CN108005266A CN201711379411.6A CN201711379411A CN108005266A CN 108005266 A CN108005266 A CN 108005266A CN 201711379411 A CN201711379411 A CN 201711379411A CN 108005266 A CN108005266 A CN 108005266A
Authority
CN
China
Prior art keywords
shear wall
reinforced concrete
wall structure
strip frame
concrete shear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711379411.6A
Other languages
Chinese (zh)
Other versions
CN108005266B (en
Inventor
龚超
曾滨
侯兆新
熊喆怡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Metallurgical Construction Research Institute (shenzhen) Co Ltd
Central Research Institute of Building and Construction Co Ltd MCC Group
China Jingye Engineering Corp Ltd
Original Assignee
Metallurgical Construction Research Institute (shenzhen) Co Ltd
Central Research Institute of Building and Construction Co Ltd MCC Group
China Jingye Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Metallurgical Construction Research Institute (shenzhen) Co Ltd, Central Research Institute of Building and Construction Co Ltd MCC Group, China Jingye Engineering Corp Ltd filed Critical Metallurgical Construction Research Institute (shenzhen) Co Ltd
Priority to CN201711379411.6A priority Critical patent/CN108005266B/en
Publication of CN108005266A publication Critical patent/CN108005266A/en
Application granted granted Critical
Publication of CN108005266B publication Critical patent/CN108005266B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
    • E04B2/58Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/02Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials
    • E04C2/04Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials of concrete or other stone-like material; of asbestos cement; of cement and other mineral fibres
    • E04C2/06Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials of concrete or other stone-like material; of asbestos cement; of cement and other mineral fibres reinforced
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/30Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the shape or structure
    • E04C2/38Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the shape or structure with attached ribs, flanges, or the like, e.g. framed panels
    • E04C2/384Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the shape or structure with attached ribs, flanges, or the like, e.g. framed panels with a metal frame
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/44Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the purpose
    • E04C2/46Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the purpose specially adapted for making walls

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The invention discloses a kind of strip frame precast reinforced concrete shear wall structure, mounting hole is provided with the upper end of the strip frame precast reinforced concrete shear wall structure or the end cross rail outer edge of a wing of lower end;The one end for not setting crossbeam is provided with Half Beam connecting seat, and mounting hole is also equipped with the Half Beam connecting seat, corresponding with the position of mounting hole on the end cross rail outer edge of a wing;Precast concrete place corresponding with the position of mounting hole on the cross rail outer edge of a wing of end is provided with the technology groove of installation bolt or nut.Strip frame precast reinforced concrete shear wall structure prefabrication degree of the present invention is high, and situ wet operation is few.Full bolt connecting mode is used between assembled steel reinforced concrete shear walls and with periphery girder steel, site operation speed is fast.Anti-seismic performance is good, is applicable to high earthquake intensity area, and structure maxi-mum height is big.

Description

A kind of strip frame precast reinforced concrete shear wall structure and preparation and installation method
Technical field
The present invention relates to construction engineering technical field, more particularly to a kind of strip frame precast reinforced concrete shear wall knot Structure and its preparation and construction method.
Background technology
In China's residential housing, cast-in-situ steel reinforced concrete Shear Wall Residential structure is widely applied.Cast in place reinforced bar Concrete shear wall structure house has:(1)Structure is integrated with going along with sb. to guard him, and shear wall, which had not only been used as structural elements but also had been used as, goes along with sb. to guard him structure Part;(2)Structure is with heat insulation integrated, and concrete is thermal inertia material in itself, good heat insulating;(3)Structure and protection integrated, Reinforcing bar is coated in concrete, is prevented fires without anti-corrosion, and non-maintaining.(4)For structure with decoration integrated, concrete can be directly as Architectural surface uses.(5)Good economy performance, the rigidity of structure are big.(6)Using effect is good, indoor not head beam dew column.(7)Soundproof effect It is good.Etc. many comprehensive advantages.But cast-in-situ steel reinforced concrete shear wall structure house still suffers from:Situ wet operation is more, assembling Change degree is not high, the wasting of resources, environmental pollution, can not achieve the deficiencies of environmental protection of four section one, does not meet building industry modernization Growth requirement.
Precast reinforced concrete shear wall structural system have prefabrication, assembled in situ construction, the wasting of resources few and The advantages such as environmental pollution is small, but precast reinforced concrete shear wall structural system still suffers from that join domain quantity is more, node connects Meet the deficiencies of inconvenient, situ wet operation is more, construction efficiency is not high, of high cost.Reinforcing bar in precast reinforced concrete shear wall structure Connected frequently with grout sleeve, this kind of connection mode is higher to precast reinforced concrete shear wall requirement on machining accuracy, reinforcing bar position Slightly deviation is put, live reinforcing bar will be difficult to penetrate in sleeve;Simultaneously because shear force wall reinforcing steel bar quantity is more, and it is working at height, The centering of levels precast reinforced concrete shear wall and bar connecting site operation difficulty are larger;Lower floor's prefabricated reinforced concrete is cut Power wall reinforcing bar is overhanging to be penetrated after upper strata precast reinforced concrete shear wall reserves sleeve, it is also necessary to high-strength grouting is irrigated in sleeve Material, since the process for concealed work and execute-in-place worker is mostly common rural migrant worker, the construction quality of reinforced bar sleeve grouting is difficult To ensure, also it is difficult to remedy even if having pinpointed the problems, there are some potential safety problems.
Therefore, exploitation has the full assembled connection of factorial praluction, scene, jointing quantity is few, construction efficiency is high, passes through The technology that the novel fabricated shear wall structural system for the comprehensive advantages such as Ji property is good becomes those skilled in the art's urgent need to resolve is difficult Topic.
The content of the invention
It is easy to use the object of the present invention is to provide a kind of structure novel and unique, and effectively situ wet can be avoided to make Industry is more, construction efficiency is not high, of high cost and reinforcing bar grout sleeve connection site operation difficulty is larger, quality is not easy to ensure and into The strip frame precast reinforced concrete shear wall structure for the problems such as this is high, is a kind of building structural element;Concrete technical scheme For:
A kind of strip frame precast reinforced concrete shear wall structure, including bar construction and precast concrete;Bar construction bag Include the vertical reinforcement of horizontal distribution and the horizontal reinforcement of genesis analysis;The strip frame precast reinforced concrete shear wall knot The height of structure is higher than high from level to level;The bar construction further includes several crossbeams and several columns;The crossbeam and described Column is made by shaped steel;The top surface of crossbeam is consistent with the floor height of floor;The left and right end portions of the horizontal reinforcement are welded respectively It is connected on the inner side edge of a wing between two columns;The precast concrete subsection setup, the corresponding position per floor plate are provided with The reserved section of cast;Precast concrete is arranged between the inner side edge of a wing between two columns;The bar construction is prefabricated in each layer Cast between concrete, which is reserved in section, to be continued through;The upper end of the strip frame precast reinforced concrete shear wall structure and The end of lower end is both provided with Half Beam connecting seat.
Further, the height of the reserved section of the cast is not more than this floor plate thickness.
Further, the height of the Half Beam connecting seat is 150mm~300mm.
Further, the thickness of the precast concrete is identical with the crossbeam and the column cross-sectional width.
Present invention also offers the preparation method of above-mentioned strip frame precast reinforced concrete shear wall structure, including it is as follows Step:
1)In factory, crossbeam made of shaped steel and column are welded into steel framework, the both ends of the steel framework are both provided with Half Beam connection Seat;
2)Steel framework is placed in die station;Horizontal reinforcement, vertical reinforcement are fixed on the steel framework;The both ends of horizontal reinforcement are distinguished It is welded on the inner side flange plate between two columns, the both ends of the vertical reinforcement is respectively welded at column both ends On the base of the Half Beam connecting seat;
3)The corresponding position per floor plate is provided with the reserved section of cast;Concrete is poured into a mould between two columns, is poured It is carried out at the same time and vibrates;
4)Concrete curing is carried out after the completion of pouring.
Further, the step 1)In be additionally included between the column edge of a wing of bean column node region and weld ribbed stiffener.
The invention also discloses the installation method of above-mentioned strip frame precast reinforced concrete shear wall structure, including it is as follows Step:
1)Next layer of strip frame precast reinforced concrete shear wall structure is installed;Fixed with temporary support, strip frame is pre- The column of reinforced concrete shear wall structure processed is attached with periphery girder steel;
2)Each horizontal floor of layer in next layer of strip frame precast reinforced concrete shear wall structure is installed, sets gradually each layer water Flat floor reinforcing bar;
3)Pour into a mould each floor plate overlapping layer concrete and the reserved section of cast;
4)The Half Beam connecting seat between upper and lower two layers of strip frame precast reinforced concrete shear wall structure is connected;
5)By the column of the upper and lower layer strip frame precast reinforced concrete shear wall structure periphery steel with junction height respectively Beam is attached;The column by last layer strip frame precast reinforced concrete shear wall structure and periphery girder steel are carried out Connection;
6)Each horizontal precast floor slab of layer in last layer strip frame precast reinforced concrete shear wall structure is installed, horizontal building is set Slab muscle;
7)Pour into a mould Concrete Filled floor and the reserved section of cast;
Repeat step 1)To step 7), until all layers of strip frame precast reinforced concrete shear wall structure are respectively mounted and finish.
Further, the periphery girder steel and the steel column of strip frame precast reinforced concrete shear wall structure pass through high-strength Spend bolted end-plate connection.
Skeleton of the present invention by the use of steel frame as load-bearing during construction, realizes pre- using multiple depth of structural layer as one Unit processed, greatly reduces the quantity of jointing, can greatly improve construction efficiency.In levels steel reinforced concrete shear walls Reinforcing bar by Half Beam connecting seat high strength exploitation, avoid site operation difficulty existing for reinforced bar sleeve grouting connection Greatly, the shortcomings that quality is not easy to ensure and is of high cost.Steel reinforced concrete shear walls structural seismic performance of the present invention is good, is applicable to height Intensity area, structure maxi-mum height are big.
Brief description of the drawings
Fig. 1 is the structure diagram of strip frame precast reinforced concrete shear wall structure of the present invention;
Fig. 2 is the internal structure schematic diagram of strip frame precast reinforced concrete shear wall structure of the present invention;
Fig. 3 is the internal structure schematic diagram of upper connecting portion;
Fig. 4 is the internal structure schematic diagram of lower connecting portion;
Fig. 5 is the assembling schematic diagram of strip frame precast reinforced concrete shear wall structure.
In figure:1st, gooseneck;2nd, steel column;3rd, horizontal reinforcement;4th, vertical reinforcement;5th, Half Beam connecting seat;5-1, connection add Strength rib;7th, concrete;8th, junction steel plate;9th, periphery girder steel;A, upper strata shear wall structure;B, lower floor's shear wall structure.
Embodiment
The present invention is more fully illustrated below with embodiment.The present invention can be presented as a variety of multi-forms, It is not construed as being confined to the exemplary embodiment described here.
For ease of explanation, spatially relative terms such as " on ", " under " " left side " " right sides " can be used herein, for saying The element or feature shown in bright figure is relative to another element or the relation of feature.It should be understood that except in figure Outside the orientation shown, spatial terminology is intended to include the different azimuth of device in use or operation.If for example, in figure Device is squeezed, be stated as positioned at other elements or feature " under " element will be located into other elements or feature " on ".Cause This, exemplary term " under " both upper and lower orientation can be included.Device can be positioned otherwise(It is rotated by 90 ° or is located at Other orientation), can correspondingly be explained used herein of the opposite explanation in space.
As shown in Figure 1, the strip frame precast reinforced concrete shear wall structure in the present embodiment, including concrete seven and Bar construction.During cast, the concrete seven of whole shear wall is not that cast is integrated;But step pouring.Concrete seven respective layer The position of floor is provided with the reserved section of cast, and the reinforcing bar of floor or only top bars stretch into and be anchored in each layer precast concrete Between cast reserve section, and together with scene pours into a mould with floor and prefabricated steel reinforced concrete shear walls, improve the knot of building Structure intensity and globality.
As shown in Figures 2 to 4, bar construction includes the vertical reinforcement 4 of horizontal distribution and the horizontal reinforcement of genesis analysis 3.In order to improve the intensity of shear wall structure, rigidity, ductility and easy to connect, bar construction further includes several layer of gooseneck 1 With the steel frame of several steel columns 2 composition;Steel frame can be by storey setting.Bar construction is between each layer precast concrete Cast reserve in section and continue through, reduce jointing quantity, simplify work progress.Upper and lower perforative vertical reinforcement 4 The intensity and globality of strip frame precast reinforced concrete shear wall structure can be improved.In the precast reinforced coagulation of strip frame The cast of the upper and lower ends of native shear wall structure, which is reserved, is provided with connection structure in section;If by connection structure can easily by Dry shear wall structure concatenates up and down, suitable for multilayer or skyscraper.
Strip frame precast reinforced concrete shear wall structure can use the forms such as yi word pattern, T-shaped, L-shaped or cross; Bearing diagonal can also be set between layer gooseneck 1 and steel column 2;Improve the intensity of steel framework.
Since column 2 is arranged on the outside of concrete seven, the end set of periphery girder steel has connecting seat, is bolted On column 2.
The shape that Half Beam connecting seat 5 is divided into upper and lower two halves with 1 horizontal truncation of crossbeam is identical.In use, utilize junction steel plate 8, two Half Beam connecting seats 5 are linked together by bolt, it is consistent with the size of whole crossbeam.In order to improve upper strata shear wall Bonding strength between structure A and lower floor shear wall structure B, between the edge of a wing of column 2, the edge of a wing pair with Half Beam connecting seat 5 The position answered is welded with horizontal ribbed stiffener;Horizontal connection ribbed stiffener 5-1 is welded with the end of column 2;Connect ribbed stiffener The length of 5-1 is more than 300mm;Bolt hole is provided with connection ribbed stiffener 5-1;By bolt by upper strata shear wall structure A and Fastened between the connection ribbed stiffener of lower floor shear wall structure B, improve the reliability of connection.
For the ease of being connected with each floor plate, the globality of structure is improved, the height for pouring into a mould reserved section is not more than this floor Plate thickness.
In order to improve the bonding strength of upper strata shear wall structure A and lower floor shear wall structure B;The height of Half Beam connecting seat is 150mm~300mm.
Strip frame precast reinforced concrete shear wall structure is prepared by the following method:
1)In factory, crossbeam made of shaped steel 1 and steel column 2 are welded into steel framework, the upper end welding end of steel column 2 is horizontal Beam;Bottom welding Half Beam connecting seat 5;If needing, ribbed stiffener can be welded between the column edge of a wing of bean column node region;
2)The outer impeller of casting concrete(Not shown in figure), thermal-insulation connecting piece is set on the outer impeller of concrete(Not shown in figure), And conserved;
3)After the completion of the outer impeller maintenance of concrete, it is placed in die station, insulating layer is placed on outer impeller(Not shown in figure), Thermal-insulation connecting piece penetrates insulating layer;Insulating layer is such as not required or insulating layer and outer impeller is not required, it is convenient to omit step 2)And step Rapid 3);
4)Steel framework is placed in die station;Horizontal reinforcement 3, vertical reinforcement 4 are fixed on steel framework;By the two end portions of horizontal reinforcement 3 It is not welded on the inner side flange plate between two columns 2, the both ends of vertical reinforcement 4 are respectively welded at the Half Beam at 2 both ends of column On the base of connecting seat 5;
5)The corresponding position per floor plate is provided with the reserved section of cast;Concrete is poured into a mould between two columns 2, it is same what is poured Shi Jinhang vibrates;
6)Concrete curing is carried out after the completion of pouring.Pour and the reserved section of cast is left among the concrete seven to be formed, poured for scene Build.Steel framework is segmented and surrounds by prefabricated concrete block 7.
As shown in figure 5, after strip frame precast reinforced concrete shear wall structure is transported to scene, by the following method into Row installation:
1)Next story shear wall construction B is installed;Fixed with temporary support, by strip frame precast reinforced concrete shear wall structure Column 2 be attached with periphery girder steel 9;
2)Each horizontal floor of layer in next story shear wall construction B is installed, sets gradually the horizontal floor bar of each layer;
3)Pour into a mould each floor plate overlapping layer concrete and the reserved section of cast;
4)The Half Beam connecting seat 5 between upper and lower two layers of strip frame precast reinforced concrete shear wall structure is connected;
5)By 2 bottom of column of last layer shear wall structure A and 2 top of column of next story shear wall construction B respectively with being connected The periphery girder steel 9 of place's height is attached;By the column 2 by last layer shear wall structure A and the periphery girder steel 1 of each floor It is attached;
6)Each horizontal precast floor slab of layer in last layer strip frame precast reinforced concrete shear wall structure is installed, horizontal building is set Slab muscle;
7)Section is reserved in the cast of cast Concrete Filled floor and junction;
Upper strata shear wall structure A and lower floor shear wall structure B are installed;Repeat step 1)To step 7), until all layers Shear wall structure, which is respectively mounted, to be finished.
Compared with prior art, precast reinforced concrete shear wall structure can only be pre- using a depth of structural layer as one Unit processed, causes that jointing quantity is more, and construction efficiency is not high;Skeleton of the present invention by the use of steel frame as load-bearing during construction, Realize using multiple depth of structural layer as a prefabricated unit, greatly reduce the quantity of jointing, can greatly improve Construction efficiency.Periphery steel framework column using hot rolled H-shaped, easy to girder steel using being bolted entirely;Periphery steel framework column and shear wall Thickness is identical, and bending bearing capacity is stronger outside the face of shear wall, is connected with girder steel more convenient.Precast reinforced concrete shear wall Structure vertically connects generally use bar splicing or grout sleeve connection mode, processing essence of this kind of connection mode to prefabricated components Spend more demanding, site operation difficulty;Sleeve grouting be concealed work, grouting quality is difficult to ensure that, and reinforcing steel bar connecting sleeve tube into This is higher.The present invention:1)Half Beam connecting seat using upper and lower section precast shear wall is connected by junction steel plate high-strength bolt, Avoid the problem of Vertical bar connection;2)Girder steel of the present invention and precast shear wall are upper and lower by high-strength bolt end plate connection Section precast shear wall periphery steel framework not only plays the role of the upper and lower precast shear wall of connection but also plays and girder steel connection function, girder steel end Plate had not only played the role of with upper and lower section precast shear wall connection function but also had played to be connected upper and lower section precast shear wall, multi-purpose content, Better economy.Due to steel construction high precision machining, connection mode of the present invention can ensure site operation quality;The connection at the same time Without concealed work, quality is easy to ensure mode.Load-bearing skeleton and last layer are installed when periphery steel framework of the present invention can play installation Connector that unit and periphery girder steel 9 connect while can be with confined concrete, and lotus is born jointly with armored concrete part Carry, bearing capacity higher, anti-seismic performance is more preferable, can be adapted for high earthquake intensity area.
A kind of strip frame precast reinforced concrete shear wall structure of the present invention and its preparation and installation method tool Have:
(1)Prefabrication degree is high, and situ wet operation is few.Strip frame precast reinforced concrete shear wall structure is with multiple structures Layer height is integral prefabricated in factory for an installation unit.
(2)Prefabricated construction.Strip frame precast reinforced concrete shear wall structure and girder steel and last layer strip frame Precast reinforced concrete shear wall structure uses full bolt connecting mode, and site operation speed is fast.
(3)Anti-corrosion fire protecting performance is good, cost saving.The big portion of steel construction in strip frame precast reinforced concrete shear wall structure Subpackage is overlying in concrete, and anti-corrosion fire protecting performance is good, anti-corrosion fire prevention cost saving.
(4)Structure, go along with sb. to guard him, keep the temperature, is decoration integrated.Strip frame precast reinforced concrete shear wall structure both plays structure The function of load-bearing, and play the function of building enclosure, at the same insulating layer can in factory with strip frame prefabricated reinforced concrete Shear wall structure is integral prefabricated, and the outer impeller outer surface of structure can realize clear-water concrete, architectural concrete effect, realize structure, Go along with sb. to guard him, keep the temperature, is decoration integrated.
(5)Anti-seismic performance is good, and steel reinforced concrete shear walls structural seismic performance is good, is applicable to highly seismic region, and structure is fitted It is big with height.
Deng many advantages, such as, can be applied to multi and tall steel building building, have especially in steel house preferable Popularizing application prospect.
Above-mentioned example is only intended to the explanation present invention, in addition, also has a variety of different embodiments, and these are implemented Mode be all those skilled in the art after comprehension inventive concept it is also envisioned that therefore, will not enumerate herein.

Claims (9)

1. a kind of strip frame precast reinforced concrete shear wall structure, including bar construction and precast concrete;Bar construction The horizontal reinforcement of vertical reinforcement and genesis analysis including horizontal distribution;It is characterized in that, the strip frame is precast reinforced The height of concrete shear wall structure is higher than high from level to level;The bar construction further includes several crossbeams and several columns; The crossbeam and the column are made by shaped steel;The top surface of crossbeam is consistent with the floor height of floor;The horizontal reinforcement Left and right end portions are respectively welded on the inner side edge of a wing between two columns;The precast concrete subsection setup, it is corresponding per floor The position of plate is provided with the reserved section of cast;Precast concrete is arranged between the inner side edge of a wing between two columns;The reinforcing bar Cast of the structure between each layer precast concrete, which is reserved in section, to be continued through;The strip frame prefabricated reinforced concrete shearing The end of the top and bottom of wall construction is both provided with Half Beam connecting seat.
2. strip frame precast reinforced concrete shear wall structure as claimed in claim 1, it is characterised in that the cast is pre- The height of section is stayed to be not more than this floor plate thickness.
3. strip frame precast reinforced concrete shear wall structure as claimed in claim 2, it is characterised in that the Half Beam connects The height of joint chair is 150mm~300mm.
4. strip frame precast reinforced concrete shear wall structure as claimed in claim 2, it is characterised in that described prefabricated mixed The thickness for coagulating soil is identical with the crossbeam and the column cross-sectional width.
5. such as the preparation method of any strip frame precast reinforced concrete shear wall structure in claim 1 to 5, its feature It is, includes the following steps:
1)In factory, crossbeam made of shaped steel and column are welded into steel framework, the both ends of the steel framework are both provided with Half Beam connection Seat;
2)Steel framework is placed in die station;Horizontal reinforcement, vertical reinforcement are fixed on the steel framework;The both ends of horizontal reinforcement are distinguished It is welded on the inner side flange plate between two columns, the both ends of the vertical reinforcement is respectively welded at column both ends On the base of the Half Beam connecting seat;
3)The corresponding position per floor plate is provided with the reserved section of cast;Concrete is poured into a mould between two columns, is poured It is carried out at the same time and vibrates;
4)Concrete curing is carried out after the completion of pouring.
6. the preparation method of strip frame precast reinforced concrete shear wall structure as claimed in claim 7, it is characterised in that The step 1)In be additionally included between the column edge of a wing of bean column node region and weld ribbed stiffener.
7. the preparation method of strip frame precast reinforced concrete shear wall structure as claimed in claim 7, it is characterised in that The step 1)In be additionally included in bean column node region column outer side wing edge bolt hole be set.
8. such as the installation method of any strip frame precast reinforced concrete shear wall structure in claim 1 to 5, its feature It is, includes the following steps:
1)Next layer of strip frame precast reinforced concrete shear wall structure is installed;Fixed with temporary support, strip frame is pre- The column of reinforced concrete shear wall structure processed is attached with periphery girder steel;
2)Each horizontal floor of layer in next layer of strip frame precast reinforced concrete shear wall structure is installed, sets gradually each layer water Flat floor reinforcing bar;
3)Pour into a mould each floor plate overlapping layer concrete and the reserved section of cast;
4)The Half Beam connecting seat between upper and lower two layers of strip frame precast reinforced concrete shear wall structure is connected;
5)By the column of the upper and lower layer strip frame precast reinforced concrete shear wall structure periphery steel with junction height respectively Beam is attached;The column by last layer strip frame precast reinforced concrete shear wall structure and periphery girder steel are carried out Connection;
6)Each horizontal precast floor slab of layer in last layer strip frame precast reinforced concrete shear wall structure is installed, horizontal building is set Slab muscle;
7)Pour into a mould Concrete Filled floor and the reserved section of cast;
Repeat step 1)To step 7), until all layers of strip frame precast reinforced concrete shear wall structure are respectively mounted and finish.
9. the installation method of strip frame precast reinforced concrete shear wall structure as claimed in claim 8, it is characterised in that The periphery girder steel and the steel column of strip frame precast reinforced concrete shear wall structure pass through high-strength bolt end plate connection.
CN201711379411.6A 2017-12-20 2017-12-20 Strip steel frame precast reinforced concrete shear wall structure and preparation and installation methods Active CN108005266B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711379411.6A CN108005266B (en) 2017-12-20 2017-12-20 Strip steel frame precast reinforced concrete shear wall structure and preparation and installation methods

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711379411.6A CN108005266B (en) 2017-12-20 2017-12-20 Strip steel frame precast reinforced concrete shear wall structure and preparation and installation methods

Publications (2)

Publication Number Publication Date
CN108005266A true CN108005266A (en) 2018-05-08
CN108005266B CN108005266B (en) 2023-06-09

Family

ID=62059948

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711379411.6A Active CN108005266B (en) 2017-12-20 2017-12-20 Strip steel frame precast reinforced concrete shear wall structure and preparation and installation methods

Country Status (1)

Country Link
CN (1) CN108005266B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108532795A (en) * 2018-07-11 2018-09-14 上海应用技术大学 The vertical rigid connection node of assembly concrete shear wall structure and construction method
CN114232844A (en) * 2021-12-16 2022-03-25 中建五局第三建设有限公司 Shear wall system of full-assembly type building and wallboard module prefabricating method thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06341247A (en) * 1993-06-01 1994-12-13 Kumagai Gumi Co Ltd Aseismic wall with vibration energy absorbing function
CN101260692A (en) * 2008-04-11 2008-09-10 广厦建设集团有限责任公司 Bearing force-free anti-knock steel support system
CN102704585A (en) * 2011-03-28 2012-10-03 张戈 Construction technology for noncombustible type double-interlayer foam concrete insulation board
CN103290952A (en) * 2013-05-13 2013-09-11 东南大学 Integrated assembled concrete frame and shear wall connection structure and construction method thereof
CN203475598U (en) * 2013-08-16 2014-03-12 威海建设集团股份有限公司 Shock-proof prefabricated building of steel bar truss shearing wall composite structure
CN106049671A (en) * 2016-05-25 2016-10-26 北京交通大学 Fabricated steel frame and steel plate shear wall structure replaceable after earthquake
CN206174118U (en) * 2016-09-30 2017-05-17 华东建筑设计研究院有限公司 Bracing reinforcing structural steel frame big space housing system of shear force wall assembled
CN207739438U (en) * 2017-12-20 2018-08-17 中冶建筑研究总院有限公司 A kind of strip frame precast reinforced concrete shear wall structure

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06341247A (en) * 1993-06-01 1994-12-13 Kumagai Gumi Co Ltd Aseismic wall with vibration energy absorbing function
CN101260692A (en) * 2008-04-11 2008-09-10 广厦建设集团有限责任公司 Bearing force-free anti-knock steel support system
CN102704585A (en) * 2011-03-28 2012-10-03 张戈 Construction technology for noncombustible type double-interlayer foam concrete insulation board
CN103290952A (en) * 2013-05-13 2013-09-11 东南大学 Integrated assembled concrete frame and shear wall connection structure and construction method thereof
CN203475598U (en) * 2013-08-16 2014-03-12 威海建设集团股份有限公司 Shock-proof prefabricated building of steel bar truss shearing wall composite structure
CN106049671A (en) * 2016-05-25 2016-10-26 北京交通大学 Fabricated steel frame and steel plate shear wall structure replaceable after earthquake
CN206174118U (en) * 2016-09-30 2017-05-17 华东建筑设计研究院有限公司 Bracing reinforcing structural steel frame big space housing system of shear force wall assembled
CN207739438U (en) * 2017-12-20 2018-08-17 中冶建筑研究总院有限公司 A kind of strip frame precast reinforced concrete shear wall structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108532795A (en) * 2018-07-11 2018-09-14 上海应用技术大学 The vertical rigid connection node of assembly concrete shear wall structure and construction method
CN114232844A (en) * 2021-12-16 2022-03-25 中建五局第三建设有限公司 Shear wall system of full-assembly type building and wallboard module prefabricating method thereof
CN114232844B (en) * 2021-12-16 2023-08-25 中建五局第三建设有限公司 Shear wall system of fully assembled building and wallboard module prefabrication method thereof

Also Published As

Publication number Publication date
CN108005266B (en) 2023-06-09

Similar Documents

Publication Publication Date Title
CN107989227B (en) Assembled steel reinforced concrete shear wall structure and preparation and installation methods thereof
CN207739436U (en) A kind of assembled steel reinforced concrete shear walls structure
CN105544733B (en) For supporting the structural framing system of building and assembling its method
CN108005410B (en) Assembled steel-concrete combined structure residential system and construction method thereof
CN108005265A (en) A kind of prefabricated steel reinforced concrete shear wall structure of multilayer and its preparation and construction method
CN108005264A (en) A kind of steel framework constraint precast reinforced concrete shear wall structure and preparation and installation method
CN103821276B (en) A kind of assembled, modular architectural system
CN107989228B (en) Prefabricated steel reinforced concrete shear wall structure and preparation and installation methods thereof
CN105089178B (en) A kind of pre-splicing Standard formula building of prefabricated steel reinforced concrete shear walls
CN207739437U (en) A kind of prefabricated steel reinforced concrete shear wall structure
CN206016309U (en) A kind of overall assembled building system
CN207739674U (en) A kind of assembled Residential System of Steel-concrete Composite Structure
CN111155681B (en) Steel concrete composite connection multilayer prefabricated section steel concrete shear wall structure and preparation and construction method thereof
CN111962952A (en) Steel tube concrete column-H-shaped steel beam-steel support-pi-shaped connecting piece combined type center pillar bottom node and manufacturing method
CN207739438U (en) A kind of strip frame precast reinforced concrete shear wall structure
CN112112265A (en) Connecting joint of dry-type connected precast beam column and construction method
CN110748077A (en) Prestressed truss wallboard, wall body manufactured by using wallboard and manufacturing method of wall body
CN105089177B (en) Prefabrication type steel truss concrete shear wall and manufacture method
CN111962948A (en) Steel tube concrete column-H-shaped steel beam-steel support-pi-shaped connecting piece combined side column bottom node and manufacturing method
CN205875394U (en) Antidetonation concrete beam column that dry process is connected
CN207739439U (en) A kind of steel framework constraint precast reinforced concrete shear wall structure
CN108005266A (en) A kind of strip frame precast reinforced concrete shear wall structure and preparation and installation method
CN208202224U (en) A kind of prefabricated steel reinforced concrete shear wall structure of multilayer
CN219386745U (en) Short limb assembled light steel combined steel wire net frame mortar-perlite-polyphenyl enclosure wall
CN111962951A (en) Steel tube concrete column-H-shaped steel beam-steel support-Pi-shaped connecting piece combined type corner column bottom node and manufacturing method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant