CN108032892A - A kind of asphalt handling device - Google Patents
A kind of asphalt handling device Download PDFInfo
- Publication number
- CN108032892A CN108032892A CN201711211169.1A CN201711211169A CN108032892A CN 108032892 A CN108032892 A CN 108032892A CN 201711211169 A CN201711211169 A CN 201711211169A CN 108032892 A CN108032892 A CN 108032892A
- Authority
- CN
- China
- Prior art keywords
- framework
- asphalt
- guide sleeve
- plate
- pushing hands
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B62—LAND VEHICLES FOR TRAVELLING OTHERWISE THAN ON RAILS
- B62B—HAND-PROPELLED VEHICLES, e.g. HAND CARTS OR PERAMBULATORS; SLEDGES
- B62B3/00—Hand carts having more than one axis carrying transport wheels; Steering devices therefor; Equipment therefor
- B62B3/08—Hand carts having more than one axis carrying transport wheels; Steering devices therefor; Equipment therefor involving tiltably-mounted containers
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B62—LAND VEHICLES FOR TRAVELLING OTHERWISE THAN ON RAILS
- B62B—HAND-PROPELLED VEHICLES, e.g. HAND CARTS OR PERAMBULATORS; SLEDGES
- B62B2203/00—Grasping, holding, supporting the objects
- B62B2203/70—Comprising means for facilitating loading or unloading
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Transportation (AREA)
- Mechanical Engineering (AREA)
- Road Paving Machines (AREA)
Abstract
The present invention relates to a kind of handling device, more particularly to a kind of asphalt handling device.The technical problem to be solved in the present invention is to provide one kind smoothly to carry asphalt, and being not easy to drop causes to waste, moreover it is possible to the asphalt handling device of processing is released to remaining asphalt.In order to solve the above technical problem, the present invention provides such a asphalt handling device, include bottom plate etc.;Symmetrical expression is provided with wheel at left and right sides of bottom base plate, bottom plate top left side is provided with pushing hands, and turnover device is equipped between bottom plate crown center and pushing hands leading flank top, framework is connected with turnover device, material-pulling device is equipped with framework, bottom plate top left side is provided with gag lever post.The present invention can be fixed the present apparatus when pouring out asphalt by brake gear, and prevents that the present apparatus moving influence asphalt from pouring out, and reached and asphalt smoothly can be carried, moreover it is possible to release the effect handled to remaining asphalt.
Description
Technical field
The present invention relates to a kind of handling device, more particularly to a kind of asphalt handling device.
Background technology
Asphalt is a kind of product of crude oil processing, be at normal temperatures black or dark brown sticky liquid,
Semi-solid or solid, mainly contains the hydro carbons for dissolving in trichloro ethylene and nonhydrocarbon analog derivative, its property and composition come with crude oil
The difference of source and production method and change.
After asphalt is mined, use for convenience, asphalt can be all carried to designated position, and generally all
It is that people carries asphalt by cart, and asphalt easily drops and causes to waste, asphalt also easily remains, because
This can smoothly carry asphalt there is an urgent need for researching and developing one kind, and being not easy to drop causes to waste, moreover it is possible to remaining oil
Pitch releases the asphalt handling device of processing.
The content of the invention
(1) technical problems to be solved
The present invention in order to overcome typically people to be carried by cart to asphalt, and asphalt easily drops and
Cause to waste, the shortcomings that asphalt also easily remains, can be to asphalt the technical problem to be solved in the present invention is to provide one kind
Smoothly carried, and being not easy to drop causes to waste, moreover it is possible to the asphalt that processing is released to remaining asphalt is carried
Device.
(2) technical solution
In order to solve the above technical problem, the present invention provides such a asphalt handling device, include bottom plate,
Wheel, pushing hands, gag lever post, framework, turnover device and material-pulling device, bottom base plate left and right sides symmetrical expression are provided with wheel,
Bottom plate top left side is provided with pushing hands, and turnover device, turnover device are equipped between bottom plate crown center and pushing hands leading flank top
On be connected with framework, material-pulling device is equipped with framework, bottom plate top left side is provided with gag lever post, and gag lever post is located at pushing hands right side.
Preferably, turnover device includes reel, the first rocking bar, bracing wire, strut and the first contiguous block, at the top of bottom plate in
Between strut is installed, strut top rotary type is provided with the first contiguous block, at the top of the first contiguous block with the right side of framework outer bottom
Connection, pushing hands leading flank top are provided with reel, and bracing wire is wound with reel, and bracing wire tail end connects with the outer left surface top of framework
Connect, reel leading flank center location is provided with the first rocking bar.
Preferably, material-pulling device includes transverse slat, the first guide sleeve, rack, bellows, inclined plate, gear, the second rocking bar and work
Movable plate, framework left side top are provided with transverse slat, and transverse slat right flank is provided with the first guide sleeve, rack, rack are equipped with the first guide sleeve
Bottom is provided with inclined plate, and inclined plate is located in framework, and inclined plate in framework with being slidably matched, the first guide sleeve bottom and inclined plate inclined-plane middle part
Between be connected with bellows, rack is located in bellows, and transverse slat top right side is provided with gear, and gear is located on the left of rack, tooth
Wheel and rack engages, and gear leading flank center location is provided with the second rocking bar, the installation of the first guide sleeve right flank lower rotational formula
There is movable plate, movable plate coordinates with framework.
Preferably, brake gear has been further included, brake gear includes the second guide sleeve, motion bar, the first spring, fixed plate
And rubber pad, bottom plate leading flank right side are provided with the second guide sleeve, motion bar is equipped with the second guide sleeve, motion bar is located at the strut right side
Side, motion bar bottom are provided with fixed plate, the first spring, the first spring are connected between the second guide sleeve bottom at the top of fixed plate
It is sleeved on motion bar, fixed plate bottom is provided with rubber pad, and rubber pad is located on the left of right-hand wheel.
Preferably, the 3rd guide sleeve and 7 type inserted links have been further included, pushing hands leading flank top is provided with the 3rd guide sleeve, and the 3rd leads
Set is equipped with 7 type inserted links, 7 type inserted links are contacted with the first rocking bar above reel in the 3rd guide sleeve.
Preferably, further included the second contiguous block, 7 type bars and second spring, movable plate top left side with before the first guide sleeve
Second spring is connected between side surface upper part, framework external right side face top is provided with the second contiguous block, is rotated on the second contiguous block
Formula is provided with 7 type bars, 7 type bar inner tops and movable plate top contact.
Operation principle:Operating personnel pour into asphalt in framework first, you can hold pushing hands and move this by wheel
Device, and then asphalt is carried.When asphalt is carried to designated position, you can stop promoting the present apparatus, lead to
Cross turnover device to topple over framework to the right, and then asphalt is poured out out of framework, you can again will be residual by material-pulling device
The asphalt stayed in framework is released, and is avoided waste, after asphalt is all poured out, you can driven by turnover device
Framework moves up recovery to original position, you can promotes the present apparatus to carry next group asphalt.
Because turnover device includes reel, the first rocking bar, bracing wire, strut and the first contiguous block, bottom plate crown center
Strut is installed, strut top rotary type is provided with the first contiguous block, connects at the top of the first contiguous block with framework outer bottom right side
Connect, pushing hands leading flank top is provided with reel, and bracing wire is wound with reel, and bracing wire tail end connects with the outer left surface top of framework
Connect, reel leading flank center location is provided with the first rocking bar, and when the present apparatus is moved to designated position, operating personnel can shake
Dynamic first rocking bar rotates forward, and the first rocking bar, which rotates forward, drives reel to rotate forward, and then bracing wire is relaxed, and framework is toppled over to the right, into
And asphalt is poured out by framework, stop shaking the first rocking bar.Similarly, after the asphalt in framework is all poured out, i.e.,
The reversion of the first rocking bar can be shaken, and then bracing wire pulls framework to recover to upper left side movement to original position, and gag lever post can prevent framework
Movement is excessive, stops shaking the first rocking bar.
Because material-pulling device includes transverse slat, the first guide sleeve, rack, bellows, inclined plate, gear, the second rocking bar and activity
Plate, framework left side top are provided with transverse slat, and transverse slat right flank is provided with the first guide sleeve, rack, rack bottom are equipped with the first guide sleeve
End is provided with inclined plate, and inclined plate is located in framework, and inclined plate in framework with being slidably matched, the first guide sleeve bottom and inclined plate inclined-plane middle part
Between be connected with bellows, rack is located in bellows, and transverse slat top right side is provided with gear, and gear is located on the left of rack, gear
Engaged with rack, gear leading flank center location is provided with the second rocking bar, and the first guide sleeve right flank lower rotational formula is provided with
Movable plate, movable plate coordinates with framework, and when asphalt is poured out in framework, operating personnel can shake the reversion of the second rocking bar,
Second rocking bar reversion band moving gear inverts, and gear reversion band carry-over bar moves right, and rack, which moves right, drives inclined plate to move right
Dynamic, inclined plate, which moves right, releases the asphalt remained in framework, when inclined plate moves right to suitable position, you can shake
Dynamic second rocking bar rotates forward, and then drives inclined plate to be moved to the left recovery to original position, stops shaking the second rocking bar.
Because having further included brake gear, brake gear include the second guide sleeve, motion bar, the first spring, fixed plate and
Rubber pad, bottom plate leading flank right side are provided with the second guide sleeve, and motion bar is equipped with the second guide sleeve, and motion bar is located on the right side of strut,
Motion bar bottom is provided with fixed plate, and the first spring, the first spring pocket are connected between the second guide sleeve bottom at the top of fixed plate
On motion bar, fixed plate bottom is provided with rubber pad, and rubber pad is located on the left of right-hand wheel, when framework tilt to the right by
When asphalt is poured out, framework is contacted with motion bar, and then framework drives motion bar to move down, and motion bar moves down drive
Fixed plate moves down, the first spring elongation, and fixed plate is moved down to drive rubber pad is moved down, and rubber pad moves down
Contacted with ground, and then rubber pad contacts with ground and fixes the present apparatus.Similarly, when framework is recovered to original position, because of the first bullet
The effect of spring, rubber pad move up recovery to original position.In this way, can prevent asphalt pour out during the present apparatus move
It is dynamic, and influence pouring out for asphalt.
Because having further included the 3rd guide sleeve and 7 type inserted links, pushing hands leading flank top is provided with the 3rd guide sleeve, the 3rd guide sleeve position
Above reel, 7 type inserted links are equipped with the 3rd guide sleeve, 7 type inserted links are contacted with the first rocking bar, when the present apparatus is moved to retarder location
When putting, operating personnel can extract 7 type inserted links, you can shake the reversion of the first rocking bar and topple over framework, and asphalt is fallen
Go out.After asphalt is all poured out, and when framework is recovered to original position, you can 7 type inserted links are inserted into the 3rd guide sleeve, and then 7
Type inserted link blocks the first rocking bar.Framework is caused to be toppled in this way, can prevent in handling process that the first rocking bar is moved.
Because having further included the second contiguous block, 7 type bars and second spring, movable plate top left side and the first guide sleeve leading flank
It is connected with second spring between top, framework external right side face top is provided with the second contiguous block, rotary type on the second contiguous block
7 type bars, 7 type bar inner tops and movable plate top contact are installed, when the present apparatus is moved to designated position, you can pull 7 types
Bar moves down, and 7 type bars rotate down not to be contacted with movable plate, and because of the effect of second spring, movable plate moves up opening, i.e.,
Asphalt can be poured out.After asphalt is poured out, and when framework is recovered to original position, you can press movable plate closing, then draw
Dynamic 7 type bars move up recovery to original position, and then 7 type bars fix movable plate.In this way, it can prevent handling process petrochina pitch
Spread out out of framework.
(3) beneficial effect
The present invention can be fixed the present apparatus when pouring out asphalt by brake gear, and prevents the present apparatus
Moving influence asphalt is poured out, and by material-pulling device, remaining asphalt can be released, without causing to waste, reached
Asphalt can smoothly be carried, and being not easy to drop causes to waste, moreover it is possible to remaining asphalt release is handled
Effect.
Brief description of the drawings
Fig. 1 is the first main structure diagram of the present invention.
Fig. 2 is second of main structure diagram of the present invention.
Fig. 3 is the third main structure diagram of the present invention.
Fig. 4 is the 4th kind of main structure diagram of the present invention.
Mark in attached drawing for:1- bottom plates, 2- wheels, 3- pushing hands, 4- gag lever posts, 5- frameworks, 6- turnover devices, 61- around
Line wheel, the first rocking bars of 62-, 63- bracing wires, 64- struts, the first contiguous blocks of 65-, 7- material-pulling devices, 71- transverse slats, 72- first are led
Set, 73- racks, 74- bellowss, 75- inclined plates, 76- gears, the second rocking bars of 77-, 78- movable plates, 8- brake gears, 81- second
Guide sleeve, 82- motion bars, the first springs of 83-, 84- fixed plates, 85- rubber pads, the 3rd guide sleeves of 9-, 10-7 type inserted links, 11- second
Contiguous block, 12-7 type bars, 13- second springs.
Embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of asphalt handling device, as shown in Figs 1-4, includes bottom plate 1, wheel 2, pushing hands 3, gag lever post 4, framework
5th, turnover device 6 and material-pulling device 7,1 bottom of bottom plate left and right sides symmetrical expression are provided with wheel 2, the installation of 1 top left side of bottom plate
There is pushing hands 3, turnover device 6 is equipped between 3 leading flank top of 1 crown center of bottom plate and pushing hands, framework is connected with turnover device 6
5, framework 5 is interior to be equipped with material-pulling device 7, and 1 top left side of bottom plate is provided with gag lever post 4, and gag lever post 4 is located at the right side of pushing hands 3.
Embodiment 2
A kind of asphalt handling device, as shown in Figs 1-4, includes bottom plate 1, wheel 2, pushing hands 3, gag lever post 4, framework
5th, turnover device 6 and material-pulling device 7,1 bottom of bottom plate left and right sides symmetrical expression are provided with wheel 2, the installation of 1 top left side of bottom plate
There is pushing hands 3, turnover device 6 is equipped between 3 leading flank top of 1 crown center of bottom plate and pushing hands, framework is connected with turnover device 6
5, framework 5 is interior to be equipped with material-pulling device 7, and 1 top left side of bottom plate is provided with gag lever post 4, and gag lever post 4 is located at the right side of pushing hands 3.
Turnover device 6 includes reel 61, the first rocking bar 62, bracing wire 63,64 and first contiguous block 65 of strut, bottom plate 1
Crown center is provided with strut 64, and 64 top rotary type of strut is provided with the first contiguous block 65, the top of the first contiguous block 65 with
Connection on the right side of 5 outer bottom of framework, 3 leading flank top of pushing hands is provided with reel 61, bracing wire 63, bracing wire 63 is wound with reel 61
Tail end is connected with the outer left surface top of framework 5, and 61 leading flank center location of reel is provided with the first rocking bar 62.
Embodiment 3
A kind of asphalt handling device, as shown in Figs 1-4, includes bottom plate 1, wheel 2, pushing hands 3, gag lever post 4, framework
5th, turnover device 6 and material-pulling device 7,1 bottom of bottom plate left and right sides symmetrical expression are provided with wheel 2, the installation of 1 top left side of bottom plate
There is pushing hands 3, turnover device 6 is equipped between 3 leading flank top of 1 crown center of bottom plate and pushing hands, framework is connected with turnover device 6
5, framework 5 is interior to be equipped with material-pulling device 7, and 1 top left side of bottom plate is provided with gag lever post 4, and gag lever post 4 is located at the right side of pushing hands 3.
Turnover device 6 includes reel 61, the first rocking bar 62, bracing wire 63,64 and first contiguous block 65 of strut, bottom plate 1
Crown center is provided with strut 64, and 64 top rotary type of strut is provided with the first contiguous block 65, the top of the first contiguous block 65 with
Connection on the right side of 5 outer bottom of framework, 3 leading flank top of pushing hands is provided with reel 61, bracing wire 63, bracing wire 63 is wound with reel 61
Tail end is connected with the outer left surface top of framework 5, and 61 leading flank center location of reel is provided with the first rocking bar 62.
Material-pulling device 7 includes transverse slat 71, the first guide sleeve 72, rack 73, bellows 74, inclined plate 75, gear 76, second shakes
Bar 77 and movable plate 78,5 left side top of framework are provided with transverse slat 71, and 71 right flank of transverse slat is provided with the first guide sleeve 72, and first leads
Rack 73 is equipped with set 72,73 bottom of rack is provided with inclined plate 75, and inclined plate 75 is located in framework 5, and inclined plate 75 in framework 5 with sliding
Coordinate, bellows 74 is connected between 72 bottom of the first guide sleeve and 75 inclined-plane of inclined plate middle part, rack 73 is located in bellows 74, horizontal
71 top right side of plate is provided with gear 76, and gear 76 is located at the left side of rack 73, and gear 76 is engaged with rack 73,76 leading flank of gear
Center location is provided with the second rocking bar 77, and 72 right flank lower rotational formula of the first guide sleeve is provided with movable plate 78, movable plate 78
Coordinate with framework 5.
Embodiment 4
A kind of asphalt handling device, as shown in Figs 1-4, includes bottom plate 1, wheel 2, pushing hands 3, gag lever post 4, framework
5th, turnover device 6 and material-pulling device 7,1 bottom of bottom plate left and right sides symmetrical expression are provided with wheel 2, the installation of 1 top left side of bottom plate
There is pushing hands 3, turnover device 6 is equipped between 3 leading flank top of 1 crown center of bottom plate and pushing hands, framework is connected with turnover device 6
5, framework 5 is interior to be equipped with material-pulling device 7, and 1 top left side of bottom plate is provided with gag lever post 4, and gag lever post 4 is located at the right side of pushing hands 3.
Turnover device 6 includes reel 61, the first rocking bar 62, bracing wire 63,64 and first contiguous block 65 of strut, bottom plate 1
Crown center is provided with strut 64, and 64 top rotary type of strut is provided with the first contiguous block 65, the top of the first contiguous block 65 with
Connection on the right side of 5 outer bottom of framework, 3 leading flank top of pushing hands is provided with reel 61, bracing wire 63, bracing wire 63 is wound with reel 61
Tail end is connected with the outer left surface top of framework 5, and 61 leading flank center location of reel is provided with the first rocking bar 62.
Material-pulling device 7 includes transverse slat 71, the first guide sleeve 72, rack 73, bellows 74, inclined plate 75, gear 76, second shakes
Bar 77 and movable plate 78,5 left side top of framework are provided with transverse slat 71, and 71 right flank of transverse slat is provided with the first guide sleeve 72, and first leads
Rack 73 is equipped with set 72,73 bottom of rack is provided with inclined plate 75, and inclined plate 75 is located in framework 5, and inclined plate 75 in framework 5 with sliding
Coordinate, bellows 74 is connected between 72 bottom of the first guide sleeve and 75 inclined-plane of inclined plate middle part, rack 73 is located in bellows 74, horizontal
71 top right side of plate is provided with gear 76, and gear 76 is located at the left side of rack 73, and gear 76 is engaged with rack 73,76 leading flank of gear
Center location is provided with the second rocking bar 77, and 72 right flank lower rotational formula of the first guide sleeve is provided with movable plate 78, movable plate 78
Coordinate with framework 5.
Brake gear 8 is further included, brake gear 8 includes the second guide sleeve 81, motion bar 82, the first spring 83, fixation
Plate 84 and rubber pad 85,1 leading flank of bottom plate right side are provided with the second guide sleeve 81, are equipped with motion bar 82 in the second guide sleeve 81, activity
Bar 82 is located at the right side of strut 64, and 82 bottom of motion bar is provided with fixed plate 84, the top of fixed plate 84 and 81 bottom of the second guide sleeve it
Between be connected with the first spring 83, the first spring 83 is sleeved on motion bar 82, and 84 bottom of fixed plate is provided with rubber pad 85, rubber pad
85 positioned at the left side of right-hand wheel 2.
The 3rd guide sleeve 9 and 7 type inserted links 10 are further included, 3 leading flank top of pushing hands is provided with the 3rd guide sleeve 9, the 3rd guide sleeve 9
Above reel 61,7 type inserted links 10 are equipped with the 3rd guide sleeve 9,7 type inserted links 10 are contacted with the first rocking bar 62.
The second contiguous block 11,7 type bars 12 and second spring 13,78 top left side of movable plate and the first guide sleeve 72 are further included
Second spring 13 is connected between leading flank top, 5 external right side face top of framework is provided with the second contiguous block 11, the second contiguous block
Rotary type is provided with 7 12,7 type bar of type bar, 12 inner top and 78 top contact of movable plate on 11.
Operation principle:Operating personnel pour into asphalt in framework 5 first, you can hold pushing hands 3 and moved by wheel 2
The present apparatus, and then asphalt is carried.When asphalt is carried to designated position, you can stop promoting the present apparatus,
Framework 5 is toppled over to the right by turnover device 6, and then asphalt is poured out out of framework 5, you can pass through material-pulling device again
7 release the asphalt remained in framework 5, and avoid waste, after asphalt is all poured out, you can filled by overturning
Put 6 drive frameworks 5 and move up recovery to original position, you can promote the present apparatus to carry next group asphalt.
Because turnover device 6 includes reel 61, the first rocking bar 62, bracing wire 63,64 and first contiguous block 65 of strut, bottom
1 crown center of plate is provided with strut 64, and 64 top rotary type of strut is provided with the first contiguous block 65, the top of the first contiguous block 65
With being connected on the right side of 5 outer bottom of framework, 3 leading flank top of pushing hands is provided with reel 61, and bracing wire 63, bracing wire are wound with reel 61
63 tail ends are connected with the outer left surface top of framework 5, and 61 leading flank center location of reel is provided with the first rocking bar 62, works as the present apparatus
When being moved to designated position, operating personnel can shake the first rocking bar 62 and rotate forward, and the first rocking bar 62, which rotates forward, is driving reel 61 just
Turn, and then bracing wire 63 is relaxed, framework 5 is toppled over to the right, and then asphalt is poured out by framework 5, stops shaking first
Rocking bar 62.Similarly, after the asphalt in framework 5 is all poured out, you can shake the first rocking bar 62 and invert, and then bracing wire 63 is drawn
Dynamic framework 5 is recovered to original position to upper left side movement, and to prevent that framework 5 from moving excessive for gag lever post 4, stops shaking the first rocking bar 62
.
Because material-pulling device 7 includes transverse slat 71, the first guide sleeve 72, rack 73, bellows 74, inclined plate 75, gear 76,
Two rocking bars 77 and movable plate 78,5 left side top of framework are provided with transverse slat 71, and 71 right flank of transverse slat is provided with the first guide sleeve 72, the
Rack 73 is equipped with one guide sleeve 72,73 bottom of rack is provided with inclined plate 75, and inclined plate 75 is located in framework 5, in inclined plate 75 and framework 5
It is slidably matched, is connected with bellows 74 between 72 bottom of the first guide sleeve and 75 inclined-plane of inclined plate middle part, rack 73 is located at bellows 74
Interior, 71 top right side of transverse slat is provided with gear 76, and gear 76 is located at the left side of rack 73, and gear 76 is engaged with rack 73, gear 76
Leading flank center location is provided with the second rocking bar 77, and 72 right flank lower rotational formula of the first guide sleeve is provided with movable plate 78, lives
Movable plate 78 coordinates with framework 5, and when asphalt is poured out in framework 5, operating personnel can shake the second rocking bar 77 and invert, and second
The reversion band moving gear 76 of rocking bar 77 inverts, and the reversion band carry-over bar 73 of gear 76 moves right, and rack 73, which moves right, drives inclined plate
75 move right, and inclined plate 75, which moves right, releases the asphalt remained in framework 5, when inclined plate 75 moves right to suitable
During position, you can shake the second rocking bar 77 and rotate forward, and then drive inclined plate 75 to be moved to the left recovery to original position, stop shake second and shake
Bar 77.
Because having further included brake gear 8, brake gear 8 include the second guide sleeve 81, motion bar 82, the first spring 83,
Fixed plate 84 and rubber pad 85,1 leading flank of bottom plate right side are provided with the second guide sleeve 81, motion bar 82 are equipped with the second guide sleeve 81,
Motion bar 82 is located at the right side of strut 64, and 82 bottom of motion bar is provided with fixed plate 84, the top of fixed plate 84 and 81 bottom of the second guide sleeve
The first spring 83 is connected between portion, the first spring 83 is sleeved on motion bar 82, and 84 bottom of fixed plate is provided with rubber pad 85, rubber
Rubber cushion 85 is located at the left side of right-hand wheel 2, and when framework 5 tilts to the right pours out asphalt, framework 5 connects with motion bar 82
Touch, and then framework 5 drives motion bar 82 to move down, motion bar 82, which moves down, drives fixed plate 84 to move down, the first bullet
Spring 83 stretches, and fixed plate 84 is moved down to drive rubber pad 85 is moved down, and rubber pad 85 is moved down to be contacted with ground, into
And rubber pad 85 contacts with ground and fixes the present apparatus.Similarly, when framework 5 is recovered to original position, because of the effect of the first spring 83,
Rubber pad 85 moves up recovery to original position.In this way, can prevent asphalt pour out during the present apparatus be moved, and shadow
Phonolite oil asphalt is poured out.
Because having further included the 3rd guide sleeve 9 and 7 type inserted links 10,3 leading flank top of pushing hands is provided with the 3rd guide sleeve 9, the 3rd
Guide sleeve 9 is located at the top of reel 61, and 7 type inserted links 10 are equipped with the 3rd guide sleeve 9, and 7 type inserted links 10 are contacted with the first rocking bar 62, when this
When device is moved to application position, operating personnel can extract 7 type inserted links 10, you can shake the first rocking bar 62 and invert framework
5 topple over, and asphalt is poured out.After asphalt is all poured out, and when framework 5 is recovered to original position, you can by 7 type inserted links
In 10 the 3rd guide sleeves 9 of insertion, and then 7 type inserted links 10 block the first rocking bar 62.In this way, it can prevent the first rocking bar in handling process
62, which are moved, causes framework 5 to be toppled over.
Because having further included the second contiguous block 11,7 type bars 12 and second spring 13,78 top left side of movable plate is led with first
Cover and second spring 13 is connected between 72 leading flank tops, 5 external right side face top of framework is provided with the second contiguous block 11, and second connects
Connect rotary type on block 11 is provided with 7 12,7 type bar of type bar, 12 inner top and 78 top contact of movable plate, when the present apparatus is moved to
During designated position, you can pull 7 type bars 12 to move down, 7 type bars 12 rotate down not to be contacted with movable plate 78, because of second spring
13 effect, movable plate 78 move up opening, you can pour out asphalt.After asphalt is poured out, and framework 5 is recovered
During to original position, you can press movable plate 78 and close, then pull 7 type bars 12 to move up recovery to original position, and then 7 type bars 12 will be living
Movable plate 78 is fixed.In this way, it can prevent handling process petrochina pitch from being spread out out of framework 5.
Embodiment described above only expresses the preferred embodiment of the present invention, its description is more specific and detailed, but simultaneously
Therefore the limitation to the scope of the claims of the present invention cannot be interpreted as.It should be pointed out that for those of ordinary skill in the art
For, without departing from the inventive concept of the premise, some deformations can also be made, improves and substitutes, these belong to this hair
Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.
Claims (6)
1. a kind of asphalt handling device, it is characterised in that include bottom plate (1), wheel (2), pushing hands (3), gag lever post
(4), framework (5), turnover device (6) and material-pulling device (7), bottom plate (1) bottom left and right sides symmetrical expression are provided with wheel
(2), bottom plate (1) top left side is provided with pushing hands (3), is equipped with and turns between bottom plate (1) crown center and pushing hands (3) leading flank top
Rotary device (6), framework (5) is connected with turnover device (6), material-pulling device (7), bottom plate (1) top left side are equipped with framework (5)
Gag lever post (4) is installed, gag lever post (4) is located on the right side of pushing hands (3).
A kind of 2. asphalt handling device according to claim 1, it is characterised in that turnover device (6) include around
Line wheel (61), the first rocking bar (62), bracing wire (63), strut (64) and the first contiguous block (65), bottom plate (1) crown center are provided with
Strut (64), strut (64) top rotary type are provided with the first contiguous block (65), the first contiguous block (65) top and framework (5)
Connection, pushing hands (3) leading flank top are provided with reel (61), bracing wire (63) are wound with reel (61) on the right side of outer bottom, draw
Line (63) tail end is connected with the outer left surface top of framework (5), and reel (61) leading flank center location is provided with the first rocking bar
(62)。
3. a kind of asphalt handling device according to claim 2, it is characterised in that material-pulling device (7) includes horizontal stroke
Plate (71), the first guide sleeve (72), rack (73), bellows (74), inclined plate (75), gear (76), the second rocking bar (77) and activity
Plate (78), framework (5) left side top are provided with transverse slat (71), and transverse slat (71) right flank is provided with the first guide sleeve (72), and first leads
Rack (73) is equipped with set (72), rack (73) bottom is provided with inclined plate (75), and inclined plate (75) is located at framework (5)
Interior, inclined plate (75) is connected with being slidably matched in framework (5) between the first guide sleeve (72) bottom and inclined plate (75) inclined-plane middle part
There is bellows (74), rack (73) is located in bellows (74), and transverse slat (71) top right side is provided with gear (76), gear (76)
On the left of rack (73), gear (76) is engaged with rack (73), and gear (76) leading flank center location is provided with the second rocking bar
(77), the first guide sleeve (72) right flank lower rotational formula is provided with movable plate (78), and movable plate (78) coordinates with framework (5).
A kind of 4. asphalt handling device according to claim 3, it is characterised in that brake gear (8) has been further included,
Brake gear (8) includes the second guide sleeve (81), motion bar (82), the first spring (83), fixed plate (84) and rubber pad (85),
Second guide sleeve (81) is installed on the right side of bottom plate (1) leading flank, motion bar (82), motion bar (82) position are equipped with the second guide sleeve (81)
On the right side of strut (64), motion bar (82) bottom is provided with fixed plate (84), fixed plate (84) top and the second guide sleeve (81) bottom
The first spring (83) is connected between portion, the first spring (83) is sleeved on motion bar (82), and fixed plate (84) bottom is provided with rubber
Rubber cushion (85), rubber pad (85) are located on the left of right-hand wheel (2).
5. a kind of asphalt handling device according to claim 4, it is characterised in that further included the 3rd guide sleeve (9)
With 7 type inserted links (10), pushing hands (3) leading flank top is provided with the 3rd guide sleeve (9), and the 3rd guide sleeve (9) is located on reel (61)
Side, the 3rd guide sleeve (9) is interior to be equipped with 7 type inserted links (10), and 7 type inserted links (10) are contacted with the first rocking bar (62).
6. a kind of asphalt handling device according to claim 5, it is characterised in that further included the second contiguous block
(11), 7 type bars (12) and second spring (13), connect between movable plate (78) top left side and the first guide sleeve (72) leading flank top
Second spring (13) is connected to, framework (5) external right side face top is provided with the second contiguous block (11), and the second contiguous block rotates on (11)
Formula is provided with 7 type bars (12), 7 type bar (12) inner tops and movable plate (78) top contact.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711211169.1A CN108032892A (en) | 2017-11-28 | 2017-11-28 | A kind of asphalt handling device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711211169.1A CN108032892A (en) | 2017-11-28 | 2017-11-28 | A kind of asphalt handling device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108032892A true CN108032892A (en) | 2018-05-15 |
Family
ID=62093042
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711211169.1A Withdrawn CN108032892A (en) | 2017-11-28 | 2017-11-28 | A kind of asphalt handling device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108032892A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110789877A (en) * | 2019-11-11 | 2020-02-14 | 舒适 | Waste collecting and dumping device for numerical control machine tool |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2013075715A1 (en) * | 2011-11-21 | 2013-05-30 | Nilfisk-Advance A/S | Tipping arrangement of a movable cleaning unit |
CN104523427A (en) * | 2015-01-15 | 2015-04-22 | 南京市妇幼保健院 | Hand holding type automatic cotton swab device |
CN204688167U (en) * | 2015-05-15 | 2015-10-07 | 聂士卫 | There is the dump car of turn over function |
US9248850B1 (en) * | 2014-11-18 | 2016-02-02 | Brian Romas | Wheelbarrow with an assisted lift dumping barrow |
CN106510202A (en) * | 2016-10-28 | 2017-03-22 | 孙丽君 | Universal mainframe case bracket device for operation of computer |
CN206288054U (en) * | 2016-12-20 | 2017-06-30 | 东莞顶好涂料有限公司 | A kind of coating lorry |
CN206406965U (en) * | 2017-01-16 | 2017-08-15 | 杨华 | A kind of feed manufacturing material transfer vehicle |
CN107139979A (en) * | 2017-07-17 | 2017-09-08 | 蔡淑娥 | A kind of trolley for building |
CN107138501A (en) * | 2017-04-19 | 2017-09-08 | 湖州风雷餐饮管理有限公司 | A kind of food and drink waste plastic refuse disposal installation |
-
2017
- 2017-11-28 CN CN201711211169.1A patent/CN108032892A/en not_active Withdrawn
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2013075715A1 (en) * | 2011-11-21 | 2013-05-30 | Nilfisk-Advance A/S | Tipping arrangement of a movable cleaning unit |
US9248850B1 (en) * | 2014-11-18 | 2016-02-02 | Brian Romas | Wheelbarrow with an assisted lift dumping barrow |
CN104523427A (en) * | 2015-01-15 | 2015-04-22 | 南京市妇幼保健院 | Hand holding type automatic cotton swab device |
CN204688167U (en) * | 2015-05-15 | 2015-10-07 | 聂士卫 | There is the dump car of turn over function |
CN106510202A (en) * | 2016-10-28 | 2017-03-22 | 孙丽君 | Universal mainframe case bracket device for operation of computer |
CN206288054U (en) * | 2016-12-20 | 2017-06-30 | 东莞顶好涂料有限公司 | A kind of coating lorry |
CN206406965U (en) * | 2017-01-16 | 2017-08-15 | 杨华 | A kind of feed manufacturing material transfer vehicle |
CN107138501A (en) * | 2017-04-19 | 2017-09-08 | 湖州风雷餐饮管理有限公司 | A kind of food and drink waste plastic refuse disposal installation |
CN107139979A (en) * | 2017-07-17 | 2017-09-08 | 蔡淑娥 | A kind of trolley for building |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110789877A (en) * | 2019-11-11 | 2020-02-14 | 舒适 | Waste collecting and dumping device for numerical control machine tool |
CN110789877B (en) * | 2019-11-11 | 2021-12-17 | 舒适 | Waste collecting and dumping device for numerical control machine tool |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102515016B (en) | Automatic gripper for storage barrel | |
CN205068916U (en) | Teaching aid is demonstrated to probability for mathematics | |
CN108032892A (en) | A kind of asphalt handling device | |
CN107953320A (en) | A kind of positioning detection mechanism based on medical collaboration robot | |
CN104354683B (en) | Can be by the railway wheel of formula band rotating driving device to inspection platform | |
CN103121620B (en) | Automatic hooking-unhooking device | |
CN204010507U (en) | Mechanical principle Mechanism Combination teaching demonstration model | |
CN203754238U (en) | Automatic grabbing hook | |
CN203294319U (en) | Boarding bridge airport pickup gate provided with turnover type electric safety guardrails | |
CN206584575U (en) | Hoistable platform extrudes experience apparatus | |
CN104709673B (en) | A kind of chain transmission type lifting of hanging basket device | |
CN201784965U (en) | Eccentric rotation-type cleaning machine for large-sized cement silo | |
CN203483177U (en) | Suspension type display structure | |
CN106738263A (en) | Somersault skinning machine | |
CN104443523B (en) | Recrater mechanical hand | |
CN204199794U (en) | A kind of ascending/decending stage rubbish self-cleaning device | |
CN205186677U (en) | Stopper paper device of stopper paper machine | |
CN108002568A (en) | A kind of natural gas extraction explosion-proof lamp nursing cleaning agent emission treatment equipment | |
CN207158241U (en) | A kind of upright turning device | |
CN206674286U (en) | A kind of Moveable X-ray-machine | |
CN204549435U (en) | Automatic charging machine | |
CN109592251A (en) | A kind of cell dustbin convenient for toppling over | |
CN204236821U (en) | Packing machine manipulator | |
CN202473269U (en) | Automatic gripping tool for storage tank | |
CN107319848A (en) | A kind of public art handicraft exhibiting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20180515 |
|
WW01 | Invention patent application withdrawn after publication |