CN107977239A - A kind of new energy power prediction system intelligent upgrade method - Google Patents

A kind of new energy power prediction system intelligent upgrade method Download PDF

Info

Publication number
CN107977239A
CN107977239A CN201610914614.XA CN201610914614A CN107977239A CN 107977239 A CN107977239 A CN 107977239A CN 201610914614 A CN201610914614 A CN 201610914614A CN 107977239 A CN107977239 A CN 107977239A
Authority
CN
China
Prior art keywords
upgrading
power prediction
data
sent
prediction system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610914614.XA
Other languages
Chinese (zh)
Inventor
唐孝舟
葛立青
金岩磊
徐浩
翟剑华
刘青红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NR Electric Co Ltd
NR Engineering Co Ltd
Original Assignee
NR Electric Co Ltd
NR Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NR Electric Co Ltd, NR Engineering Co Ltd filed Critical NR Electric Co Ltd
Priority to CN201610914614.XA priority Critical patent/CN107977239A/en
Publication of CN107977239A publication Critical patent/CN107977239A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/44Arrangements for executing specific programs
    • G06F9/445Program loading or initiating
    • G06F9/44568Immediately runnable code
    • G06F9/44578Preparing or optimising for loading
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Software Systems (AREA)
  • Business, Economics & Management (AREA)
  • Economics (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a kind of new energy power prediction system intelligent upgrade method, it is characterised in that includes the following steps:Step 1, the upgrading catalogue for monitoring power prediction system, if finding there is new upgrade procedure, enter step 2, otherwise continue to monitor the upgrading catalogue of power prediction system;Step 2, detection power prediction data on send state, successful status signal is sent in data if having detected, judge on send and come into idle periods and enter step 3;Step 3, automatic start upgrade procedure carry out the upgrading of system, and system is restarted after the completion of upgrading and enters step 4;The state sent in step 4, continuous monitoring n times data, all succeeds, decision-making system upgrades successfully, and upgrading terminates if being sent in n times;Otherwise it is assumed that upgrading failure, performs rolling back action, revocation program upgrading, system returns to state before upgrading.Using the idle periods automatic running upgrade procedure, escalation process is avoided to cause to send interruption in data.

Description

A kind of new energy power prediction system intelligent upgrade method
Technical field
The present invention relates to a kind of new energy power prediction system intelligent upgrade method.
Background technology
New energy power prediction system formulates the Primary Reference means of generation schedule as grid dispatching management department, it is transported Market condition directly affects the amount of generating electricity by way of merging two or more grid systems of new energy electric field, meanwhile, directly affect the scheduling strategy of grid company.Therefore predict Data report the key index that rate is always power prediction examination, and many area power grid companies even require new energy power station power It is 100% that rate is sent in prediction data, in addition to requiring power prediction system usually to run steadily in the long term, due to system journey Sequence optimize or function enhancing and carry out program upgrading should not also influence prediction data on give, this is to power prediction system It is a greatly challenge.
It is all the set time to dispatching of power netwoks department or new energy centralized control center to send data in power prediction system at present Interval (such as whole 5 minutes or 15 minutes whole), above send and general requires to complete within a few minutes before and after these moment.Predict number According to time-out not on give or on send interruption to produce the serious result of appraisal, cause serious economic loss to new energy power plant, It can influence the power generation decision-making of dispatching of power netwoks department again at the same time.Existing power prediction system is either since which kind of reason is upgraded All it is difficult to avoid sending the time in data, can inevitably cause to send interruption, and existing program can only rely on people once upgrading failure To recover, above send the break period longer, negative effect is larger.
The content of the invention
In view of the above-mentioned problems, the present invention provides a kind of new energy power prediction system intelligent upgrade method, by monitoring work( Data mode is sent in rate forecasting system, according to above sending the idle periods sent in successful status information accurate judgement prediction data, profit With the idle periods automatic running upgrade procedure, escalation process is avoided to cause to send interruption in data.Also, continue to supervise after the completion of upgrading Depending on sending state in ensuing data, once send failure on occurring, then it is assumed that upgrading failure, is immediately performed rollback program, cancels Upgrade, sent in fast quick-recovery data, so that the influence for upgrading failure be preferably minimized.
To realize above-mentioned technical purpose and the technique effect, the present invention is achieved through the following technical solutions:
A kind of new energy power prediction system intelligent upgrade method, it is characterised in that include the following steps:
Step 1, monitor power prediction system upgrading catalogue, if find have new upgrade procedure, enter step 2, otherwise after The upgrading catalogue of continuous monitoring power prediction system;
Step 2, detection power prediction data on send state, successful status signal is sent in data if having detected, is judged On send and come into idle periods and enter step 3;
Step 3, automatic start upgrade procedure carry out the upgrading of system, and system is restarted after the completion of upgrading and enters step 4;
The state sent in step 4, continuous monitoring n times data, all succeeds if being sent in n times, and decision-making system upgrades successfully, upgrading knot Beam;Otherwise it is assumed that upgrading failure, performs rolling back action, revocation program upgrading, system returns to state before upgrading.
It is preferred that the value range of N is 1-5, preferably N is equal to 2 or 3.
The beneficial effects of the invention are as follows:
The idle periods sent according to above sending in successful status information accurate judgement prediction data, utilize the idle periods automatic running liter Level program, continues to monitor after system upgrade and send state in ensuing n times data, once send failure on occurring, then it is assumed that upgrading Failure, is immediately performed rollback program, and revocation upgrades, and is sent in fast quick-recovery data, so that the influence for upgrading failure is reduced to minimum. This method enables power prediction system upgrade quickly to be carried out in the case where not influencing normal operation, avoids and send in data It is disconnected, at the same when upgrading failure again can quick recovery system, reduce and send the break period in data, administration of power networks portion can be reduced Examination pressure is sent in the uncertainty of door analysis decision and the data of new energy power plant, there is very high use value and promote and anticipate Justice.
Brief description of the drawings
Fig. 1 is a kind of flow chart of new energy power prediction system intelligent upgrade method of the present invention.
Embodiment
Technical solution of the present invention is described in further detail with specific embodiment below in conjunction with the accompanying drawings, so that ability The technical staff in domain can be better understood from the present invention and can be practiced, but illustrated embodiment is not as the limit to the present invention It is fixed.
During new energy power prediction is also in a constantly improve at present, the demand of dispatching of power netwoks department, new energy The demand of source user is all constantly changing, and power prediction producer can also continue to optimize system performance in itself, power prediction system Upgrading is unavoidable.Existing power prediction system upgrade can not avoid sending interruption in prediction data, new energy can only be relied on to use Apply for core of exempting from examination to dispatching of power netwoks department in family.But this way is only feasible in very rare situations, unless dispatching of power netwoks department sheet The upgrading of body requirement, other upgradings generally cannot all exempt examination.Unexpected caused upgrading is additionally, since unsuccessfully to be also required to manually Differentiation, manual intervention could recover, and so add the time for sending data outage, and negative effect is larger.
A kind of new energy power prediction system intelligent upgrade method, as shown in Figure 1, including the following steps:
Step 1, monitor power prediction system upgrading catalogue, if find have new upgrade procedure, enter step 2, otherwise after The upgrading catalogue of continuous monitoring power prediction system.
Step 2, detection power prediction data on send state, successful status signal is sent in data if having detected, Sent in judgement and come into idle periods and enter step 3, that is, detected after being sent in power prediction data, once find in data Send and successfully then immediately enter step 3.
Step 3, automatic start upgrade procedure carry out the upgrading of system, start system upgrade, restart system after the completion of upgrading And enter step 4.
The state sent in step 4, continuous monitoring n times data, all succeeds, decision-making system upgrades successfully, and rises if being sent in n times Level terminates;Otherwise it is assumed that upgrading failure, performs rolling back action, revocation program upgrading, system returns to state before upgrading.
It is preferred that the value range of N is 1-5, such as, N is equal to 2 or 3.According to above sending, successful status information accurate judgement is pre- The idle periods sent are surveyed in data, using the idle periods automatic running upgrade procedure, continue to monitor ensuing n times after system upgrade State is sent in data, once send failure on occurring, then it is assumed that upgrading failure, is immediately performed rollback program, revocation upgrading is quick extensive Sent in complex data, so that the influence for upgrading failure is reduced to minimum.This method enables power prediction system upgrade not influencing Quickly carried out in the case of normal operation, avoid and send data outage, while again being capable of quick restorer when upgrading failure System, reduces and send the break period in data, can reduce uncertainty and the new energy power plant of administration of power networks segment analysis decision-making Examination pressure is sent in data, there is very high use value and dissemination.
It these are only the preferred embodiment of the present invention, be not intended to limit the scope of the invention, it is every to utilize this hair The equivalent structure that bright specification and accompanying drawing content are made either equivalent process transformation or to be directly or indirectly used in other related Technical field, be included within the scope of the present invention.

Claims (3)

1. a kind of new energy power prediction system intelligent upgrade method, it is characterised in that include the following steps:
Step 1, monitor power prediction system upgrading catalogue, if find have new upgrade procedure, enter step 2, otherwise after The upgrading catalogue of continuous monitoring power prediction system;
Step 2, detection power prediction data on send state, successful status signal is sent in data if having detected, is judged On send and come into idle periods and enter step 3;
Step 3, automatic start upgrade procedure carry out the upgrading of system, and system is restarted after the completion of upgrading and enters step 4;
The state sent in step 4, continuous monitoring n times data, all succeeds if being sent in n times, and decision-making system upgrades successfully, upgrading knot Beam;Otherwise it is assumed that upgrading failure, performs rolling back action, revocation program upgrading, system returns to state before upgrading.
2. a kind of new energy power prediction system intelligent upgrade method according to claim 1, it is characterised in that N's takes Value scope is 1-5.
3. a kind of new energy power prediction system intelligent upgrade method according to claim 2, it is characterised in that N is equal to 2 Or 3.
CN201610914614.XA 2016-10-20 2016-10-20 A kind of new energy power prediction system intelligent upgrade method Pending CN107977239A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610914614.XA CN107977239A (en) 2016-10-20 2016-10-20 A kind of new energy power prediction system intelligent upgrade method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610914614.XA CN107977239A (en) 2016-10-20 2016-10-20 A kind of new energy power prediction system intelligent upgrade method

Publications (1)

Publication Number Publication Date
CN107977239A true CN107977239A (en) 2018-05-01

Family

ID=62003648

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610914614.XA Pending CN107977239A (en) 2016-10-20 2016-10-20 A kind of new energy power prediction system intelligent upgrade method

Country Status (1)

Country Link
CN (1) CN107977239A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112202909A (en) * 2020-10-10 2021-01-08 上海威固信息技术股份有限公司 Online upgrading method and system for computer storage system

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104407877A (en) * 2014-10-16 2015-03-11 北京京东尚科信息技术有限公司 Method and system for upgrading terminal

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104407877A (en) * 2014-10-16 2015-03-11 北京京东尚科信息技术有限公司 Method and system for upgrading terminal

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112202909A (en) * 2020-10-10 2021-01-08 上海威固信息技术股份有限公司 Online upgrading method and system for computer storage system

Similar Documents

Publication Publication Date Title
CN110212645B (en) Power consumption information acquisition terminal power failure event reporting method and device
Bao et al. Impact analysis of human factors on power system operation reliability
CN101267644B (en) A storage method for monitoring data
WO2016169240A1 (en) Load transfer method and system for transformer substation bus
CN105388990A (en) Power saving processing method and apparatus for terminal device
CN104038373B (en) information early warning and self-repairing system and method
CN110866646B (en) Electric power system safety check method and safety check device
CN105157294A (en) Control method and system for multi-online intelligent oil returning and multi-online system
CN110083640A (en) A kind of recognition methods of platform area and device based on power failure data
CN110097275A (en) A kind of family change relational checking method and device based on platform area power failure data
CN106300436A (en) A kind of hydroelectric power plant's simultaneous interconnecting control method and device
CN112529445A (en) Scheduling power failure and recovery condition anti-misoperation method and system based on artificial intelligence
Li et al. Collaborative cyber-physical restoration for enhancing the resilience of power distribution systems
CN105117348A (en) Method for monitoring test execution progress of software
CN113789829B (en) District water supply method and system based on big data
CN106126422B (en) A kind of hydroenergy storage station control software automatic debugging system and method
RU2754484C9 (en) Method and device for ensuring the balance of electricity consumption
CN107977239A (en) A kind of new energy power prediction system intelligent upgrade method
Qiu et al. Power system restoration with renewable participation
CN106067886A (en) Security strategy update method and system
CN112508384A (en) Visual automatic monitoring equipment and method for power dispatching operation ticket
CN109686070B (en) Terminal automatic debugging method of electricity consumption information acquisition system, medium and equipment thereof
CN109978301A (en) A kind of Dispatching anti-misoperation method
CN110046143B (en) Integrated architecture optimization system and optimization method of integrated data platform
CN104360189B (en) A kind of grid power blackout event judgment method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180501