CN108020784A - A kind of marine generator group load test teledata acquisition device - Google Patents

A kind of marine generator group load test teledata acquisition device Download PDF

Info

Publication number
CN108020784A
CN108020784A CN201711327830.5A CN201711327830A CN108020784A CN 108020784 A CN108020784 A CN 108020784A CN 201711327830 A CN201711327830 A CN 201711327830A CN 108020784 A CN108020784 A CN 108020784A
Authority
CN
China
Prior art keywords
electric energy
data
energy meter
intelligent electric
power supply
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711327830.5A
Other languages
Chinese (zh)
Inventor
王平
王金苓
罗元方
匡剑
艾湖
蒋芳叶
陈良生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxin Shipbuilding and Heavy Industry Co Ltd
Original Assignee
Guangxin Shipbuilding and Heavy Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxin Shipbuilding and Heavy Industry Co Ltd filed Critical Guangxin Shipbuilding and Heavy Industry Co Ltd
Priority to CN201711327830.5A priority Critical patent/CN108020784A/en
Publication of CN108020784A publication Critical patent/CN108020784A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/34Testing dynamo-electric machines
    • G01R31/343Testing dynamo-electric machines in operation
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R21/00Arrangements for measuring electric power or power factor
    • G01R21/006Measuring power factor
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R21/00Arrangements for measuring electric power or power factor
    • G01R21/06Arrangements for measuring electric power or power factor by measuring current and voltage
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R23/00Arrangements for measuring frequencies; Arrangements for analysing frequency spectra
    • G01R23/02Arrangements for measuring frequency, e.g. pulse repetition rate; Arrangements for measuring period of current or voltage

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention discloses a kind of marine generator group load test teledata acquisition device, including stainless steel chest, four intelligent electric energy meters, stainless steel case is locked, power switch, power supply indicator, wiring fixing plate, PLC module, back panel wiring is arranged and control power supply, the lower section of intelligent electric energy meter is equipped with power switch and power supply indicator, and power switch and power supply indicator are located in same level, the bottom of the stainless steel chest is provided with wiring fixing plate, the inside of the stainless steel chest is provided with PLC module, back panel wiring is arranged and control power supply, wherein control power supply is located between PLC module and back panel wiring row;Intelligent electric energy meter is responsible for the measured voltage and current data of collection in the present system, and PLC module is responsible for collecting the data that intelligent electric energy meter collects, and sends data to remote data capture and centralized displaying terminal PC.Automatically working of the present invention, it is safe and reliable, working strength can be reduced, reduce manually input, increase data accuracy.

Description

A kind of marine generator group load test teledata acquisition device
Technical field
The present invention relates to data acquisition device technical field, more particularly to a kind of marine generator group load test remotely to count According to harvester.
Background technology
Marine generator group is the important core equipment of marine system, and generating set provides daily life to marine system Electricity consumption, correspondence with foreign country electricity consumption and dynamical system electricity consumption etc., are the premises of marine system normal work, therefore marine generator group is It is no can safely and steadily run be ship on ocean can safety important guarantee.
According to the requirement of national standard and international standard, ship will be into the mooring trial test before being delivered for use is built The load test of row generating set, need to gather in experiment voltage of the motor part under various loads in generating set, electric current, Power factor, rotating speed are equivalent.Above numerical value gathers the experiment that requirement is single unit 5 different load states of progress, 5 shapes State carry out altogether 3.5 it is small when experiment(Each load condition test period is different).
According to requirements of the national standard, go to gather any of the above data before single unit is at least interior when 3.5 is small 5 times, and root According to Ship Design code requirement, at least two generating sets on a ship, therefore general ship at least to carry out it is 7 small When, the data collection task of totally 10 times.
At present, the load test data collection task of each shipyard marine generator group is using manually collection, master It is to arrange special messenger manually to observe the instrument on main distribution board before main distribution board to want method, by observed data hand-kept in paper On shelves.This original method has problems with:
1st, heavy workload, present marine system become increasingly complex, and the degree of automation is high.The ship of few only 2 generating sets Oceangoing ship, causes test period long, it may be necessary to more people's rotation observation collections.
2nd, easily there is the error of observation, prolonged special messenger's observation, people is easily tired out, and error is produced in observation, data occurs Mistake.
3rd, the paper files of manual sorting need to rearrange, printing submit to ship inspection and shipowner, it is time-consuming and laborious but also It is possible to malfunction during arrangement.
Therefore a kind of method and device for automating data above gatherer process is needed, had both can guarantee that collection was correct on time Data, also to automate output and form that form is convenient to submit examination & approval.
The content of the invention
The purpose of the present invention is to solve shortcoming existing in the prior art, and a kind of marine generator group proposed is born Lotus tests teledata acquisition device.
To achieve these goals, present invention employs following technical solution:
A kind of marine generator group load test teledata acquisition device, including stainless steel chest, four intelligent electric energy meters, no Become rusty steel case lock, power switch, power supply indicator, wiring fixing plate, PLC module, back panel wiring row and control power supply, described stainless In terms of steel face plane side of a case is placed with four intelligent electric energy by rectangular array, the lower section of intelligent electric energy meter is equipped with power switch and power supply Indicator light, and power switch and power supply indicator are located in same level, the bottom of the stainless steel chest is provided with wiring Fixed plate, the inside of the stainless steel chest is provided with PLC module, back panel wiring row and control power supply, wherein control power supply position Between PLC module and back panel wiring row;Intelligent electric energy meter is responsible for the measured voltage and current data of collection in the present system, PLC module is responsible for collecting the data that intelligent electric energy meter collects, and sends data to remote data capture and centralized displaying end Holding PC, voltage acquisition the end V1, V2, V3 of intelligent electric energy meter are connected directly to measured L1 respectively, L2, on L3 three-phases, intelligence The highest three-phase voltage that electric energy meter voltage acquisition end can be born is AC415V, and China's standard industry three-phase utilization voltage is AC380V, therefore this voltage can meet China's ship test requirement, and the ship of AC415V is higher than for small part three-phase voltage, can Increase transformer between intelligent electric energy meter being measured, voltage is down to below AC415V, the current acquisition end of intelligent electric energy meter Mouthful L1+, L1-, L2+, L2-, L3+, L3- are respectively connected to measured L1, L2, the Current Transmit 1 on L3 three-phases, On CT2, CT3, intelligent electric energy meter current acquisition port maximum allowed current is 5A, and the standard output voltage of current transformer also exists 5A, will lead back L1, the high current in L2, L3 is converted into the low current that electric energy meter can measure, and electric current is mutual by current transformer Sensor CT1, CT2, CT3 are not belonging to the system composition, in the main distribution system design of Ship Power Station, due to automatically controlling and supervising The needs of survey, must configure current transformer on major loop, this load data harvester make use of the electric current being configured mutual Sensor carries out current data collection, company of the intelligent electric energy meter in the gatherer process by above-mentioned voltage and current with major loop Connect, while calculate power, frequency and the power factor in measured circuit;PLC module is made of host and 5 communication modules, Wherein communication module 1 is responsible for carrying out the data transfer of voltage, electric current, power, frequency and power factor with remote display unit PC, Remaining 4 communication module is each responsible for carrying out data transmission with 4 intelligent electric energy meters, collects voltage, electricity that electric energy meter collects Stream, power, frequency and power factor, control power supply are exclusively used in providing electricity to the intelligent electric energy meter inside the present apparatus and PLC module Source, the input voltage for controlling power supply is AC220V, consistent with the single-phase utilization voltage of China's standard, and output voltage meets for DC24V The General Requirement of electric energy meter and PLC module.
Preferably, No. 2 in the system, No. 3 be connecteds with the system of No. 4 intelligent electric energy meters and in the of No. 1, are simply measured back Road is different.
Preferably, the present apparatus can at most measure 4 generators at the same time, meet that common ship generating set unit load tries Test and the requirement of maximum 4 machine shunt load Test Data Collectings.
Preferably, the system device is using, and can be placed on data acquisition device in the main switching compound of power station.
Preferably, data transfer uses RS485 communication interfaces, and data transfer uses MODBUS protocol bus, long-range display Terminal PC is general-purpose computer, be provided with shown for data, data form arranges and the software of data storage, which also has Set data to adopt the function in cycle automatically, according to requirements of the national standard, generator load needed when testing carry out 25%, 50%, 75%th, 100%, 110% totally 5 states be separately operable 0.25,0.25,0.50,2,0.50 it is small when data record, which can be with Set upon actuation the corresponding time according to data of above time showing automatic collection.
Compared with prior art, the beneficial effects of the invention are as follows:
(1)Collecting work automates, and reduces workload, reduces human input;
(2)Ensure the accuracy of data acquisition, reducing last phase tidying up mistake may;
(3)Data output automation, directly generates document with fixed format;
(4)Data are directly stored with e-file.
Automatically working of the present invention, it is safe and reliable, working strength can be reduced, reduce manually input, increase data accuracy.
Brief description of the drawings
Fig. 1 is a kind of structural representation of marine generator group load test teledata acquisition device proposed by the present invention Figure;
Fig. 2 is a kind of structure diagram of marine generator group load test teledata acquisition device proposed by the present invention;
Fig. 3 is a kind of system principle diagram of marine generator group load test teledata acquisition device proposed by the present invention.
In figure:1 stainless steel chest, 2 intelligent electric energy meters, 3 stainless steel casees lock, 4 power switches, 5 power supply indicators, 6 wiring Fixed plate, 7 PLC modules, 8 back panel wirings row, 9 control power supplys.
Embodiment
Below in conjunction with the attached drawing in the embodiment of the present invention, the technical solution in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, instead of all the embodiments.
With reference to Fig. 1-3, a kind of marine generator group load test teledata acquisition device, including stainless steel chest 1, four Platform intelligence electric energy meter 2, stainless steel case lock 3, power switch 4, power supply indicator 5, wiring fixing plate 6, PLC module 7, back panel wiring Row 8 and control power supply 9, the front of stainless steel chest 1 by rectangular array be placed with four intelligent electric energy in terms of 2, intelligent electric energy meter 2 Lower section is equipped with power switch 4 and power supply indicator 5, and power switch 4 and power supply indicator 5 are located in same level, stainless The bottom of steel chest 1 is provided with wiring fixing plate 6, and the inside of stainless steel chest 1 is provided with PLC module 7,8 and of back panel wiring row Power supply 9 is controlled, wherein control power supply 9 is located between PLC module 7 and back panel wiring row 8;Intelligent electric energy meter 2 is born in the present system The measured voltage and current data of duty collection, PLC module are responsible for collecting the data that intelligent electric energy meter 2 collects, and by data Send to remote data capture and centralized displaying terminal PC, voltage acquisition the end V1, V2, V3 of intelligent electric energy meter 2 and directly connect respectively It is connected to measured L1, L2, on L3 three-phases, the highest three-phase voltage that intelligent 2 voltage acquisition end of electric energy meter can be born is AC415V, China's standard industry three-phase utilization voltage is AC380V, therefore this voltage can meet China's ship test requirement, for small part Three-phase voltage is higher than the ship of AC415V, can increase transformer between intelligent electric energy meter 2 being measured, voltage is down to AC415V Hereinafter, current acquisition port L1+, L1- of intelligent electric energy meter 2, L2+, L2-, L3+, L3-, are respectively connected to measured L1, Current Transmit 1, CT2 on L2, L3 three-phase, on CT3, intelligent 2 current acquisition port maximum allowed current of electric energy meter is 5A, The standard output voltage of current transformer will lead back L1 also in 5A, by current transformer, and the high current in L2, L3 is converted into electricity The low current that can be measured, Current Transmit 1, CT2 can be counted, CT3 is not belonging to the system composition, the main distribution in Ship Power Station In system design, due to the needs of automatic controlling and monitoring, current transformer, the collection of this load data must be configured on major loop Device make use of the current transformer being configured to carry out current data collection, and intelligent electric energy meter is passing through above-mentioned voltage and current Gatherer process in connection with major loop, while calculate power, frequency and the power factor in measured circuit;PLC module 7 Be made of host and 5 communication modules, wherein communication module 1 be responsible for remote display unit PC carry out voltage, electric current, power, The data transfer of frequency and power factor, remaining 4 communication module are each responsible for carrying out data transmission with 4 intelligent electric energy meters, Voltage, electric current, power, frequency and power factor that electric energy meter collects are collected, control power supply 9 is exclusively used in the inside of the present apparatus Intelligent electric energy meter and PLC module provide power supply, and the input voltage for controlling power supply 9 is AC220V, electricity consumption electricity single-phase with China's standard Pressure is consistent, and output voltage meets electric energy meter and the General Requirement of PLC module 7 for DC24V.
In the present invention, No. 2 in the system, No. 3 be connected with the system of No. 4 intelligent electric energy meters and in the of No. 1, is simply measured Circuit is different, and the present apparatus can at most measure 4 generators at the same time, meets common ship generating set unit load test and most The requirement of big 4 machine shunt load Test Data Collecting, the system device are using, and data acquisition device can be placed on to power station is main to match somebody with somebody In electric installation, data transfer uses RS485 communication interfaces, and data transfer uses MODBUS protocol bus, remote display terminals PC For general-purpose computer, be provided with shown for data, data form arranges and the software of data storage, which, which also has, sets number According to the function of adopting the cycle automatically, according to requirements of the national standard, generator load needed when testing carry out 25%, 50%, 75%, 100%, 110% totally 5 states be separately operable 0.25,0.25,0.50,2,0.50 it is small when data record, which can be arranged on startup The corresponding time is according to data of above time showing automatic collection afterwards.
In the use of the present invention,(1)Collecting work automates, and reduces workload, reduces human input;(2)Ensure data The accuracy of collection, reducing last phase tidying up mistake may;(3)Data output automation, directly generates document with fixed format;(4) Data are directly stored with e-file.The main advantage of the present invention is automatically working, it is safe and reliable, working strength can be reduced, subtract Few manually input, increases data accuracy.
The foregoing is only a preferred embodiment of the present invention, but protection scope of the present invention be not limited thereto, Any one skilled in the art the invention discloses technical scope in, technique according to the invention scheme and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (5)

1. a kind of marine generator group load test teledata acquisition device, including stainless steel chest(1), four intelligent electric energy Meter(2), stainless steel case lock(3), power switch(4), power supply indicator(5), wiring fixing plate(6), PLC module(7), inside connects Line is arranged(8)With control power supply(9), it is characterised in that the stainless steel chest(1)Front four intelligence are placed with rectangular array Can electric energy meter(2), intelligent electric energy meter(2)Lower section be equipped with power switch(4)And power supply indicator(5), and power switch(4)With Power supply indicator(5)In same level, the stainless steel chest(1)Bottom wiring fixing plate is installed(6), it is described Stainless steel chest(1)Inside PLC module is installed(7), back panel wiring row(8)With control power supply(9), wherein controlling power supply (9)Positioned at PLC module(7)Arranged with back panel wiring(8)Between;Intelligent electric energy meter(2)It is responsible for what collection was measured in the present system Voltage and current data, PLC module are responsible for collecting intelligent electric energy meter(2)The data collected, and send data to long-range number According to collection and centralized displaying terminal PC, intelligent electric energy meter(2)Voltage acquisition end V1, V2, V3 be connected directly to respectively it is measured L1, L2, on L3 three-phases, intelligent electric energy meter(2)The highest three-phase voltage that voltage acquisition end can be born is AC415V, China's standard Industrial three-phase utilization voltage is AC380V, therefore this voltage can meet China's ship test requirement, for small part three-phase voltage Ship higher than AC415V, can be measured and intelligent electric energy meter(2)Between increase transformer, voltage is down to below AC415V, Intelligent electric energy meter(2)Current acquisition port L1+, L1-, L2+, L2-, L3+, L3-, are respectively connected to measured L1, L2, L3 Current Transmit 1, CT2 on three-phase, on CT3, intelligent electric energy meter(2)Current acquisition port maximum allowed current is 5A, electricity The standard output voltage of current transformer will lead back L1 also in 5A, by current transformer, and the high current in L2, L3 is converted into electric energy The low current that can be measured, Current Transmit 1, CT2 are counted, CT3 is not belonging to the system composition, the main distribution system in Ship Power Station In system design, due to the needs of automatic controlling and monitoring, current transformer, this load data collection dress must be configured on major loop Put and make use of the current transformer being configured to carry out current data collection, intelligent electric energy meter is passing through above-mentioned voltage and current With the connection of major loop in gatherer process, while power, frequency and the power factor in measured circuit are calculated;PLC module(7) Be made of host and 5 communication modules, wherein communication module 1 be responsible for remote display unit PC carry out voltage, electric current, power, The data transfer of frequency and power factor, remaining 4 communication module are each responsible for carrying out data transmission with 4 intelligent electric energy meters, Voltage, electric current, power, frequency and power factor that electric energy meter collects are collected, controls power supply(9)It is exclusively used in present apparatus inside Intelligent electric energy meter and PLC module provide power supply, control power supply(9)Input voltage be AC220V, with the single-phase use of China's standard Piezoelectric voltage is consistent, and output voltage meets electric energy meter and PLC module for DC24V(7)General Requirement.
A kind of 2. marine generator group load test teledata acquisition device according to claim 1, it is characterised in that No. 2 in the system, No. 3 be connected, simply measured circuit difference the same with No. 1 with the system of No. 4 intelligent electric energy meters.
A kind of 3. marine generator group load test teledata acquisition device according to claim 1, it is characterised in that The present apparatus can at most measure 4 generators at the same time, meet that common ship generating set unit load test and maximum 4 machines are in parallel The requirement of load test data acquisition.
A kind of 4. marine generator group load test teledata acquisition device according to claim 1, it is characterised in that The system device is using, and can be placed on data acquisition device in the main switching compound of power station.
A kind of 5. marine generator group load test teledata acquisition device according to claim 1, it is characterised in that Data transfer uses RS485 communication interfaces, and data transfer uses MODBUS protocol bus, and remote display terminals PC is general electricity Brain, be provided with shown for data, data form arrange and data storage software, the software also have set data adopt automatically The function in cycle, according to requirements of the national standard, generator load needs carry out 25%, 50%, 75%, 100%, 110% totally 5 when testing A state be separately operable 0.25,0.25,0.50,2,0.50 it is small when data record, which can set corresponding upon actuation Time according to data of above time showing automatic collection.
CN201711327830.5A 2017-12-13 2017-12-13 A kind of marine generator group load test teledata acquisition device Pending CN108020784A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711327830.5A CN108020784A (en) 2017-12-13 2017-12-13 A kind of marine generator group load test teledata acquisition device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711327830.5A CN108020784A (en) 2017-12-13 2017-12-13 A kind of marine generator group load test teledata acquisition device

Publications (1)

Publication Number Publication Date
CN108020784A true CN108020784A (en) 2018-05-11

Family

ID=62073363

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711327830.5A Pending CN108020784A (en) 2017-12-13 2017-12-13 A kind of marine generator group load test teledata acquisition device

Country Status (1)

Country Link
CN (1) CN108020784A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109143065A (en) * 2018-08-17 2019-01-04 广新海事重工股份有限公司 A kind of Ship Power Station testing equipment

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101706656A (en) * 2009-05-26 2010-05-12 上海海事大学 Development platform for automatic power station of ships
CN101951025A (en) * 2010-08-19 2011-01-19 中国海洋石油总公司 Energy management system of offshore grid
CN102608463A (en) * 2012-03-15 2012-07-25 华南理工大学 Full-automatic ship generator set measurement and control system
CN203179642U (en) * 2013-03-20 2013-09-04 广东中远船务工程有限公司 Novel water resistance device for load test of marine generating set
CN204167914U (en) * 2014-11-17 2015-02-18 招商局重工(江苏)有限公司 A kind of energy back feed device and marine generator stress test system
CN205157662U (en) * 2015-10-28 2016-04-13 河南开启电力实业有限公司 Power consumption quality monitoring early warning device
CN106443441A (en) * 2016-07-12 2017-02-22 广船国际有限公司 Ship and maritime work platform medium-voltage power system load test device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101706656A (en) * 2009-05-26 2010-05-12 上海海事大学 Development platform for automatic power station of ships
CN101951025A (en) * 2010-08-19 2011-01-19 中国海洋石油总公司 Energy management system of offshore grid
CN102608463A (en) * 2012-03-15 2012-07-25 华南理工大学 Full-automatic ship generator set measurement and control system
CN203179642U (en) * 2013-03-20 2013-09-04 广东中远船务工程有限公司 Novel water resistance device for load test of marine generating set
CN204167914U (en) * 2014-11-17 2015-02-18 招商局重工(江苏)有限公司 A kind of energy back feed device and marine generator stress test system
CN205157662U (en) * 2015-10-28 2016-04-13 河南开启电力实业有限公司 Power consumption quality monitoring early warning device
CN106443441A (en) * 2016-07-12 2017-02-22 广船国际有限公司 Ship and maritime work platform medium-voltage power system load test device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109143065A (en) * 2018-08-17 2019-01-04 广新海事重工股份有限公司 A kind of Ship Power Station testing equipment

Similar Documents

Publication Publication Date Title
KR20140046788A (en) Training apparatus for a smart grid education
CN108051726A (en) High voltage direct current Control protection system board test device
CN103323686B (en) A kind of intelligent grid power quality analyzer
CN101963639A (en) Monitoring system of power transformer
CN103964312B (en) Electric block energy efficiency testing device and test method
CN101764550A (en) Integrated protection controller for wireless intelligent motor
CN108072830A (en) The floating inertial platform veneer automatic test device of one kind three
CN112910098A (en) Novel open-source real-time testing platform for motor frequency converter
CN202372592U (en) Electric energy quality monitoring instrument
CN108020784A (en) A kind of marine generator group load test teledata acquisition device
CN201323472Y (en) Distribution transformer monitoring device
CN203976235U (en) Electric block energy efficiency testing device
CN205899309U (en) Dedicated multi -functional sampling alarm device of pump station
CN102778863B (en) A kind of based on programmable computer controller unit bay automatic monitored control system
CN202276135U (en) Comprehensive protection controller for wireless intelligent motor
CN201637831U (en) State monitoring and malfunction diagnosing system for large generator
CN102062819B (en) Intelligent nuclear phase device
CN202524168U (en) Power quality data monitoring device
CN207504642U (en) Intelligent power distribution terminal
CN203251140U (en) Monitoring system of photovoltaic power generation unit
CN202394107U (en) Nuclear power generator test device
CN207232382U (en) Electric energy metering secondary overall operation situation on-Line Monitor Device
CN202041596U (en) Digital substation comprehensive on-line monitoring device based on DSP (Digital Signal Processor)
CN110646666A (en) High-precision network frequency homologous direct mining device and method thereof
CN201548663U (en) Statistical model-based on-line monitoring and diagnostic device for AC motor

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180511