CN107989584A CN201610947834.2A CN201610947834A CN107989584A CN 107989584 A CN107989584 A CN 107989584A CN 201610947834 A CN201610947834 A CN 201610947834A CN 107989584 A CN107989584 A CN 107989584A
Authority
CN
China
Prior art keywords
steam injection
oil
integrated apparatus
note
horizontal well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610947834.2A
Other languages
Chinese (zh)
Other versions
CN107989584B (en
Inventor
王超
戴宇婷
逯国成
徐鹏
刘明
赵晓
刘廷峰
张鹏
沈静
王志敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Chemical Corp
Sinopec Research Institute of Petroleum Engineering Shengli Co
Original Assignee
China Petroleum and Chemical Corp
Sinopec Research Institute of Petroleum Engineering Shengli Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Chemical Corp, Sinopec Research Institute of Petroleum Engineering Shengli Co filed Critical China Petroleum and Chemical Corp
Priority to CN201610947834.2A priority Critical patent/CN107989584B/en
Publication of CN107989584A publication Critical patent/CN107989584A/en
Application granted granted Critical
Publication of CN107989584B publication Critical patent/CN107989584B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/24Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/10Geothermal energy

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Extraction Or Liquid Replacement (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The present invention relates to a kind of oil field oil-gas mining device, particularly a kind of horizontal well note adopts integrated apparatus.The invention further relates to adopt integrated apparatus using this note to realize steam injection, the method recovered the oil.Note disclosed by the invention adopts integrated apparatus and is adopted integrated pump, the 3rd insulated tubing, packer, oil pipe and at least one steam injection oil-producing unit by the first insulated tubing, heat-insulated down-well compensator, the second insulated tubing, note and be connected in sequence, by by steam injection, the integrated design of extracting device of oil, realize a set of tubing string and carry out horizontal well steam injection and production, it not only simplify process, the generation of complex situations is avoided, and it can alleviate horizontal well in steam injection and production phase and employ uneven contradiction.

Description

Horizontal well note adopts integrated apparatus and method
Technical field
The present invention relates to a kind of oil field oil-gas mining device, particularly a kind of horizontal well note adopts integrated apparatus.This hair It is bright to further relate to using this method for noting and adopting integrated apparatus and realizing steam injection, recover the oil.
Background technology
Horizontal well technology is that current heavy crude reservoir thermal recovery is taped the latent power and one of the major technique of Productivity Construction, but with viscous crude Horizontal well is handled up the increasing of round, and is influenced by factors such as Reservoir Heterogeneity, net horizontal section flow resistances, makes injection steam edge High permeability zone is advanced by leaps and bounds, or even is formed steam and broken through, and not only causes steam heat to waste, but also the degree that can make to employ inequality adds Play, finally reduces recovery ratio.
In order to solve the problems, such as the steam injection uneven heating occurred during horizontal well thermal production, successively occurs level in recent years Well Double-pipe gas-injection, multiple spot steam injection, the segmentation technology such as steam injection, alleviate the contradiction that horizontal segment inhales vapour inequality, but level above well Steam injection string can cause respectively to go out vapour point steam quality distribution inequality under the influence of horizontal segment flow resistance and Reservoir Heterogeneity, The heat content ratio of steam distribution is mismatched with steam flow ratio, so as to cause the error that steam heat distributes.With steam not Disconnected injection, oil reservoir internal temperature field constantly change, and the percolation law of reservoir fluid are affected, in the production phase, using normal Generally production make it that the high viscosity of viscous crude and condensation in addition, holds horizontal segment there are a pressure drop remittance field to the oil well pump of rule Horizontal segment toe-end and heel end flow resistance skewness are easily caused, causes oil reservoir to be employed unbalanced, influences development effectiveness;Ask above Topic becomes urgent problem in thick oil horizontal well thermal recovery technology.
The content of the invention
For the above-mentioned technical problem in the presence of the prior art, the present invention proposes horizontal well note and adopts integrated apparatus. By the integrated apparatus of the present invention, steam injection and oil recovery function can be realized at the same time in recovery process, and can realize steam injection mistake Journey respectively goes out the distribution of the mass dryness fractions such as the steam flow of vapour point and oil recovery process horizontal segment equilibrium draining.The invention further relates to use this note Adopt integrated apparatus and carry out steam injection, the method recovered the oil.
According to the first aspect of the invention, it is proposed that horizontal well note adopt integrated apparatus, the integrated apparatus by first every Deep fat pipe, heat-insulated down-well compensator, the second insulated tubing, note adopt integrated pump, the 3rd insulated tubing, packer, oil pipe and extremely A few steam injection oil-producing unit is connected in sequence, wherein, the steam injection oil-producing unit by etc. mass dryness fraction distributor and balanced draining Device is formed by connecting, and the upper end of the oil pipe is connected with the packer lower end, and the lower end of the oil pipe is matched somebody with somebody with the mass dryness fraction such as described Note device is connected.
As a modification of the present invention, which includes multiple steam injection oil-producing units, and adjacent steam injection is recovered the oil It is connected between unit by being inserted into sealing.
As another improvement of the present invention, the equilibrium drainage device is connected successively by top connection, central tube and lower contact Connect and form, the side wall of the central tube is provided with gate gurgle valve, and the top connection upper end is connected with the mass dryness fraction distributor such as described.
The outer wall of the central tube is arranged with draining cover, and the both ends of the draining cover are fixed by upper shield and lower shield respectively; The upper shield is connected through a screw thread fixation with the central tube, and it is fixed that the lower shield is fixed with the central tube by pin Position.Oil leak hole is provided with the draining cover.
The gate gurgle valve is ball-and-seat, and centralizer is arranged with the lower shield lower end, central tube periphery.
The packer is self compensation heat-sensitive packer.
As another improvement of the present invention, the mass dryness fraction distributor such as described is formed by connecting by hoop and steam injection body, the note The side of vapour body is additionally provided with hollow steam injection branch pipe, which, which is additionally provided with pipe, is mutually separated device, in the pipe It is mutually separated device and the inner cavity of the steam injection body is separated into two parts inner cavity, a portion inner cavity is interior with the steam injection branch pipe Chamber is connected, and forms the first steam injection passage, another part inner cavity then forms the second steam injection and leads to.
The steam injection branch tube cavity is additionally provided with steam injection valve, baffle ring and critical flow nozzle.
The steam injection chamber body is additionally provided with rectifier, which is helical swirl piece.
According to the second aspect of the invention, it is proposed that adopt integrated apparatus using note and carry out steam injection, the method recovered the oil, including Following steps:
Step 1:Assembling, tripping in integrated apparatus
First, the oil reservoir number that steam injection as needed is recovered the oil selects the steam injection oil-producing unit of identical quantity;
Secondly, fixation is attached to steam injection oil-producing unit, is carried out between multiple steam injection oil-producing units by being inserted into sealing Connection;
Again, the first insulated tubing, heat-insulated down-well compensator, the second insulated tubing, note are adopted into integration pump, the 3rd heat-insulated Oil pipe, packer, oil pipe and the steam injection oil-producing unit that assembles are sequentially connected, so that steam injection oil recovery integrated apparatus assembled Finish;
Finally, by integrated apparatus G.I.H so that the position of each steam injection oil-producing unit and the oil for needing steam injection to recover the oil Layer position is corresponding.
Step 2:Etc. mass dryness fraction steam injection
Ground steam injection pipeline, blow-on steam injection are connected, steam realizes steam by mass dryness fraction distributors such as ground steam transmitting pipe line entrance Distributed etc. mass dryness fraction, and the mass dryness fraction steam injection such as carry out to oil reservoir.
Step 3:Tripping in sucker rod produces;
After the completion of steam injection, tripping in sucker rod is adopted integrated pump with note and is docked, and carries pump closing steam injection passage, and turn on pump enters life The production stage.
Compared with prior art, it is an advantage of the current invention that by by steam injection, the integrated design of extracting device of oil, realizing A set of tubing string carries out horizontal well steam injection and production, not only simplify process, avoids the generation of complex situations, Er Qieqi It can alleviate horizontal well in steam injection and production phase and employ uneven contradiction;Meanwhile the setting of mass dryness fraction distributor such as pass through, it is real Showed each section of steam flow etc. mass dryness fraction distribution, it is ensured that the heat content ratio of steam distribution matches with steam flow ratio;Pass through equilibrium The setting of drainage device, is capable of the producing pressure differential of equilibrium level section, realizes the equilibrium producing of horizontal segment oil reservoir, be conducive to horizontal well The improvement of development effectiveness and the raising of recovery percent of reserves.
Brief description of the drawings
The horizontal well note that Fig. 1 is the present invention adopts integrated apparatus schematic diagram.
Fig. 2 be the present invention etc. mass dryness fraction distributor sectional view.
Fig. 3 be the present invention etc. mass dryness fraction distributor A-A sectional views.
Fig. 4 be the present invention etc. mass dryness fraction distributor B-B sectional views.
Fig. 5 be the present invention etc. mass dryness fraction distributor rectifier 3-D view.
Fig. 6 is the half sectional view of the balanced drainage device of the present invention.
Embodiment
Detailed description for the present invention and technology contents, coordinate brief description of the drawings it is as follows, but attached drawing only provide reference with Purposes of discussion, is not used for being any limitation as the present invention.
The horizontal well note that Fig. 1 is the present invention adopts integrated apparatus schematic diagram.Horizontal well note adopts integrated apparatus insulated tubing 1st, heat-insulated down-well compensator 2, the second insulated tubing 3, note adopt integration pump the 4, the 3rd insulated tubing 5, packer 6, oil pipe 12 and Steam injection oil-producing unit is connected in sequence, wherein, steam injection oil-producing unit by etc. mass dryness fraction distributor 7 connected with balanced drainage device 8 Form, the upper end of oil pipe 12 is connected with 6 lower end of packer, the lower end of oil pipe 12 with etc. mass dryness fraction distributor 7 be connected.Adjacent steam injection It is connected between oil-producing unit by being inserted into sealing 10.Insertion sealing 10 is docked with the sealing drum of the external packer of pipe 9 of horizontal segment, Sealing drum internal diameter is less than horizontal segment pipe aperture, palette between insertion sealing 10 and sealing drum, so that by horizontal segment stratum Opened by exploitation oil reservoir packing, each steam injection production unit corresponds to an exploitation oil reservoir, realizes that segmentation is close in the pipe of horizontal segment oil reservoir Envelope.First insulated tubing 1, the second insulated tubing 3, the 3rd insulated tubing 5 are used cooperatively, and can both have been reduced note and are adopted integrated pipe Heat loss of the column in steam injection process, and insulation effect can be played to Produced Liquid in exploitation process;Heat-insulated down-well compensator 2 exists In steam injection process, inner tube is moved to outer tube, and outer tube is insulated tubing, so that inner tube is in instlated tubular and was extending Heat loss is avoided in journey, while plays the role of thermal compensation, avoids the generation of steam injection string thermal stress;Note adopts integration pump 4 can be real Existing tubing string steam injection oil recovery cycles production, during steam injection operation, plunger is in pump state of touching, and hot steam is entered by steam injection hole to be pumped Cylinder and outer working tube annular space, through pumping lower injection stratum.When turning to take out, above carry plunger and seal steam injection hole, note adopts integration pump 4 Can normally it pump.In a preferred embodiment, packer 6 is self compensation heat-sensitive packer, and self compensation heat-sensitive packer can be with The temperature for steam injection string raises and gradually swollen envelope, and then realize packing sealing.
As shown in Figure 2-5, it is formed by connecting etc. mass dryness fraction distributor 7 by hoop 701 with steam injection body 708, the steam injection body 708 Side be additionally provided with hollow steam injection branch pipe 704, which, which is additionally provided with pipe, is mutually separated device 703, the pipe Inside it is mutually separated device 703 and the inner cavity of the steam injection body 708 is separated into two parts inner cavity, a portion inner cavity and the steam injection The inner cavity of branch pipe 704 is connected, and forms the first steam injection passage, another part inner cavity then forms the second steam injection and leads to, introduces steam into Next steam injection oil-producing unit.704 inner cavity of steam injection branch pipe is additionally provided with steam injection valve 705, baffle ring 706 and critical flow nozzle 707, can Directly to oil reservoir steam injection.708 inner cavity of steam injection body is additionally provided with rectifier 702, which is helical swirl piece, when When the fluid of two-phase mixtures flows through rectifier 702, since the density of out-phase material is variant, suffered centrifugal force is different, due to Centrifugal action in the range of from pipeline center's different distance, forms centrosymmetric eddy flow field in downstream distribution, so that by two Phase fluid centrifuges.Two end lines that device 703 is mutually separated in pipe are bonded with the bore seal of steam injection body 708;Critical flow sprays 707 inner cavity of mouth is the runner that aperture is gradually reduced, and the part of aperture minimum is known as aditus laryngis, there is taper diffusion behind aditus laryngis Face, nozzle can obtain different critical pressure ratios with the difference for expanding diffusingsurface length downstream, when the flow velocity of throat reaches sound When fast, steam flow is only related with upstream pressure and throat aperture, from the influence of horizontal segment reservoir heterogeneity;It is preferred one Embodiment in, steam injection valve 705 is ball-and-seat, and opening is in steam injection process, is closed in production process.
As shown in fig. 6, balanced drainage device 8 is connected in sequence by top connection 801, central tube 805 and lower contact 809, The side wall of the central tube 805 is evenly arranged with multiple gate gurgle valves 804, and gate gurgle valve 804 is ball-and-seat, in steam injection process, by note Steam pressure difference is closed, and opening is in by producing pressure differential in production process.801 upper end of top connection with etc. mass dryness fraction match somebody with somebody Device 7 is noted to be connected.The outer wall of central tube 805 is arranged with draining cover 803, and the both ends of the draining cover 803 are respectively by upper shield 802 with Shield 806 is fixed;Upper shield 802 is connected through a screw thread fixation with central tube 805, and lower shield 806 passes through pin with central tube 805 807 stationary positioneds.Multiple oil leak holes 810 are provided with draining cover 803.In a further preferred embodiment, under lower shield 806 End, 805 periphery of central tube are arranged with centralizer 808, prevent the friction of steam injection oil-producing unit and casing wall.
It will describe to adopt integrated apparatus progress steam injection, the method recovered the oil using note according to Fig. 1-6 below, it includes following Step:
Step 1:Assembling, tripping in integrated apparatus
First, the oil reservoir number that steam injection as needed is recovered the oil selects the steam injection oil-producing unit of identical quantity;
Secondly, be attached fixation to steam injection oil-producing unit, between multiple steam injection oil-producing units by be inserted into sealing 10 into Row connection, the least significant end of steam injection oil-producing unit can be connected with silk plug 11;
Again, as shown in Figure 1, the first insulated tubing 1, heat-insulated down-well compensator 2, the second insulated tubing 3, note are adopted into one Change the 4, the 3rd insulated tubing 5 of pump, packer 6, oil pipe 12 and the steam injection oil-producing unit that assembles to be sequentially connected, so that steam injection be adopted Oily integrated apparatus assembling finishes;
Finally, by integrated apparatus G.I.H, sealing paste between insertion sealing 10 and the sealing drum of external packer of pipe 9 Close, so that horizontal segment be opened by exploitation oil reservoir packing so that the position of each steam injection oil-producing unit and the oil reservoir for needing steam injection to recover the oil Position is corresponding.
Step 2:Etc. mass dryness fraction steam injection
Ground steam injection pipeline is connected, blow-on steam injection, steam adopts integrated apparatus by ground steam transmitting pipe line into note, in steam injection During, heat-insulated 2 inner tube of down-well compensator is moved to outer tube, and outer tube is insulated tubing, so that inner tube is in instlated tubular In and avoid in elongation process heat loss, while play the role of thermal compensation, avoid the generation of steam injection string thermal stress;Self compensation The gradually swollen envelope, and then realize that casing off more than horizontal segment is sealed with the temperature rise of steam injection string of heat-sensitive packer 6; Afterwards, steam such as enters at the mass dryness fraction distributor 7, is distributed so as to fulfill mass dryness fractions such as steam, the mass dryness fraction steam injection such as carries out to oil reservoir.
Step 3:Tripping in sucker rod produces;
After the completion of steam injection, tripping in sucker rod adopts the integrated docking of pump 4 with note, and carries pump closing steam injection passage, and turn on pump enters Production phase.
The foregoing is merely presently preferred embodiments of the present invention, is not used to limit the scope of the claims of the present invention, other are with this The equivalence changes of the patent spirit of invention, should all belong to the scope of the claims of the present invention.

Claims (10)

1. horizontal well note adopts integrated apparatus, it is characterised in that:The integrated apparatus is compensated by the first insulated tubing, heat-insulated underground Device, the second insulated tubing, note adopt integrated pump, the 3rd insulated tubing, packer, oil pipe and at least one steam injection oil-producing unit according to It is secondary to be formed by connecting, wherein, the steam injection oil-producing unit by etc. mass dryness fraction distributor be formed by connecting with balanced drainage device, the oil pipe Upper end be connected with the packer lower end, the lower end of the oil pipe is connected with the mass dryness fraction distributor such as described.
2. horizontal well note as claimed in claim 1 adopts integrated apparatus, it is characterised in that:The integrated apparatus includes multiple notes Vapour oil-producing unit, is connected by being inserted into sealing between adjacent steam injection oil-producing unit.
3. horizontal well note as claimed in claim 1 or 2 adopts integrated apparatus, it is characterised in that:It is described equilibrium drainage device by Top connection, central tube and lower contact are connected in sequence, and the side wall of the central tube is provided with gate gurgle valve, the top connection upper end with The mass dryness fraction distributor such as described is connected.
4. horizontal well note as claimed in claim 3 adopts integrated apparatus, it is characterised in that:The outer wall of the central tube is arranged with Draining cover, the both ends of the draining cover are fixed by upper shield and lower shield respectively;The upper shield passes through screw thread with the central tube Connection is fixed, and the lower shield passes through pin stationary positioned with the central tube;Oil leak hole is provided with the draining cover.
5. horizontal well note as claimed in claim 4 adopts integrated apparatus, it is characterised in that the gate gurgle valve is ball-and-seat, The lower shield lower end, central tube periphery are arranged with centralizer.
6. horizontal well note as claimed in claim 3 adopts integrated apparatus, it is characterised in that the packer is self compensation temperature-sensitive Packer.
7. horizontal well note as claimed in claim 3 adopts integrated apparatus, it is characterised in that:The mass dryness fraction distributor such as described is by hoop It is formed by connecting with steam injection body, the side of the steam injection body is additionally provided with hollow steam injection branch pipe, which also sets It is equipped with pipe and is mutually separated device, device is mutually separated in the pipe inner cavity of the steam injection body is separated into two parts inner cavity, wherein one Point inner cavity is connected with the inner cavity of the steam injection branch pipe, forms the first steam injection passage, another part inner cavity then forms the second steam injection It is logical.
8. horizontal well note as claimed in claim 7 adopts integrated apparatus, it is characterised in that:The steam injection branch tube cavity is also set up There are steam injection valve, baffle ring and critical flow nozzle.
9. horizontal well note as claimed in claim 8 adopts integrated apparatus, it is characterised in that:The steam injection chamber body is also set up There is rectifier, which is helical swirl piece.
10. a kind of adopt the method that integrated apparatus carries out steam injection, recovers the oil using note as claimed in any one of claims 1-9 wherein, Comprise the following steps:
Step 1:Assembling, tripping in integrated apparatus
First, the oil reservoir number that steam injection as needed is recovered the oil selects the steam injection oil-producing unit of identical quantity;
Secondly, fixation is attached to steam injection oil-producing unit, is attached between multiple steam injection oil-producing units by being inserted into sealing;
Again, the first insulated tubing, heat-insulated down-well compensator, the second insulated tubing, note are adopted into integration pump, the 3rd insulation oil Pipe, packer, oil pipe and the steam injection oil-producing unit that assembles are sequentially connected, so that steam injection oil recovery integrated apparatus assembled Finish;
Finally, by integrated apparatus G.I.H so that the position of each steam injection oil-producing unit and the oil reservoir position for needing steam injection to recover the oil Put corresponding;
Step 2:Etc. mass dryness fraction steam injection
Ground steam injection pipeline, blow-on steam injection are connected, steam realizes that steam etc. is dry by mass dryness fraction distributors such as ground steam transmitting pipe line entrance Degree distribution, and the mass dryness fraction steam injection such as carry out to oil reservoir;
Step 3:Tripping in sucker rod produces;
After the completion of steam injection, tripping in sucker rod is adopted integrated pump with note and is docked, and carries pump closing steam injection passage, and turn on pump enters production rank Section.
CN201610947834.2A 2016-10-26 2016-10-26 Injection and production integrated device and method for horizontal well Active CN107989584B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610947834.2A CN107989584B (en) 2016-10-26 2016-10-26 Injection and production integrated device and method for horizontal well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610947834.2A CN107989584B (en) 2016-10-26 2016-10-26 Injection and production integrated device and method for horizontal well

Publications (2)

Publication Number Publication Date
CN107989584A true CN107989584A (en) 2018-05-04
CN107989584B CN107989584B (en) 2023-06-16

Family

ID=62029100

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610947834.2A Active CN107989584B (en) 2016-10-26 2016-10-26 Injection and production integrated device and method for horizontal well

Country Status (1)

Country Link
CN (1) CN107989584B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109854217A (en) * 2018-12-25 2019-06-07 天津克睿特维科技发展有限公司 A kind of heat injection oil recovery and the integrated thickened oil recovery method of mechanical oil recovery
CN111946314A (en) * 2019-05-15 2020-11-17 中国石油天然气股份有限公司 Injection and extraction control pipe column for thickened oil horizontal well
CN111980647A (en) * 2019-05-21 2020-11-24 中国石油天然气股份有限公司 Unsteady steam injection method used during huff and puff and steam drive
CN112543840A (en) * 2018-08-10 2021-03-23 Rgl 油藏管理公司 Nozzle for steam injection and steam stop
US11536115B2 (en) 2018-07-07 2022-12-27 Variperm Energy Services Inc. Flow control nozzle and system

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201021662Y (en) * 2007-02-13 2008-02-13 胡滨 A gas injection oil exploration pole pump
CN201972682U (en) * 2011-03-25 2011-09-14 山东立鑫石油机械制造有限公司 Gas-injection oil-exploitation tubular column adopting packer technology for horizontal well
WO2015000447A1 (en) * 2013-07-03 2015-01-08 胜利油田隆迪石油技术(装备)有限责任公司 Injection-extraction integrated sand-discharging oil extraction method for a thermal recovery and device thereof
CN104481484A (en) * 2014-12-26 2015-04-01 东营市福利德石油科技开发有限责任公司 Horizontal well segmented intermittent steam huff and puff injection-production integrated pipe column
CN205243489U (en) * 2015-09-25 2016-05-18 中国石油化工股份有限公司 Steam flow distributor in pit
CN205243488U (en) * 2015-09-25 2016-05-18 中国石油化工股份有限公司 Sand control, notes vapour integrated device
CN206129253U (en) * 2016-10-26 2017-04-26 中国石油化工股份有限公司 Horizontal well is annotated and is adopted integrated device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201021662Y (en) * 2007-02-13 2008-02-13 胡滨 A gas injection oil exploration pole pump
CN201972682U (en) * 2011-03-25 2011-09-14 山东立鑫石油机械制造有限公司 Gas-injection oil-exploitation tubular column adopting packer technology for horizontal well
WO2015000447A1 (en) * 2013-07-03 2015-01-08 胜利油田隆迪石油技术(装备)有限责任公司 Injection-extraction integrated sand-discharging oil extraction method for a thermal recovery and device thereof
CN104481484A (en) * 2014-12-26 2015-04-01 东营市福利德石油科技开发有限责任公司 Horizontal well segmented intermittent steam huff and puff injection-production integrated pipe column
CN205243489U (en) * 2015-09-25 2016-05-18 中国石油化工股份有限公司 Steam flow distributor in pit
CN205243488U (en) * 2015-09-25 2016-05-18 中国石油化工股份有限公司 Sand control, notes vapour integrated device
CN206129253U (en) * 2016-10-26 2017-04-26 中国石油化工股份有限公司 Horizontal well is annotated and is adopted integrated device

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11536115B2 (en) 2018-07-07 2022-12-27 Variperm Energy Services Inc. Flow control nozzle and system
CN112543840A (en) * 2018-08-10 2021-03-23 Rgl 油藏管理公司 Nozzle for steam injection and steam stop
US11525337B2 (en) 2018-08-10 2022-12-13 Variperm Energy Services Inc. Nozzle for steam injection and steam choking
CN109854217A (en) * 2018-12-25 2019-06-07 天津克睿特维科技发展有限公司 A kind of heat injection oil recovery and the integrated thickened oil recovery method of mechanical oil recovery
CN111946314A (en) * 2019-05-15 2020-11-17 中国石油天然气股份有限公司 Injection and extraction control pipe column for thickened oil horizontal well
CN111980647A (en) * 2019-05-21 2020-11-24 中国石油天然气股份有限公司 Unsteady steam injection method used during huff and puff and steam drive

Also Published As

Publication number Publication date
CN107989584B (en) 2023-06-16

Similar Documents

Publication Publication Date Title
CN206129253U (en) Horizontal well is annotated and is adopted integrated device
CN107989584A (en) Horizontal well note adopts integrated apparatus and method
CN106593414B (en) A kind of experimental provision and method for testing cement sheath and casing cementing strength
CN206386111U (en) A kind of experimental provision for testing cement sheath and sleeve pipe cementing strength
CN105239981B (en) Heavy crude heat extraction net horizontal section is along journey variable mass flow analogue experimental provision
CN104533356B (en) The method and oil production by layer method of a kind of two-layer automatic control oil production by layer
CN104481484B (en) Horizontal well in segments Intermittent cyclic steam stimulation note adopts integrated pipe column
CN106593411B (en) A kind of cement sheath sealing and the experimental provision and method of sleeve pipe lifting
CN102606118A (en) Subdivision water injection, ball-off and profile control integrated tubular column for water injection well of oilfield and process of tubular column
CN103867172B (en) Injection-production system and injection-production method
CN102575514A (en) Steam distribution apparatus and method for enhanced oil recovery of viscous oil
CN102505921B (en) Water searching pipe column of open-hole horizontal well
CN205577962U (en) Long horizontal well double -flow -passage of viscous crude sprays and annotates vapour device
CN105822252B (en) Pipe string combination of cementing the well and cementing method
CN107152262A (en) Multistage open-hole gravel pack sand control completion tubing string of horizontal well and method
CN104405355A (en) Injection-production tubular column of horizontal well
CN104912535B (en) Many cluster fracturing sliding bushs in a kind of section
CN205063927U (en) Viscous crude thermal recovery horizontal section becomes mobile simulation experiment device of quality along journey
CN206386109U (en) A kind of cement sheath sealing and the experimental provision of sleeve pipe lifting
CN110017133B (en) Method and device for testing output profile of horizontal well and plugging water
CN111502622A (en) Concentric layered steam drive pipe column structure and layered steam drive method thereof
CN211314199U (en) Horizontal well annular output profile testing device
CN110118071A (en) A kind of thermal production well layering section packing device and method
CN105089648A (en) Device and method for nested layered injection of isotopic tracer
CN206957625U (en) A kind of wellhead tree system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant