CN102606118A - Subdivision water injection, ball-off and profile control integrated tubular column for water injection well of oilfield and process of tubular column - Google Patents

Subdivision water injection, ball-off and profile control integrated tubular column for water injection well of oilfield and process of tubular column Download PDF

Info

Publication number
CN102606118A
CN102606118A CN2012100862803A CN201210086280A CN102606118A CN 102606118 A CN102606118 A CN 102606118A CN 2012100862803 A CN2012100862803 A CN 2012100862803A CN 201210086280 A CN201210086280 A CN 201210086280A CN 102606118 A CN102606118 A CN 102606118A
Authority
CN
China
Prior art keywords
injection well
profile control
water injection
water
flow regulator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012100862803A
Other languages
Chinese (zh)
Inventor
王德伟
岳玉全
马春宝
贾财华
段效威
高玉军
周佳伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Natural Gas Co Ltd
Original Assignee
China Petroleum and Natural Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Natural Gas Co Ltd filed Critical China Petroleum and Natural Gas Co Ltd
Priority to CN2012100862803A priority Critical patent/CN102606118A/en
Publication of CN102606118A publication Critical patent/CN102606118A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention relates to a subdivision water injection, ball-off and profile control integrated tubular column for a water injection well of an oilfield. A plurality of special water distributors for subdivision water injection, ball-off and profile control of the water injection well are serially connected to form the integrated tubular column, packers are arranged among the special water distributors, and a ball valve is disposed at the bottom end of the integrated tubular column; the special water distributors for subdivision water injection, ball-off and profile control of the water injection well comprise water distributor bodies, and a ball containing basket is hermetically sleeved on the outer side of each water distributor body along the axial direction of the water distributor body and corresponds to a water outlet of the water distributor body; each ball containing basket is in the shape of an annular barrel, the upper end of each ball containing basket is hermetically connected to the outer wall of the corresponding water distributor body while an annular opening at the lower end of each ball containing basket is hermetically closed by an annular baffle plate, and each annular baffle plate is connected with the lower end of the corresponding ball containing basket via a shear pin; an inner cavity of each ball containing basket is communicated with the water outlet of the corresponding water distributor body; and subdivision water injection, ball-off and profile control selective plugging balls are arranged in the ball containing baskets. The profile control balls are fed in a subdivision water injection section to plug shot holes so as to adjust uneven interlayer water absorption, a water injection effect is improved, and accordingly crude oil production yield and oil production efficiency are improved.

Description

Water injection well in oil fields subdivision injection pitching profile control integrated pipe column and technology thereof
Technical field
The invention relates to a kind of water injection well in oil fields subdivision injection technology, relate in particular to a kind of water injection well in oil fields subdivision injection pitching profile control integrated pipe column and technology thereof.
Background technology
The oil field ligh-oil reservoir adopts waterflooding extraction mostly, in the waterflooding extraction later stage, because the existence of the interlayer contradiction of the non-homogeneity of oil reservoir and oil reservoir; Commingled water injection is prone to cause the interlayer suction unbalanced, does not therefore reach waterflooding effect, and conventional solution is to adopt subdivision injection or chemical profile control; Adjust the intake profile of water injection well; Improve to inject the sweep efficiency of water, reduce and inject water and charge into oil well, in giving full play to, the effect of less permeable layer along high permeability zone; Thereby improve waterflooding development effect, improve oil well output.
Existing subdivision injection technology is to adopt packer that the pit shaft interval is separated, and comes to reach the requirement of seperated layer water injection to each layer distribution water yield through water nozzle in the injection well downhole flow regulator.
The chemical profile control technology mainly is the interlayer contradiction that is used for solving the commingled water injection well; It is that chemical agent is injected in the high permeability zone section from water injection well, and effects such as the absorption through chemical agent, power capture, physics obstruction reduce the water phase permeability of high permeability formation greatly; Adjust the intake profile of water injection well; Improve the sweep efficiency that injects water, improve waterflooding development effect, improve the effect of crude output thereby play.
The pitching profile control technology is mainly used in the inspissated pool thermal production well, can't cause interlayer to inhale the uneven problem of vapour by layer steam injection to solve because of cover becomes, and improves the steam soak effect, uses the Metal Ball of diameter greater than borehole diameter.When annotating vapour, Metal Ball stops steam to get into the direct shutoff high permeability formation of steam flow borehole, accomplishes profile control in the pit shaft.In recent years, this technology also is useful on water injection well shutoff high permeability formation borehole, thereby the shutoff waterflood path is annotated well but be only limited to system, and is shutoff in the pit shaft.See (2003 1 phase P2022 of oilfield chemistry) such as " Studies on Technology of Water Injectivity " Sun Tongwen for details; It is at the big interval of water injection well water absorption; With inject that water flows synchronously, somewhat larger in diameter in the direct homogeneous rigidity plastics of borehole ball; Leaning on the tangible borehole of pressing under the difference between reservoir pre ssure and injection pressure effect, borehole is blocked, make and inject current direction and get into other intervals;
In recent years; Problems such as substratum is many because the water filling block that has exists, interlayer is thin; Cause thinner that water injection string can't divide; Still there is the interlayer uneven problem that absorbs water in this with regard to causing in little interval that divides notes, and the interval that has divided notes is not easy to take chemical profile control technology owing to reasons such as Water-filling nozzle throttlings; As shown in Figure 4; Existing conventional eccentric injection mandrel 9 is to be made up of top connection 91, last tube connector 92, centralizer 93, seating nipple main body 94, following tube connector 95, support 96, guide way 97; Be formed with water injection path 99 in the seating nipple main body 94; The outer inclined to one side holes 98 of blanking plug that are formed with of seating nipple main body 94, injection well downhole flow regulator outer wall be provided with one with the water outlet A of blanking plug inclined to one side hole 98 conductings.But conventional eccentric injection mandrel function singleness; Just can the injection allocation amount of needs be assigned to each interval by designing requirement; Owing to there is not outside table tennis holding device; Can't realize throwing in a point notes pitching profile control selective plugging ball minute notes pitching profile control selective plugging spherical zone to water filling layer position, more can't implement the pitching profile control in the layering well section.
Thus, the inventor relies on experience and the practice of being engaged in relevant industries for many years, proposes a kind of water injection well in oil fields subdivision injection pitching profile control integrated pipe column and technology thereof, to overcome the defective of prior art.
Summary of the invention
The object of the present invention is to provide a kind of water injection well in oil fields subdivision injection pitching profile control integrated pipe column and technology thereof; Can be implemented in and throw profile control ball shutoff borehole in the subdivision injection interval; Adjust the uneven problem of interlayer suction; With the raising flood effectiveness, thereby improve oil extraction output and oil recovery efficiency.
The objective of the invention is to realize like this; A kind of water injection well in oil fields subdivision injection pitching profile control integrated pipe column; Said integrated pipe column is to divide the special-purpose injection well downhole flow regulator serial connection of notes pitching profile control to constitute a plurality of water injection wells by oil pipe; Said each water injection well branch is annotated between the special-purpose injection well downhole flow regulator of pitching profile control and is provided with packer, and the distance between per two packers is identical with the height of corresponding segmentation interval, and the bottom of said foot oil pipe is provided with ball valve; Said water injection well divides annotates the special-purpose injection well downhole flow regulator of pitching profile control, includes injection well downhole flow regulator, in the outside of injection well downhole flow regulator and corresponding to the position of the delivery port of injection well downhole flow regulator, contains cage along the axial seal of injection well downhole flow regulator sheathed one; Said Sheng cage is the ring tubbiness, and its upper end is connected in the outer wall of injection well downhole flow regulator hermetically, and the annular opening of lower end is hermetically enclosed by a ring baffle, and said ring baffle is connected by shear pin with Sheng cage lower end; The delivery port conducting of the inner chamber of said Sheng cage and injection well downhole flow regulator; Be provided with a point notes pitching profile control selective plugging ball in the said Sheng cage.
In a preferred embodiments of the present invention, said injection well downhole flow regulator is conventional eccentric injection mandrel.
In a preferred embodiments of the present invention, said Sheng cage upper end is provided with the joint portion that is connected with injection well downhole flow regulator, and said joint portion is connected with the injection well downhole flow regulator outer wall thread.
In a preferred embodiments of the present invention, the inner ring of said ring baffle contacts with the sealing of injection well downhole flow regulator outer wall; The outer ring of ring baffle contacts with containing cage lower end inner seal, and by being fixedly connected along containing the circumferential a plurality of shear pins that distribute in cage lower end.
In a preferred embodiments of the present invention, each water injection well point is annotated in the Sheng cage of the special-purpose injection well downhole flow regulator of pitching profile control according to pack into point notes pitching profile control selective plugging ball of a great deal of of the borehole quantity of the segmentation interval of correspondence and borehole size.
The object of the invention can also be realized like this, a kind of water injection well in oil fields subdivision injection pitching profile control integral process that utilizes the described profile control integrated pipe column of claim 1 to implement, and this technology comprises the steps:
(1) the described water injection well in oil fields subdivision injection of claim 1 pitching profile control integrated pipe column is connected;
(2) each water injection well point is annotated in the Sheng cage of the special-purpose injection well downhole flow regulator of pitching profile control by pack into point notes pitching profile control selective plugging ball of a great deal of of the borehole quantity of the segmentation interval of correspondence and borehole size;
(3) through oil pipe with under this integrated pipe column behind the desired location completion and implement water filling.
In a preferred embodiments of the present invention, in step (1) before,, water injection well is divided into several intervals according to formation condition according to geologic requirements, select the interval of needs point notes pitching profile control selective plugging ball profile control again according to the formation condition of the substratum in each interval.
From the above mentioned; Water injection well in oil fields subdivision injection pitching profile control integral process of the present invention is used for layering water distribution and splendid attire and input point notes pitching profile control selective plugging ball, can be a minute notes pitching profile control selective plugging spherical zone to the segmentation interval; Can be implemented in and throw profile control ball shutoff borehole in the subdivision injection interval; Adjust the uneven problem of interlayer suction,, thereby improve oil extraction output and oil recovery efficiency with the raising flood effectiveness.In addition, this water injection well in oil fields subdivision injection pitching profile control integrated pipe column is simple in structure, with low cost, reusable.
Description of drawings
Following accompanying drawing only is intended to the present invention is done schematic illustration and explanation, not delimit the scope of the invention.Wherein:
Fig. 1: be the structural representation of water injection well in oil fields subdivision injection pitching profile control integrated pipe column of the present invention.
Fig. 2: divide the structural representation of annotating the special-purpose injection well downhole flow regulator of pitching profile control for water injection well among the present invention.
Fig. 3: be the structural representation of water injection well in oil fields subdivision injection pitching profile control integrated pipe column ball-off among the present invention.
Fig. 4: be the structural representation of existing conventional eccentric injection mandrel.
The specific embodiment
To understand in order technical characterictic of the present invention, purpose and effect being had more clearly, to contrast the description of drawings specific embodiment of the present invention at present.
As shown in Figure 1; The present invention proposes a kind of water injection well in oil fields subdivision injection pitching profile control integrated pipe column 200; Said integrated pipe column 200 is to divide special-purpose injection well downhole flow regulator 100 serial connections of notes pitching profile control to constitute a plurality of water injection wells by oil pipe; Said each water injection well branch is annotated between the special-purpose injection well downhole flow regulator 100 of pitching profile control and is provided with packer 6; Distance between per two packers 6 is identical with the height of corresponding segmentation interval, and the bottom of said foot oil pipe is provided with ball valve 8, and said ball valve 8 is made up of valve seat 81 and spherical valve core 82; As shown in Figure 2, said water injection well divides annotates the special-purpose injection well downhole flow regulator 100 of pitching profile control, includes injection well downhole flow regulator 1, and said injection well downhole flow regulator 1 is conventional eccentric injection mandrel; In the outside of injection well downhole flow regulator 1 and corresponding to the position of the delivery port 11 of injection well downhole flow regulator, contain cage 2 along the axial seal of injection well downhole flow regulator 1 sheathed one; Said Sheng cage 2 is the ring tubbiness, and its upper end is connected in the outer wall of injection well downhole flow regulator 1 hermetically, and the annular opening 22 of lower end is hermetically enclosed by a ring baffle 3, and said ring baffle 3 is connected by shear pin 4 with Sheng cage 2 lower ends; The inner chamber of said Sheng cage 2 is provided with a point notes pitching profile control selective plugging ball 5, and delivery port 11 conductings of the inner chamber of said Sheng cage and injection well downhole flow regulator; As shown in Figure 2, in this embodiment, said Sheng cage 2 upper ends are provided with the joint portion 21 that is connected with injection well downhole flow regulator 1, and this joint portion 21 is connected with injection well downhole flow regulator 1 outer wall thread; The inner ring of said ring baffle 3 contacts with the sealing of injection well downhole flow regulator 1 outer wall; The outer ring of ring baffle 3 contacts with containing cage 2 lower end inner seals, and by being fixedly connected along containing the circumferential a plurality of shear pins that distribute 4 in cage lower end.Each water injection well point is annotated in the Sheng cage 2 of the special-purpose injection well downhole flow regulator 100 of pitching profile control according to pack into point notes pitching profile control selective plugging ball 5 of a great deal of of borehole 71 quantity of the segmentation interval 7 of correspondence and borehole 71 sizes.
To the well of taking branch to annotate; In separate injection interval because interlayer is thin or other reasons subdivision injection interval again; And it is uneven to occur suction in this interval, the water injection well in oil fields subdivision injection pitching profile control integral process that at this moment can adopt the present invention to propose.
The water injection well in oil fields subdivision injection pitching profile control integral process that the present invention proposes comprises the steps:
(1) according to geologic requirements, water injection well is divided into several intervals according to formation condition, select the interval of needs point notes pitching profile control selective plugging ball profile control again according to the formation condition of the substratum in each interval;
(2) above-mentioned water injection well in oil fields subdivision injection pitching profile control integrated pipe column 200 is connected; Comprising a plurality of water injection wells being divided the special-purpose injection well downhole flow regulator 100 of notes pitching profile control connect and compose the steps A of profile control integrated pipe column 200 and the installation step B of each special-purpose injection well downhole flow regulator 100;
In steps A, divide notes pitching profile control special-purpose injection well downhole flow regulator 100 serial connections a plurality of water injection wells, divide to annotate between the pitching profile control special use injection well downhole flow regulator 100 at each water injection well packer 6 is set; The top of special-purpose injection well downhole flow regulator 100 also is provided with a packer 6 in the top;
In step B, as shown in Figure 1, after will containing cage 2 and connecting,, annotate pitching profile control selective plugging ball 5 with a certain amount of point and be contained in and contain in the cage 2 according to designing requirement with conventional injection well downhole flow regulator 1; Upwards shifting baffle plate 3 onto precalculated position also all keeps off a point notes pitching profile control selective plugging ball 5 in the inner chamber of containing cage; Shear pin 4 is packed into, be connected baffle plate 3 fixing with Sheng cage 2;
(3) each water injection well point is annotated in the Sheng cage of the special-purpose injection well downhole flow regulator of pitching profile control by pack into point notes pitching profile control selective plugging ball of a great deal of of the borehole quantity of the segmentation interval of correspondence and borehole size;
In this step, the project planner selects still to exist the uneven layer position of suction to take pitching profile control in the interval according to the water filling interval that has divided; The designer point annotates pitching profile control selective plugging ball according to what the diameter of borehole in this interval was selected respective diameters then, and the selective plugging ball that guarantee this diameter can enter in the borehole and after can enumerating blocks borehole; Simultaneously; The designer also will be according to borehole in this interval how much select selective plugging ball consumption; The pitching amount should be as the criterion with the borehole number that can block high water accepting layer design flow in the interval that has divided notes, and the borehole of high water accepting layer blocks rate and also should be as the criterion with geologic requirements, has guaranteed waterflooding requirement;
(4) through oil pipe this integrated pipe column is sealed completion and implements water filling to desired location (the water filling interval of design) and by 6 of packers down; During water filling; As shown in Figure 3; Injection water enters into through water nozzle a point Sheng cage 2 of annotating pitching profile control selective plugging ball is housed, because the baffle plate shear pin 4 of containing cage 2 bottoms is cut off in the effect of hydraulic pressure; Baffle plate 3 moves down, and then a point notes pitching profile control selective plugging ball 5 can come out in containing cage 2 and segment the borehole 71 that needs shutoff the interval 7 with the current entering.Point annotating pitching profile control selective plugging ball 5 can be introduced into the borehole of high permeability formation section and build up in borehole along with rate of flow of water, and borehole is partly or entirely blocked, and reduces injected water volume; Low-permeability layer is because the current entering is delayed, and a point notes pitching profile control selective plugging ball has all got into high permeability formation, the phenomenon that low-permeability layer is blocked can not occur; Thereby reach the shutoff high permeability formation; Employ the purpose of low-permeability layer, effectively adjust intake profile, improve waterflooding effect.
Used point is annotated pitching profile control selective plugging ball 5 is homogeneous rigidity plastics ball, and said profile control selective plugging ball is slightly less than the borehole aperture, can get into to carry out profile control in the borehole.In addition,, cause water injection pressure too high, do not meet field requirement, can adopt the method for heating that a point notes pitching profile control selective plugging ball is melted de-plugging if actual plugging strength is higher.
From the above mentioned; Water injection well in oil fields subdivision injection pitching profile control integral process of the present invention is used for layering water distribution and splendid attire and input point notes pitching profile control selective plugging ball, can be a minute notes pitching profile control selective plugging spherical zone to the segmentation interval; Can be implemented in and throw profile control ball shutoff borehole in the subdivision injection interval; Adjust the uneven problem of interlayer suction,, thereby improve oil extraction output and oil recovery efficiency with the raising flood effectiveness.In addition, this water injection well in oil fields subdivision injection pitching profile control integrated pipe column is simple in structure, with low cost, reusable.
The present invention has the following advantages:
1, technology is simple, and this branch is annotated the pitching profile control technology and only used the tubing string connection both can accomplish, and is simple, convenient.
2, with low cost, the input expense is low, compare with existing subdivision injection technology, has just increased to divide the expense of annotating the pitching profile control ball, reduces great amount of cost than the chemical profile control technology.
3, safe in utilization, environmental protection, this technology is compared than chemical profile control technology, environmental protection more, safety.
4, used profile control ball can be slightly less than borehole, can get into to carry out profile control in the borehole.
5, used profile control ball can block up and can separate; If plugging strength is high, do not meet actual requirement, can adopt the method for heating that profile control ball is melted de-plugging.
The above is merely the schematic specific embodiment of the present invention, is not in order to limit scope of the present invention.Any those skilled in the art, equivalent variations of under the prerequisite that does not break away from design of the present invention and principle, having done and modification all should belong to the scope that the present invention protects.

Claims (7)

1. water injection well in oil fields subdivision injection pitching profile control integrated pipe column; It is characterized in that: said integrated pipe column is to divide the special-purpose injection well downhole flow regulator serial connection of notes pitching profile control to constitute a plurality of water injection wells by oil pipe; Said each water injection well branch is annotated between the special-purpose injection well downhole flow regulator of pitching profile control and is provided with packer; Distance between per two packers is identical with the height of corresponding segmentation interval, and the bottom of said foot oil pipe is provided with ball valve; Said water injection well divides annotates the special-purpose injection well downhole flow regulator of pitching profile control, includes injection well downhole flow regulator, in the outside of injection well downhole flow regulator and corresponding to the position of the delivery port of injection well downhole flow regulator, contains cage along the axial seal of injection well downhole flow regulator sheathed one; Said Sheng cage is the ring tubbiness, and its upper end is connected in the outer wall of injection well downhole flow regulator hermetically, and the annular opening of lower end is hermetically enclosed by a ring baffle, and said ring baffle is connected by shear pin with Sheng cage lower end; The delivery port conducting of the inner chamber of said Sheng cage and injection well downhole flow regulator; Be provided with a point notes pitching profile control selective plugging ball in the said Sheng cage.
2. water injection well in oil fields subdivision injection pitching profile control integrated pipe column as claimed in claim 1, it is characterized in that: said injection well downhole flow regulator is conventional eccentric injection mandrel.
3. water injection well in oil fields subdivision injection pitching profile control integrated pipe column as claimed in claim 1 is characterized in that: said Sheng cage upper end is provided with the joint portion that is connected with injection well downhole flow regulator, and said joint portion is connected with the injection well downhole flow regulator outer wall thread.
4. water injection well in oil fields subdivision injection pitching profile control integrated pipe column as claimed in claim 1 is characterized in that: the inner ring of said ring baffle contacts with the sealing of injection well downhole flow regulator outer wall; The outer ring of ring baffle contacts with containing cage lower end inner seal, and by being fixedly connected along containing the circumferential a plurality of shear pins that distribute in cage lower end.
5. water injection well in oil fields subdivision injection pitching profile control integrated pipe column as claimed in claim 1 is characterized in that: each water injection well point is annotated in the Sheng cage of the special-purpose injection well downhole flow regulator of pitching profile control according to pack into point notes pitching profile control selective plugging ball of a great deal of of the borehole quantity of the segmentation interval of correspondence and borehole size.
6. water injection well in oil fields subdivision injection pitching profile control integral process that utilizes the described profile control integrated pipe column of claim 1 to implement, this technology comprises the steps:
(1) the described water injection well in oil fields subdivision injection of claim 1 pitching profile control integrated pipe column is connected;
(2) each water injection well point is annotated in the Sheng cage of the special-purpose injection well downhole flow regulator of pitching profile control by pack into point notes pitching profile control selective plugging ball of a great deal of of the borehole quantity of the segmentation interval of correspondence and borehole size;
(3) through oil pipe with under this integrated pipe column behind the desired location completion and implement water filling.
7. water injection well in oil fields subdivision injection pitching profile control integral process as claimed in claim 6; It is characterized in that: before in step (1); According to geologic requirements; Water injection well is divided into several intervals according to formation condition, selects the interval of needs point notes pitching profile control selective plugging ball profile control again according to the formation condition of the substratum in each interval.
CN2012100862803A 2012-03-28 2012-03-28 Subdivision water injection, ball-off and profile control integrated tubular column for water injection well of oilfield and process of tubular column Pending CN102606118A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012100862803A CN102606118A (en) 2012-03-28 2012-03-28 Subdivision water injection, ball-off and profile control integrated tubular column for water injection well of oilfield and process of tubular column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012100862803A CN102606118A (en) 2012-03-28 2012-03-28 Subdivision water injection, ball-off and profile control integrated tubular column for water injection well of oilfield and process of tubular column

Publications (1)

Publication Number Publication Date
CN102606118A true CN102606118A (en) 2012-07-25

Family

ID=46523839

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012100862803A Pending CN102606118A (en) 2012-03-28 2012-03-28 Subdivision water injection, ball-off and profile control integrated tubular column for water injection well of oilfield and process of tubular column

Country Status (1)

Country Link
CN (1) CN102606118A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102877811A (en) * 2012-09-21 2013-01-16 中国石油天然气股份有限公司 Selective water plugging ball for profile control of water injection well and preparation method and application of selective water plugging ball
RU2517294C1 (en) * 2013-01-10 2014-05-27 Олег Сергеевич Николаев Device for dual injection operation to two formations of same well (versions)
RU2569390C1 (en) * 2014-11-25 2015-11-27 Общество с Ограниченной Ответственностью "ТНГ-Групп" Borehole unit with field exploitation monitoring and control system
CN105401906A (en) * 2015-12-02 2016-03-16 中国石油天然气股份有限公司 Profile adjusting/water plugging ball selection method and device for testing shearing allowable stress of profile adjusting/water plugging ball
CN105422064A (en) * 2015-12-24 2016-03-23 牡丹江博实石油机械科技有限公司 Special profile control device
CN106014314A (en) * 2016-07-05 2016-10-12 中交第四航务工程勘察设计院有限公司 Hydraulic rock core lifting device for exploratory boring
CN108301796A (en) * 2018-01-31 2018-07-20 中国石油天然气股份有限公司 A kind of pitching auxiliary Flushing tubular column
CN108999590A (en) * 2017-06-06 2018-12-14 中国石油天然气股份有限公司 Profile control tool, dispensing profile control integrated pipe column and technique
CN110399640A (en) * 2019-06-17 2019-11-01 中国石油天然气股份有限公司 A kind of dispensing well dispensing technical limits comprehensive judgement method
CN112855102A (en) * 2021-04-01 2021-05-28 中国石油天然气股份有限公司 Automatic selection composite steam injection device and method
CN112980422A (en) * 2021-03-31 2021-06-18 中国石油化工股份有限公司 Timed gel-breaking carrier fluid composition and using method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3437147A (en) * 1967-02-23 1969-04-08 Mobil Oil Corp Method and apparatus for plugging well pipe perforations
US4187909A (en) * 1977-11-16 1980-02-12 Exxon Production Research Company Method and apparatus for placing buoyant ball sealers
CN1248663A (en) * 1999-08-19 2000-03-29 白云渡 Section regulation process for interrupted water-injection depth of water injection well
CN2381781Y (en) * 1999-07-09 2000-06-07 中原石油勘探局采油三厂 Pipe column for regulating separated layer water injection
CN202467796U (en) * 2012-03-28 2012-10-03 中国石油天然气股份有限公司 Sub-divisional water injection ball-launching profile control integrated pipe post for oil field water injection well

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3437147A (en) * 1967-02-23 1969-04-08 Mobil Oil Corp Method and apparatus for plugging well pipe perforations
US4187909A (en) * 1977-11-16 1980-02-12 Exxon Production Research Company Method and apparatus for placing buoyant ball sealers
CN2381781Y (en) * 1999-07-09 2000-06-07 中原石油勘探局采油三厂 Pipe column for regulating separated layer water injection
CN1248663A (en) * 1999-08-19 2000-03-29 白云渡 Section regulation process for interrupted water-injection depth of water injection well
CN202467796U (en) * 2012-03-28 2012-10-03 中国石油天然气股份有限公司 Sub-divisional water injection ball-launching profile control integrated pipe post for oil field water injection well

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102877811A (en) * 2012-09-21 2013-01-16 中国石油天然气股份有限公司 Selective water plugging ball for profile control of water injection well and preparation method and application of selective water plugging ball
CN102877811B (en) * 2012-09-21 2016-02-10 中国石油天然气股份有限公司 Profile Control in Injection Well selective plugging ball and preparation method thereof and application
RU2517294C1 (en) * 2013-01-10 2014-05-27 Олег Сергеевич Николаев Device for dual injection operation to two formations of same well (versions)
RU2569390C1 (en) * 2014-11-25 2015-11-27 Общество с Ограниченной Ответственностью "ТНГ-Групп" Borehole unit with field exploitation monitoring and control system
CN105401906B (en) * 2015-12-02 2018-01-02 中国石油天然气股份有限公司 Adjust stifled ball choosing method and adjust stifled ball shearing allowable stress test device
CN105401906A (en) * 2015-12-02 2016-03-16 中国石油天然气股份有限公司 Profile adjusting/water plugging ball selection method and device for testing shearing allowable stress of profile adjusting/water plugging ball
CN105422064B (en) * 2015-12-24 2017-09-05 牡丹江博实石油机械科技有限公司 Special profile control device
CN105422064A (en) * 2015-12-24 2016-03-23 牡丹江博实石油机械科技有限公司 Special profile control device
CN106014314B (en) * 2016-07-05 2018-11-20 中交第四航务工程勘察设计院有限公司 A kind of drill takes device with hydraulic rock core card
CN106014314A (en) * 2016-07-05 2016-10-12 中交第四航务工程勘察设计院有限公司 Hydraulic rock core lifting device for exploratory boring
CN108999590A (en) * 2017-06-06 2018-12-14 中国石油天然气股份有限公司 Profile control tool, dispensing profile control integrated pipe column and technique
CN108999590B (en) * 2017-06-06 2021-07-02 中国石油天然气股份有限公司 Profile control tool, separate injection profile control integrated pipe column and process
CN108301796A (en) * 2018-01-31 2018-07-20 中国石油天然气股份有限公司 A kind of pitching auxiliary Flushing tubular column
CN110399640A (en) * 2019-06-17 2019-11-01 中国石油天然气股份有限公司 A kind of dispensing well dispensing technical limits comprehensive judgement method
CN110399640B (en) * 2019-06-17 2022-03-29 中国石油天然气股份有限公司 Comprehensive judgment method for separate injection technical boundary of separate injection well
CN112980422A (en) * 2021-03-31 2021-06-18 中国石油化工股份有限公司 Timed gel-breaking carrier fluid composition and using method thereof
CN112980422B (en) * 2021-03-31 2023-03-28 中国石油化工股份有限公司 Timed gel-breaking carrier fluid composition and using method thereof
CN112855102A (en) * 2021-04-01 2021-05-28 中国石油天然气股份有限公司 Automatic selection composite steam injection device and method
CN112855102B (en) * 2021-04-01 2022-11-18 中国石油天然气股份有限公司 Automatic selection composite steam injection device and method

Similar Documents

Publication Publication Date Title
CN102606118A (en) Subdivision water injection, ball-off and profile control integrated tubular column for water injection well of oilfield and process of tubular column
CN203285410U (en) Steam injection technique pipe capable of improving thickened oil horizontal well horizontal section utilization degree
CN202467796U (en) Sub-divisional water injection ball-launching profile control integrated pipe post for oil field water injection well
CN205225215U (en) A mining devices for two sets of oil reservoir slicing mining
CN203808945U (en) Water plugging and controlling technical tubular column for open hole screen pipe completion horizontal well root
CN104453839A (en) Large-discharge-capacity oil-water separation automatically flowing water injection system
CN101769271B (en) Deep-well oil-extraction external flow-channel direct and reverse circulation freely-throwing jet injector oil production method and device
CN104989326A (en) Regulating separate layer production string and separate layer oil production method
CN205330612U (en) Hole sealing device for gas extraction
CN205243489U (en) Steam flow distributor in pit
CN203961924U (en) A kind of thick oil horizontal well divides to take out and mixes out oil extraction process tubular column
CN203948037U (en) Sectional quantitative injection string
CN111577204B (en) Underground cascade sliding sleeve system
CN201053309Y (en) Down-hole filter for water filling well
CN203175503U (en) Tubular column for safety production in fluid producing and injecting process through one well of offshore oilfield
CN201671607U (en) Concentric double-tube separate-injection tube column with ground water distribution for high-inclination well
CN103437742A (en) Sand-replenishing tool for rapidly opening and closing filling channel
CN202832453U (en) Steam assisted gravity drainage (SAGD) producing well single tubing pumping process tubular column
CN208456570U (en) A kind of extracting device of oil
CN207686693U (en) A kind of flow string and device for producing thickened oil
CN207568573U (en) A kind of flushing separate injection tubing string
CN203239302U (en) Separated-layer water injection tubular column
CN205805530U (en) A kind of layer steam injection regulating separate stratum injection string
CN207093049U (en) A kind of separate injection tubing string for flushing
CN202467795U (en) Water distributor special for separated injection, ball injection and profile control of water injection well

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120725