CN107989230A - A kind of L-type assembled stem steel plate shear force wall and its assembling constructing method - Google Patents

A kind of L-type assembled stem steel plate shear force wall and its assembling constructing method Download PDF

Info

Publication number
CN107989230A
CN107989230A CN201810004798.5A CN201810004798A CN107989230A CN 107989230 A CN107989230 A CN 107989230A CN 201810004798 A CN201810004798 A CN 201810004798A CN 107989230 A CN107989230 A CN 107989230A
Authority
CN
China
Prior art keywords
stem
wall
steel plate
shear force
plate shear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810004798.5A
Other languages
Chinese (zh)
Inventor
徐国军
蒋路
宋生志
邱森
杨宇焜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Green Building Integration Technology Co Ltd
Original Assignee
Zhejiang Green Building Integration Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Green Building Integration Technology Co Ltd filed Critical Zhejiang Green Building Integration Technology Co Ltd
Priority to CN201810004798.5A priority Critical patent/CN107989230A/en
Publication of CN107989230A publication Critical patent/CN107989230A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/32Columns; Pillars; Struts of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/34Columns; Pillars; Struts of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention mainly relates to a kind of L-type assembled stem steel plate shear force wall, including square rim stiffening column, circular stem, band steel tie-rod, web and concrete, the circle stem sets some L-shaped evenly distributed, form L-type stem wall, the corner of wall and top set square rim stiffening column, square rim stiffening column is welded to one another with circular stem by web using groove penetration weld, some band steel tie-rods are uniformly provided with two lateral surfaces of wall, band steel tie-rod both ends are respectively welded on adjacent two stem, in circular stem and the outside left fill concrete of square rim stiffening column;The upper end of circular stem and square rim stiffening column is all arranged with four gap, and the lower end of circular stem and square rim stiffening column is designed with the tubaeform necking reduced downwards.Overall performance of the present invention is good, it is simple to make, and splicing is convenient, improves work efficiency;Bonding strength is high between component at the same time, and structural safety performance is high, and anti-seismic performance is good.

Description

A kind of L-type assembled stem steel plate shear force wall and its assembling constructing method
Technical field
The present invention relates to technical field of buildings, especially relates to a kind of L-type assembled stem steel plate shear force wall and its dress With construction method.
Background technology
Building industrialization is a kind of low-carbon, green, environmental protection, efficient mode of construction, is the Prefabrication in factory, transport The drawbacks of carrying out assembling assembly to scene, overcome traditional construction pattern, effectively improves architecture production efficiency, improves structure safety Performance, energy-saving and emission-reduction, improve resource utilization, reduce construction cost.
At present, for assembled architecture, two mainly influence the problem of structure is safe:1st, component anti-seismic performance;2nd, structure Bonding strength between part.In traditional reinforced concrete shear wall in order to improve its anti-seismic performance, it is necessary to configure a large amount of reinforcing bars come Resistance seismic shear, when factory makes and processes, bar-mat reinforcement and steel reinforcement cage etc. are not implemented completely certainly fabricated shear wall at present Dynamic metaplasia production, most still by manually binding, production efficiency is low, and quality is difficult to ensure that, labour cost is higher, and is difficult to full Foot automation pours the demand of production line.Currently, the connection between traditional assembled steel reinforced concrete shear wall member is mostly Connected using grout sleeve, the form such as slurry anchor connection, above type of attachment, component requirement on machining accuracy is high, constructional difficulties, efficiency Lowly, simultaneously as the bad control of internal grouting quality, can seriously affect bonding strength between component, reduce integrally-built peace Full performance.
The content of the invention
To solve the above problems, the present invention provides a kind of L-type assembled stem steel plate shear force wall and its assembling construction party Method, program overall performance is good, it is simple to make, without cumbersome steel bar meter process, and scene splicing is convenient and reliable, can be completely achieved mark Standardization design, be factory produced, prefabricated construction, greatly improves production and processing and construction efficiency;Meanwhile connect between program component Intensity height is connect, structural safety performance is reliable, and anti-seismic performance is good.
To achieve the above object, the present invention adopts the following technical scheme that:
A kind of L-type assembled stem steel plate shear force wall, including square rim stiffening column, circular stem, band steel tie-rod, web and mixed Solidifying soil, the circle stem setting is some L-shaped evenly distributed, forms L-type stem wall, and the corner of wall and top are set Square rim stiffening column, square rim stiffening column is welded to one another with circular stem by web using groove penetration weld, in wall Two lateral surfaces of body are uniformly provided with some band steel tie-rods, and band steel tie-rod both ends are respectively welded on adjacent two stem, in circular core The outside left fill concrete of column and square rim stiffening column 1;
The upper end of circular stem and square rim stiffening column is all arranged with four gap, circular stem and square rim stiffening column Lower end be designed with the tubaeform necking reduced downwards.
The reentrant diameter is less than stem diameter at the top of wall, and necking is inserted into that the interior of wall top stem need to be docked Portion, gap length is identical with the necking built-in length that need to dock wall stem lower end, the wall after assembly is good, stem assembly portion Position, gap position need to be welded to together using plug weld, then toward circular stem and square rim stiffening column tube chamber Internal fill concrete.
The web of the wall upper and lower ends is equipped with some evenly distributed bolts hole, when assembling second layer wall, The web of lower wall upper end and the web of upper wall lower end by connecting plate and are bolted reinforcing.
Hole is equipped with the web.
A kind of assembling constructing method of L-type assembled stem steel plate shear force wall:
Step 1:Stem steel plate shear force wall body welded in factory, it is prefabricated after transport to scene and assembled, what is be vertically arranged is upper The circular stem of lower two stem steel plate shear force walls is connected with square rim stiffening column in the form of plug-in type is welded with and connects;Dress Timing, fixes by lower floor's stem steel plate shear force wall first, then lifts new stem steel plate shear force wall, by new stem steel Plate shear wall is hung above the wall fixed, and upper and lower stem steel pipe alignment, then slowly declines, by upper strata stem steel plate The stem necking of shear wall bottom is inserted into the stem steel pipe at the top of lower floor's stem steel plate shear force wall, by upper wall tiltedly branch Fixation is supportted, then using connecting plate and bolt by the web of lower wall upper end and the web reinforcement by connection of upper wall lower end, Then, the opening position of lower floor's shear wall stem upper end is welded using the form of plug welding so that levels stem steel pipe tube wall welds It is connected together, then in levels stem steel plate shear force wall body docking site with to pull rod fixed form, to template internal high pressure Inject concrete;
Step 2:Finally self-compacting concrete is injected to stem steel duct at the top of the stem steel plate shear force wall of upper strata again so that on Full self-compacting concrete is filled inside the stem of lower floor's stem steel plate shear force wall body;The core of levels stem steel plate shear force wall body Filling self-compacting concrete in column, every time during perfusion, need to be filled into the half of new splicing upper strata stem steel plate shear force wall body height, Namely ensure the New-old concrete in stem connects stubble in the middle part of shear wall, it is ensured that the overall performance of wall;
Step 3:After the completion of levels wall assembly, conserve the stipulated time after, after intensity reaches design standard can with form removal into The assembly of row last layer.
The present invention has the advantages that:
1st, a kind of L-type assembled stem steel plate shear force wall, including square rim stiffening column, circular stem, band steel tie-rod, web and Concrete, the circle stem setting is some L-shaped evenly distributed, forms L-type stem wall, the corner of wall and top are set Square rim stiffening column is put, square rim stiffening column is welded to one another with circular stem by web using groove penetration weld, Two lateral surfaces of wall are uniformly provided with some band steel tie-rods, and band steel tie-rod both ends are respectively welded on adjacent two stem, play about The effect of concrete on the outside of beam, improves the compressive property of concrete, while also strengthens wall ductility, in circular stem and Quad Sides The outside left fill concrete of edge stiffening column, the concrete are to pour maintenance in advance in factory to complete, circular stem and square The hollow part of edge stiffening column is needed after two wall assemblies are good up and down at the scene, then scene casting concrete from top to bottom, guarantee The globality of splicing construction;The upper end of circular stem and square rim stiffening column is all arranged with four gap, circular stem and The lower end of square rim stiffening column is designed with the tubaeform necking reduced downwards.Program overall performance is good, it is simple to make, without numerous Trivial steel bar meter process, scene splicing is convenient and reliable, can be completely achieved standardized designs, factorial praluction, prefabricated construction, greatly It is big to improve production and processing and construction efficiency.
2nd, reentrant diameter is less than stem diameter at the top of wall, and necking is inserted into docking the inside of stem at the top of wall, Gap length is identical with the necking built-in length that need to dock wall stem lower end.Wall after assembly is good, stem assembly position, slit Oral area position needs to be welded to together using plug weld, then toward filling out inside circular stem and square rim stiffening column tube chamber Fill concrete.Bonding strength is high between component, and structural safety performance is reliable, and anti-seismic performance is good.
3rd, the web of wall upper and lower ends is equipped with some evenly distributed bolts hole, when assembling second layer wall, lower wall The web of body upper end and the web of upper wall lower end by connecting plate and are bolted reinforcing.Bonding strength is high between strengthening component, Strengthen anti-seismic performance.
Brief description of the drawings
Fig. 1 is the front view of the present invention;
Fig. 2 is the sectional drawing in AA directions in Fig. 1 of the present invention;
Fig. 3 is the partial enlarged view of B in Fig. 2 of the present invention;
Fig. 4 is the connection diagram of web of the present invention;
Fig. 5 docks schematic diagram for necking of the present invention and gap;
Fig. 6 is the circular stem joint sectional schematic diagram of the present invention;
Fig. 7 is the square stem joint sectional schematic diagram of the present invention.
Figure label:1st, square rim stiffening column;11st, gap;12nd, necking;2nd, circular stem;3rd, band steel tie-rod;4th, abdomen Plate;41st, hole;42nd, bolt hole;5th, concrete;6th, connecting plate;61st, bolt;7th, plug welding.
Embodiment
The present invention can be explained in more detail by following embodiment:
A kind of L-type assembled stem steel plate shear force wall as shown in Figure 1, 2, 3, including square rim stiffening column 1, circular stem 2, Band steel tie-rod 3, web 4 and concrete 5, the circle stem 2 set some L-shaped evenly distributed, formation L-type stem wall, The corner of wall and top set square rim stiffening column 1, and square rim stiffening column 1 is adopted with circular stem 2 by web 4 It is welded to one another with groove penetration weld, some band steel tie-rods 3,3 both ends of band steel tie-rod difference is uniformly provided with two lateral surfaces of wall It is welded on adjacent two stem, plays the role of constraint outside concrete 5, improve the compressive property of concrete 5, while also strengthen Wall ductility, in circular stem 2 and the outside left fill concrete 5 of square rim stiffening column 1, which is in factory Pour maintenance in advance to complete, the hollow part of circular stem 2 and square rim stiffening column 1 needs two wall assemblies above and below at the scene good Afterwards, then scene casting concrete from top to bottom, the globality of splicing construction is ensured;
The upper end of circular stem 2 and square rim stiffening column 1 is all arranged with four gap 11, circular stem 2 and square rim The lower end of stiffening column 1 is designed with the tubaeform necking 12 reduced downwards.Program overall performance is good, it is simple to make, without cumbersome steel Muscle manufacturing procedure, scene splicing is convenient and reliable, can be completely achieved standardized designs, factorial praluction, prefabricated construction, carries significantly Height production and processing and construction efficiency.
12 diameter of necking is less than stem diameter at the top of wall, and necking 12 is inserted into that the interior of wall top stem need to be docked Portion, 11 length of gap are identical with 12 built-in length of necking that need to dock wall stem lower end.Wall after assembly is good, stem are assembled Position, 11 position of gap need to be welded to together using 7 weld seam of plug welding, then put more energy into toward circular stem 2 and square rim Fill concrete 5 inside 1 tube chamber of column.Bonding strength is high between component, and structural safety performance is reliable, and anti-seismic performance is good.
With reference to shown in Fig. 4, the web 4 of wall upper and lower ends is equipped with some evenly distributed bolts hole 42, assembling second During layer wall, the web 4 of lower wall upper end and the web 4 of upper wall lower end pass through 61 reinforcement by connection of connecting plate 6 and bolt.Enhancing Bonding strength is high between component, strengthens anti-seismic performance.
Hole 41 is equipped with web 4, which circulates easy to the concrete 5 of 4 both sides of web, while increases by 4 both sides of web The adhesion area of concrete 5, makes that its wall is firmer, and anti-seismic performance is more preferable.
With reference to shown in Fig. 5,6,7, a kind of assembling constructing method of L-type assembled stem steel plate shear force wall:
Step 1:Stem steel plate shear force wall body welded in factory, it is prefabricated after transport to scene and assembled, what is be vertically arranged is upper The circular stem 2 of lower two stem steel plate shear force walls is connected with square rim stiffening column 1 in the form of plug-in type is welded with and connects; During assembling, fixed first by lower floor's stem steel plate shear force wall, then lift new stem steel plate shear force wall, by new stem Steel plate shear force wall is hung above the wall fixed, and upper and lower stem steel pipe alignment, then slowly declines, by upper strata stem steel The stem necking 12 of plate shear wall bottom is inserted into the stem steel pipe at the top of lower floor's stem steel plate shear force wall, and upper wall is used Bearing diagonal fixation, then using connecting plate 6 and bolt 61 by the web 4 of lower wall upper end and the web 4 of upper wall lower end Reinforcement by connection, then, the form using plug welding 7 will weld at the gap 11 of lower floor's shear wall stem upper end so that levels core Column steel pipe tube wall welds together, then in levels stem steel plate shear force wall body docking site with to pull rod fixed form, to Template internal high pressure injects concrete 5;
Step 2:Finally self-compacting concrete 5 is injected to stem steel duct at the top of the stem steel plate shear force wall of upper strata again so that Full self-compacting concrete 5 is filled inside the stem of levels stem steel plate shear force wall body;Levels stem steel plate shear force wall body Stem in filling self-compacting concrete 5, every time during perfusion, new splicing upper strata stem steel plate shear force wall body height need to be filled into Half, that is, ensure that the New-old concrete 5 in stem connects stubble in the middle part of shear wall, it is ensured that the globality of wall Energy;
Step 3:After the completion of levels wall assembly, conserve the stipulated time after, after intensity reaches design standard can with form removal into The assembly of row last layer.

Claims (5)

  1. A kind of 1. L-type assembled stem steel plate shear force wall, it is characterised in that:Including square rim stiffening column, circular stem, band steel Tie-rod, web and concrete, the circle stem setting is some L-shaped evenly distributed, forms L-type stem wall, wall turns At angle and top sets square rim stiffening column, and square rim stiffening column uses groove penetration weld with circular stem by web It is welded to one another, is uniformly provided with some band steel tie-rods in two lateral surfaces of wall, band steel tie-rod both ends are respectively welded in adjacent two core On column, in circular stem and the outside left fill concrete of square rim stiffening column 1;
    The upper end of circular stem and square rim stiffening column is all arranged with four gap, circular stem and square rim stiffening column Lower end be designed with the tubaeform necking reduced downwards.
  2. A kind of 2. L-type assembled stem steel plate shear force wall according to claim 1, it is characterised in that:Reentrant diameter is less than Stem diameter at the top of wall, necking are inserted into docking the inside of stem at the top of wall, and gap length is with that need to dock wall core The necking built-in length of column lower end is identical, and the wall after assembly is good, stem assembly position, gap position need to use plug weld It is welded to together, then toward fill concrete inside circular stem and square rim stiffening column tube chamber.
  3. A kind of 3. L-type assembled stem steel plate shear force wall according to claim 1, it is characterised in that:Wall upper and lower ends Web be equipped with some evenly distributed bolts hole, when assembling second layer wall, the web of lower wall upper end with upper wall The web at end is by connecting plate and is bolted reinforcing.
  4. A kind of 4. L-type assembled stem steel plate shear force wall according to claim 3, it is characterised in that:Hole is equipped with web Hole.
  5. A kind of 5. assembling constructing method of L-type assembled stem steel plate shear force wall, it is characterised in that:
    Step 1:Stem steel plate shear force wall body welded in factory, it is prefabricated after transport to scene and assembled, what is be vertically arranged is upper The circular stem of lower two stem steel plate shear force walls is connected with square rim stiffening column in the form of plug-in type is welded with and connects;Dress Timing, fixes by lower floor's stem steel plate shear force wall first, then lifts new stem steel plate shear force wall, by new stem steel Plate shear wall is hung above the wall fixed, and upper and lower stem steel pipe alignment, then slowly declines, by upper strata stem steel plate The stem necking of shear wall bottom is inserted into the stem steel pipe at the top of lower floor's stem steel plate shear force wall, by upper wall tiltedly branch Fixation is supportted, then using connecting plate and bolt by the web of lower wall upper end and the web reinforcement by connection of upper wall lower end, Then, the opening position of lower floor's shear wall stem upper end is welded using the form of plug welding so that levels stem steel pipe tube wall welds It is connected together, then in levels stem steel plate shear force wall body docking site with to pull rod fixed form, to template internal high pressure Inject concrete;
    Step 2:Finally self-compacting concrete is injected to stem steel duct at the top of the stem steel plate shear force wall of upper strata again so that on Full self-compacting concrete is filled inside the stem of lower floor's stem steel plate shear force wall body;The core of levels stem steel plate shear force wall body Filling self-compacting concrete in column, every time during perfusion, need to be filled into the half of new splicing upper strata stem steel plate shear force wall body height, Namely ensure the New-old concrete in stem connects stubble in the middle part of shear wall, it is ensured that the overall performance of wall;
    Step 3:After the completion of levels wall assembly, conserve the stipulated time after, after intensity reaches design standard can with form removal into The assembly of row last layer.
CN201810004798.5A 2018-01-03 2018-01-03 A kind of L-type assembled stem steel plate shear force wall and its assembling constructing method Pending CN107989230A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810004798.5A CN107989230A (en) 2018-01-03 2018-01-03 A kind of L-type assembled stem steel plate shear force wall and its assembling constructing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810004798.5A CN107989230A (en) 2018-01-03 2018-01-03 A kind of L-type assembled stem steel plate shear force wall and its assembling constructing method

Publications (1)

Publication Number Publication Date
CN107989230A true CN107989230A (en) 2018-05-04

Family

ID=62040182

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810004798.5A Pending CN107989230A (en) 2018-01-03 2018-01-03 A kind of L-type assembled stem steel plate shear force wall and its assembling constructing method

Country Status (1)

Country Link
CN (1) CN107989230A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110952772A (en) * 2019-10-23 2020-04-03 中船第九设计研究院工程有限公司 Assembled wall formwork and mounting method thereof
CN111075117A (en) * 2019-12-30 2020-04-28 周建 Binding and welding sleeve for connecting reinforcing steel bars and using method thereof

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101324293A (en) * 2007-06-17 2008-12-17 李东泽 Tube used for refrigerating device and its processing method
CN102383498A (en) * 2011-09-19 2012-03-21 浙江东南网架股份有限公司 Equal-strength connection nodes of high-strength bolts for box-shaped steel tube frame columns and method for making same
CN102493576A (en) * 2011-12-05 2012-06-13 哈尔滨工业大学深圳研究生院 Short steel plate shear wall
CN103255853A (en) * 2013-05-15 2013-08-21 天津大学建筑设计研究院 Tooth-groove-type connection structure of upper-layer inner wallboard of assembly-type shear wall and lower-layer inner wallboard of assembly-type shear wall
CN103485441A (en) * 2013-09-10 2014-01-01 华南理工大学 Combined shearing wall
CN103790265A (en) * 2014-01-28 2014-05-14 江苏建筑职业技术学院 Method for manufacturing and assembling prefabricated concrete filled steel tube core column stiffening shear wall
CN203628077U (en) * 2013-12-03 2014-06-04 湖北鼎誉环保科技有限公司 Bell and spigot joint and bell and spigot pipe fitting connecting device
CN204435602U (en) * 2014-12-30 2015-07-01 长安大学 A kind of built-in steel plate concrete combined shear wall
CN106247833A (en) * 2016-07-29 2016-12-21 苏州聚力电机有限公司 Pipe end dock loop type heat pipe and forming method thereof

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101324293A (en) * 2007-06-17 2008-12-17 李东泽 Tube used for refrigerating device and its processing method
CN102383498A (en) * 2011-09-19 2012-03-21 浙江东南网架股份有限公司 Equal-strength connection nodes of high-strength bolts for box-shaped steel tube frame columns and method for making same
CN102493576A (en) * 2011-12-05 2012-06-13 哈尔滨工业大学深圳研究生院 Short steel plate shear wall
CN103255853A (en) * 2013-05-15 2013-08-21 天津大学建筑设计研究院 Tooth-groove-type connection structure of upper-layer inner wallboard of assembly-type shear wall and lower-layer inner wallboard of assembly-type shear wall
CN103485441A (en) * 2013-09-10 2014-01-01 华南理工大学 Combined shearing wall
CN203628077U (en) * 2013-12-03 2014-06-04 湖北鼎誉环保科技有限公司 Bell and spigot joint and bell and spigot pipe fitting connecting device
CN103790265A (en) * 2014-01-28 2014-05-14 江苏建筑职业技术学院 Method for manufacturing and assembling prefabricated concrete filled steel tube core column stiffening shear wall
CN204435602U (en) * 2014-12-30 2015-07-01 长安大学 A kind of built-in steel plate concrete combined shear wall
CN106247833A (en) * 2016-07-29 2016-12-21 苏州聚力电机有限公司 Pipe end dock loop type heat pipe and forming method thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
邱立功等, 湖南科学技术出版社 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110952772A (en) * 2019-10-23 2020-04-03 中船第九设计研究院工程有限公司 Assembled wall formwork and mounting method thereof
CN111075117A (en) * 2019-12-30 2020-04-28 周建 Binding and welding sleeve for connecting reinforcing steel bars and using method thereof

Similar Documents

Publication Publication Date Title
WO2018214477A1 (en) Prefabricated dual-steel-tube concrete shear wall, and assembly method therefor
CN105544801A (en) Bolted connection technique for prefabricated large plate shear wall provided with concealed bracing and construction method
CN205954921U (en) Novel big board shear wall structure is secretly supported in bolted connection's prefabricated assembled area
CN108005267A (en) A kind of yi word pattern assembled stem steel plate shear force wall and its assembling constructing method
CN103850363B (en) Prefabricated through hole assembly type reinforced concrete shear wall and construction method of prefabricated through hole assembly type reinforced concrete shear wall
CN108412128A (en) A kind of connection structure of steel core concrete column
CN108487453B (en) Connecting structure and connecting method for steel tube concrete column and reinforced concrete beam
CN206941858U (en) Band is encorbelmented the structure of attached prestressing force assembled power consumption frame strengthening outside plate framework
CN206337641U (en) Transverse joint connecting node between a kind of prefabricated board wall layers
CN207553289U (en) A kind of assembled steel and concrete frame space modular structure and system
CN209260897U (en) Assembly concrete beam column sleeve combination connecting node
CN103174260B (en) Ten shape steel reinforced concrete special-shaped columns of supporting role's steel skeleton
CN109296066A (en) Assembly concrete beam column sleeve combination connecting node
CN107605038A (en) A kind of assembled steel and concrete frame space modular structure and system and construction method
CN108951847A (en) A kind of Precast Concrete Frame system and its construction method based on UHPC
CN107989230A (en) A kind of L-type assembled stem steel plate shear force wall and its assembling constructing method
CN108118804A (en) A kind of Z-type assembled stem steel plate shear force wall and its assembling constructing method
CN103397704B (en) A kind of concrete filled steel tube coupled column-reinforced beam connects node
CN205637239U (en) Completely assembling formula steel pipe concrete frame compound shear wall structure
CN206829416U (en) A kind of prefabricated assembled double steel pipe concrete shear force wall
CN205530819U (en) Steel frame structure of embedded precast concrete shear force wall bending resistance simultaneously
CN108005262A (en) A kind of cross assembled stem steel plate shear force wall and its assembling constructing method
CN204551897U (en) With the steel framework post of joint type linkage
CN106592821A (en) Side-standing integral forming structure and method of shear steel plates and lateral reinforcement fabric
CN111021630A (en) Section steel concrete column and semi-assembly type construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180504