CN108018867A - The method that coastal waters beach column foot construction is realized based on trestle method - Google Patents

The method that coastal waters beach column foot construction is realized based on trestle method Download PDF

Info

Publication number
CN108018867A
CN108018867A CN201711379624.9A CN201711379624A CN108018867A CN 108018867 A CN108018867 A CN 108018867A CN 201711379624 A CN201711379624 A CN 201711379624A CN 108018867 A CN108018867 A CN 108018867A
Authority
CN
China
Prior art keywords
steel
trestle
construction
column foot
beach
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711379624.9A
Other languages
Chinese (zh)
Other versions
CN108018867B (en
Inventor
陈历祥
吴念沁
庄江闽俤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FUJIAN POWER TRANSMISSION & DISTRIBUTION ENGINEERING Co Ltd
State Grid Corp of China SGCC
State Grid Fujian Electric Power Co Ltd
Original Assignee
FUJIAN POWER TRANSMISSION & DISTRIBUTION ENGINEERING Co Ltd
State Grid Corp of China SGCC
State Grid Fujian Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FUJIAN POWER TRANSMISSION & DISTRIBUTION ENGINEERING Co Ltd, State Grid Corp of China SGCC, State Grid Fujian Electric Power Co Ltd filed Critical FUJIAN POWER TRANSMISSION & DISTRIBUTION ENGINEERING Co Ltd
Priority to CN201711379624.9A priority Critical patent/CN108018867B/en
Publication of CN108018867A publication Critical patent/CN108018867A/en
Application granted granted Critical
Publication of CN108018867B publication Critical patent/CN108018867B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D15/00Movable or portable bridges; Floating bridges
    • E01D15/12Portable or sectional bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Revetment (AREA)

Abstract

The present invention provides a kind of method for realizing coastal waters beach column foot construction in trestle method, including building steel trestle successively, column foot construction platform removes steel trestle again afterwards, the present invention sets up steel trestle using in sea wall and tower interdigit, column foot position sets up steel trestle construction operation assistance platform, tide can effectively be solved, beach, influence caused by the site work environments such as maritime affairs, and then effectively ensure engineering construction quality, it is completed as scheduled and goes into operation, connected between longitudinal steel pipe and between steel trestle superstructure using transverse link or brace, structure is set to become an entirety, increase its stability.Steel trestle is simple in structure;Molding structure, installs and removes fairly simple, the very big shortening construction period;Overall stability is good, large carrying capacity, facilitates construction machinery by or operation above;Labor intensity is low, work efficiency is high, cost is relatively low, environmental protection and energy saving, security risk are low, there is no at home in the construction of work transmission line coastal waters beach column foot using precedent.

Description

The method that coastal waters beach column foot construction is realized based on trestle method
Technical field
The present invention relates to a kind of method that coastal waters beach column foot construction is realized based on trestle method.
Background technology
Work transmission line path completely needs to design multiple steel towers, runs into iron tower foundation sometimes and is located at outside the dike of coastal waters On beach, the depth of water is higher during full sea, and anhydrous column foot exposure at ebb tide, iron tower foundation construction operation of the site environment for engineering is made It is using pontoon erection construction operation auxiliary platform or easy using the conventional offshore construction method of ship construction into great difficulty Being risen to move back by tidewater influences, and ship is easily stranded, and construction cost is high, and the effective construction operation the limited time of column foot, seriously affects engineering Quality and duration.
The content of the invention
The present invention improves the above problem, i.e., the technical problem to be solved in the present invention is iron tower of power transmission line scene During operation, it can cause to rise using the conventional offshore construction method moisture-sensitive water of ship construction in environment such as tide, beach, maritime affairs and move back Influence, ship is easily stranded, and construction cost is high, and the effective construction operation the limited time of column foot, seriously affects construction quality and duration.
Specific embodiments of the present invention are:The method that coastal waters beach column foot construction is realized based on trestle method, including it is following Step:
(1)Build steel trestle, at the beach of coastal waters by bank lift longitudinal steel pipe to passing through liquid at beach using hanging apparatus Vibration hammer is pressed to carry out longitudinal steel pipe piling, the arranged type gooseneck between the top of longitudinal steel pipe, in shaped steel cross rail top edge longitudinal direction Bailey beam is welded in steel pipe direction, and the Bailey beam top is evenly equipped with shaped steel distribution beam, and the shaped steel distribution beam upper surface is welded with Steel facing, the both sides of the just panel are fixed with anti-fall guardrail;Transverse connecting rod and oblique is provided between adjacent longitudinal direction steel pipe Connecting rod;
(2)Build after completing steel trestle, one end both sides that sea is extended in steel trestle are laid with four column foot construction platforms, institute The Pile Foundations Design for stating column foot construction platform is friction pile, and steel pile casting is provided with outside friction pile, and ox is fixed in friction pile upper end side Leg, bracket and on be fixed with cushion cap crossbeam, cushion cap crossbeam top is fixed with support platform reinforcing bar;It is provided between adjacent friction pile Transverse link and oblique connecting rod;
(3)Side setting template is poured to cushion cap platform reinforcing bar and casting concrete shaping, support platform are also equipped with anti-fall shield Column;
(4)The reverse sequence built according to steel trestle progressively removes steel trestle and extracts longitudinal steel pipe using vibration hammer.
Further, using the impact drill percussion drilling of respective diameters model during friction pile driving construction, direct circulation is counter to starch, borehole cleaning Using direct circulation, cage inspection hole is visited in decentralization, and the connection of multiple steel reinforcement cages is put into hole after steel reinforcement cage segmental machining, and coagulation under water Soil pours pile.
Further, longitudinal steel pipe is Φ 630mm steel pipes, and the thickness of longitudinal steel pipe is 10mm, and steel facing is thickness Spend and use 48mm × 3.5mm steel pipe manufacturings, anti-fall guardrail height 1.2m, anti-fall shield for 8mm, the anti-fall guard rail steel pipe guardrail Coat red white oil paint in marge portion.
Compared with prior art, the invention has the advantages that:The present invention sets up steel using in sea wall and tower interdigit Trestle, column foot position set up steel trestle construction operation assistance platform, can effectively solve the field operation ring such as tide, beach, maritime affairs Influence caused by border, hence it is evident that construction cost is reduced, and then effectively ensures engineering construction quality, be completed go into operation as scheduled, longitudinal steel Connected between pipe and between steel trestle superstructure using transverse link or brace, structure is become an entirety, increase it Stability.Steel trestle is simple in structure;Molding structure, installs and removes fairly simple, the very big shortening construction period;Overall stability Good, large carrying capacity, facilitates construction machinery by or operation above;Labor intensity is low, work efficiency is high, cost is relatively low, environmentally friendly section Energy, security risk are low, there is no at home in the construction of work transmission line coastal waters beach column foot using precedent.
Brief description of the drawings
Fig. 1 is schematic structural view of the invention(Lower section is bank in illustrated angle).
Fig. 2 is steel trestle cross section structure schematic diagram of the present invention.
Fig. 3 is column foot construction platform cross section structure schematic diagram of the present invention.
Embodiment
The present invention will be further described in detail with reference to the accompanying drawings and detailed description.
As shown in Figures 1 to 3, the method that coastal waters beach column foot construction is realized based on trestle method, is comprised the following steps:
(1)Build steel trestle 10, at the beach of coastal waters by bank lift longitudinal steel pipe to passing through at beach using hanging apparatus Hydraulic vibration driver carries out longitudinal steel pipe 110 and drives piles, the arranged type gooseneck 120 between the top of longitudinal steel pipe 110, in shaped steel crossbeam Bailey beam 130 is welded in 120 tops along longitudinal 110 direction of steel pipe, and 130 top of Bailey beam is evenly equipped with shaped steel distribution beam 140, institute State 140 upper surface of shaped steel distribution beam and be welded with steel facing 160, the both sides of the steel facing 160 are fixed with anti-fall guardrail 150;Phase Transverse connecting rod 161 and oblique connecting rod 162 are provided between adjacent longitudinal direction steel pipe;
In the present embodiment, longitudinal steel pipe is Φ 630mm steel pipes, and the thickness of longitudinal steel pipe is 10mm, and steel facing is thickness For 8mm, transverse connecting rod 161 and oblique connecting rod 162 use channel steel.
(2)Build after completing steel trestle, extending to one end both sides on sea in steel trestle, to be laid with the construction of four column foots flat Platform 20, the Pile Foundations Design of the column foot construction platform is friction pile 210, is provided with steel pile casting outside friction pile 210, on friction pile Hold side fix bracket, bracket and on be fixed with cushion cap crossbeam 220, cushion cap crossbeam top is fixed with support platform reinforcing bar 230;Phase Transverse link 231 and oblique connecting rod 232 are provided between adjacent friction pile;
(3)Side being poured to cushion cap platform reinforcing bar template and casting concrete shaping being set, support platform 240 is also equipped with anti-fall Guardrail 250;
(4)The reverse sequence built according to steel trestle progressively removes steel trestle and extracts longitudinal steel pipe using vibration hammer.
During construction, diameter 1.2m is using small Strain method detection pile body integrity, and diameter 1.4m and above stake are using setting The method that sound detecting pipe carries out ultrasonic wave inspection stake.The anti-fall guardrail(150,250)Steel tube guardrail uses 48mm × 3.5mm steel pipes Make, anti-fall guardrail height 1.2m, red white oil paint is coated outside anti-fall guardrail.
Any technical solution disclosed in the invention described above unless otherwise stated, if it discloses number range, then open Number range be preferable number range, it is any it should be appreciated by those skilled in the art:Preferable number range is only It is the numerical value that technique effect is obvious or representative in many enforceable numerical value.It is impossible to exhaust since numerical value is more, So the present invention just technical solution of the open component values to illustrate the present invention, also, the above-mentioned numerical value enumerated does not answer structure The limitation of paired the invention protection domain.
The term for representing position relationship or shape applied in any technical solution of disclosure of the invention is except as otherwise sound Its bright outer implication includes approximate with its, similar or close state or shape.
Either component provided by the invention by multiple individually parts either assembled, or one The separate part that forming technology manufactures.
Finally it should be noted that:The above embodiments are merely illustrative of the technical scheme of the present invention and are not intended to be limiting thereof;To the greatest extent The present invention is described in detail with reference to preferred embodiments for pipe, those of ordinary skills in the art should understand that:Still It can modify to the embodiment of the present invention or equivalent substitution is carried out to some technical characteristics;Without departing from this hair The spirit of bright technical solution, it should all cover among the claimed technical solution scope of the present invention.

Claims (3)

1. the method for coastal waters beach column foot construction is realized based on trestle method, it is characterised in that comprise the following steps:
(1)Build steel trestle, at the beach of coastal waters by bank lift longitudinal steel pipe to passing through liquid at beach using hanging apparatus Vibration hammer is pressed to carry out longitudinal steel pipe piling, the arranged type gooseneck between the top of longitudinal steel pipe, in shaped steel cross rail top edge longitudinal direction Bailey beam is welded in steel pipe direction, and the Bailey beam top is evenly equipped with shaped steel distribution beam, and the shaped steel distribution beam upper surface is welded with Steel facing, the both sides of the just panel are fixed with anti-fall guardrail;Transverse connecting rod and oblique is provided between adjacent longitudinal direction steel pipe Connecting rod;
(2)Build after completing steel trestle, one end both sides that sea is extended in steel trestle are laid with four column foot construction platforms, institute The Pile Foundations Design for stating column foot construction platform is friction pile, and steel pile casting is provided with outside friction pile, and ox is fixed in friction pile upper end side Leg, bracket and on be fixed with cushion cap crossbeam, cushion cap crossbeam top is fixed with support platform reinforcing bar;It is provided between adjacent friction pile Transverse link and oblique connecting rod;
(3)Side setting template is poured to cushion cap platform reinforcing bar and casting concrete shaping, support platform are also equipped with anti-fall shield Column;
(4)The reverse sequence built according to steel trestle progressively removes steel trestle and extracts longitudinal steel pipe using vibration hammer.
2. the method according to claim 1 that coastal waters beach column foot construction is realized based on trestle method, it is characterised in that friction Using the impact drill percussion drilling of respective diameters model during pile driving construction, direct circulation is counter to starch, and borehole cleaning uses direct circulation, and cage inspection is visited in decentralization The connection of multiple steel reinforcement cages, is put into hole after steel reinforcement cage segmental machining by hole, and concreting pile under water.
3. the method according to claim 1 that coastal waters beach column foot construction is realized based on trestle method, it is characterised in that described Longitudinal steel pipe be Φ 630mm steel pipes, the thickness of longitudinal steel pipe is 10mm, and steel facing is that thickness is 8mm, the anti-fall guardrail steel Manage and protect column and use 48mm × 3.5mm steel pipe manufacturings, anti-fall guardrail height 1.2m, coats red white oil paint outside anti-fall guardrail.
CN201711379624.9A 2017-12-20 2017-12-20 The method for realizing the construction of coastal waters beach column foot based on trestle method Active CN108018867B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711379624.9A CN108018867B (en) 2017-12-20 2017-12-20 The method for realizing the construction of coastal waters beach column foot based on trestle method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711379624.9A CN108018867B (en) 2017-12-20 2017-12-20 The method for realizing the construction of coastal waters beach column foot based on trestle method

Publications (2)

Publication Number Publication Date
CN108018867A true CN108018867A (en) 2018-05-11
CN108018867B CN108018867B (en) 2019-10-01

Family

ID=62074186

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711379624.9A Active CN108018867B (en) 2017-12-20 2017-12-20 The method for realizing the construction of coastal waters beach column foot based on trestle method

Country Status (1)

Country Link
CN (1) CN108018867B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109322241A (en) * 2018-11-08 2019-02-12 中建五局土木工程有限公司 Trestle work structure and construction method
CN112081131A (en) * 2020-08-06 2020-12-15 中交二公局东萌工程有限公司 Steel casing bearing platform process

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103510529A (en) * 2012-11-22 2014-01-15 中交第三公路工程局有限公司 Steel hanging box system for underwater high-rise pile cap construction and construction technology thereof
CN204039922U (en) * 2014-07-10 2014-12-24 中交二航局第四工程有限公司 A kind of temporary steel trestle
CN104358207A (en) * 2014-10-24 2015-02-18 中铁大桥局集团第六工程有限公司 Rapid steel trestle construction structure and construction method
CN205024600U (en) * 2015-10-06 2016-02-10 中交第四公路工程局有限公司 A work platform that is used for bridge aquatic pile foundation to be under construction
CN105350526A (en) * 2015-11-27 2016-02-24 中国一冶集团有限公司 Method for setting up steel platform
CN106192774A (en) * 2015-09-11 2016-12-07 中铁四局集团有限公司 Steel trestle construction facility
CN206538672U (en) * 2017-01-18 2017-10-03 中交路桥建设有限公司 Novel fabricated truss steel trestle

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103510529A (en) * 2012-11-22 2014-01-15 中交第三公路工程局有限公司 Steel hanging box system for underwater high-rise pile cap construction and construction technology thereof
CN204039922U (en) * 2014-07-10 2014-12-24 中交二航局第四工程有限公司 A kind of temporary steel trestle
CN104358207A (en) * 2014-10-24 2015-02-18 中铁大桥局集团第六工程有限公司 Rapid steel trestle construction structure and construction method
CN106192774A (en) * 2015-09-11 2016-12-07 中铁四局集团有限公司 Steel trestle construction facility
CN205024600U (en) * 2015-10-06 2016-02-10 中交第四公路工程局有限公司 A work platform that is used for bridge aquatic pile foundation to be under construction
CN105350526A (en) * 2015-11-27 2016-02-24 中国一冶集团有限公司 Method for setting up steel platform
CN206538672U (en) * 2017-01-18 2017-10-03 中交路桥建设有限公司 Novel fabricated truss steel trestle

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109322241A (en) * 2018-11-08 2019-02-12 中建五局土木工程有限公司 Trestle work structure and construction method
CN112081131A (en) * 2020-08-06 2020-12-15 中交二公局东萌工程有限公司 Steel casing bearing platform process

Also Published As

Publication number Publication date
CN108018867B (en) 2019-10-01

Similar Documents

Publication Publication Date Title
CN104805854B (en) A kind of Deep Water Ultra-long steel sheet pile cofferdam construction method under tide environment
CN102383431B (en) Middle pick prestressed centrifugally pile tube pile-sinking device and pile sinking method thereof
CN102677592B (en) Method for erecting deepwater steel trestle and platform on exposed bedrock in shallow sea
CN104153384A (en) On-sea sandwich steel pipe pile foundation and construction method
CN103225304B (en) A kind of marine foundation supporting structure and construction method thereof
CN103882878A (en) Method for constructing combined type steel sheet pile cofferdam for abrupt slope hard rock river bed deepwater bearing platform
CN106088120B (en) A kind of cofferdam decentralization construction method
CN105780802A (en) Jacket offshore wind turbine foundation with brackets and construction method thereof
CN206467667U (en) Suspended net shotcrete building enclosure between a kind of stake of use expansion type fixation reinforced mesh
CN102644290A (en) Steel cofferdam construction method suitable for construction of deep silt layer bridge in shallow sea area
CN105780806A (en) Offshore wind turbine foundation for long-leg jacket of drilling piles and construction method of offshore wind turbine foundation
CN100535264C (en) Steel boxed cofferdam and recovery method thereof
CN108018867B (en) The method for realizing the construction of coastal waters beach column foot based on trestle method
CN105350526A (en) Method for setting up steel platform
CN217580865U (en) Large-diameter steel casing drilling platform under deep water slope bare rock geological condition
CN204676584U (en) A kind of high stake truss-like offshore wind turbine foundation structure
CN203429648U (en) Large steel cylinder cofferdam structure
EP3904674A1 (en) Floating platform for high-power wind turbines
CN106223355A (en) A kind of high bearing platform supported on piles in deep water Hold Hoop method has device and the construction method of end steel jacket box
CN201158821Y (en) Cofferdam of steel pouring jacket
CN208430526U (en) Offshore wind turbine foundation structure
CN206956713U (en) Sea is non-to squeeze into type large diameter single pile foundation structure
CN102758434B (en) Middle pick prestressed centrifugally pile tube pile-sinking device and pile sinking method thereof
CN204212171U (en) marine sandwich steel pipe pile foundation
JP2022163916A (en) Method for constructing foundation of on-water structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant