CN108006925A - Air-conditioning stress test method, computer installation, computer-readable recording medium - Google Patents

Air-conditioning stress test method, computer installation, computer-readable recording medium Download PDF

Info

Publication number
CN108006925A
CN108006925A CN201711256361.2A CN201711256361A CN108006925A CN 108006925 A CN108006925 A CN 108006925A CN 201711256361 A CN201711256361 A CN 201711256361A CN 108006925 A CN108006925 A CN 108006925A
Authority
CN
China
Prior art keywords
air
conditioning
frequency
setpoint frequency
stress
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711256361.2A
Other languages
Chinese (zh)
Inventor
赫晓龙
李斌
唐伟新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhuhai Aden Science And Technology Co Ltd
Original Assignee
Zhuhai Aden Science And Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhuhai Aden Science And Technology Co Ltd filed Critical Zhuhai Aden Science And Technology Co Ltd
Priority to CN201711256361.2A priority Critical patent/CN108006925A/en
Publication of CN108006925A publication Critical patent/CN108006925A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B49/00Arrangement or mounting of control or safety devices
    • F25B49/02Arrangement or mounting of control or safety devices for compression type machines, plants or systems
    • F25B49/022Compressor control arrangements

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Thermal Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Air Conditioning Control Device (AREA)

Abstract

The present invention discloses a kind of air-conditioning stress test method, computer installation, computer-readable recording medium, when master controller of this method including definite air-conditioning is in running order, the first setpoint frequency is sent to the outer controller of air-conditioning, obtain the data of the actual motion frequency of the compressor of the air-conditioning transmitted by outer controller, as air-conditioning meets the condition of acquisition stress Value Data, then obtain the data of the simultaneously stress value transmitted by record test device, as air-conditioning meets to open the condition of acquisition stress Value Data next time, the data of the second setpoint frequency are then sent to outer controller, and when determining that air-conditioning meets to obtain the condition of stress Value Data, obtain and record the data of stress value.The present invention also provides the computer installation and computer-readable recording medium for realizing the above method.The present invention can realize that convertible frequency air-conditioner pipeline stress test automates, and can reduce the labor intensity of user, greatly improve testing efficiency and test accuracy.

Description

Air-conditioning stress test method, computer installation, computer-readable recording medium
Technical field
The present invention relates to air conditioner controlling technology field, more particularly, to a kind of air-conditioning stress test method, realizes this side The computer installation and computer-readable recording medium of method.
Background technology
The characteristics of convertible frequency air-conditioner, is according to actual indoor environment, design temperature and electric current, voltage etc. are related to join Several running frequencies to compressor are adjusted, and in the stage high frequency operation just started shooting, realize that fast-refrigerating heats, in environment temperature When degree is close to user's design temperature, running frequency is reduced, accurate temperature controlling is realized, avoids the occurrence of sometimes hot and sometimes cold situation.
That is, under identical conditions, compressor is possible to operate in minimum frequency value between maximum frequency values Any one frequency values.And in the case of different frequency value, the resonant conditions between compressor and pipeline are different, therefore production of resonating The size of raw stress value is also different.In order to ensure convertible frequency air-conditioner in any case can reliability service, in convertible frequency air-conditioner Development phase is just needed under different working conditions, and pipeline stress survey is carried out to all Frequency points in compressor prescribed limit Examination, ensures that the stress value of all Frequency points is all not above limit value.
And at present during stress test, usually all it is to be set by test man by remote controler on the master controller of air-conditioning Determine running frequency, then mutually communicated by master controller and outer controller and the frequency values of setting are sent to outer controller, outside Controller is run according to the frequency values that receive, and after stable operation 10 minutes to 15 minutes, test device re-records current frequency Stress value size.After a frequency values are completed in test, test man need to carry out again laboratory to the running frequency into Row setting.
Due to such test method, it is necessary to which test man repeatedly sets compressor operating frequency into laboratory, And often occur because laboratory technician is busy with other things, compressor increases in the situation of some frequency values long-play Add the test required time, waste test resource.
The content of the invention
The first object of the present invention, which is to provide one kind, can realize the automation of convertible frequency air-conditioner pipeline stress test and can carry The air-conditioning stress test method of high testing efficiency and test accuracy.
It is a further object of the present invention to provide a kind of computer installation that can realize above-mentioned air-conditioning stress test method.
Another object of the present invention, which is to provide, a kind of can realize that above-mentioned the computer-readable of air-conditioning stress test method is deposited Storage media.
To realize above-mentioned main purpose, air-conditioning stress test method provided by the invention is included in the master control of definite air-conditioning When device processed is in running order, the first setpoint frequency is sent to the outer controller of air-conditioning, the first setpoint frequency is for setting sky The running frequency of the compressor of tune, the data of the actual motion frequency of the compressor of the air-conditioning transmitted by acquisition outer controller, sentences Whether disconnected air-conditioning meets the condition for obtaining stress Value Data, if so, the data of the stress value transmitted by test device are then obtained, and And the data of the stress value acquired in record, judge whether air-conditioning meets to open the condition for obtaining stress Value Data next time, such as It is that the data of the second setpoint frequency are sent to outer controller, the second setpoint frequency is the running frequency for setting compressor, and And when determining that air-conditioning meets to obtain the condition of stress Value Data, obtain the number of the simultaneously stress value transmitted by record test device According to.
By such scheme as it can be seen that user is by the autonomous running frequency scope for setting compressor on PC ends, when definite When the master controller of tested air-conditioning is in running order, outer controller can get a setpoint frequency transmitted by PC ends, this When, controlled by PC ends and enter the pipeline stress test state of tested air-conditioning, the compressor for being tested air-conditioning will be according to setting frequency Rate is run, and then, outer controller can get the actual motion frequency of compressor, and be transmitted back to PC ends by test device, its In, test device is used for the pipeline stress value for detecting compressor actual motion frequency.In this way, each frequency is recorded by PC ends in real time The pipeline stress value of rate value, avoids situation of the compressor in some frequency values long-play, realizes that convertible frequency air-conditioner pipeline should Power test automation, can reduce the labor intensity of user, greatly improve testing efficiency and test accuracy.
One preferable scheme is whether the actual motion frequency for judging compressor reaches the default model of the first setpoint frequency In enclosing, in this way, it is determined that air-conditioning meets the condition for obtaining stress Value Data.
As it can be seen that after if PC ends detect that the actual motion frequency of compressor reaches in the preset range of setpoint frequency, i.e., It can determine that the compressor of tested air-conditioning is started to work according to the setpoint frequency to run, it is determined that tested air-conditioning has met to obtain The condition of stress value is taken, at this moment, PC ends start the stress value obtained and record test device sends in real time.
Further scheme is that the actual motion frequency for determining compressor reaches in the preset range of the first setpoint frequency Afterwards, and judge whether to reach the default testing time, in this way, it is determined that air-conditioning meets to open obtains stress Value Data next time Condition.
As it can be seen that after the actual motion frequency for determining compressor reaches in the preset range of the setpoint frequency, and obtaining Start timing mode while taking actual motion frequency stress value, produce a timing signal, and be according to time judgement It is no to reach the default testing time, to determine whether tested air-conditioning meets to open the bar of acquisition stress Value Data next time Part.
Specifically, the default testing time can be according to specific according to practical application sets itself, user by user The runnability of use environment and tested air-conditioning is set.
Further scheme is, if the first setpoint frequency is the minimum setpoint frequency of setpoint frequency, the second setpoint frequency More than the first setpoint frequency, setpoint frequency is the running frequency for setting compressor.
As it can be seen that when entering the pipeline stress test of tested air-conditioning, PC ends first fill minimum setpoint frequency by testing Transmission is put to outer controller, outer controller will be got and the corresponding compressor minimum running frequency of minimum setpoint frequency, from And the pipeline stress value of minimum running frequency is obtained and recorded by PC ends, at this moment, PC ends are automatically by minimum setpoint frequency Regularly change the frequency values of setting by increasing the frequency values of a unit, then proceed to the stress of test different frequency value Value.
Further scheme be judge the second setpoint frequency whether be setpoint frequency maximum setpoint frequency, if not being, Under conditions of determining that air-conditioning meets to open acquisition stress Value Data next time again, the 3rd setpoint frequency is sent to outer controller Data.
It can be seen from the above that before the pipeline stress test of tested air-conditioning is entered, user will manually set most on PC ends Small setpoint frequency and maximum setpoint frequency, and by testing in the frequency model between minimum setpoint frequency and maximum setpoint frequency Interior different frequency value is enclosed to obtain different stress values, after the pipeline stress test state of convertible frequency air-conditioner is entered, outer control Device works according to different setpoint frequencies in the frequency range and runs, and the actual motion frequency of compressor is passed through to test and is filled Transmission is put to PC ends, so that a variety of stress values of corresponding different frequency value can be got by PC ends, avoids compressor at certain The situation of a frequency values long-play.
Further scheme is such as to determine the maximum setpoint frequency that the second setpoint frequency is setpoint frequency, obtaining and remembering After the data for recording the stress value transmitted by test device, the control signal for closing master controller is sent.
As it can be seen that during the stress value of test different frequency value, if it is determined that the setpoint frequency is setpoint frequency During maximum setpoint frequency, then after PC ends obtain and record the stress value of the setpoint frequency, then, send and close tested air-conditioning master control The control signal of device processed, so as to complete the pipeline stress test of convertible frequency air-conditioner, realizes convertible frequency air-conditioner pipeline stress test oneself Dynamicization.
In order to realize above-mentioned another object, the present invention also provides computer installation include processor and memory, Memory storage has computer program, and each of above-mentioned air-conditioning stress test method is realized when computer program is executed by processor A step.
In order to realize above-mentioned a further object, computer-readable recording medium storage provided by the invention has computer journey Sequence, the computer-readable medium are read out by the processor and perform each step of above-mentioned air-conditioning stress test method.
Brief description of the drawings
Fig. 1 is the principle frame of convertible frequency air-conditioner pipeline stress test system in air-conditioning stress test method embodiment of the present invention Figure.
Fig. 2 is the flow chart of air-conditioning stress test method embodiment of the present invention.
The invention will be further described with reference to the accompanying drawings and embodiments.
Embodiment
The air-conditioning stress test method of the present invention can be applied on convertible frequency air-conditioner pipeline stress test system and real The method of the pipeline stress test of existing convertible frequency air-conditioner.Referring to Fig. 1, convertible frequency air-conditioner pipeline stress test system includes PC ends 10, surveys 20, master controller 40, outer controller 30 and compressor 41 are put in trial assembly, and master controller 40 sends a control signal to compressor 41, PC ends 10 send setpoint frequency to outer controller 30 via test device 20, and outer controller 30 obtains the actual motion frequency of compressor Rate, and the actual motion frequency will be sent via test device 20 to PC ends 10, test device 20 is used to test tested air-conditioning Pipeline stress.The present invention provides a kind of computer installation, which includes processor, and processor can perform application The instruction of program, so as to fulfill each step of above-mentioned air-conditioning stress test method.The computer-readable of offer of the present invention is deposited Computer program is stored with storage media, and when computer program is executed by processor realizes above-mentioned air-conditioning stress test method Each step.
Air-conditioning stress test method embodiment:
Referring to Fig. 2, the air-conditioning stress test method of the present embodiment is first when carrying out the pipeline stress to convertible frequency air-conditioner and testing Step S1 is first carried out, judges whether the master controller 40 of air-conditioning is in running order, if it is judged that being no, then continues to execute Step S1, if it is determined that the master controller 40 of tested air-conditioning is in running order, then step S2 is performed, to the outer controller of air-conditioning 30 send setpoint frequency, wherein, when the master controller 40 for determining air-conditioning is in running order, PC ends 10 can pass through test device 20 send a setpoint frequency to outer controller 30, and at this moment, test device 20 is used as a transmission channel, will obtain PC ends 10 and send out The setpoint frequency brought, and the setpoint frequency is sent to outer controller 30, when outer controller 30 detects the setpoint frequency When, the pipeline stress test state of tested air-conditioning will be entered, outer controller 30 will work by the setpoint frequency and run, and obtain The actual motion frequency of tested compressor of air conditioner 41.
Test device 20 is to establish to connect by serial communication and outer controller 30, wherein, which can be Universal asynchronous receiving-transmitting transmitter(Universal Asynchronous Receiver/Transmitter), universal asynchronous receiving-transmitting Transmitter abbreviation UART, UART are changed the data for needing to transmit between serial communication and parallel communications.As simultaneously Row input signal changes into the chip of serial output signal, and UART is usually integrated in the link of other communication interfaces.
Then, step S3 is performed, the actual motion frequency of the compressor 41 of the air-conditioning transmitted by acquisition outer controller 30 Data, at this moment, outer controller 30 obtain the actual motion frequency of tested compressor of air conditioner 41, and send the actual motion frequency extremely Test device 20, test device 20 send the actual motion frequency to PC ends 10 by serial communication interface, wherein, serial communication Interface can be RS-232 interface, its main feature is that communication line is simple, it is only necessary to a pair of of transmission line can realize both-way communication, Thus greatly reduce cost.
Then, judge air-conditioning whether meet obtain stress value condition, that is, perform step S4, if it is judged that be it is no, Step S4 is then continued to execute, wherein it is determined that the condition that air-conditioning meets to obtain stress Value Data includes:Judge the reality of compressor 41 Whether running frequency reaches in the preset range of the first setpoint frequency, in this way, it is determined that tested air-conditioning meets to obtain stress value number According to condition.As it can be seen that if PC ends 10 detect that the actual motion frequency of compressor 41 reaches in the preset range of setpoint frequency Afterwards, you can determine that the compressor 41 of tested air-conditioning is started to work according to the setpoint frequency and run, it is determined that tested air-conditioning is Condition through meeting to obtain stress value, at this moment, PC ends 10 start to obtain and what real-time record test device 20 sended over answers Force value.Wherein, the first setpoint frequency can be the frequency values that user sets at PC ends 10 in advance, in the master controller of tested air-conditioning After 40 enter working status, user can input minimum setpoint frequency and maximum setpoint frequency at PC ends 10, and specifically, first sets It can be minimum setpoint frequency to determine frequency.
Such as definite air-conditioning meets the condition for obtaining stress value, then performs step S5, obtains answering transmitted by test device 20 The data of force value, and the data of acquired stress value are recorded, wherein, test device 20 is used to detect the actual fortune of compressor 41 The pipeline stress value of line frequency, and the pipeline stress value of accessed 41 actual motion frequency of compressor is sent to PC ends 10, in this way, recording the pipeline stress value of each frequency values in real time by PC ends 10, avoid compressor 41 and grown in some frequency values The situation of time operation, realizes that convertible frequency air-conditioner pipeline stress test automates, can reduce the labor intensity of user, carry significantly High testing efficiency and test accuracy.
Test device 20 includes multiple strain gauges, and multiple strain gauges are separately mounted to pipeline in tested air-conditioning Test position, multiple strain gauges carry out the detection of stress value to being tested air-conditioning duct respectively, and by stress test data set In be sent to PC ends 10, and then obtained by PC ends 10 and record the pipeline stress value of each frequency values in real time.
Then, judge whether air-conditioning meets to open the condition for obtaining stress Value Data next time, that is, perform step S6, its In, determine air-conditioning meet open next time obtain stress Value Data condition include:Determine the actual motion frequency of compressor 41 After reaching in the preset range of the first setpoint frequency, and judge whether to reach the default testing time, in this way, it is determined that tested Air-conditioning meets to open the condition for obtaining stress Value Data next time, it is seen then that reaches in the actual motion frequency for determining compressor 41 After in the preset range of the setpoint frequency, and start timing mode while actual motion frequency stress value is obtained, produce One timing signal, and judged whether according to the time to reach the default testing time, to determine whether that tested air-conditioning is It is no to meet to open the condition for obtaining stress Value Data next time.
Certainly, in order to improve the Accuracy and high efficiency of detection, it is necessary to sentence by whether reaching the default testing time Whether disconnected tested air-conditioning meets to open the condition for obtaining stress Value Data next time, if for example, the default testing time is 4 points Clock, begins to start timing mode while PC ends 10 obtain actual motion frequency stress value, and according to the startup time Judge whether to reach the default testing time, that is, whether reach 4 minutes, if so, then judging that tested air-conditioning meets under opening Once obtain the condition of stress Value Data.
Specifically, the default testing time can be according to specific according to practical application sets itself, user by user The runnability of use environment and tested air-conditioning is set, setting for the testing time, the test in above-described embodiment Time is set as 4 minutes, may be set to be 10 minutes, 15 minutes, other numerical value such as 20 minutes.It can be according to actual use In, obtain the parameter settings such as the efficiency of 41 actual motion frequency of compressor or tested air-conditioning internal controller processing speed.
Such as determine that air-conditioning meets to open the condition for obtaining stress Value Data next time, then return and perform step S2, to air-conditioning Outer controller 30 send setpoint frequency, wherein, which is the second setpoint frequency, if the first setpoint frequency for setting frequency The minimum setpoint frequency of rate, then the second setpoint frequency be more than the first setpoint frequency, setpoint frequency is for setting compressor 41 Running frequency.As it can be seen that when entering the pipeline stress test of tested air-conditioning, minimum setpoint frequency is passed through test by PC ends 10 first Device 20 is sent to outer controller 30, and outer controller 30 will be got and the minimum fortune of the corresponding compressor 41 of minimum setpoint frequency Line frequency, so as to obtain and record the pipeline stress value of minimum running frequency by PC ends 10, at this moment, PC ends 10 set minimum The regular frequency values by one unit of increase of frequency are determined to change the frequency values of setting, then proceed to test different frequency value Stress value., can be with repeat step S2 to S6, so as to complete under different frequency value by setting relevant parameter on PC ends 10 Different stress values test.
Then, judge the second setpoint frequency whether be setpoint frequency maximum setpoint frequency, if not being, again determine sky Adjust under conditions of meeting to open acquisition stress Value Data next time, the data of the 3rd setpoint frequency are sent to outer controller 30, by , as it can be seen that before the pipeline stress test of tested air-conditioning is entered, user will manually set minimum setting frequency on PC ends 10 for this Rate and maximum setpoint frequency, and by testing the difference in the frequency range between minimum setpoint frequency and maximum setpoint frequency Frequency values obtain different pipeline stress values, and after the pipeline stress test state of tested air-conditioning is entered, outer controller 30 exists Work and run according to different setpoint frequencies in the frequency range, and the actual motion frequency of compressor 41 is passed through test device 20 send to PC ends 10, so as to can get a variety of stress values of corresponding different frequency value by PC ends 10, avoid compressor 41 some frequency values long-play situation.
Then, as determined maximum setpoint frequency of second setpoint frequency for setpoint frequency, simultaneously record test device is being obtained After the data of stress value transmitted by 20, the control signal for closing master controller 40 is sent, wherein, in test different frequency value During stress value, if it is determined that when the setpoint frequency is the maximum setpoint frequency of setpoint frequency, then PC ends 10 obtain and remember After the stress value for recording the setpoint frequency, then, the control signal for closing air-conditioning master controller 40 is sent, so as to complete tested air-conditioning Pipeline stress test, realize the automation of convertible frequency air-conditioner pipeline stress test.
In addition, obtained by PC ends 10 and record the pipeline stress value of each different frequency value, so that PC ends 10 generate quilt Survey the stress test report of air-conditioning, it is seen then that PC ends 10 can automatically generate the stress test report of tested air-conditioning duct, test During, the data that PC ends 10 obtain can be shown by display, that is, can display real-time the test process of tested air-conditioning Data, and being shown by the form of curve and real time data, wherein, display and input equipment respectively with 10 phase of PC ends Connection, display can show setting interface, and can real-time display be tested the real-time testing information of air-conditioning and final test The content such as a result.Display and input equipment can be touch-screens, by touch screen operation to the 10 input control order of PC ends.
Computer installation embodiment:
The computer installation of the present embodiment includes processor, memory and storage in memory and can transport on a processor Capable computer program, such as it is used for realization the message handling program of above- mentioned information processing method.Processor performs computer journey Each step of above-mentioned air-conditioning stress test method is realized during sequence.
For example, computer program can be divided into one or more modules, one or more module, which is stored in, deposits In reservoir, and performed by processor, to complete the modules of the present invention.One or more modules can be can complete it is specific The series of computation machine programmed instruction section of function, the instruction segment are used to describe execution of the computer program in terminal device Journey.
It should be noted that terminal device can be desktop PC, notebook, palm PC and cloud server etc. Computing device.Terminal device may include, but be not limited only to, processor, memory.It will be understood by those skilled in the art that this hair Bright schematic diagram is only the example of terminal device, does not form the restriction to terminal device, can include than illustrate it is more or Less component, either combines some components or different components, such as terminal device can also be set including input and output Standby, network access equipment, bus etc..
Processor alleged by the present invention can be central processing unit (Central Processing Unit, CPU), may be used also To be other general processors, digital signal processor (Digital Signal Processor, DSP), application-specific integrated circuit (Application Specific Integrated Circuit, ASIC), ready-made programmable gate array (Field- Programmable Gate Array, FPGA) either other programmable logic device, discrete gate or transistor logic device Part, discrete hardware components etc..General processor can be microprocessor or the processor can also be any conventional processing Device etc., processor are the control centres of terminal device, utilize the various pieces of various interfaces and the whole terminal device of connection.
Memory can be used for storage computer program and/or module, processor to be stored in memory by running or performing Interior computer program and/or module, and the data being stored in memory are called, realize the various functions of terminal device. Memory can mainly include storing program area and storage data field, wherein, storing program area can storage program area, at least one Application program needed for function(Such as sound-playing function, image player function etc.)Deng;Storage data field can be stored according to hand Machine uses created data(Such as voice data, phone directory etc.)Deng.In addition, memory can include high random access Memory, can also include nonvolatile memory, such as hard disk, memory, plug-in type hard disk, intelligent memory card(Smart Media Card, SMC), secure digital(Secure Digital, SD)Card, flash card(Flash Card), at least one magnetic Disk storage device, flush memory device or other volatile solid-state parts.
Computer-readable recording medium embodiment:
If the module that terminal device integrates is realized in the form of SFU software functional unit and is used as independent production marketing or use When, it can be stored in a computer read/write memory medium.Based on such understanding, the present invention realizes above-described embodiment side All or part of flow in method, can also instruct relevant hardware to complete, the computer program by computer program It can be stored in a computer-readable recording medium, the computer program is when being executed by processor, it can be achieved that above-mentioned each sky Adjust each step of stress test method.
Wherein, computer program includes computer program code, and computer program code can be source code form, object Code form, executable file or some intermediate forms etc..Computer-readable medium can include:Computer program can be carried Any entity or device, recording medium, USB flash disk, mobile hard disk, magnetic disc, CD, computer storage, the read-only storage of code (ROM, Read-Only Memory), random access memory(RAM, Random Access Memory), electric carrier signal, electricity Believe signal and software distribution medium etc..It should be noted that the content that computer-readable medium includes can be managed according to the administration of justice Local legislation and the requirement of patent practice carry out appropriate increase and decrease, such as in some jurisdictions, according to legislation and patent Practice, computer-readable medium do not include electric carrier signal and telecommunication signal.
It should be noted that these are only the preferred embodiment of the present invention, but the design concept invented is not limited thereto, All insubstantial modifications made using this design to the present invention, are also each fallen within protection scope of the present invention.

Claims (8)

1. air-conditioning stress test method, it is characterised in that the test method includes:
When the master controller for determining air-conditioning is in running order, the first setpoint frequency is sent to the outer controller of the air-conditioning, First setpoint frequency is for the running frequency for the compressor for setting the air-conditioning;
Obtain the data of the actual motion frequency of the compressor of the air-conditioning transmitted by the outer controller;
Judge whether the air-conditioning meets the condition for obtaining stress Value Data, if so, then obtaining the stress transmitted by test device The data of value, and record the data of acquired stress value;
Judge whether the air-conditioning meets to open the condition for obtaining stress Value Data next time, if so, being sent out to the outer controller The data of the second setpoint frequency are sent, second setpoint frequency is the running frequency for setting the compressor, and true When the fixed air-conditioning meets to obtain the condition of stress Value Data, obtain and record the number of the stress value transmitted by the test device According to.
2. air-conditioning stress test method according to claim 1, it is characterised in that determine that the air-conditioning meets to obtain stress The condition of Value Data includes:
Judge whether the actual motion frequency of the compressor reaches in the preset range of first setpoint frequency, if so, then Determine that the air-conditioning meets the condition for obtaining stress Value Data.
3. air-conditioning stress test method according to claim 1, it is characterised in that it is next to determine that the air-conditioning meets to open The secondary condition for obtaining stress Value Data includes:
After determining that the actual motion frequency of the compressor reaches in the preset range of first setpoint frequency, and sentence It is disconnected whether to reach the default testing time, in this way, it is determined that the air-conditioning meets to open the bar for obtaining stress Value Data next time Part.
4. air-conditioning stress test method according to claim 1, it is characterised in that described to send the to the outer controller The data of two setpoint frequencies, including:
If first setpoint frequency is the minimum setpoint frequency of setpoint frequency, second setpoint frequency is more than described first Setpoint frequency, the setpoint frequency are the running frequency for setting the compressor.
5. air-conditioning stress test method according to claim 4, it is characterised in that this method further includes:
Judge second setpoint frequency whether be the setpoint frequency maximum setpoint frequency, if not being, again determine institute State air-conditioning and meet that under conditions of acquisition stress Value Data, the number of the 3rd setpoint frequency is sent to the outer controller next time for unlatching According to.
6. air-conditioning stress test method according to claim 5, it is characterised in that described to judge second setpoint frequency Whether be the setpoint frequency maximum setpoint frequency, including:
The second setpoint frequency as described in determining is the maximum setpoint frequency of the setpoint frequency, is obtaining and is recording the test dress After the data for putting transmitted stress value, the control signal for closing the master controller is sent.
7. a kind of computer installation, it is characterised in that including processor and memory, the memory storage has computer journey Sequence, the processor are realized such as the air-conditioning stress test method of any one of claim 1 to 6 when performing the computer program.
8. a kind of computer-readable recording medium, it is characterised in that the computer-readable recording medium storage has computer journey Sequence, is realized such as the air-conditioning stress test method of any one of claim 1 to 6 when the computer program is executed by processor.
CN201711256361.2A 2017-12-03 2017-12-03 Air-conditioning stress test method, computer installation, computer-readable recording medium Pending CN108006925A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711256361.2A CN108006925A (en) 2017-12-03 2017-12-03 Air-conditioning stress test method, computer installation, computer-readable recording medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711256361.2A CN108006925A (en) 2017-12-03 2017-12-03 Air-conditioning stress test method, computer installation, computer-readable recording medium

Publications (1)

Publication Number Publication Date
CN108006925A true CN108006925A (en) 2018-05-08

Family

ID=62056111

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711256361.2A Pending CN108006925A (en) 2017-12-03 2017-12-03 Air-conditioning stress test method, computer installation, computer-readable recording medium

Country Status (1)

Country Link
CN (1) CN108006925A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114413437A (en) * 2021-12-31 2022-04-29 北京小米移动软件有限公司 Parameter adjusting method and device for air conditioner compressor and storage medium
CN115325656A (en) * 2022-08-22 2022-11-11 宁波奥克斯电气股份有限公司 Air conditioner control method and device, air conditioner and storage medium
WO2023246143A1 (en) * 2022-06-24 2023-12-28 青岛海尔空调器有限总公司 Pipeline stress testing method applied to saddle type window air conditioner, and saddle type window air conditioner

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07260234A (en) * 1994-03-22 1995-10-13 Daikin Ind Ltd Operation controller for air conditioner
CN101408468A (en) * 2008-11-06 2009-04-15 广东美的电器股份有限公司 Method for determining maximum position of air conditioner piping stress
CN104655179A (en) * 2013-11-21 2015-05-27 珠海格力电器股份有限公司 Stress-strain testing method, device and system
CN105510621A (en) * 2015-09-28 2016-04-20 沈阳鼓风机集团安装检修配件有限公司 Method and device for obtaining critical rotating speed of centrifugal compressor
CN106529048A (en) * 2016-11-11 2017-03-22 四川长虹空调有限公司 Pipe vibration simulation method for air conditioner compressor
CN106871359A (en) * 2017-03-02 2017-06-20 青岛海尔空调器有限总公司 Air-conditioning Torque Control method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07260234A (en) * 1994-03-22 1995-10-13 Daikin Ind Ltd Operation controller for air conditioner
CN101408468A (en) * 2008-11-06 2009-04-15 广东美的电器股份有限公司 Method for determining maximum position of air conditioner piping stress
CN104655179A (en) * 2013-11-21 2015-05-27 珠海格力电器股份有限公司 Stress-strain testing method, device and system
CN105510621A (en) * 2015-09-28 2016-04-20 沈阳鼓风机集团安装检修配件有限公司 Method and device for obtaining critical rotating speed of centrifugal compressor
CN106529048A (en) * 2016-11-11 2017-03-22 四川长虹空调有限公司 Pipe vibration simulation method for air conditioner compressor
CN106871359A (en) * 2017-03-02 2017-06-20 青岛海尔空调器有限总公司 Air-conditioning Torque Control method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
北京长城航空测控技术研究所: "《航空测试技术》", 31 December 2013, 航空工业出版社 *
张会福,胡勇华,文宏: "《高等教育十三五规划教材 嵌入式系统设计与开发》", 30 April 2016, 中国矿业大学出版社 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114413437A (en) * 2021-12-31 2022-04-29 北京小米移动软件有限公司 Parameter adjusting method and device for air conditioner compressor and storage medium
CN114413437B (en) * 2021-12-31 2024-04-02 北京小米移动软件有限公司 Air conditioner compressor parameter adjusting method, device and storage medium
WO2023246143A1 (en) * 2022-06-24 2023-12-28 青岛海尔空调器有限总公司 Pipeline stress testing method applied to saddle type window air conditioner, and saddle type window air conditioner
CN115325656A (en) * 2022-08-22 2022-11-11 宁波奥克斯电气股份有限公司 Air conditioner control method and device, air conditioner and storage medium
CN115325656B (en) * 2022-08-22 2024-06-11 宁波奥克斯电气股份有限公司 Air conditioner control method and device, air conditioner and storage medium

Similar Documents

Publication Publication Date Title
CN109740222B (en) Testing device and system for automobile networking scene
CN107480382A (en) A kind of Coverage- Driven verification method of Fast Convergent
CN105786549B (en) Smart machine and its upgrade method
CN107656126B (en) CAN-based automatic testing method and system for quiescent current of vehicle-mounted sound equipment
KR20210055560A (en) Apparatus and Method for Managing Performance about Artificial Intelligent Service
CN108006925A (en) Air-conditioning stress test method, computer installation, computer-readable recording medium
CN110162464A (en) Mcok test method and system, electronic equipment and readable storage medium storing program for executing
CN106403188A (en) Air conditioner maintenance method and maintenance device thereof
CN103425580A (en) Method for automatically and rapidly obtaining and calibrating configuration information of cloud computing device
CN106201852A (en) A kind of distributed test method and test system
CN109309598B (en) Sampling point automatic test system and method for tested vehicle-mounted module with CAN function
CN110334385B (en) Test method, device and equipment for central controller of comprehensive energy system
CN110297756B (en) Intelligent test system based on logic simulation model
CN111901155A (en) Internet of things debugging method, device and system and storage medium
CN112420019B (en) Equipment testing method and device
CN110022243A (en) A kind of system and method for low-power consumption bluetooth chip performance parameter adjust automatically
CN111541589B (en) Method, device and equipment for testing expansion module interface of intelligent terminal
CN114268650A (en) Configuration method and system for establishing communication connection
CN115499348A (en) Local communication micro application detection system and method
CN113778895A (en) Automatic interface testing method and device
CN103678054B (en) Test method and device for BACnet equipment
US20200112588A1 (en) Controlling behavior of an internet of things (iot) automation system by identifying policy violations
CN109726476B (en) Verification method and device based on UVM verification platform
CN113364121B (en) Unattended operation method, system and device of power distribution cabinet and storage medium
CN110445784A (en) Display method and device of operation data and energy system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180508