settlement quality at the junction of the underground pipe gallery of the urban road, which does not need to repair cracks, has simple and easy treatment scheme, greatly saves the treatment cost and is suitable for large-scale popularization and application.
The invention also aims to provide a method for solving the problem of uneven settlement quality at the junction of the urban road underground pipe gallery, which has the advantages of ingenious design, simple, convenient and quick operation and low cost, and is suitable for large-scale popularization and application.
In order to achieve the above object, in a first aspect of the present invention, there is provided a structure for solving the problem of uneven settlement quality at the junction of an urban road and an underground pipe gallery, comprising an underground pipe gallery, an urban road, a pipe gallery soft foundation and two road soft foundations, wherein the urban road comprises an underground pipe gallery area and two non-underground pipe gallery areas, the underground pipe gallery is located on the pipe gallery soft foundation, the underground pipe gallery area is located on the underground pipe gallery, the two non-underground pipe gallery areas are respectively located on the two road soft foundations, the underground pipe gallery area is located between the two non-underground pipe gallery areas, the underground pipe gallery and the pipe gallery soft foundation are located between the two road soft foundations, the pipe gallery soft foundation and the road soft foundation are treated by different soft foundation treatment methods, and the structure for solving the problem of uneven settlement quality at the junction of the urban road and the underground pipe gallery is further comprising a green belt, the middle part of greenbelt sets up on the underground pipe gallery is regional, the both sides of greenbelt set up respectively two on the non-underground pipe gallery is regional.
Preferably, the soft foundation of pipe gallery is PHC pile foundation, and the soft foundation of road is plain concrete pile composite foundation.
Preferably, the green belt is a planting pond.
Preferably, the planting pond includes two plain concrete foundations, two planting pond frames, planting soil and afforestation nursery stock, two plain concrete foundations sets up two respectively on the non-underground pipe gallery region, two the planting pond frame sets up two respectively on the plain concrete foundation, the planting soil is located underground pipe gallery region and two on the non-underground pipe gallery region and be located two between the planting pond frame, afforestation nursery stock is planted in the planting soil.
Preferably, the problem of the uneven settlement quality problem of urban road underground pipe gallery junction structure still include the drain pipe, the drain pipe sets up the lowest of planting the pond.
In a second aspect of the invention, a method for solving the problem of uneven settlement quality at the junction of an underground pipe gallery of an urban road is provided, which is characterized by comprising the following steps:
(1) set up the greenbelt on city road's utility tunnel region and two non-utility tunnel regions, the middle part of greenbelt sets up on the utility tunnel region, the both sides of greenbelt set up respectively two on the non-utility tunnel region, wherein, the utility tunnel has the utility tunnel under the region, the utility tunnel soft foundation has, two under the utility tunnel non-utility tunnel region has two soft foundations of road respectively, the utility tunnel region is located two between the non-utility tunnel region, the utility tunnel with the soft foundation of utility tunnel is located two between the soft foundation of road, the utility tunnel soft foundation with the soft foundation of road adopts different soft foundation processing methods to handle and forms.
Preferably, the method further comprises:
(2) when the junction of the underground pipe gallery area and the non-underground pipe gallery area is settled, so that the planting soil of the green belt is settled, filling the green belt with additional planting soil.
Preferably, the green belt is a planting pond.
Preferably, the planting pond comprises two plain concrete foundations, two planting pond frames, planting soil and green nursery stocks, and the step (1) specifically comprises:
and respectively arranging two plain concrete foundations on the two non-underground pipe gallery areas, respectively arranging two planting pool frames on the two plain concrete foundations, and respectively arranging planting soil between the two planting pool frames on the underground pipe gallery areas and the two non-underground pipe gallery areas, so that the green seedlings are planted in the planting soil.
More preferably, the step (1) further comprises: and arranging a drain pipe at the lowest part of the planting pond.
The invention has the following beneficial effects:
1. the invention relates to a structure for solving the problem of uneven settlement quality at the junction of an urban road and an underground pipe gallery, which comprises an underground pipe gallery, an urban road, pipe gallery soft foundations, a green belt and two road soft foundations, wherein the urban road comprises an underground pipe gallery area and two non-underground pipe gallery areas, the underground pipe gallery is positioned on the pipe gallery soft foundations, the underground pipe gallery areas are positioned on the underground pipe gallery, the two non-underground pipe gallery areas are respectively positioned on the two road soft foundations, the underground pipe gallery area is positioned between the two non-underground pipe gallery areas, the underground pipe gallery and the pipe gallery soft foundations are positioned between the two road soft foundations, the pipe gallery soft foundations and the road soft foundations are processed by adopting different soft foundation processing methods, the middle part of the green belt is arranged on the underground pipe gallery areas, the two sides of the green belt are respectively arranged on the two non-underground pipe gallery areas, so that cracks generated by uneven settlement are shielded by the green belt, and planting soil of the green belt is filled if, the safety of the traffic lane is not affected, so that the crack does not need to be repaired, the processing scheme is simple and easy to implement, the processing cost is greatly saved, and the method is suitable for large-scale popularization and application.
2. The invention relates to a structure for solving the problem of uneven settlement quality at the junction of an urban road and an underground pipe gallery, which comprises an underground pipe gallery, an urban road, pipe gallery soft foundations, a green belt and two road soft foundations, wherein the urban road comprises an underground pipe gallery area and two non-underground pipe gallery areas, the underground pipe gallery is positioned on the pipe gallery soft foundations, the underground pipe gallery areas are positioned on the underground pipe gallery, the two non-underground pipe gallery areas are respectively positioned on the two road soft foundations, the underground pipe gallery area is positioned between the two non-underground pipe gallery areas, the underground pipe gallery and the pipe gallery soft foundations are positioned between the two road soft foundations, the pipe gallery soft foundations and the road soft foundations are processed by adopting different soft foundation processing methods, the middle part of the green belt is arranged on the underground pipe gallery areas, the two sides of the green belt are respectively arranged on the two non-underground pipe gallery areas, so that cracks generated by uneven settlement are shielded by the green belt, and planting soil of the green belt is filled if, the safety of the traffic lane is not affected, so the design is ingenious, the structure is simple, the cost is low, and the method is suitable for large-scale popularization and application.
3. The method for solving the problem of uneven settlement quality at the junction of the urban road underground pipe gallery comprises the following steps: the method is characterized in that green belts are arranged on an underground pipe gallery area and two non-underground pipe gallery areas of an urban road, the middle of each green belt is arranged on the underground pipe gallery area, two sides of each green belt are respectively arranged on the two non-underground pipe gallery areas, an underground pipe gallery is arranged below each underground pipe gallery area, a pipe gallery soft foundation is arranged below each underground pipe gallery, two road soft foundations are arranged below each non-underground pipe gallery area, each underground pipe gallery area is arranged between the two non-underground pipe gallery areas, the underground pipe gallery and the pipe gallery soft foundation are arranged between the two road soft foundations, and the pipe gallery soft foundation and the road soft foundation are processed by different soft foundation processing methods, so that cracks generated by uneven settlement are shielded by the green belts, planting soil of the green belts is filled if necessary, the safety of a traffic lane is not affected, therefore, the green belts do not need to be repaired, the processing scheme is simple and feasible, and the processing cost is greatly saved, is suitable for large-scale popularization and application.
4. The method for solving the problem of uneven settlement quality at the junction of the urban road underground pipe gallery comprises the following steps: the method is characterized in that green belts are arranged on an underground pipe gallery area and two non-underground pipe gallery areas of an urban road, the middle part of the green belt is arranged on the underground pipe gallery area, the two sides of the green belt are respectively arranged on the two non-underground pipe gallery areas, an underground pipe gallery is arranged below the underground pipe gallery area, a pipe gallery soft foundation is arranged below the underground pipe gallery, two road soft foundations are respectively arranged below the two non-underground pipe gallery areas, the underground pipe gallery area is positioned between the two non-underground pipe gallery areas, the underground pipe gallery and the pipe gallery soft foundation are positioned between the two road soft foundations, and the pipe gallery soft foundation and the road soft foundation are processed by adopting different soft foundation processing methods, so that the green belt shields the cracks generated by uneven settlement, and the planting soil of the green belt is filled if necessary without influencing the safety of the traffic lane, therefore, the device has the advantages of ingenious design, simple, convenient and quick operation and low cost, and is suitable for large-scale popularization and application.
These and other objects, features and advantages of the present invention will become more fully apparent from the following detailed description, the accompanying drawings and the appended claims, wherein like reference numerals refer to like parts throughout the several views, and wherein like reference numerals refer to like parts throughout the several views.
Drawings
Fig. 1 is a schematic sectional view of a main view of a junction of an underground pipe gallery area and a non-underground pipe gallery area of an urban road, wherein a horizontal dotted line represents the urban road after uneven settlement, and a vertical dotted line represents a crack.
Fig. 2 is a schematic sectional view of a front view of a structure for solving the problem of uneven settlement quality at the junction of the underground pipe gallery of the urban road according to an embodiment of the present invention.
(symbol description)
1, underground pipe gallery; 2, urban roads; 21 underground pipe gallery area; 22 non-underground pipe gallery areas; 3, a pipe gallery soft foundation; 31PHC pile foundations; 4, road soft foundation; 41 plain concrete pile composite foundation; 5, cracking; 6, greening belt; 61 planting pool; 62, planting pool frame; 63 greening the seedlings.
Detailed Description
The present invention will now be described in more detail with reference to the accompanying drawings and specific examples.
Referring to fig. 2, in a specific embodiment of the present invention, the structure for solving the problem of uneven settlement quality at the junction of the urban road and underground pipe gallery comprises an underground pipe gallery 1, an urban road 2, a pipe gallery soft foundation 3, a green belt 6 and two road soft foundations 4, wherein the urban road 2 comprises an underground pipe gallery area 21 and two non-underground pipe gallery areas 22, the underground pipe gallery 1 is located on the pipe gallery soft foundation 3, the underground pipe gallery area 21 is located on the underground pipe gallery 1, the two non-underground pipe gallery areas 22 are respectively located on the two road soft foundations 4, the underground pipe gallery area 21 is located between the two non-underground pipe gallery areas 22, the underground pipe gallery 1 and the pipe gallery soft foundation 3 are located between the two road soft foundations 4, and the pipe gallery soft foundation 3 and the road soft foundation 4 are treated by different soft foundation treatment methods, the middle part of greenbelt 6 sets up on the utility tunnel region 21, the both sides of greenbelt 6 set up respectively two on the non-utility tunnel region 22.
The pipe gallery soft foundation 3 may be processed by any suitable soft foundation processing method, and as shown in fig. 2, in an embodiment of the present invention, the pipe gallery soft foundation 3 is a PHC pile foundation 31. Namely, the pipe gallery soft foundation 3 is formed by adopting a PHC high-strength prestressed concrete pipe pile to carry out soft foundation treatment.
The PHC pile foundation 31 may be any suitable PHC pile foundation, and in a specific embodiment of the present invention, the PHC pile foundation 31 is a PHC- Φ 400-95 pipe pile AB-type pipe pile foundation.
The soft road foundation 4 may be formed by any suitable soft foundation treatment method, and as shown in fig. 2, in an embodiment of the present invention, the soft road foundation 4 is a plain concrete pile composite foundation 41. Namely, the road soft foundation 4 is formed by adopting plain concrete piles to carry out soft foundation treatment.
The plain concrete pile composite foundation 41 may be any suitable plain concrete pile composite foundation, and in one embodiment of the invention, the plain concrete pile composite foundation 41 is a C20 plain concrete pile composite foundation.
The green belt 6 can be any suitable green belt, and referring to fig. 2, in an embodiment of the present invention, the green belt 6 is a planting pond 61.
The planting pond 61 may have any suitable structure, as shown in fig. 2, in an embodiment of the present invention, the planting pond 61 includes two plain concrete foundations (not shown), two planting pond frames 62, planting soil (not shown), and green nursery stock 63, the two plain concrete foundations are respectively disposed on the two non-underground pipe gallery areas 22, the two planting pond frames 62 are respectively disposed on the two plain concrete foundations, the planting soil is disposed on the underground pipe gallery area 21 and the two non-underground pipe gallery areas 22 and between the two planting pond frames 62, and the green nursery stock 63 is planted in the planting soil.
In order to avoid the problem that rainwater seeps into the foundation along the crack when the accumulated water in the planting soil is serious, and causes the subsidence of the road surface, in a specific embodiment of the present invention, the structure for solving the problem of uneven settlement quality at the junction of the urban road underground pipe gallery further comprises a drain pipe (not shown in the figure), and the drain pipe is arranged at the lowest position of the planting pond 61. I.e. closest to the underground pipe gallery 1.
The width of the two sides of the green belt 6 can be determined according to the requirement, and in a specific embodiment of the present invention, the width of the two sides of the green belt 6 is 1000 m.
The invention also provides a construction method of the structure for solving the problem of uneven settlement quality at the junction of the underground pipe gallery of the urban road, which is characterized by comprising the following steps:
(1) set up greenbelt 6 on city road 2's utility tunnel region 21 and two non-utility tunnel regions 22, the middle part of greenbelt 6 sets up on the utility tunnel region 21, the both sides of greenbelt 6 set up respectively two on the non-utility tunnel region 22.
In order to shield the cracks generated by uneven settlement when large settlement occurs, in an embodiment of the present invention, the method further comprises:
(2) when the junction of the underground pipe gallery area 21 and the non-underground pipe gallery area 22 is settled, so that the planting soil of the green belt 6 is settled, the green belt 6 is filled with additional planting soil.
In the case that the green belt 6 is a planting pond 61 and the planting pond 61 comprises two plain concrete foundations, two planting pond frames 62, planting soil and green nursery stocks 63, the step (1) specifically comprises:
the two plain concrete foundations are respectively arranged on the two non-underground pipe gallery areas 22, the two planting pool frames 62 are respectively arranged on the two plain concrete foundations, the planting soil is located on the underground pipe gallery area 21 and the two non-underground pipe gallery areas 22 and between the two planting pool frames 62, and the greening nursery stocks 63 are planted in the planting soil.
The problem of the uneven settlement quality problem of urban road underground pipe gallery junction structure still include the drain pipe under the condition, step (1) still includes: the drain pipe is provided at the lowest position of the planting pond 61.
In order to clearly understand the technical contents of the present invention, the following examples are given in detail.
Example 1
The total length of the underground pipe gallery 1 and the urban road 2 is 41.4km, the underground pipe gallery 1 passes through a silt soft soil area, and the soft foundation is thicker (6-15 m). The soft soil layers under the two non-underground pipe gallery areas 22 of the underground pipe gallery 1 and the urban road 2 need to be treated with foundations. The soft foundation 3 of the pipe gallery under the underground pipe gallery 1 is a PHC-phi 400-95 pipe pile AB type pipe pile foundation, the pile distance is 1.1 m-2.5 m, the characteristic value of the vertical bearing capacity of a single pile is 760KN, the soft foundation 4 of the road under the non-underground pipe gallery area 22 is a C20 plain concrete pile composite foundation, the pile distance is 1.2 m-1.6 m, the pile bottom of the plain concrete pile penetrates through a silt layer and enters a hard soil layer which is not less than 1m, and the characteristic value of the vertical bearing capacity of the single pile is 20 KN.
According to the traditional thought, the junction of the two soft soil foundation treatment processes is the same as that of other surface layers, and no special treatment is carried out, so that cracks are easily generated at the junction.
In order to solve the problem, a method for setting a green belt 6 to solve the problem of uneven settlement quality at the junction of an underground pipe gallery area 21 and a non-underground pipe gallery area 22 adopting two soft foundation treatment schemes is provided, the green belt 6 adopts a planting pool 61, and the soil body and vegetation in the planting pool 61 well shield cracks generated by uneven settlement. The planting soil is easy to backfill when larger settlement occurs, the repairing cost is reduced, and the method is worthy of wide popularization and application. The specific method comprises the following steps: in order to predict the area with uneven settlement and the range of 1000mm on both sides (in other words, including the underground pipe gallery area 21 and a part of two non-underground pipe gallery areas 22 on both sides), the green belt 6 is arranged, when small settlement occurs, the soil body and vegetation of the green belt 6 well shield the cracks generated by uneven settlement, and when large settlement occurs, the planting soil is filled, so that the safety of the traffic lane is not affected.
1. Preparation for construction
(1) Labor preparation
4 concreters, 6 gardeners and 4 planting pond installers are arranged at each 50m construction operation section.
(2) Material preparation
The planting pond frame 62 adopts granite planting pond frame, cement mortar, concrete, planting soil and greening nursery stock 63.
2. Process flow
Acceptance of construction equipment and raw materials entering a field → determination of the size and positioning of the planting pond 61 → installation of a frame 62 of the planting pond → planting of green seedlings 63.
3. The construction points
(1) Planting pool 61 positioning
The green belt 6 is arranged in the range of 1000mm beyond the expected crack generation at the uneven settlement position of the junction of the two soft soil foundations.
(2) The frame 62 of the planting pond is made of granite, and the foundation is made of C15 plain concrete. Ensure the firmness and integrity, the D300PVC pipe is arranged at the lowest part of the planting pond 61, and the surface is fully drilled
Figure BDA0001484410570000091
The holes are wrapped with non-woven fabrics to be used as drain pipes, so that rainwater is prevented from infiltrating into the foundation along cracks when the water accumulation in the planting soil is serious, and the pavement is prevented from sinking.
(3) The planting pond 61 is installed, and when the planting soil is backfilled, the surface elevation of the planting soil is lower than the top surface of the frame elevation of the granite planting pond by 50 mm.
(4) And planting green seedlings 63.
(5) When the planting soil in the planting pond 61 sinks a large amount due to large sedimentation, the planting soil is filled with additional planting soil.
Therefore, for the problem of uneven settlement quality at the junction of the underground pipe gallery area and the non-underground pipe gallery area of the urban road, the invention additionally designs a solution idea, and a green belt is arranged at the junction of the foundations treated by different soft foundations for greening planting. The green belt soil body and the vegetation cover the cracks generated by uneven settlement well, the safety of the traffic lane is not influenced, the problem of the cracks is solved skillfully, the construction method is highly innovative, and the problem is solved well.
Therefore, the invention provides a structure and a method for solving the problem of uneven settlement quality at the junction of the underground pipe gallery of the urban road. By arranging the green belt at the junction of the two foundations adopting two different soft foundation treatment methods, when the settlement difference of the two foundations occurs, the planting soil in the green belt directly sinks, at the moment, only the planting soil needs to be filled, the crack does not need to be repaired, the treatment scheme is simple and easy, and the treatment cost is greatly saved. The method is used for solving the crack at the junction of the soft soil foundation treated by two different processes.
In conclusion, the structure for solving the problem of uneven settlement quality at the junction of the urban road underground pipe gallery does not need to repair cracks, the processing scheme is simple and feasible, the processing cost is greatly saved, the design is ingenious, the structure is simple, the cost is low, and the structure is suitable for large-scale popularization and application.
It will thus be seen that the objects of the invention have been fully and effectively accomplished. The functional and structural principles of the present invention have been shown and described in the embodiments, and the embodiments may be modified without departing from the principles. Therefore, this invention includes all modifications encompassed within the spirit and scope of the claims.

Claims (10)

1. A structure for solving the problem of uneven settlement quality of an urban road underground pipe gallery junction comprises an underground pipe gallery, an urban road, a pipe gallery soft foundation and two road soft foundations, wherein the urban road comprises an underground pipe gallery area and two non-underground pipe gallery areas, the underground pipe gallery is located on the pipe gallery soft foundation, the underground pipe gallery area is located on the underground pipe gallery, the two non-underground pipe gallery areas are respectively located on the two road soft foundations, the underground pipe gallery area is located between the two non-underground pipe gallery areas, the underground pipe gallery and the pipe gallery soft foundation are located between the two road soft foundations, the pipe gallery soft foundation and the road soft foundation are processed by adopting different soft foundation processing methods, and when the settlement difference of the two foundations occurs, the structure for solving the problem of uneven settlement quality of the urban road underground pipe gallery junction further comprises a green belt, the middle part of greenbelt sets up on the underground pipe gallery is regional, the both sides of greenbelt set up respectively two on the non-underground pipe gallery is regional.
2. The structure for solving the problem of uneven settlement quality at the junction of the urban road and underground pipe gallery according to claim 1, wherein the soft foundation of the pipe gallery is a PHC pile foundation, and the soft foundation of the road is a plain concrete pile composite foundation.
3. The structure for solving the problem of uneven settlement quality at the junction of the urban road underground pipe gallery according to claim 1, wherein the green belt is a planting pond.
4. The structure for solving the problem of uneven settlement quality at the junction of an urban road underground pipe gallery according to claim 3, wherein the planting pond comprises two plain concrete foundations, two planting pond borders, planting soil and green nursery stock, the two plain concrete foundations are respectively disposed on the two non-underground pipe gallery areas, the two planting pond borders are respectively disposed on the two plain concrete foundations, the planting soil is located on the underground pipe gallery area and the two non-underground pipe gallery areas and between the two planting pond borders, and the green nursery stock is planted in the planting soil.
5. The structure for solving the problem of uneven settlement quality at the junction of the urban road underground pipe gallery according to claim 3, characterized in that the structure for solving the problem of uneven settlement quality at the junction of the urban road underground pipe gallery further comprises a drain pipe, and the drain pipe is arranged at the lowest position of the planting pond.
6. The method for solving the problem of uneven settlement quality of the junction of the urban road underground pipe gallery is characterized by comprising the following steps of:
(1) set up the greenbelt on city road's utility tunnel region and two non-utility tunnel regions, the middle part of greenbelt sets up on the utility tunnel region, the both sides of greenbelt set up respectively two on the non-utility tunnel region, wherein, the utility tunnel has the utility tunnel under the area, the utility tunnel soft foundation has, two under the utility tunnel non-utility tunnel region has two soft foundations of road respectively, the utility tunnel region is located two between the non-utility tunnel region, the utility tunnel with the soft foundation of utility tunnel is located two between the soft foundation of road, the utility tunnel soft foundation with the soft foundation of road adopts different soft foundation processing method to handle and form to make two kinds of foundations appear subsiding the difference.
7. The method for solving the problem of uneven settlement quality at the junction of the urban road underground pipe gallery according to claim 6, characterized in that the method further comprises:
(2) when the junction of the underground pipe gallery area and the non-underground pipe gallery area is settled, so that the planting soil of the green belt is settled, filling the green belt with additional planting soil.
8. The method for solving the problem of uneven settlement quality at the junction of the urban road underground pipe gallery according to claim 6, wherein the green belt is a planting pond.
9. The method for solving the problem of uneven settlement quality at the junction of the urban road underground pipe gallery according to claim 8, wherein the planting pond comprises two plain concrete foundations, two planting pond borders, planting soil and green nursery stock, and the step (1) specifically comprises:
and respectively arranging two plain concrete foundations on the two non-underground pipe gallery areas, respectively arranging two planting pool frames on the two plain concrete foundations, and respectively arranging planting soil between the two planting pool frames on the underground pipe gallery areas and the two non-underground pipe gallery areas, so that the green seedlings are planted in the planting soil.
10. The method for solving the problem of uneven settlement quality at the junction of the urban road underground pipe gallery according to claim 8, wherein the step (1) further comprises: and arranging a drain pipe at the lowest part of the planting pond.
CN201711210030.5A 2017-11-28 2017-11-28 Structure and method for solving problem of uneven settlement quality of junction of urban road underground pipe gallery Active CN108035204B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711210030.5A CN108035204B (en) 2017-11-28 2017-11-28 Structure and method for solving problem of uneven settlement quality of junction of urban road underground pipe gallery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711210030.5A CN108035204B (en) 2017-11-28 2017-11-28 Structure and method for solving problem of uneven settlement quality of junction of urban road underground pipe gallery

Publications (2)

Publication Number Publication Date
CN108035204A CN108035204A (en) 2018-05-15
CN108035204B true CN108035204B (en) 2020-06-09

Family

ID=62094254

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711210030.5A Active CN108035204B (en) 2017-11-28 2017-11-28 Structure and method for solving problem of uneven settlement quality of junction of urban road underground pipe gallery

Country Status (1)

Country Link
CN (1) CN108035204B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114908625A (en) * 2021-11-25 2022-08-16 上海建工集团股份有限公司 Foundation treatment and anti-settlement device and method for comprehensive pipe gallery crossing road

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101170815B1 (en) * 2011-12-16 2012-08-02 조영철 Vegetational apparatus for rainwater retention
CN105804116A (en) * 2016-04-01 2016-07-27 上海市政工程设计研究总院(集团)有限公司 Combined-construction section structure of underpass tunnel and comprehensive pipe gallery
CN106592608A (en) * 2016-12-21 2017-04-26 东南大学 Differential settlement control method for new foundation and old roadbed of utility tunnel
CN106759473A (en) * 2016-11-11 2017-05-31 中国建筑第八工程局有限公司 The constructing structure and its construction method of underground pipe gallery and road

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101170815B1 (en) * 2011-12-16 2012-08-02 조영철 Vegetational apparatus for rainwater retention
CN105804116A (en) * 2016-04-01 2016-07-27 上海市政工程设计研究总院(集团)有限公司 Combined-construction section structure of underpass tunnel and comprehensive pipe gallery
CN106759473A (en) * 2016-11-11 2017-05-31 中国建筑第八工程局有限公司 The constructing structure and its construction method of underground pipe gallery and road
CN106592608A (en) * 2016-12-21 2017-04-26 东南大学 Differential settlement control method for new foundation and old roadbed of utility tunnel

Also Published As

Publication number Publication date
CN108035204A (en) 2018-05-15

Similar Documents

Publication Publication Date Title
CN105863671A (en) Frame type low-position draining system tunnel lining structure
CN103410159A (en) Expansive soil cut slope support structure and construction method thereof
CN107100227B (en) A kind of pergola on the city road LID biology delay ditch construction method
CN201835198U (en) Drainage roadbed for high underground water level
CN106758623B (en) A kind of dam filling construction of the no muscle lightweight earthen platform back of the body
CN203741666U (en) Roadbed structure for preventing cut-fill section of highway in cold region from frost boiling
CN111042293A (en) Construction process of road central green belt seepage-proofing drainage structure
CN113445396A (en) High-fill road foundation filling construction method for high liquid limit soil road section
CN204570720U (en) A kind of widening of subgrade culvert foundation
CN105064380B (en) Harnessed the river anti-skid structure rich in diving high slope
CN106759778A (en) For the scattered collection mating type waterproof and water drainage system of highway median strip
CN108035204B (en) Structure and method for solving problem of uneven settlement quality of junction of urban road underground pipe gallery
CN109113045A (en) A kind of soft-soil foundation treatment method
CN205936632U (en) Tunnel lining structure can be maintained to disconnect -type
US20120269573A1 (en) Systems and Methods for Diverting Sub-surface Water
CN105178134B (en) Green road reconstruction method
CN110172884B (en) Mountain highway subgrade and construction method
CN204898465U (en) Ecological drainage facility of permafrost region dish
CN206503213U (en) Scattered collection mating type waterproof and water drainage system for highway median strip
CN212427186U (en) Slide-resistant plate retaining wall for slope protection
CN211815447U (en) Maintenance structure that sinks is damaged to road surface of crossing pipeline department bituminous paving
CN105926396B (en) A kind of town road subgrade drainage structure and its construction method
CN105178133B (en) Permafrost region dish Demonstration for Ecological Sanitation facility and its construction process
CN113152628A (en) V-shaped gully high-fill temporary drainage system and construction method thereof
CN106436725A (en) Construction method of road cutting stereoscopic protection structure achieving high polymer grouting reinforcement and water prevention

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant