CN108004940A - Build a bridge bridge pier, bridge floor of one kind is built and fixes machine with armored concrete steel reinforcement cage - Google Patents
Build a bridge bridge pier, bridge floor of one kind is built and fixes machine with armored concrete steel reinforcement cage Download PDFInfo
- Publication number
- CN108004940A CN108004940A CN201810036322.XA CN201810036322A CN108004940A CN 108004940 A CN108004940 A CN 108004940A CN 201810036322 A CN201810036322 A CN 201810036322A CN 108004940 A CN108004940 A CN 108004940A
- Authority
- CN
- China
- Prior art keywords
- plate
- bridge
- side chain
- wall
- electric
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Abstract
Build a bridge bridge pier the present invention relates to one kind, bridge floor is built fixes machine with armored concrete steel reinforcement cage, including bottom plate, mounting bracket, grabbing device is with building device, mounting bracket is installed on the bottom plate, grabbing device is installed on mounting bracket, grabbing device lower end, which is provided with, builds device, device is built on bottom plate, building device includes line slide rail, substrate, limiting slot, connecting plate, push cylinder, fixed plate, line slideway, electric return board and supporting mechanism, supporting mechanism includes connecting pole, link, connecting shaft, support tube, side chain is supported with adjusting side chain.The present invention can solve the problems such as security risk present in existing triangular reinforced bar cage fixation procedure is big, labor intensity is big, high labor cost and work efficiency are low, it can realize the fixed function of triangular reinforced bar cage automation, have the advantages that no security risk, labor intensity are low, cost of labor is low high with work efficiency.
Description
Technical field
The present invention relates to bridge construction apparatus field, specifically build a bridge bridge pier, bridge floor of one kind is built and uses reinforcing bar
Concrete reinforcing cage fixes machine.
Background technology
At present in China, armored concrete is a kind of most structure type of application, while is also to use reinforcing bar in the world
The most area of concrete structure, wherein armored concrete are most widely used in the bridge pier that builds a bridge, bridge floor are built.Coagulation
The tensile strength of soil is relatively low, and usually only 1/10th or so of compression strength, any significant stretch bending effect can all make its micro-
Lattice structure cracking and separation are seen so as to cause structural damage.For comparing concrete, Steel Bar Tensile Strength is very high, generally
In more than 200MPa, therefore usually people add the material of putting more energy into such as reinforcing bar in concrete and work together therewith, it is undertaken by reinforcing bar
In pulling force, concrete undertakes compression part.Steel reinforcement cage primarily function is similarly master with the stress of pillar longitudinal reinforcement
Drawing-resistant function is played, the compression strength of concrete is high but tensile strength is very low, and steel reinforcement cage plays constraint to pile concrete
Effect, makes it to bear certain horizontal force.Steel reinforcement cage is complicated mainly using being manually fixed at present, time-consuming and laborious,
Cost of labor is higher, and fixed operation needs to carry out on certain altitude position, staff in operation there are security risk,
The security of operation cannot be guaranteed, and human body is also easy to produce fatigue after long working, and easily fixed and subsequent operation is imitated
Fruit has an impact, and operation quality hardly results in guarantee, to solve the above-mentioned problems, builds a bridge bridge the present invention provides one kind
Pier, bridge floor are built fixes machine with armored concrete steel reinforcement cage.
The content of the invention
In order to make up for the deficiencies of the prior art, the present invention provides build a bridge bridge pier, bridge floor of one kind to build and is mixed with reinforcing bar
Solidifying soil steel reinforcement cage fixes machine, and the present invention can solve that security risk present in existing triangular reinforced bar cage fixation procedure is big, labor
The problems such as fatigue resistance is big, high labor cost and work efficiency are low, it is possible to achieve the fixed function of triangular reinforced bar cage automation, tool
Whether there is the advantages that security risk, labor intensity are low, cost of labor is low and work efficiency is high.
The present invention to be solved its technical problem and be realized using following technical scheme:One kind builds a bridge bridge pier, bridge
Face is built fixes machine with armored concrete steel reinforcement cage, including bottom plate, mounting bracket, grabbing device and builds device, on the bottom plate
Mounting bracket is installed, grabbing device is installed on mounting bracket, grabbing device lower end, which is provided with, builds device, builds device and is installed on
On bottom plate;Wherein:
It is described build device include line slide rail, substrate, limiting slot, connecting plate, push cylinder, fixed plate, line slideway,
Electric return board and supporting mechanism, line slide rail are installed on bottom plate, and line slide rail quantity is two, is passed through on each line slide rail
Sliding matching mode is provided with substrate, and spaced set has limiting slot in transverse direction on substrate, and connection is provided with the outside of substrate
Plate, connecting plate side wall are connected with push cylinder one end, and the push cylinder other end is connected with fixed plate, two line slide rails it
Between line slideway is installed, line slideway is installed on bottom plate, and electric sliding is provided with by sliding matching mode on line slideway
Plate, is provided with supporting mechanism on electric return board;By the mutual cooperation of push cylinder and electric return board, substrate position is adjusted suitable
When so that triangular framing can be placed in corresponding limiting slot, and under the action of supporting mechanism, three main reinforcements are consolidated
Be scheduled on suitable position, with triangular framing form steel reinforcement cage, without manually building, improve work efficiency, reduce manually into
This, ensure that the personal safety of staff.
The supporting mechanism includes connecting pole, link, connecting shaft, support tube, support side chain with adjusting side chain, connecting pole
Quantity is two, and two connecting poles are symmetrically mounted on electric return board left and right ends, and each top end that connects is mounted on link, even
Connect and connecting shaft is installed between frame, support tube is installed in connecting shaft, support and be provided with equal intervals from left to right on drum outer wall
Three support side chains, and adjusting side chain is provided between adjacent supports side chain, and adjust side chain and be installed on support drum outer wall;By three
Root main reinforcement is placed on support side chain, is adjusted three main reinforcement positions suitably by adjusting side chain so that every main reinforcement
All it is connected just with one of angle in triangular framing, without being manually supported and adjusting, reduces labor intensity,
Improve work efficiency, avoid producing harmful effect to building effect because of personnel's fatigue.
As a preferred technical solution of the present invention, the grabbing device includes falsework, electric rotating machine, leading screw, shifting
Motion block, guided way, supporting plate, lifting cylinder, lifting panel, crawl semi-ring and crawl electric pushrod, falsework are installed on mounting bracket
Upper end, falsework underface offer shifting chute, electric rotating machine are provided with falsework inner wall, electric rotating machine output shaft passes through connection
Axis device is connected with leading screw one end, and the leading screw other end is installed on falsework inner wall by bearing, and movement is provided with the middle part of leading screw
Block, the width of shifting chute are less than the width of movable block, and movable block upper end is connected with guided way, and guided way is installed on falsework
On inner wall, movable block lower end is provided with supporting plate, and supporting plate lower end is connected with lifting cylinder bottom, lifting cylinder top and lifting face
Plate is connected, and lifts and is provided with crawl semi-ring by hinge on panel, crawl semi-ring quantity is two, and two crawl semi-rings are symmetrically pacified
Mounted in lifting panel left and right ends, capture and crawl electric pushrod, crawl electric pushrod bottom are provided with by axis pin on semi-ring outer wall
End is installed on lifting panel lower end by axis pin;Leading screw is driven to be rotated by electric rotating machine, while in the effect of guided way
Under, movable block carries out linear reciprocating motion, and lifting cylinder drives lifting panel to be moved to proper height, while is captured by adjusting
Electric pushrod make it that capturing semi-ring catches triangular reinforced bar frame, to be moved to after suitable position, then by triangular reinforced bar frame
Frame is placed in limiting slot, without manually movement, is reduced workload, is reduced labor intensity.
As a preferred technical solution of the present invention, the support side chain includes lifting electric putter, bracket, arc and slides
Rail, arc shaped slider, traction electric pushrod, traction support plate and locating slot, lifting electric putter are installed on support tube upper end, lifting electricity
Dynamic push rod top is provided with bracket, supports and is provided with arc-shaped slide rail on drum outer wall, is pacified on arc-shaped slide rail by sliding matching mode
Equipped with arc shaped slider, arc shaped slider quantity is two, and two arc shaped sliders are symmetrically mounted on arc-shaped slide rail rear and front end, each arc
Traction electric pushrod is mounted on sliding block, and bracket and two locating slots are in the arrangement of falling Y-shaped, traction electric pushrod top peace
Equipped with traction support plate, draw and locating slot is installed on support plate;According to the shape of triangular framing by lifting electric putter with drawing
It is appropriate that electric pushrod is adjusted, and can connect until being placed on bracket with three main reinforcements in locating slot with triangular framing inner wall
Touch, without manually reinforcing bar is fixed and adjusted into row position, reduce labor intensity, improve work efficiency.
As a preferred technical solution of the present invention, the adjusting side chain includes active hydraulic cylinder, connection ring, traction
Plate, working plate and auxiliary slide, active hydraulic cylinder are installed on electric return board, and active hydraulic cylinder top is provided with connection ring, even
Connect and be connected on ring outer wall by hinge with towing plate one end, the towing plate other end is installed on working plate by hinge, work
Plate is installed on two adjacent arc shaped sliders, and working plate lower end is connected by sliding matching mode with auxiliary slide, auxiliary
Slide is helped to be installed on support drum outer wall;By the stretching motion of active hydraulic cylinder drive the towing plate being installed in connection ring into
Row opening and closing campaign, thus drives the working plate being connected with towing plate to be moved on auxiliary slide, realizes electronic to drawing
The adjusting of push rod angle, operation is flexible, easy, expands the use scope of the present invention.
During work, grabbing device is started to work first, drives leading screw to be rotated by electric rotating machine, while in guided way
Under the action of, movable block carries out linear reciprocating motion, and lifting cylinder drives lifting panel to be moved to proper height, while passes through tune
Section crawl electric pushrod make it that capturing semi-ring catches triangular reinforced bar frame, in electric rotating machine, push cylinder and electric return board
Mutual cooperation effect under, triangular framing can be placed in corresponding limiting slot, then supporting mechanism start to work, work
Make personnel three main reinforcements are placed on support side chain, adjusted three main reinforcement positions suitably by adjusting side chain so that
Every main reinforcement is all connected with one of angle in triangular framing just, so that all reinforcement locations on steel reinforcement cage is true
It is fixed, subsequent operation is carried out to steel reinforcement cage easy to staff, the present invention can be solved in existing triangular reinforced bar cage fixation procedure
The problems such as existing security risk is big, labor intensity is big, high labor cost and work efficiency are low, it is possible to achieve triangular reinforced bar cage
Automate fixed function.
Compared with prior art, the present invention has the following advantages:
1. the present invention can solve, security risk present in existing triangular reinforced bar cage fixation procedure is big, labor intensity
Greatly, high labor cost and the problems such as work efficiency is low, it is possible to achieve the fixed function of triangular reinforced bar cage automation, with no peace
The advantages that hidden danger, labor intensity are low entirely, cost of labor is low and work efficiency is high;
2. the present invention, which is provided with, builds device, without manually building, improve work efficiency, reduce cost of labor, protect
The personal safety of staff is demonstrate,proved;
3. the present invention is provided with grabbing device, without manually being moved to steel bar framework, workload is reduced, is reduced
Labor intensity.
Brief description of the drawings
The present invention is further described with reference to the accompanying drawings and examples.
Fig. 1 is the dimensional structure diagram of the present invention;
Fig. 2 is bottom plate of the present invention and builds the cooperation dimensional structure diagram between device;
Fig. 3 is the cooperation planar structure schematic diagram between mounting bracket and grabbing device of the present invention;
Fig. 4 is the N of Fig. 3 of the present invention to partial enlarged view;
Fig. 5 is that electric return board of the present invention, support tube, support side chain and the cooperation stereochemical structure that adjusts between side chain are illustrated
Figure.
Embodiment
In order to make the technical means, the creative features, the aims and the efficiencies achieved by the present invention easy to understand, tie below
Conjunction is specifically illustrating, and the present invention is further explained.
As shown in Figures 1 to 5, build a bridge bridge pier, bridge floor of one kind is built and fixes machine with armored concrete steel reinforcement cage, including
Bottom plate 1, mounting bracket 2, grabbing device 3 and device 4 is built, mounting bracket 2 is installed on the bottom plate 1, is provided with and grabs on mounting bracket 2
Device 3 is taken, 3 lower end of grabbing device, which is provided with, builds device 4, builds device 4 on bottom plate 1;Wherein:
The device 4 of building includes line slide rail 41, substrate 42, limiting slot 43, connecting plate 44, push cylinder 45, fixation
Plate 46, line slideway 47, electric return board 48 and supporting mechanism 49, line slide rail 41 are installed on bottom plate 1,41 quantity of line slide rail
For two, substrate 42 is provided with by sliding matching mode on each line slide rail 41, it is equidistant in transverse direction on substrate 42
Limiting slot 43 is provided with, the outside of substrate 42 is provided with connecting plate 44, and 44 side wall of connecting plate is connected with 45 one end of push cylinder, pushes away
45 other end of cylinder of supplying gas is connected with fixed plate 46, and line slideway 47, line slideway 47 are provided between two line slide rails 41
On bottom plate 1, electric return board 48 is provided with by sliding matching mode on line slideway 47, is provided with electric return board 48
Supporting mechanism 49;By the mutual cooperation of push cylinder 45 and electric return board 48, it is appropriate that 42 position of substrate is adjusted so that triangle
Shape frame can be placed in corresponding limiting slot 43, and under the action of supporting mechanism 49, three main reinforcements are fixed on conjunction
Right position is put, and is formed steel reinforcement cage with triangular framing, without manually building, is improved work efficiency, reduce cost of labor, ensures
The personal safety of staff.
The supporting mechanism 49 includes connecting pole 491, link 492, connecting shaft 493, support tube 494, support side chain 495
With adjusting side chain 496,491 quantity of connecting pole is two, and two connecting poles 491 are symmetrically mounted on 48 left and right ends of electric return board, often
A 491 top of connecting pole is mounted on link 492, and connecting shaft 493 is provided between link 492, is installed in connecting shaft 493
There is support tube 494, three support side chains 495, adjacent supports side chain are installed at equal intervals from left to right on 494 outer wall of support tube
It is provided between 495 and adjusts side chain 496, and is adjusted side chain 496 and be installed on 494 outer wall of support tube;Three main reinforcements are placed
On support side chain 495, three main reinforcement positions are adjusted suitably by adjusting side chain 496 so that every main reinforcement is all lucky
It is connected with one of angle in triangular framing, without being manually supported and adjusting, reduces labor intensity, improve
Work efficiency, avoids producing harmful effect to building effect because of personnel's fatigue.
The grabbing device 3 include falsework 31, electric rotating machine 32, leading screw 33, movable block 34, guided way 35, supporting plate 36,
Lifting cylinder 37, lifting panel 38, crawl semi-ring 39 and crawl electric pushrod 310, falsework 31 are installed on 2 upper end of mounting bracket,
Shifting chute is offered immediately below falsework 31, electric rotating machine 32 is installed, 32 output shaft of electric rotating machine leads on 31 inner wall of falsework
Cross shaft coupling with 33 one end of leading screw to be connected, 33 other end of leading screw is installed on 31 inner wall of falsework by bearing, in leading screw 33
Portion is provided with movable block 34, and the width of shifting chute is less than the width of movable block 34, and 34 upper end of movable block is connected with guided way 35,
And guided way 35 is installed on 31 inner wall of falsework, 34 lower end of movable block is provided with supporting plate 36,36 lower end of supporting plate and lifting cylinder
37 bottoms are connected, and 37 top of lifting cylinder is connected with lifting panel 38, lift and are provided with crawl by hinge on panel 38
Semi-ring 39,39 quantity of crawl semi-ring are two, and two crawl semi-rings 39 are symmetrically mounted on 38 left and right ends of lifting panel, capture semi-ring
Crawl electric pushrod 310 is provided with by axis pin on 39 outer walls, 310 bottom of crawl electric pushrod is installed on lifting face by axis pin
38 lower end of plate;Leading screw 33 is driven to be rotated by electric rotating machine 32, while under the action of guided way 35, movable block 34 carries out
Linear reciprocating motion, lifting cylinder 37 drives lifting panel 38 to be moved to proper height, while captures electric pushrod by adjusting
310 so that crawl semi-ring 39 catches triangular reinforced bar frame, to be moved to after suitable position, then triangular reinforced bar frame is put
Put in limiting slot 43, without manually movement, reduce workload, reduce labor intensity.
The support side chain 495 includes lifting electric putter 4951, bracket 4952, arc-shaped slide rail 4953, arc shaped slider
4954th, electric pushrod 4955, traction support plate 4956 and locating slot 4957, lifting electric putter 4951 are drawn and is installed on support tube
494 upper ends, 4951 top of lifting electric putter are provided with bracket 4952, arc-shaped slide rail 4953 are provided with 494 outer wall of support tube,
Arc shaped slider 4954 is provided with by sliding matching mode on arc-shaped slide rail 4953,4954 quantity of arc shaped slider is two, two arcs
Shape sliding block 4954 is symmetrically mounted on 4953 rear and front end of arc-shaped slide rail, is mounted on drawing electronic push away on each arc shaped slider 4954
Bar 4955, and bracket 4952 and two locating slots 4957 are in the arrangement of falling Y-shaped, 4955 top of traction electric pushrod is provided with traction
Support plate 4956, draws and is provided with locating slot 4957 on support plate 4956;According to the shape of triangular framing by lifting electric putter
4951 are adjusted suitably with traction electric pushrod 4955, until being placed on bracket 4952 and three main reinforcement energy in locating slot 4957
It is enough to be in contact with triangular framing inner wall, without manually reinforcing bar is fixed and adjusted into row position, labor intensity is reduced, is improved
Work efficiency.
It is described adjusting side chain 496 include active hydraulic cylinder 4961, connection ring 4962, towing plate 4963, working plate 4964 with
Slide 4965 is aided in, active hydraulic cylinder 4961 is installed on electric return board 48, and 4961 top of active hydraulic cylinder is provided with connection ring
4962, it is connected by hinge with 4963 one end of towing plate on 4962 outer wall of connection ring, 4963 other end of towing plate passes through hinge
On working plate 4964, working plate 4964 is installed on two adjacent arc shaped sliders 4954, and 4964 lower end of working plate
It is connected by sliding matching mode with auxiliary slide 4965, auxiliary slide 4965 is installed on 494 outer wall of support tube;Pass through master
The stretching motion of hydrodynamic cylinder pressure 4961 drives the towing plate 4963 being installed in connection ring 4962 to carry out opening and closing campaign, thus drives
The working plate 4964 being connected with towing plate 4963 is moved on auxiliary slide 4965, is realized to drawing electric pushrod 4955
The adjusting of angle, operation is flexible, easy, expands the use scope of the present invention.
During work, grabbing device 3 is started to work first, drives leading screw 33 to be rotated by electric rotating machine 32, while
Under the action of guided way 35, movable block 34 carries out linear reciprocating motion, and lifting cylinder 37 drives lifting panel 38 to be moved to properly
Highly, while by adjusting the crawl crawl semi-ring 39 of electric pushrod 310 triangular reinforced bar frame is caught, in electric rotating machine
32nd, under the mutual cooperation of push cylinder 45 and electric return board 48 acts on, triangular framing can be placed on corresponding limiting slot
In 43, then supporting mechanism 49 is started to work, and three main reinforcements are placed on support side chain 495 by staff, pass through adjusting
It is appropriate that side chain 496 adjusts three main reinforcement positions so that every main reinforcement all just with triangular framing one of them
Angle is connected, so that all reinforcement locations on steel reinforcement cage be determined, subsequent operation, this hair are carried out to steel reinforcement cage easy to staff
Bright solve that security risk present in existing triangular reinforced bar cage fixation procedure is big, labor intensity is big, high labor cost and work
Make the problems such as efficiency is low, realize the fixed function of triangular reinforced bar cage automation, reached purpose.
The basic principles, main features and advantages of the invention have been shown and described above.The technical staff of the industry should
Understand, the present invention is not limited to the above embodiments, and the description in above embodiments and description simply illustrates the present invention
Principle, without departing from the spirit and scope of the present invention, various changes and modifications of the present invention are possible, these change and change
Into all fall within the protetion scope of the claimed invention.The claimed scope of the invention is by appended claims and its equivalent
Define.
Claims (5)
1. one kind builds a bridge, bridge pier, bridge floor are built fixes machine, including bottom plate (1), mounting bracket with armored concrete steel reinforcement cage
(2), grabbing device (3) is with building device (4), it is characterised in that:Mounting bracket (2), mounting bracket are installed on the bottom plate (1)
(2) grabbing device (3) is installed, grabbing device (3) lower end, which is provided with, builds device (4), builds device (4) in bottom plate (1) on
On;Wherein:
The device (4) of building includes line slide rail (41), substrate (42), limiting slot (43), connecting plate (44), push cylinder
(45), fixed plate (46), line slideway (47), electric return board (48) and supporting mechanism (49), line slide rail (41) are installed on bottom
On plate (1), line slide rail (41) quantity is two, and substrate is provided with by sliding matching mode on each line slide rail (41)
(42), spaced set has limiting slot (43) in transverse direction on substrate (42), and connecting plate (44) is provided with the outside of substrate (42),
Connecting plate (44) side wall is connected with push cylinder (45) one end, and push cylinder (45) other end is connected with fixed plate (46),
Line slideway (47) is installed, line slideway (47) is installed on bottom plate (1), line slideway between two line slide rails (41)
(47) electric return board (48) is provided with by sliding matching mode on, supporting mechanism (49) is installed on electric return board (48);
The supporting mechanism (49) includes connecting pole (491), link (492), connecting shaft (493), support tube (494), support
Side chain (495) is two with adjusting side chain (496), connecting pole (491) quantity, and two connecting poles (491) are symmetrically mounted on electric sliding
Plate (48) left and right ends, each connecting pole (491) top are mounted on link (492), the company of being provided between link (492)
Spindle (493), is provided with support tube (494) in connecting shaft (493), peace at equal intervals from left to right on support tube (494) outer wall
Equipped with three support side chains (495), it is provided between adjacent supports side chain (495) and adjusts side chain (496), and adjust side chain
(496) it is installed on support tube (494) outer wall.
2. one kind according to claim 1 builds a bridge, bridge pier, bridge floor are built fixes machine with armored concrete steel reinforcement cage, its
It is characterized in that:The grabbing device (3) includes falsework (31), electric rotating machine (32), leading screw (33), movable block (34), guiding
Rail (35), supporting plate (36), lifting cylinder (37), lifting panel (38), crawl semi-ring (39) and crawl electric pushrod (310), work
Make frame (31) and be installed on mounting bracket (2) upper end, offer shifting chute immediately below falsework (31), installed on falsework (31) inner wall
There is electric rotating machine (32), electric rotating machine (32) output shaft is connected by shaft coupling with leading screw (33) one end, and leading screw (33) is another
End is installed on falsework (31) inner wall by bearing, and movable block (34), movable block (34) upper end are provided with the middle part of leading screw (33)
It is connected with guided way (35), and guided way (35) is installed on falsework (31) inner wall, movable block (34) lower end is provided with support
Plate (36), supporting plate (36) lower end are connected with lifting cylinder (37) bottom, and lifting cylinder (37) top is with lifting panel (38) phase
Connection, lifts and is provided with crawl semi-ring (39) by hinge on panel (38), crawl semi-ring (39) quantity is two, and two crawls are partly
Ring (39) be symmetrically mounted on lifting panel (38) left and right ends, capture semi-ring (39) outer wall on by axis pin be provided with crawl it is electronic
Push rod (310), crawl electric pushrod (310) bottom are installed on lifting panel (38) lower end by axis pin.
3. one kind according to claim 1 builds a bridge, bridge pier, bridge floor are built fixes machine with armored concrete steel reinforcement cage, its
It is characterized in that:The support side chain (495) includes lifting electric putter (4951), bracket (4952), arc-shaped slide rail (4953), arc
Shape sliding block (4954), traction electric pushrod (4955), traction support plate (4956) and locating slot (4957), lifting electric putter
(4951) support tube (494) upper end is installed on, lifting electric putter (4951) top is provided with bracket (4952), support tube
(494) arc-shaped slide rail (4953) is installed, being provided with arc by sliding matching mode on arc-shaped slide rail (4953) slides on outer wall
Block (4954), arc shaped slider (4954) quantity is two, before two arc shaped sliders (4954) are symmetrically mounted on arc-shaped slide rail (4953)
Both ends afterwards, traction electric pushrod (4955), and bracket (4952) and two positioning are mounted on each arc shaped slider (4954)
Groove (4957) is in the arrangement of falling Y-shaped, and traction electric pushrod (4955) top is provided with traction support plate (4956), draws support plate
(4956) locating slot (4957) is installed on.
4. one kind according to claim 1 builds a bridge, bridge pier, bridge floor are built fixes machine with armored concrete steel reinforcement cage, its
It is characterized in that:The adjusting side chain (496) includes active hydraulic cylinder (4961), connection ring (4962), towing plate (4963), work
Plate (4964) and auxiliary slide (4965), active hydraulic cylinder (4961) are installed on electric return board (48), active hydraulic cylinder
(4961) top is provided with connection ring (4962), is connected on connection ring (4962) outer wall by hinge with towing plate (4963) one end
Connect, towing plate (4963) other end is installed on working plate (4964) by hinge, and working plate (4964) is installed on adjacent two
On a arc shaped slider (4954), and working plate (4964) lower end is connected by sliding matching mode with auxiliary slide (4965),
Slide (4965) is aided in be installed on support tube (494) outer wall.
5. one kind according to claim 2 builds a bridge, bridge pier, bridge floor are built fixes machine with armored concrete steel reinforcement cage, its
It is characterized in that:The mobile well width is less than movable block (34) width.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810036322.XA CN108004940A (en) | 2018-01-15 | 2018-01-15 | Build a bridge bridge pier, bridge floor of one kind is built and fixes machine with armored concrete steel reinforcement cage |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810036322.XA CN108004940A (en) | 2018-01-15 | 2018-01-15 | Build a bridge bridge pier, bridge floor of one kind is built and fixes machine with armored concrete steel reinforcement cage |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108004940A true CN108004940A (en) | 2018-05-08 |
Family
ID=62050668
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810036322.XA Withdrawn CN108004940A (en) | 2018-01-15 | 2018-01-15 | Build a bridge bridge pier, bridge floor of one kind is built and fixes machine with armored concrete steel reinforcement cage |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108004940A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112139770A (en) * | 2020-09-28 | 2020-12-29 | 王国超 | Preparation process of assembled integral floor slab |
CN113481972A (en) * | 2021-08-19 | 2021-10-08 | 新河县华构桩工机械厂 | Steel reinforcement cage material loading transportation and lower cage device |
-
2018
- 2018-01-15 CN CN201810036322.XA patent/CN108004940A/en not_active Withdrawn
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112139770A (en) * | 2020-09-28 | 2020-12-29 | 王国超 | Preparation process of assembled integral floor slab |
CN113481972A (en) * | 2021-08-19 | 2021-10-08 | 新河县华构桩工机械厂 | Steel reinforcement cage material loading transportation and lower cage device |
CN113481972B (en) * | 2021-08-19 | 2022-11-08 | 新河县华构桩工机械厂 | Steel reinforcement cage material loading transportation and lower cage device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208696761U (en) | A kind of equipment for after-treatment of raised floor | |
CN108031777A (en) | Can bear down on one armored concrete triangle the building decorating machine that steel reinforcement cage is built automatically | |
CN211393616U (en) | Lifting beam frame for manure leaking plate front traveling crane | |
CN108004940A (en) | Build a bridge bridge pier, bridge floor of one kind is built and fixes machine with armored concrete steel reinforcement cage | |
CN106079067A (en) | The tensioning equipment of a kind of precast track plate and method thereof | |
CN208197139U (en) | A kind of pre-stress rail plate continuous production complete set of equipments | |
CN107013030B (en) | Hoisting type elevator shaft construction platform device and elevator shaft construction method | |
CN107815971B (en) | High pier is from climbing liquid press to turn over molds system | |
CN108358087A (en) | A kind of hydraulic engineering hanging device | |
CN208593818U (en) | A kind of reinforcing bar feeder of reinforcing mesh production line | |
CN208105053U (en) | One kind builds a bridge bridge pier and bridge floor is built and fixes machine with armored concrete steel reinforcement cage | |
CN108127055A (en) | A kind of building iron concrete triangular reinforced bar bending frameworks machine | |
CN208327208U (en) | A kind of hydraulic engineering hanging device | |
CN211338595U (en) | Motor hoist and mount overhauls device | |
CN213198142U (en) | T roof beam hydraulic pressure shedder | |
CN108221980A (en) | A kind of architectural engineering automated programming system | |
CN107989379A (en) | The building iron concrete for making equipment that triangular reinforced bar cage can be built automatically | |
CN211523211U (en) | Pile extractor for hydraulic engineering | |
CN210232924U (en) | Subway train brake dismantles auxiliary device | |
CN207806472U (en) | A kind of building iron concrete triangular reinforced bar bending frameworks machine | |
CN216974863U (en) | Gob-side entry retaining mechanized mold hanging device | |
CN210438262U (en) | Buckling and pressing type simple sleeper hoisting device | |
CN208152037U (en) | A kind of architectural engineering automatic installation apparatus | |
CN2218197Y (en) | Hydraulic moving apparatus of small-size hydraulic tamping tool | |
CN108907665A (en) | A kind of column scuffing of cylinder bore machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20180508 |