CN107989347A - A kind of novel building engineering ceramic tile joint filling device - Google Patents

A kind of novel building engineering ceramic tile joint filling device Download PDF

Info

Publication number
CN107989347A
CN107989347A CN201711346272.7A CN201711346272A CN107989347A CN 107989347 A CN107989347 A CN 107989347A CN 201711346272 A CN201711346272 A CN 201711346272A CN 107989347 A CN107989347 A CN 107989347A
Authority
CN
China
Prior art keywords
sliding block
stent
support
ceramic tile
leading screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711346272.7A
Other languages
Chinese (zh)
Other versions
CN107989347B (en
Inventor
李平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG XINRUI CONSTRUCTION GROUP Co.,Ltd.
Original Assignee
李平
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 李平 filed Critical 李平
Priority to CN201711346272.7A priority Critical patent/CN107989347B/en
Publication of CN107989347A publication Critical patent/CN107989347A/en
Application granted granted Critical
Publication of CN107989347B publication Critical patent/CN107989347B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/165Implements for finishing work on buildings for finishing joints, e.g. implements for raking or filling joints, jointers

Abstract

A kind of novel building engineering ceramic tile joint filling device,Belong to construction equipment field,Including the first motor,First support,First leading screw,Second support,Wheel,Discharge head,Pedestal,Camera,Sliding block,Camera pedestal,Slide,3rd stent,Material storing box,Cleaning box,Feed pipe,4th stent,Fixed sliding block,Fixing bolt,Elastic device,Controller,Second motor,Second leading screw and skin brush,First motor is installed on first support one end,First leading screw is connected with the first motor main shaft,The discharge head is connected with pedestal,The pedestal is connected with sliding block,The sliding block is connected with slide and the first leading screw,Real time scan by camera to ceramic tile surface,So as to collect working status real time information,The correction deviated to discharge head relative to target trajectory is realized by controller and the first motor,The filling work of ceramic tile seam is completed by output of the discharge head to joint filling mud.

Description

A kind of novel building engineering ceramic tile joint filling device
Technical field
The present invention relates to a kind of novel building engineering ceramic tile joint filling device, specifically by the adjusting of the first leading screw and The spraying of discharge head, and the device for the cleaning effect completion ceramic tile joint filling for passing through cleaning box, belong to construction equipment field.
Background technology
With the fast development of China's economy, the income of people steps up, and the standard of many construction and decorations greatly improves, Either city or small towns, in fitment process the use of ceramic tile popularized, and after tile paste finishes, due to ceramic tile Gap is left between ceramic tile, so as to need gap filling manually.
The gap filling between ceramic tile is all that worker has been manually done at present, is worker after tile paste finishes first Hand-held joint filling mud, is entered the pressing of joint filling mud in ceramic tile seam by the pressing of hand, so as to complete the filling in gap between ceramic tile Work, not only work efficiency is low for manual joint filling process, but also the quality of joint filling cannot be guaranteed.
The content of the invention
For above-mentioned deficiency, the present invention provides a kind of novel building engineering ceramic tile joint filling device.
The present invention is achieved by the following technical solutions:A kind of novel building engineering ceramic tile joint filling device, including the One motor, first support, the first leading screw, second support, wheel, discharge head, pedestal, camera, sliding block, camera pedestal, Slide, the 3rd stent, material storing box, cleaning box, feed pipe, the 4th stent, fixed sliding block, fixing bolt, elastic device, control Device, the second motor, the second leading screw and skin brush, first motor are installed on first support one end, its position is located at first On the left of stent, the first support is connected with second support, its position be located at second support surface, first leading screw and First motor main shaft is connected, its position is located inside first support, the second support have two respectively with two wheels It is connected, the wheel there are four to be separately mounted to below second support, and the discharge head is connected with pedestal, its position is located at The underface of pedestal, the pedestal are connected with sliding block, its position is located at the front of sliding block, the camera and camera base Seat is connected, it is fixed on camera pedestal, and the sliding block is connected with slide and the first leading screw, it can be relatively sliding along slide Dynamic, the camera pedestal is fixed on above feed pipe, and the slide is installed on inside first support, its installation direction and first Leading screw is parallel, and the 3rd stent is mutually fixed with sliding block, its position is located at the surface of sliding block, the material storing box and the 3rd stent It is connected, it is fixed on the 3rd internal stent, and the cleaning box is installed on below elastic device, and the feed pipe connects material storing box And discharge head, the 4th stent are connected with sliding block, it is fixed on the dead astern of sliding block, the fixed sliding block and the 4th stent It is connected, it can keep opposite with the 4th stent and slide, and the fixing bolt is installed on the 4th stent, its top connection is fixed Sliding block, the elastic device are installed on immediately below fixed sliding block, it connects fixed sliding block and cleaning box, the controller and first Stent is connected, its be installed on first support top, second motor be installed on material storing box one end, described second Thick stick is connected with the main shaft of the second motor, and the skin brush is installed on inside cleaning box.
Preferably, described material storing box one end is provided with cross-shaped configuration, it is cylindrical structure.
Preferably, the first support is N type junction structure, is below rectangular parallelepiped structure, its left side lower position is provided with circle Hole.
Preferably, the length of the discharge head is scalable.
Preferably, described 4th stent one end is provided with square hole, it, which is located above square hole, is provided with threaded hole.
Preferably, the cleaning box is cuboid hollow structure, is provided with square hole with front below.
Preferably, the fixed sliding block is installed in the square hole of the 4th stent, it can be relatively sliding along the square hole of the 4th stent It is dynamic.
Preferably, the sliding block is rectangular parallelepiped structure, is provided with two holes inside it, one, two hole is circular hole, another A hole is threaded hole.
Preferably, the skin brush is cylindrical structure arranged side by side, and the bottom of its cylinder is equal with cleaning box ground, its side installed To with the horizontal 60 degree.
Preferably, described second leading screw one end connects the main shaft of the second motor, and the other end is provided with and the second leading screw phase The baffle of cooperation, its baffle are engaged with material storing box internal diameter.
The usefulness of the invention is the tune of the height of the adjusting for the length that the present invention passes through discharge head and fixed sliding block Section, realizes the cooperation with different operating surface, so that device is adapted to different surface of wall, ensure that the matter of device work Amount;Real time scan by camera to ceramic tile surface, so as to collect working status real time information, work real time information is passed Controller is given, position of the discharge head relative to target trajectory is judged by the algorithm of controller, so that controller control first Electric motor operation, drives the first leading screw to rotate by adjusting of the controller to the first motor, and then with movable slider and discharge head It is mobile, realize the correction deviated to discharge head relative to target trajectory;The second leading screw is driven to rotate by the second motor, so that Complete joint filling mud by feed pipe to enter in discharge head, realize the joint filling action of joint filling mud, improve the effect of device work Rate;The height of fixed sliding block is adjusted by rotary fixing screw bolt, skin brush in cleaning box is realized and is close to ceramic tile surface movement, protect Unnecessary joint filling mud is demonstrate,proved and has been removed by skin brushing and entered in cleaning box, improved the quality of device work, saved joint filling materials.
Brief description of the drawings
Fig. 1 is the structure diagram of the present invention.
Fig. 2 is the Front Frame schematic diagram of Fig. 1 of the present invention.
Fig. 3 is the back upper place structure diagram of Fig. 1 of the present invention.
Fig. 4 is storing case structure schematic diagram in Fig. 1 of the present invention.
Fig. 5 is cleaning box structure diagram in Fig. 1 of the present invention.
Fig. 6 is the rectangular structure schematic diagram of Fig. 1 of the present invention.
Fig. 7 is the second screw structure schematic diagram in Fig. 1 of the present invention.
In figure, the 1, first motor, 2, first support, the 3, first leading screw, 4, second support, 5, wheel, 6, discharge head, 7, Pedestal, 8, camera, 9, sliding block, 10, camera pedestal, 11, slide, the 12, the 3rd stent, 13, material storing box, 14, cleaning box, 15th, feed pipe, the 16, the 4th stent, 17, fixed sliding block, 18, fixing bolt, 19, elastic device, 20, controller, the 21, second electricity Motivation, the 22, second leading screw, 23, skin brush.
Embodiment
What the present invention was achieved through the following technical solutions:
A kind of novel building engineering ceramic tile joint filling device, including the first motor 1, first support 2, the first leading screw 3, Two stents 4, wheel 5, discharge head 6, pedestal 7, camera 8, sliding block 9, camera pedestal 10, slide 11, the 3rd stent 12, storing Case 13, cleaning box 14, feed pipe 15, the 4th stent 16, fixed sliding block 17, fixing bolt 18, elastic device 19, controller 20, Second motor 21, the second leading screw 22 and skin brush 23, first motor 1 are installed on 2 one end of first support, its position is located at The left side of first support 2, the first support 2 are connected with second support 4, its position is located at the surface of second support 4, and described the One leading screw 3 is connected with 1 main shaft of the first motor, its position is located inside first support 2, and the second support 4 has two points It is not connected with two wheels 5, the wheel 5 there are four to be separately mounted to the lower section of second support 4, the discharge head 6 and pedestal 7 Be connected, its position is located at the underface of pedestal 7, and the pedestal 7 is connected with sliding block 9, its position be located at sliding block 9 just before Side, the camera 8 is connected with camera pedestal 10, it is fixed on camera pedestal 10, the sliding block 9 and slide 11 and First leading screw 3 is connected, it can be slided along slide 11 is opposite, and the camera pedestal 10 is fixed on the top of feed pipe 15, described Slide 11 is installed on inside first support 2, its installation direction is parallel with the first leading screw 3, and the 3rd stent 12 is consolidated with 9 phase of sliding block Fixed, its position is located at the surface of sliding block 9, and the material storing box 13 is connected with the 3rd stent 12, it is fixed on the 3rd stent 12 Inside, the cleaning box 14 are installed on the lower section of elastic device 19, and the feed pipe 15 connects material storing box 13 and discharge head 6, described 4th stent 16 is connected with sliding block 9, it is fixed on the dead astern of sliding block 9, and the fixed sliding block 17 is connected with the 4th stent 16 Connect, it can keep opposite with the 4th stent 16 and slide, and the fixing bolt 18 is installed on the 4th stent 16, its top connection is solid Fixed slider 17, the elastic device 19 are installed on immediately below fixed sliding block 17, it connects fixed sliding block 17 and cleaning box 14, described Controller 20 is connected with first support 2, it is installed on the top of first support 2, and second motor 21 is installed on storing One end of case 13, second leading screw 22 are connected with the main shaft of the second motor 21, and the skin brush 23 is installed on cleaning box 14 It is internal.
Preferably, described 13 one end of material storing box is provided with cross-shaped configuration, it is cylindrical structure.
Preferably, the first support 2 is N type junction structure, is below rectangular parallelepiped structure, its left side is located at the first motor 1 position is provided with circular hole.
Preferably, the length of the discharge head 6 is scalable.
Preferably, described 4th stent, 16 one end is provided with square hole, it, which is located above square hole, is provided with threaded hole.
Preferably, the cleaning box 14 is cuboid hollow structure, is provided with square hole with front below.
Preferably, the fixed sliding block 17 is installed in the square hole of the 4th stent 16, it can be along the square hole of the 4th stent 16 It is opposite to slide.
Preferably, the sliding block 9 is rectangular parallelepiped structure, is provided with two holes inside it, one, two hole is circular hole, another A hole is threaded hole.
Preferably, the skin brush 23 is cylindrical structure arranged side by side, and the bottom of its cylinder is equal with 14 ground of cleaning box, it is installed Direction with the horizontal 60 degree.
Preferably, described second leading screw, 22 one end connects the main shaft of the second motor 21, and the other end is provided with and second 22 matched baffle of thick stick, its baffle are engaged with 13 internal diameter of material storing box.
Operation principle:The original state of the present apparatus is in relaxed state for fixing bolt 18, and the first motor 1, which is in, to be stopped Operating condition, sliding block 9 are located at the random site on slide 11, and the length of discharge head 6 is random length, and the second motor 21 is in Shut down state, during using the present apparatus, adjust first discharge head 6 length and and fixed sliding block 17 relative to the 4th stent 16 Position, the height of 14 bottom of discharge head 6 and cleaning box controller 20 is opened, by holding first close to ceramic tile surface Frame 2 makes wheel 5, and close to ceramic tile surface, with hand propelled first support 2, first support 2 is by second support 4 so that 5 edge of wheel Ceramic tile surface moves, and controller 20 controls camera 8 to open at this time, and camera 8 gathers real-time image information and sends controller to 20, the analysis of controller 20 calculates the real-time image information of camera 8, so as to judge the opposite position that discharge head 6 is stitched relative to ceramic tile Put, so that controller 20 controls the first motor 1 to work, the first motor 1 drives the first leading screw 3 to rotate, so that the first leading screw 3 Rotation band movable slider 9 is moved relative to slide 11, and the movement of slide 11 drives discharge port 6 to move by pedestal 7, so that discharge port 6 Face ceramic tile stitch, so circulation ensure that 6 moment of discharge port face ceramic tile stitch, controller 20 control the second motor 21 rotate from And drive the second leading screw 22 to rotate, rotated by the second leading screw 22 so that joint filling mud enters in discharge head 6, and then fills ceramic tile Seam, with the advance of device, unnecessary joint filling mud cleaning with water by skin brush 23 in being stitched into ceramic tile, joint filling mud is fallen by gravity Enter in cleaning box 14, after ceramic tile seam filling finishes, controller 20 controls the first motor 1 and the second motor 21 to stop turning Dynamic, controller 20 controls camera 8 to close, and when the joint filling mud in material storing box 13 is insufficient, storing is removed from the 3rd stent 12 Case 13 carries out filler, restPoses, waits next task.
For the ordinary skill in the art, according to the present invention teaching, do not depart from the principle of the present invention with In the case of spirit, the changes, modifications, replacement and the modification that are carried out to embodiment still fall within protection scope of the present invention it It is interior.

Claims (10)

1. a kind of novel building engineering ceramic tile joint filling device, including the first motor, first support, the first leading screw, second Frame, wheel, discharge head, pedestal, camera, sliding block, camera pedestal, slide, the 3rd stent, material storing box, cleaning box, feeding Pipe, the 4th stent, fixed sliding block, fixing bolt, elastic device, controller, the second motor, the second leading screw and skin brush, it is special Sign is:First motor is installed on first support one end, its position is located on the left of first support, the first support with Second support is connected, its position is located at directly over second support, and first leading screw is connected with the first motor main shaft, its Position is located inside first support, and the second support has two to be connected respectively with two wheels, and the wheel has four points An Zhuan not be below second support, the discharge head is connected with pedestal, its position is located at the underface of pedestal, the pedestal and Sliding block is connected, its position is located at the front of sliding block, and the camera is connected with camera pedestal, it is fixed on camera On pedestal, the sliding block is connected with slide and the first leading screw, it can be slided along slide is opposite, and the camera pedestal is fixed on Above feed pipe, the slide is installed on inside first support, its installation direction is parallel with the first leading screw, the 3rd stent and Sliding block is mutually fixed, its position is located at the surface of sliding block, and the material storing box is connected with the 3rd stent, it is fixed on the 3rd stent Inside, the cleaning box are installed on below elastic device, feed pipe connection material storing box and discharge head, the 4th stent with Sliding block is connected, it is fixed on the dead astern of sliding block, and the fixed sliding block is connected with the 4th stent, it can be protected with the 4th stent Opposite slip is held, the fixing bolt is installed on the 4th stent, its fixed sliding block of top connection, the elastic device is installed on Immediately below fixed sliding block, it connects fixed sliding block and cleaning box, the controller and is connected with first support, it is installed on first The top of stent, second motor are installed on one end of material storing box, the main shaft phase of second leading screw and the second motor Connection, the skin brush are installed on inside cleaning box.
2. architectural engineering as claimed in claim 1 ceramic tile joint filling device, it is characterised in that:Described material storing box one end is provided with Cross-shaped configuration, it is cylindrical structure.
3. architectural engineering as claimed in claim 1 ceramic tile joint filling device, it is characterised in that:The first support is N type junction Structure, is below rectangular parallelepiped structure, its left side lower position is provided with circular hole.
4. architectural engineering as claimed in claim 1 ceramic tile joint filling device, it is characterised in that:The length of the discharge head can stretch Contracting.
5. architectural engineering as claimed in claim 1 ceramic tile joint filling device, it is characterised in that:Described 4th stent one end is provided with Square hole, it, which is located above square hole, is provided with threaded hole.
6. architectural engineering as claimed in claim 1 ceramic tile joint filling device, it is characterised in that:The cleaning box is in cuboid Hollow structure, is provided with square hole with front below.
7. architectural engineering as claimed in claim 1 ceramic tile joint filling device, it is characterised in that:The fixed sliding block is installed on the In the square hole of four stents, it can be along the opposite slip of square hole of the 4th stent.
8. architectural engineering as claimed in claim 1 ceramic tile joint filling device, it is characterised in that:The sliding block is cuboid knot Structure, is provided with two holes inside it, one, two hole is circular hole, another hole is threaded hole.
9. architectural engineering as claimed in claim 1 ceramic tile joint filling device, it is characterised in that:The skin brush is cylinder knot arranged side by side Structure, the bottom of its cylinder is equal with cleaning box ground, and the direction that it is installed is with the horizontal 60 degree.
10. architectural engineering as claimed in claim 1 ceramic tile joint filling device, it is characterised in that:Described second leading screw one end connects The main shaft of the second motor is connect, the other end is provided with to match with the matched baffle of the second leading screw, its baffle with material storing box internal diameter Close.
CN201711346272.7A 2017-12-15 2017-12-15 Novel ceramic tile for building engineering is caulked device Active CN107989347B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711346272.7A CN107989347B (en) 2017-12-15 2017-12-15 Novel ceramic tile for building engineering is caulked device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711346272.7A CN107989347B (en) 2017-12-15 2017-12-15 Novel ceramic tile for building engineering is caulked device

Publications (2)

Publication Number Publication Date
CN107989347A true CN107989347A (en) 2018-05-04
CN107989347B CN107989347B (en) 2020-06-12

Family

ID=62037934

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711346272.7A Active CN107989347B (en) 2017-12-15 2017-12-15 Novel ceramic tile for building engineering is caulked device

Country Status (1)

Country Link
CN (1) CN107989347B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109025205A (en) * 2018-09-10 2018-12-18 卜伟斐 A kind of construction ceramic tile joint filling device
CN110315609A (en) * 2019-07-08 2019-10-11 宛兴怀 A kind of processing of Furniture manufacture plate surface is mechanical and its processing method
CN110629985A (en) * 2019-09-06 2019-12-31 三峡大学 Automatic filling construction device and method for seam beautifying agent of gaps among floor tiles
CN110629988A (en) * 2019-10-09 2019-12-31 广东博智林机器人有限公司 Grouting apparatus, control method of grouting apparatus, and computer-readable storage medium
CN110984534A (en) * 2019-12-21 2020-04-10 武艳灵 Construction method for joint filling treatment after installation and fixation of building decoration curtain wall hanging plate
CN111236594A (en) * 2020-03-05 2020-06-05 广东博智林机器人有限公司 Discharging device and caulking robot
CN111962837A (en) * 2020-08-26 2020-11-20 山东劳动职业技术学院(山东劳动技师学院) Ceramic tile seam beautifying device
CN112096016A (en) * 2020-09-11 2020-12-18 上海光华建筑规划设计有限公司 Beautiful seam device of interior decoration design ceramic tile
CN112663914A (en) * 2019-10-15 2021-04-16 广东博智林机器人有限公司 Seam filling sub-machine, seam filling workstation, seam filling system and working method of seam filling system
CN113187110A (en) * 2021-05-18 2021-07-30 吴文凯 Gap filling device with calibration structure for mounting sound insulation board

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07217186A (en) * 1994-01-28 1995-08-15 Morii Tile Kk Coating tool
US6059475A (en) * 1997-10-20 2000-05-09 Jafarmadar; Hossein H. Apparatus for cleaning tile grout joints
CN101514585A (en) * 2009-03-27 2009-08-26 冉鹏程 Tile pointing device
CN201517281U (en) * 2009-05-12 2010-06-30 洪成君 Pointing machine for building
CN101824903A (en) * 2010-02-09 2010-09-08 麻正和 Caulking machine
CN106193554A (en) * 2016-07-30 2016-12-07 张学衡 A kind of automatic tracking Glue Spreading Robot
CN205840279U (en) * 2016-08-02 2016-12-28 鄂星峄 A kind of mosaic tiles high density joint filling device
CN106930515A (en) * 2017-03-29 2017-07-07 哈尔滨理工大学 Automatic tracking Mei Feng joint fillings robot

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07217186A (en) * 1994-01-28 1995-08-15 Morii Tile Kk Coating tool
US6059475A (en) * 1997-10-20 2000-05-09 Jafarmadar; Hossein H. Apparatus for cleaning tile grout joints
CN101514585A (en) * 2009-03-27 2009-08-26 冉鹏程 Tile pointing device
CN201517281U (en) * 2009-05-12 2010-06-30 洪成君 Pointing machine for building
CN101824903A (en) * 2010-02-09 2010-09-08 麻正和 Caulking machine
CN106193554A (en) * 2016-07-30 2016-12-07 张学衡 A kind of automatic tracking Glue Spreading Robot
CN205840279U (en) * 2016-08-02 2016-12-28 鄂星峄 A kind of mosaic tiles high density joint filling device
CN106930515A (en) * 2017-03-29 2017-07-07 哈尔滨理工大学 Automatic tracking Mei Feng joint fillings robot

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109025205A (en) * 2018-09-10 2018-12-18 卜伟斐 A kind of construction ceramic tile joint filling device
CN110315609A (en) * 2019-07-08 2019-10-11 宛兴怀 A kind of processing of Furniture manufacture plate surface is mechanical and its processing method
CN110315609B (en) * 2019-07-08 2021-05-14 四川省永亨实业有限责任公司 Furniture manufacturing plate surface treatment machine and treatment method thereof
CN110629985A (en) * 2019-09-06 2019-12-31 三峡大学 Automatic filling construction device and method for seam beautifying agent of gaps among floor tiles
CN110629988A (en) * 2019-10-09 2019-12-31 广东博智林机器人有限公司 Grouting apparatus, control method of grouting apparatus, and computer-readable storage medium
CN110629988B (en) * 2019-10-09 2021-11-23 广东博智林机器人有限公司 Grouting apparatus, control method of grouting apparatus, and computer-readable storage medium
CN112663914A (en) * 2019-10-15 2021-04-16 广东博智林机器人有限公司 Seam filling sub-machine, seam filling workstation, seam filling system and working method of seam filling system
CN110984534B (en) * 2019-12-21 2020-12-11 中信建设有限责任公司 Construction method for joint filling treatment after installation and fixation of building decoration curtain wall hanging plate
CN110984534A (en) * 2019-12-21 2020-04-10 武艳灵 Construction method for joint filling treatment after installation and fixation of building decoration curtain wall hanging plate
CN111236594B (en) * 2020-03-05 2021-05-11 广东博智林机器人有限公司 Discharging device and caulking robot
CN111236594A (en) * 2020-03-05 2020-06-05 广东博智林机器人有限公司 Discharging device and caulking robot
CN111962837A (en) * 2020-08-26 2020-11-20 山东劳动职业技术学院(山东劳动技师学院) Ceramic tile seam beautifying device
CN112096016A (en) * 2020-09-11 2020-12-18 上海光华建筑规划设计有限公司 Beautiful seam device of interior decoration design ceramic tile
CN113187110A (en) * 2021-05-18 2021-07-30 吴文凯 Gap filling device with calibration structure for mounting sound insulation board
CN113187110B (en) * 2021-05-18 2023-05-09 吴文凯 Gap filling device with calibration structure for installation of sound insulation plate

Also Published As

Publication number Publication date
CN107989347B (en) 2020-06-12

Similar Documents

Publication Publication Date Title
CN107989347A (en) A kind of novel building engineering ceramic tile joint filling device
CN110424220A (en) A kind of road engineering pavement asphalt laying equipment
CN106499159B (en) Integrated full-automatic wall plaster unit and its application method
CN103352557B (en) Drone version full-automatic multi-functional wall surface mortar strikes off trowelling machine
CN206824239U (en) A kind of metal casting surface dust cleaning apparatus
CN107227837B (en) The application method of portable ceramic tile machinery apparatus of plastering
CN204413825U (en) A kind of TV frame polishing machine
CN107649428A (en) A kind of power supply sequential device cleaning device
CN108526056A (en) A kind of hardware nut inner thread cleaning equipment
CN209163388U (en) A kind of efficient joint trimming agent cleaning device for casting
CN113445457A (en) Municipal engineering step cleaning device and using method thereof
CN105544367A (en) Seam filling device for road brick paving
CN211612057U (en) Building construction dust collector
CN209011511U (en) A kind of Art Design is seamed standby with wall U.S.A
CN207609144U (en) A kind of architecture indoor finishing cannots be used up the engagement type wall plaster device of all gear rack
CN203452347U (en) Full-automatic multifunctional remote control type wall space mortar scraping and trowelling machine
CN205531235U (en) Wall body prosthetic devices
CN209907156U (en) A sprinkler for bituminous paving protective agent
JP6952419B2 (en) Tunnel cleaning method
CN209099727U (en) Smart levelling machine
CN205591558U (en) Building templates surface building prosthetic devices
CN206721831U (en) Automatic plastering device is used in a kind of farmland flume construction
CN220834734U (en) But collapse ground of multi-angle regulation is administered construction and is administered device with raise dust
CN208231448U (en) A kind of building roof grinding device for clearing up dust
CN108209770A (en) A kind of indoor cobweb cleaning plant of environment-protecting clean

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20200520

Address after: No. 669, Anyang South Road, Dongshan street, Ruian City, Wenzhou City, Zhejiang Province 325200

Applicant after: ZHEJIANG XINRUI CONSTRUCTION GROUP Co.,Ltd.

Address before: 431899 175 households, No. 49 traffic road, Xinshi Town, Jingshan County, Hubei, Jingmen

Applicant before: Li Ping

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant