CN107989121B - Freezing structure for protecting municipal pipelines in city - Google Patents

Freezing structure for protecting municipal pipelines in city Download PDF

Info

Publication number
CN107989121B
CN107989121B CN201711209752.9A CN201711209752A CN107989121B CN 107989121 B CN107989121 B CN 107989121B CN 201711209752 A CN201711209752 A CN 201711209752A CN 107989121 B CN107989121 B CN 107989121B
Authority
CN
China
Prior art keywords
freezing
pipe
pipes
distance
cement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711209752.9A
Other languages
Chinese (zh)
Other versions
CN107989121A (en
Inventor
叶香竹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Langrun Zhiye Information Technology Co.,Ltd.
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201711209752.9A priority Critical patent/CN107989121B/en
Publication of CN107989121A publication Critical patent/CN107989121A/en
Application granted granted Critical
Publication of CN107989121B publication Critical patent/CN107989121B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/10Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against soil pressure or hydraulic pressure
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03BINSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
    • E03B7/00Water main or service pipe systems
    • E03B7/09Component parts or accessories
    • E03B7/10Devices preventing bursting of pipes by freezing
    • E03B7/12Devices preventing bursting of pipes by freezing by preventing freezing
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/08Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against transmission of vibrations or movements in the foundation soil
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L57/00Protection of pipes or objects of similar shape against external or internal damage or wear
    • F16L57/02Protection of pipes or objects of similar shape against external or internal damage or wear against cracking or buckling
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/11Improving or preserving soil or rock, e.g. preserving permafrost soil by thermal, electrical or electro-chemical means
    • E02D3/115Improving or preserving soil or rock, e.g. preserving permafrost soil by thermal, electrical or electro-chemical means by freezing
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/12Consolidating by placing solidifying or pore-filling substances in the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/10Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against soil pressure or hydraulic pressure
    • E02D31/14Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against soil pressure or hydraulic pressure against frost heaves in soil

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Agronomy & Crop Science (AREA)
  • Soil Sciences (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Health & Medical Sciences (AREA)
  • Mechanical Engineering (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Piles And Underground Anchors (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses a freezing structure for protecting municipal pipelines in cities, which is characterized in that a stress release hole is arranged at a distance of 15-20 m away from a newly-built building, a freezing pipe is arranged at a distance of 7-9 m away from the stress release hole, and a circular arc frozen wall is formed after freezing construction is finished; the adjacent rows of freezing pipes are arranged in a quincunx crossed manner, a temperature measuring pipe is arranged between the adjacent rows of freezing pipes at the end part, and the depth of the temperature measuring pipe is the same as that of the freezing pipes; the freezing pipes are connected by adopting a thread and a sealing agent, and the joints are subjected to repair welding to ensure the concentricity and welding strength among all pipe joints; arranging an anti-frost-heaving ditch at a distance of 35-50 m from the newly built building; three cement mixing piles are arranged at the joint of the pipeline, the cement mixing piles are arranged in an occlusion manner, and moso bamboos are inserted into the cement mixing piles.

Description

Freezing structure for protecting municipal pipelines in city
The application is a divisional application with application number 201610311186.1, the name of a parent application is 'structure for protecting municipal pipelines', and the date of the application of the parent application is 2016, 4 and 30.
Technical Field
The invention relates to a structure for protecting urban municipal pipelines, which is suitable for the municipal field.
Background
With the development of basic construction, buildings (structures) and roads in cities are more and more dense, a large number of municipal pipelines are buried underground, and due to the shortage of land, projects are built in dense building groups, and due to the fact that the municipal pipelines are damaged by soil-squeezing pile construction, the cases of damage to the municipal pipelines caused by the soil-squeezing pile construction happen occasionally, so that the problem of how to prevent the soil-squeezing pile construction from influencing the municipal pipelines is paid attention to engineers.
Disclosure of Invention
The invention provides a structure for protecting municipal pipelines, which solves the problem of influence of traditional soil-extruding pile construction on the municipal pipelines.
The stress release holes are arranged at a distance of 15-20 m from a newly-built building, the diameter of each stress release hole is 500-700 mm, the depth of each stress release hole is 18-25 mm, and bamboo cages are placed in the stress release holes to prevent the stress release holes from collapsing during construction of the newly-built building.
The freezing pipe is arranged at a distance of 7-9 m away from the stress release hole, the stress release hole is formed between the newly-built building and the freezing pipe, the diameter of the freezing pipe is 90-150 mm, and the wall thickness of the freezing pipe is 5-8 mm. The freezing pipes are arranged in three rows, each row of freezing pipes is arranged into an arc shape, an arc-shaped frozen wall can be formed after freezing construction is finished, and the horizontal extrusion force generated during soil-extruding pile construction can be converted into oblique force by the arc-shaped frozen wall relative to a straight frozen wall, so that the horizontal extrusion force is effectively resisted. The freezing pipes in adjacent rows are arranged in a quincunx crossing mode, the depth of the freezing pipes is 16-20 m, the distance between the freezing pipes is 500-600 mm, a temperature measuring pipe is arranged between the freezing pipes in the adjacent rows and is arranged at the end of each row of the freezing pipes, the depth of the temperature measuring pipe is the same as that of the freezing pipes, and the expansion speed of frozen soil during freezing construction is 20-25 mm/d. The freezing pipes are connected by adopting a thread and a sealing agent, and the joints are subjected to repair welding to ensure the concentricity and the welding strength among all pipe joints.
According to the characteristics of the arc freezing wall, the freezing pipe is frozen by liquid nitrogen, the temperature of the outlet of the liquid nitrogen storage tank is controlled to be-150 to-170 ℃, the pressure is controlled to be 0.05 to 0.1MPa, the liquid nitrogen uses a loop type cooling plate to adjust the temperature, and a stop valve on the liquid nitrogen storage tank is used for adjusting the pressure. Because the liquid nitrogen temperature is low, the temperature difference between the inside and the outside of the pipe is large, and the cold loss is easy to generate, the pipeline needs to be subjected to heat preservation treatment, and the nitrogen supply main pipe is wrapped by 2 layers of 10 mm-thick polyethylene heat preservation materials and 3 layers of sealing films alternately. According to the test result, the supply amount of liquid nitrogen for achieving the frozen soil expansion speed of 20-25 mm/d is 1.2-1.3 t per hour. The pressure of the freezing pipe is controlled to be 0.05-0.1 MPa.
Arranging an anti-frost-heaving ditch at a distance of 35-50 m away from the newly-built building, wherein the width of the anti-frost-heaving ditch is 600-800 mm, the depth is determined according to the soil quality condition, and when the soil quality is clay, the depth is more than 700mm and less than or equal to 800 mm; when the soil is silt, the depth is more than 600mm and less than or equal to 700 mm; when the soil is sandy soil, the depth is 600 mm. Tests show that the frost heaving conditions of different soil qualities are different, the clay is the largest, the silt is the second, and the sandy soil is the smallest.
In order to avoid overlarge frost heaving deformation of the soil body, the frost heaving of the soil body is tested, and construction control is carried out. If the maximum frost heaving amount of the soil body exceeds or is equal to 3mm, the freezing speed needs to be increased, and the frozen soil expansion speed is 25-35 mm/d.
In order to further prevent horizontal extrusion force generated during construction from influencing a pipeline joint, three cement mixing piles are arranged at the pipeline joint, the diameter of each cement mixing pile is 450-550 mm, the cement mixing piles are arranged in a meshed mode, and moso bamboos are inserted into the cement mixing piles to resist the horizontal extrusion force generated during construction.
The construction steps comprise:
(1) arranging freezing devices
The bottom of the freezing pipe is provided with a drill bit, and the drill bit rotates to stir the soil body and simultaneously freezes the pipe to sink.
Freezing the borehole deviation is a difficult problem encountered in engineering, and in order to solve the problem, the invention adopts the following method for controlling the drilling process: the flashlight is placed in the freezing pipe to serve as an observation mark, the position of lamplight in the pipe is observed in a segmented mode through the theodolite, the actual deviation distance, the deviation direction and the deviation rate of the drill hole at a certain depth are analyzed according to the similar triangle principle, and the deviation rate of the drill hole is controlled within 3%.
(2) Construction of cement mixing pile
(3) Excavation frost heaving prevention ditch
(4) Stress relief hole for excavation
(5) Freezing construction
The temperature of the positive freezing period is-30 ℃ to-32 ℃, and the temperature of the maintenance freezing period is-28 ℃ to-30 ℃.
(6) Thaw collapse compensation grouting
After thawing, the soil body sinks, so that a thawing-sinking compensation measure needs to be taken. When the sinking rate of the soil body after thawing is more than or equal to 3mm, injecting mixed liquid of cement and water glass into the frozen soil area, wherein the mixed liquid of cement and water glass is prepared according to the following proportion: the volume ratio of the cement paste to the water glass solution is 1:1, wherein the water cement ratio of the cement paste is 1, and the water glass solution is diluted by B35-B40 water glass and water added by 1-2 times of volume. The grouting pressure is 0.4-0.5 MPa.
The invention has safe and reliable operation and good performance of the protection structure.
Drawings
FIG. 1 is a schematic diagram of a structure for protecting municipal pipelines.
The reference symbols: 1. stress release hole, 2, freezing pipe, 3, temperature measuring pipe, 4, anti-freezing expansion groove, 5, cement mixing pile, 6 and pipeline.
Detailed Description
The present embodiment is described in detail below with reference to the accompanying drawings.
The present embodiment arranges stress release holes 1 at a distance of 18m from the newly built building, the diameter of the stress release holes 1 being 600mm, and the depth of the stress release holes 1 being 20 mm.
The freezing pipe 2 is arranged at a distance of 8m from the stress release hole, the diameter of the freezing pipe 2 is 100mm, and the wall thickness of the freezing pipe 2 is 6 mm. The freezing pipes 2 are arranged in three rows, each row of the freezing pipes 2 is arranged in an arc shape, and after freezing construction is finished, an arc-shaped frozen wall can be formed. The freezing pipes 2 in the adjacent rows are arranged in a quincunx-shaped crossed mode, the depth of each freezing pipe 2 is 18m, the distance between every two freezing pipes 2 is 550mm, a temperature measuring pipe 3 is arranged between every two freezing pipes 2 in the adjacent rows, the temperature measuring pipe 3 is arranged at the end of each freezing pipe 2, the depth of each temperature measuring pipe 3 is the same as that of each freezing pipe 2, and the expansion speed of frozen soil in freezing construction is 20-25 mm/d. The freezing pipes 2 are connected by adopting a thread and a sealing agent, and the joints are subjected to repair welding to ensure the concentricity and the welding strength among all pipe joints.
The freezing pipe 2 is frozen by liquid nitrogen, the temperature of the outlet of the liquid nitrogen storage tank is controlled at minus 160 ℃, the pressure is controlled at 0.08MPa, the liquid nitrogen uses a loop type cooling plate to adjust the temperature, and the pressure is adjusted by using a stop valve on the liquid nitrogen storage tank. And (3) carrying out heat preservation treatment on the pipeline, wherein the nitrogen supply main pipe is alternately wrapped by 2 layers of 10 mm-thick polyethylene heat preservation materials and 3 layers of sealing films. The supply amount of the liquid nitrogen is 1.2-1.3 t per hour. The pressure of the freezing pipe 2 is controlled at 0.08 MPa.
And arranging an anti-frost heaving ditch 4 at a distance of 38m from the newly built building, wherein the width of the anti-frost heaving ditch 4 is 700mm, and the depth of the anti-frost heaving ditch is 650 mm.
If the maximum frost heaving amount of the soil body exceeds or is equal to 3mm, the freezing speed needs to be increased, and the frozen soil expansion speed is 25-35 mm/d.
Three cement mixing piles 5 are arranged at the joint position of the pipeline 6, the diameter of each cement mixing pile 5 is 500mm, the cement mixing piles 5 are arranged in a meshing mode, and moso bamboos are inserted into the cement mixing piles 5.
The construction steps comprise:
(1) arranging freezing devices
The bottom of the freezing pipe 2 is provided with a drill bit, and the drill bit rotates to stir the soil body and simultaneously the freezing pipe 2 sinks for construction.
The following method is adopted to control the drill hole deflection: the flashlight is placed in the freezing pipe 2 to serve as an observation mark, the position of lamplight in the pipe is observed in a segmented mode through the theodolite, the actual deviation distance, the deviation direction and the deviation rate of the drill hole at a certain depth are analyzed according to the similar triangle principle, and the deviation rate of the drill hole is controlled within 3%.
(2) Construction of cement mixing pile 5
(3) Excavation frost heaving prevention ditch 4
(4) Excavation stress relief hole 1
(5) Freezing construction
The temperature of the positive freezing period is-30 ℃ to-32 ℃, and the temperature of the maintenance freezing period is-28 ℃ to-30 ℃.
(6) Thaw collapse compensation grouting
When the sinking rate of the soil body after thawing is more than or equal to 3mm, injecting mixed liquid of cement and water glass into the frozen soil area, wherein the mixed liquid of cement and water glass is prepared according to the following proportion: the volume ratio of the cement paste to the water glass solution is 1:1, wherein the water cement ratio of the cement paste is 1, and the water glass solution is diluted by B35-B40 water glass and water added by 1-2 times of volume. The grouting pressure is 0.4-0.5 MPa.

Claims (1)

1. A freezing structure for protecting urban municipal pipelines is characterized in that stress release holes are arranged at a distance of 15-20 m from a newly built building, the diameter of each stress release hole is 500-700 mm, and the depth of each stress release hole is 18-25 mm; arranging a freezing pipe at a distance of 7-9 m away from the stress release hole, wherein the stress release hole is arranged between the newly-built building and the freezing pipe, the diameter of the freezing pipe is 90-150 mm, and the wall thickness of the freezing pipe is 5-8 mm; the freezing pipes are arranged in three rows, each row of the freezing pipes is arranged in an arc shape, and an arc-shaped frozen wall can be formed after freezing construction is finished; the freezing pipes in adjacent rows are arranged in a quincunx crossed manner, the depth of the freezing pipes is 16-20 m, the distance between the freezing pipes is 500-600 mm, temperature measuring pipes are respectively arranged on two sides of the end part of one row of the freezing pipes, the depth of the temperature measuring pipes is the same as that of the freezing pipes, and the spreading speed of frozen soil during freezing construction is 20-25 mm/d; the freezing pipes are connected by adopting a thread and a sealing agent, and the joints are subjected to repair welding to ensure the concentricity and welding strength among all pipe joints; the pressure of the freezing pipe is controlled to be 0.05-0.1 MPa; arranging an anti-frost-heaving ditch at a distance of 35-50 m from the newly built building; arranging three cement mixing piles at the joint position of the pipeline, wherein the diameter of each cement mixing pile is 450-550 mm, the cement mixing piles are arranged in a meshing manner, and moso bamboos are inserted into the cement mixing piles;
during freezing construction, if the maximum frost heaving amount of the soil body is more than or equal to 3mm, the freezing speed is increased, and the frozen soil expansion speed is 25-35 mm/d;
during the construction of the freezing device, the following method is adopted to control the drill hole deflection: putting a flashlight into the freezing pipe as an observation mark, observing the position of lamplight in the pipe in sections by using a theodolite, and analyzing the actual deviation distance, the deviation direction and the deviation rate of the drill hole at a certain depth according to the similar triangle principle to ensure that the deviation rate of the drill hole is less than or equal to 3 percent;
after the freezing construction is finished, adopting thaw settlement compensation grouting, when the soil body sinking rate after thawing is more than or equal to 3mm, injecting mixed liquid of cement and water glass into the frozen soil area, wherein the mixed liquid of cement and water glass adopts the following proportion: the volume ratio of the cement paste to the water glass solution is 1:1, wherein the water cement ratio of the cement paste is 1, and the water glass solution is diluted by B35-B40 water glass and water with the volume 1-2 times of that of the water glass solution; the grouting pressure is 0.4-0.5 MPa.
CN201711209752.9A 2016-04-30 2016-04-30 Freezing structure for protecting municipal pipelines in city Active CN107989121B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711209752.9A CN107989121B (en) 2016-04-30 2016-04-30 Freezing structure for protecting municipal pipelines in city

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201711209752.9A CN107989121B (en) 2016-04-30 2016-04-30 Freezing structure for protecting municipal pipelines in city
CN201610311186.1A CN105862932B (en) 2016-04-30 2016-04-30 Protect the structure of municipal pipeline

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201610311186.1A Division CN105862932B (en) 2016-04-30 2016-04-30 Protect the structure of municipal pipeline

Publications (2)

Publication Number Publication Date
CN107989121A CN107989121A (en) 2018-05-04
CN107989121B true CN107989121B (en) 2020-06-05

Family

ID=56631891

Family Applications (5)

Application Number Title Priority Date Filing Date
CN201711209765.6A Active CN108036151B (en) 2016-04-30 2016-04-30 Protect the construction method of municipal pipeline
CN201711212375.4A Active CN107989079B (en) 2016-04-30 2016-04-30 Structure for protecting municipal pipeline in city
CN201610311186.1A Active CN105862932B (en) 2016-04-30 2016-04-30 Protect the structure of municipal pipeline
CN201711209752.9A Active CN107989121B (en) 2016-04-30 2016-04-30 Freezing structure for protecting municipal pipelines in city
CN201711209771.1A Active CN107989152B (en) 2016-04-30 2016-04-30 Freezing structure for protecting municipal pipeline

Family Applications Before (3)

Application Number Title Priority Date Filing Date
CN201711209765.6A Active CN108036151B (en) 2016-04-30 2016-04-30 Protect the construction method of municipal pipeline
CN201711212375.4A Active CN107989079B (en) 2016-04-30 2016-04-30 Structure for protecting municipal pipeline in city
CN201610311186.1A Active CN105862932B (en) 2016-04-30 2016-04-30 Protect the structure of municipal pipeline

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201711209771.1A Active CN107989152B (en) 2016-04-30 2016-04-30 Freezing structure for protecting municipal pipeline

Country Status (1)

Country Link
CN (5) CN108036151B (en)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR3066204B1 (en) 2017-05-11 2020-12-04 Vinci Construction METHOD AND DEVICE FOR FREEZING A SOLID SOIL
CN108330968A (en) * 2018-04-26 2018-07-27 佳琳 A kind of anchor pole liquid feeding nitrogen frozen soil wall foundation pit enclosure structure and its construction method
CN108330991A (en) * 2018-04-26 2018-07-27 佳琳 A kind of soil nailing liquid feeding nitrogen frozen soil wall foundation pit enclosure structure and its construction method
CN108797603A (en) * 2018-06-13 2018-11-13 王海霖 A kind of protection network and liquid nitrogen frozen soil wall composite supporting construction and its construction method
CN108797605A (en) * 2018-06-13 2018-11-13 王海霖 A kind of the piled anchor formula composite supporting construction and its construction method of combination liquid nitrogen frozen soil wall
CN108797606A (en) * 2018-06-13 2018-11-13 王海霖 A kind of construction method of protection network and liquid nitrogen frozen soil wall composite support system
CN108797601A (en) * 2018-06-13 2018-11-13 王海霖 A kind of construction method of piled anchor and liquid nitrogen frozen soil wall composite support system
CN108797602A (en) * 2018-06-13 2018-11-13 王海霖 A kind of piled anchor and liquid nitrogen frozen soil wall composite supporting construction and its construction method
CN112145814B (en) * 2020-09-24 2022-04-15 武汉大学 Slurry shield wear-resistant slurry pipe for sandy gravel-cobble stratum
CN112227468A (en) * 2020-10-26 2021-01-15 温州展业建设工程有限公司 Freezing construction method for protecting municipal pipelines in city
CN113832953A (en) * 2021-10-25 2021-12-24 广州市设计院集团有限公司 Method for reducing influence of vacuum preloading on surrounding environment
CN115288735A (en) * 2022-07-19 2022-11-04 北京中煤矿山工程有限公司 Shallow buried underground space frozen soil steel pipe group composite pre-supporting structure and combined bearing reinforcement method thereof

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2153558C2 (en) * 1998-11-02 2000-07-27 Кубанский государственный аграрный университет Landslide control structure for protection of underground pipelines
CN204199335U (en) * 2014-09-29 2015-03-11 中国建筑第八工程局有限公司 A kind of pressure release well reducing PHC tube pile construction soil compaction effect

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2164274C2 (en) * 1998-01-27 2001-03-20 Шемелин Геннадий Иванович Thermal device for cooling and freezing of soil
CN1614152A (en) * 2004-10-14 2005-05-11 上海隧道工程股份有限公司 Constructing method for in tunnel weak soil layer by freezing method horizontally
RU2384672C1 (en) * 2009-02-11 2010-03-20 Александр Иванович Абросимов Cooled pile support for structures erected on permanently frozen soil
CN101871218B (en) * 2010-02-03 2012-04-18 上海隧道工程股份有限公司 Trenchless construction method of underground station space and arc-shaped freezing pipe construction equipment thereof
CN103334757B (en) * 2013-06-11 2015-04-15 中国矿业大学(北京) Freezing pipe, frigo, and method of excavating rock-soil by adopting freezing method
CN104895059A (en) * 2015-03-31 2015-09-09 中铁时代建筑设计院有限公司 Freezing cement mixing pile and construction method thereof
CN104806253B (en) * 2015-05-15 2016-11-09 中铁二局工程有限公司 A kind of construction method punched between rectangular top pipe passage
CN105257297B (en) * 2015-11-04 2017-10-10 中铁十八局集团有限公司 The construction method of Frozen Soil Cylinder is precisely controlled between a kind of pipe

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2153558C2 (en) * 1998-11-02 2000-07-27 Кубанский государственный аграрный университет Landslide control structure for protection of underground pipelines
CN204199335U (en) * 2014-09-29 2015-03-11 中国建筑第八工程局有限公司 A kind of pressure release well reducing PHC tube pile construction soil compaction effect

Also Published As

Publication number Publication date
CN107989152B (en) 2020-06-05
CN107989079A (en) 2018-05-04
CN107989079B (en) 2020-06-12
CN108036151B (en) 2019-06-04
CN105862932A (en) 2016-08-17
CN108036151A (en) 2018-05-15
CN105862932B (en) 2018-08-17
CN107989152A (en) 2018-05-04
CN107989121A (en) 2018-05-04

Similar Documents

Publication Publication Date Title
CN107989121B (en) Freezing structure for protecting municipal pipelines in city
US9353888B2 (en) Polymer bag grouting method for repairing settlement of underground pipelines
CN105908765B (en) For protecting the open trench tunnel water sealing structure and construction method of groundwater environment
CN104696664A (en) High-polymer composite grouting method for leakage and sand inrush blocking of underground pipeline
CN104963334A (en) Construction method for utilizing grouting freezing pipe to reinforce and freeze contact passage to restrain frost heaving and thaw collapsing
CN205975649U (en) Freezing pipe curtain steel pipe supporting construction
CN104806253A (en) Construction method for opening hole between rectangular pipe jacking channels
CN112252973A (en) Non-excavation directional drilling construction method for pipeline buried channel
CN104762955A (en) Manually excavated pedestal pile construction method based on freezing process
CN110847151B (en) Method for repairing tunnel underpass cavity by freezing method
CN109296371A (en) MJS method and horizontal freezing joint reinforcement pressure-bearing rich water arenaceous stratum overlap the system and its construction method that section is worn under station
Varol et al. Grouting applications in the Istanbul metro, Turkey
CN108005059B (en) Freezing construction method for protecting municipal pipelines in city
CN104963341A (en) Coupling type ground source heat pump mixed backfill technology and backfill material
CN116537795A (en) Construction process for subway freezing engineering
CN214997645U (en) Be applicable to subway station goes out inlet pipe curtain construction pipe curtain structure
CN112431189A (en) Advanced freezing and reinforcing method for water-rich silt stratum for underground continuous wall construction
CN112302669A (en) Subway shield arrival auxiliary construction method and structure under complex environment condition
CN209959251U (en) System for reinforcing lower crossing section of pressure-bearing water-rich sandy stratum overlapped station by combining MJS method and horizontal freezing method
CN213980797U (en) Subway shield arrives auxiliary structure under complex environmental condition
CN218150974U (en) Shield in rich water soft soil stratum constructs and receives portal stagnant water sealing device
Hass Tunneling through soft ground using ground freezing
CN116335203A (en) Liquid nitrogen treatment method for water leakage of underground diaphragm wall of water-rich stratum
CN117306492A (en) Liquid nitrogen frozen soil reinforcement construction method suitable for wall of underground diaphragm wall
CN117684641A (en) Construction method of traction pipe for short-distance household section of sand

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20201230

Address after: 251800 No. 079, Lehu Road, Yanghu Township, Yangxin County, Binzhou City, Shandong Province

Patentee after: Binzhou Jiahe Animal Husbandry Development Co.,Ltd.

Address before: 325000, 302, Jingshan Hill, Ouhai District, Zhejiang, Wenzhou, 11 rooms

Patentee before: Ye Xiangzhu

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210521

Address after: No. 58, Yingbin Avenue, Xiadu community, Pingnan County, Guigang City, Guangxi Zhuang Autonomous Region, 537300

Patentee after: Li Weizhi

Address before: 251800 No. 079, Lehu Road, Yanghu Township, Yangxin County, Binzhou City, Shandong Province

Patentee before: Binzhou Jiahe Animal Husbandry Development Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240426

Address after: Room 0422, Wenhui Building, No. 38 Shuangtasi Street, Yingze District, Taiyuan City, Shanxi Province, 030000

Patentee after: Shanxi Langrun Zhiye Information Technology Co.,Ltd.

Country or region after: China

Address before: No. 58, Yingbin Avenue, Xiadu community, Pingnan County, Guigang City, Guangxi Zhuang Autonomous Region, 537300

Patentee before: Li Weizhi

Country or region before: China

TR01 Transfer of patent right