CN107975945A - The control method and device of water heater - Google Patents

The control method and device of water heater Download PDF

Info

Publication number
CN107975945A
CN107975945A CN201711192135.2A CN201711192135A CN107975945A CN 107975945 A CN107975945 A CN 107975945A CN 201711192135 A CN201711192135 A CN 201711192135A CN 107975945 A CN107975945 A CN 107975945A
Authority
CN
China
Prior art keywords
water
hot water
pipeline
hot
water heater
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711192135.2A
Other languages
Chinese (zh)
Other versions
CN107975945B (en
Inventor
孙永利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Xiaomi Mobile Software Co Ltd
Original Assignee
Beijing Xiaomi Mobile Software Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Xiaomi Mobile Software Co Ltd filed Critical Beijing Xiaomi Mobile Software Co Ltd
Priority to CN201711192135.2A priority Critical patent/CN107975945B/en
Publication of CN107975945A publication Critical patent/CN107975945A/en
Application granted granted Critical
Publication of CN107975945B publication Critical patent/CN107975945B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24HFLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H9/00Details
    • F24H9/20Arrangement or mounting of control or safety devices
    • F24H9/2007Arrangement or mounting of control or safety devices for water heaters

Abstract

The disclosure is directed to a kind of control method and device of water heater, this method includes:Before the water outlet of hot water pipeline of the water heater is opened, the water in hot water pipeline is transferred to backup line;Control the water heater to begin to warm up, and control the water after the water heater heating to flow into the hot water pipeline.The technical solution can enable a user to the hot water after timely being heated using upper water heater, let user experiencing the use pleasant sensation of instant-heating;In addition, the cold water of hot water pipeline outflow is transferred to other backup lines to re-use, the cold water resource that it also avoid to a certain extent wastes.

Description

The control method and device of water heater
Technical field
This disclosure relates to field of terminal technology, more particularly to the control method and device of water heater.
Background technology
As people's living standard increasingly improves, people are also higher and higher to the comfort requirement in family life.Therewith The various electric equipment products come facilitate human lives.For example, water heater, can be that user manufactures hot water, in this way, cold Cold winter, user can easily use hot water in kitchen, bathing when needing to use water.
The content of the invention
The embodiment of the present disclosure provides a kind of control method and device of water heater.The technical solution is as follows:
According to the first aspect of the embodiment of the present disclosure, there is provided a kind of control method of water heater, including:
Before the water outlet of hot water pipeline of the water heater is opened, the water in hot water pipeline is transferred to spare pipe Road;
Control the water heater to begin to warm up, and control the water after the water heater heating to flow into the hot water pipeline.
In one embodiment, the method further includes:
User is obtained to be accustomed to the water moment;
Before the water outlet of the hot water pipeline in the opening water heater, the water in hot water pipeline is transferred to spare Pipeline;Including:
It is accustomed to, with before the water moment, the water in hot water pipeline being transferred to backup line in the user.
In one embodiment, the control water heater is begun to warm up, including:
Detect the temperature of the water in the hot water pipeline;
When the temperature is less than or equal to preset temperature, the water in the hot water pipeline is transferred to backup line.
In one embodiment, the method further includes:
When the hot water pipeline water outlet is closed, water the going out in hot water pipeline after the water heater heating is detected When entering amount and meeting preset condition, the water after the water heater is heated, which is pumped into the incubation cavity, to be cached;
After water in by hot water pipeline is transferred to backup line, the method further includes:
The water of caching in the incubation cavity is controlled to flow into the hot water pipeline.
In one embodiment, it is described before the water outlet of hot water pipeline of the water heater is opened, by hot water pipeline Interior water is transferred to backup line, including:
Enabled instruction is received, the enabled instruction is used to notify user to begin to use hot water;
Water in the hot water pipeline is transferred to the backup line;
Open the water outlet of the hot water pipeline.
According to the second aspect of the embodiment of the present disclosure, there is provided a kind of control device of water heater, including:
Shift module, for before the water outlet of hot water pipeline of the water heater is opened, by the water in hot water pipeline It is transferred to backup line;
First control module, for controlling the water heater to begin to warm up, and controls the current after the water heater heating Enter the hot water pipeline.
In one embodiment, described device further includes:
Acquisition module, is accustomed to the water moment for obtaining user;
The shift module includes:
First transfer submodule, for being accustomed to, with before the water moment, the water in hot water pipeline being transferred in the user Backup line.
In one embodiment, the shift module includes:
Detection sub-module, for detecting the temperature of the water in the hot water pipeline;
Second transfer submodule, for when the temperature is less than or equal to preset temperature, by the water in the hot water pipeline It is transferred to backup line.
In one embodiment, described device further includes:
Cache module, for when the hot water pipeline water outlet is closed, detecting that the water after the water heater heating exists When discrepancy amount in hot water pipeline meets preset condition, the water after the water heater is heated, which is pumped into the incubation cavity, to be cached;
Described device further includes:
Second control module, for controlling the water cached in the incubation cavity to flow into the hot water pipeline.
In one embodiment, the shift module includes:
Receiving submodule, for receiving enabled instruction, the enabled instruction is used to notify user to begin to use hot water;
3rd transfer submodule, for the water in the hot water pipeline to be transferred to the backup line;
Submodule is opened, for opening the water outlet of the hot water pipeline.
According to the third aspect of the embodiment of the present disclosure, there is provided a kind of control device of water heater, including:
Processor;
For storing the memory of processor-executable instruction;
Wherein, the processor is configured as:
Before the water outlet of hot water pipeline of the water heater is opened, the water in hot water pipeline is transferred to spare pipe Road;
Control the water heater to begin to warm up, and control the water after the water heater heating to flow into the hot water pipeline.
According to the fourth aspect of the embodiment of the present disclosure, there is provided a kind of computer-readable recording medium, is stored with computer and refers to Order, the computer instruction realize the step in the above method when being executed by processor.
The technical scheme provided by this disclosed embodiment can include the following benefits:The present embodiment can open institute Before the water outlet for stating the hot water pipeline of water heater, the water in hot water pipeline is transferred to backup line, controls the water heater Begin to warm up, and control the water after the water heater heating to flow into the hot water pipeline, in this way, opening the hot-water line of water heater Before the water outlet in road, the water in hot water pipeline is transferred to backup line, and the water for heating water heater flows into hot water Pipeline so that after the water outlet of hot water pipeline of water heater is opened, after user can timely use water heater's heating Hot water, while the cold water that hot water pipeline flows out is transferred to other backup lines to re-use, it also avoid certain journey Cold water resource on degree wastes.
It should be appreciated that the general description and following detailed description of the above are only exemplary and explanatory, not The disclosure can be limited.
Brief description of the drawings
Attached drawing herein is merged in specification and forms the part of this specification, shows the implementation for meeting the disclosure Example, and be used to together with specification to explain the principle of the disclosure.
Fig. 1 is a kind of flow chart of the control method of water heater according to an exemplary embodiment.
Fig. 2 is a kind of flow chart of the control method of water heater according to an exemplary embodiment.
Fig. 3 is a kind of flow chart of the control method of water heater according to an exemplary embodiment.
Fig. 4 is a kind of block diagram of the control device of water heater according to an exemplary embodiment.
Fig. 5 is a kind of block diagram of the control device of water heater according to an exemplary embodiment.
Fig. 6 is a kind of block diagram of the control device of water heater according to an exemplary embodiment.
Fig. 7 is a kind of block diagram of the control device of water heater according to an exemplary embodiment.
Fig. 8 is a kind of block diagram of the control device of water heater according to an exemplary embodiment.
Fig. 9 is a kind of block diagram of the control device of water heater according to an exemplary embodiment.
Embodiment
Here exemplary embodiment will be illustrated in detail, its example is illustrated in the accompanying drawings.Following description is related to During attached drawing, unless otherwise indicated, the same numbers in different attached drawings represent the same or similar key element.Following exemplary embodiment Described in embodiment do not represent all embodiments consistent with the disclosure.On the contrary, they be only with it is such as appended The example of the consistent apparatus and method of some aspects be described in detail in claims, the disclosure.
In general, when user heats acquisition hot water by water heater in the winter time, when just opening the hot-water switch of tap, Often still cold water for some time out, more than hot water is just had after certain time, this is because user opens heat During water water valve, water heater is just begun to warm up, it is therefore desirable to is waited for a period of time, simultaneously as water heater is between tap Existing always between hot water pipeline is cold water, it is necessary to waits the cold water in hot water pipeline to have hot water stream after all releasing Go out, then within this period of cold water outflow, user can be constantly in the state of wait, also tend to that there are time-consuming water wasting Situation.
To solve the above-mentioned problems, the present embodiment can before the water outlet of hot water pipeline of the water heater is opened, Water in hot water pipeline is transferred to backup line, controls the water heater to begin to warm up, and after the control water heater heating Water flow into the hot water pipeline, in this way, before the water outlet of hot water pipeline of water heater is opened, by hot water pipeline Water be transferred to backup line, and make water heater heat water flow into hot water pipeline so that open water heater hot water pipeline Water outlet after, user can timely use water heater heating after hot water, while by hot water pipeline flow out cold water quilt Other backup lines are transferred to re-use, the cold water resource that it also avoid to a certain extent wastes.
Fig. 1 is a kind of flow chart of the control method of water heater according to an exemplary embodiment, as shown in Figure 1, The control method of the water heater is used in the equipment such as water heater, comprises the following steps 101-102:
In a step 101, before the water outlet of hot water pipeline of the water heater is opened, the water in hot water pipeline is turned Move to backup line.
In a step 102, control the water heater to begin to warm up, and control described in the water inflow after the water heater heating Hot water pipeline.
Here, hot water pipeline refers to the pipeline that the hot water after water heater heating flows through, and user is when using hot water, water heater The switch of the water outlet of hot water pipeline, which can be opened, makes hot water be flowed out for users to use from water outlet.The backup line can be with cold water Inlet channel of pipeline or water heater etc..
Here, hot water pipeline can be switched to backup line by water heater, in hot water pipeline and the interface of backup line First switch is set, water heater control can open the first switch before the water outlet of hot water pipeline of water heater is opened, So that the water in hot water pipeline flows into the backup line, and certainly, if hydraulic pressure is inadequate when the water in hot water pipeline flow to backup line, The first water pump can also be set in backup line or interface, control first water pump that the water in hot water pipeline is pumped into this spare Pipeline.Here, water heater when receiving enabled instruction, can open the water outlet of the hot water pipeline of water heater, and open Before the water outlet of the hot water pipeline of water heater, the water in hot water pipeline is transferred to backup line.
Here, while the water that water heater can be in by hot water pipeline is transferred to backup line, control water heater starts Heating, when heated, it is necessary to wait for a period of time, the hot water for just having certain temperature comes out water heater, therefore, can be in water heater Hot water apparatus water outlet set second switch, the switch to close after, the water of heating is not just in the hot water apparatus of water heater It can flow out, after the water in hot water pipeline is fully transferred to backup line by water heater, close first switch, stop hot water Water in pipeline is transferred to backup line, while opens the second switch, and at this time, the water in the hot water apparatus of water heater is added Heat, controls the water after the water heater heating to flow into hot water pipeline, adds in this way, the hot water pipeline inner cold water has just changed water heater into Hot water after heat.So when opening the switch of water outlet of hot water pipeline, since the cold water in hot water pipeline has been transferred To backup line, the hot water of water heater heating has flowed into hot water pipeline, therefore hot water pipeline directly can flow out hot water for user, In this way, user can directly use upper hot water, it is often more important that, the cold water of hot water pipeline outflow is transferred to other backup lines To re-use, the cold water resource that it also avoid to a certain extent wastes.
Explanation is needed exist for, the water outlet of the hot water apparatus of water heater can not also set switch, in this way, hot water While water of the device in by hot water pipeline is transferred to backup line, the water after water heater heating can also flow into the hot-water line Road, at this point it is possible to set a temperature sensor in the interface of hot water pipeline and backup line, is so continuing hot water pipeline When being transferred to backup line after interior water extraction, if detecting, the water temperature pumped out from hot water pipeline reaches preset temperature such as user and practises Used hot water temperature, it is possible to close first switch, stop the water in hot water pipeline being transferred to backup line, at this time, hot water Water in pipeline is exactly the hot water for reaching preset temperature, is also existed in hot water pipeline when avoiding the user from using hot water substantial amounts of cold Water.
The present embodiment can turn the water in hot water pipeline before the water outlet of hot water pipeline of the water heater is opened Backup line is moved to, controls the water heater to begin to warm up, and controls the water after the water heater heating to flow into the hot-water line Road, in this way, before the water outlet of hot water pipeline of water heater is opened, is transferred to spare pipe by the water in hot water pipeline Road, and the water for heating water heater flows into hot water pipeline so that after the water outlet of hot water pipeline of water heater is opened, Yong Huneng Enough using upper water heater heating after hot water, while by hot water pipeline flow out cold water be transferred to other backup lines so as to Re-use, the cold water resource that it also avoid to a certain extent wastes.
In a kind of possible embodiment, the control method of above-mentioned water heater can also comprise the following steps A1, above-mentioned Step 101 may be embodied as following steps A2.
In step A1, obtain user and be accustomed to the water moment.
In step A2, it is accustomed to, with before the water moment, the water in hot water pipeline being transferred to backup line in the user.
Here, user can install the client of water heater in user terminal such as on mobile phone, be bound by the client The water heater, user inputs user and is accustomed to the water moment on the client, when the client in terminal gets custom water After quarter, the user can be accustomed to being got with water timing synchronization to the water heater bound with terminal, such water heater User was accustomed to the water moment.
Alternatively, water heater can also obtain user and be accustomed to being used with water moment, the custom according to the custom water information of user Water information can be the information using hot water that different user is accustomed in family, such as use the time information of hot water every time.If User can obtain the history of each user in family using overheat hydrophone, the then water heater from the application server of the water heater With water information, the custom water information using these history by the use of water information as user.If user uses the water heater for the first time, The water heater can obtain the identity information such as information such as age, gender, occupation of user, according to above-mentioned use by connecting network The identity information networking search at family, obtains the custom water information of similar crowd, using the custom of affiliated crowd by the use of water information as The custom of these users water information.Alternatively, user can install the client of water heater in user terminal such as on mobile phone, lead to Cross the client and bind the water heater, user inputs the custom water information of user on the client, the client in terminal The custom of user is got with after water information, the custom of the user can be sent to water heater with water information.Certainly, water heater Other modes can also be used to obtain the custom water information of user, be no longer described in detail one by one herein.Water heater gets user's After custom uses water information, it can determine that user was accustomed to the water moment according to the custom water information of user.
Here, water heater gets user and is accustomed to after the water moment, can be when user is accustomed to being preset before the water moment Between, the water in hot water pipeline is transferred to backup line, e.g., the custom water moment for obtaining user is 21:00, then can with Family custom preset time period before the water moment such as 10 minutes i.e. 20:50, the water in hot water pipeline can be transferred to standby by terminal With pipeline, meanwhile, can also it control water heater to begin to warm up, and control the water after the water heater heating to flow into the hot-water line Road.In this way, when user is 21:When 00 or so opening hot water water valve uses hot water, since the cold water in hot water pipeline has been turned Backup line is moved to, the hot water of water heater heating has flowed into hot water pipeline, directly can flow out hot water for user, in this way, with Family can timely use upper hot water, let user experiencing the use pleasant sensation of instant-heating;Importantly, hot water pipeline flows out Cold water be transferred to other backup lines to re-use, it also avoid cold water resource to a certain extent and waste.
The present embodiment can obtain user and be accustomed to the water moment, being thus accustomed to, with before the water moment, carrying in user The preceding water by hot water pipeline is transferred to backup line, while can also control the water after water heater heating to flow into the hot-water line Road, in this way, the water after the water in hot water pipeline is transferred to backup line before user's use and heats water heater flows into The hot water pipeline so that user is when using hot water without waiting for the heat after can timely being heated using upper water heater Water, lets user experiencing the use pleasant sensation of instant-heating.
In a kind of possible embodiment, the step 101 in the control method of above-mentioned water heater may be embodied as following Step B1 and B2.
In step bl is determined, the temperature of the water in the hot water pipeline is detected.
In step B2, when the temperature is less than or equal to preset temperature, the water in the hot water pipeline is transferred to standby Use pipeline.
Here, user every time use hot water before, the water in hot water pipeline can be able to be heat be also likely to be it is cold, work as hot water When water in pipeline is heat, and the water in the hot water pipeline need not be shifted, when user opens opening for hot water pipeline water outlet When pass uses hot water, the water flowed out out of this hot water pipeline is exactly hot water;When the water in hot water pipeline is cold water, just need The water in the hot water pipeline is shifted, changes the cold water in the hot water pipeline into hot water after water heater heating.Therefore can be in hot water One temperature sensor is set on the hot water pipeline of device, which is used for the temperature for measuring the water in hot water pipeline.At this When temperature is more than preset temperature, show that the water in hot water pipeline is warm enough, and the water in the hot water pipeline need not be shifted, when with The switch of hot water pipeline water outlet is opened when using hot water in family, and the water flowed out out of this hot water pipeline is hot water, user can and When use on hot water.When the temperature is less than or equal to preset temperature, show that the water in hot water pipeline is not warm enough, it is necessary to shift this Water in hot water pipeline, is just transferred to backup line by the water in hot water pipeline at this time.
The present embodiment just controls water pump only when the temperature for detecting the water in hot water pipeline is less than or equal to preset temperature Water in hot water pipeline is transferred to backup line, reduces the transfer number of water in hot water pipeline, resource consumption is reduced, also avoids Hot water, which is transferred out of, in hot water pipeline turns cold and wastes thermal water resource.
In a kind of possible embodiment, the control method of above-mentioned water heater can also comprise the following steps C1, in step The further comprising the steps of C2 of the method after rapid 103.
In step C1, when the hot water pipeline water outlet is closed, detect the water after the water heater heating in heat When discrepancy amount in waterpipe meets preset condition, the water after the water heater is heated, which is pumped into the incubation cavity, to be cached.
In step C2, the water of caching in the incubation cavity is controlled to flow into the hot water pipeline.
Here, an incubation cavity can be set on water heater, which is used to cache the hot water after water heater heating, heat Water flow monitoring device is installed on hydrophone, after water heater, which starts, to be begun to warm up, when the hot water pipeline water outlet is closed, table Bright user need not use hot water at this time, monitor at this time from the heating unit of water heater flow into the hot water amount of the hot water pipeline with Compared from the water of hot water pipeline outflow, discrepancy amount meets that preset condition such as discrepancy amount difference is hot water pipeline capacity or hot-water line The 70% of road capacity with it is first-class when, indicating that has enough hot water in hot water pipeline, at this time can will in water heater heat after Water be pumped into incubation cavity caching, the hot water cached in incubation cavity can persistently be kept the temperature.In this way, the hot water in hot water pipeline becomes It is cold, after the water in the hot water pipeline is transferred to backup line by water heater, it is possible to open the outlet valve of the incubation cavity so that The hot water of caching flows into the hot water pipeline in incubation cavity.Certainly, the hot water in incubation cavity may be insufficient to be full of hot water pipeline, this When water heater hot water apparatus in heating after hot water can continue to flow into full of the hot water pipeline.Certainly work as and monitor hot-water line After road is filled, the hot water that can continue to heat in hot water apparatus, which is pumped into the incubation cavity, to be preserved.
The present embodiment can set incubation cavity on water heater, the good hot water of buffered in advance in the incubation cavity, at this by heat Water in waterpipe is transferred to after backup line, the hot water cached in incubation cavity is pumped into the hot water pipeline so that the hot water Hot water can be rapidly filled with pipeline, water speed is changed in raising.
In a kind of possible embodiment, the step 101 in the control method of above-mentioned water heater can be implemented as following Step D1 to D3.
In step D1, enabled instruction is received, the enabled instruction is used to notify user to begin to use hot water.
In step d 2, the water in the hot water pipeline is transferred to the backup line.
In step D3, the water outlet of the hot water pipeline is opened.
Here, the user that water heater is predicted is accustomed to may be inaccurate with the water moment, this may result in user and is not surveying Examination moment use will waste the thermal water resource of water heater, alternatively, user at the nonanticipating moment in use, being flowed out in hot water pipeline Water be still cold water, to solve the problems, such as this, in the present embodiment, water heater can user open water heater starting switch When, enabled instruction is received, which is used to notify user to begin to use hot water, and at this time, water heater will not open hot water The water outlet of pipeline, but the water in hot water pipeline is first transferred to backup line, water heater can start to add while transfer Heat, simultaneously closes off the switch of the heating unit of water heater;After water in by hot water pipeline is fully transferred to backup line, The switch for opening the heating unit of water heater opens the water outlet of hot water pipeline at the same time, and the water after water heater heating can pass through Hot water pipeline flows out for users to use.
Water in hot water pipeline just can be transferred to the spare pipe by the present embodiment when user inputs enabled instruction Road, and the water outlet of hot water pipeline is opened after the transfer so that the water of water heater heating is flowed out by hot water pipeline, accurate to ensure Water in hot water pipeline can be transferred to backup line by user using during water heater every time, and the water for heating water heater flows into Hot water pipeline so that after the water outlet of hot water pipeline of water heater is opened, after user can use upper water heater heating Hot water.
The process of realization is discussed in detail below by several embodiments.
Fig. 2 is a kind of flow chart of the control method of water heater according to an exemplary embodiment, as shown in Fig. 2, This method can be realized by equipment such as water heaters, including step 201-204.
In step 201, user is obtained to be accustomed to the water moment.
In step 202, it is accustomed to, with before the water moment, detecting the temperature of the water in the hot water pipeline in the user.
In step 203, when the temperature is less than or equal to preset temperature, the water in the hot water pipeline is transferred to standby Use pipeline.
In step 204, control the water heater to begin to warm up, and control described in the water inflow after the water heater heating Hot water pipeline.
Fig. 3 is a kind of flow chart of the control method of water heater according to an exemplary embodiment, as shown in figure 3, This method can be realized by equipment such as water heaters, including step 301-306.
In step 301, when the hot water pipeline water outlet is closed, detect the water after the water heater heating in heat When discrepancy amount in waterpipe meets preset condition, the water after the water heater is heated, which is pumped into the incubation cavity, to be cached.
In step 302, enabled instruction is received, the enabled instruction is used to notify user to begin to use hot water.
In step 303, the water in the hot water pipeline is transferred to the backup line.
In step 304, the water of caching in the incubation cavity is controlled to flow into the hot water pipeline.
In step 305, control the water heater to begin to warm up, and control described in the water inflow after the water heater heating Hot water pipeline.
Within step 306, the water outlet of the hot water pipeline is opened.
Following is embodiment of the present disclosure, can be used for performing embodiments of the present disclosure.
Fig. 4 is a kind of block diagram of the control device of water heater according to an exemplary embodiment, which can lead to Cross software, hardware or both be implemented in combination with it is some or all of as electronic equipment.As shown in figure 4, the water heater Control device includes:401 and first control module 402 of shift module;Wherein:
Shift module 401, for before the water outlet of hot water pipeline of the water heater is opened, by hot water pipeline Water is transferred to backup line;
First control module 402, for controlling the water heater to begin to warm up, and controls the water after the water heater heating Flow into the hot water pipeline.
As a kind of possible embodiment, Fig. 5 is a kind of control dress of water heater according to an exemplary embodiment The block diagram put, as shown in figure 5, the control device of water heater disclosed above can be configured to include acquisition module 403, The shift module 401 is configured to include the first transfer submodule 4011, wherein:
Acquisition module 403, is accustomed to the water moment for obtaining user;
First transfer submodule 4011, for being accustomed to, with before the water moment, the water in hot water pipeline being turned in the user Move to backup line.
As a kind of possible embodiment, Fig. 6 is a kind of control dress of water heater according to an exemplary embodiment The block diagram put, the control device of water heater disclosed above can also be configured to shift module 401 to include detection sub-module 4012 and second shift submodule 4013, wherein:
Detection sub-module 4012, for detecting the temperature of the water in the hot water pipeline;
Second transfer submodule 4013, for when the temperature is less than or equal to preset temperature, by the hot water pipeline Water be transferred to backup line.
As a kind of possible embodiment, Fig. 7 is a kind of control dress of water heater according to an exemplary embodiment The block diagram put, as shown in fig. 7, the control device of water heater disclosed above can be configured to include 404 He of cache module Second control module 405, wherein:
Cache module 404, for when the hot water pipeline water outlet is closed, detecting the water after water heater heating When discrepancy amount in hot water pipeline meets preset condition, the water after the water heater is heated, which is pumped into the incubation cavity, to be delayed Deposit.
Second control module 405, for controlling the water cached in the incubation cavity to flow into the hot water pipeline.
As a kind of possible embodiment, Fig. 8 is a kind of control dress of water heater according to an exemplary embodiment The block diagram put, as shown in figure 8, the control device of water heater disclosed above can also be configured to shift module 401 to include connecing Submodule the 4014, the 3rd is received to shift submodule 4015 and open submodule 4016, wherein:
Receiving submodule 4014, for receiving enabled instruction, the enabled instruction is used to notify user to begin to use hot water;
3rd transfer submodule 4015, for the water in the hot water pipeline to be transferred to the backup line;
Submodule 4016 is opened, for opening the water outlet of the hot water pipeline.
On the device in above-described embodiment, wherein modules perform the concrete mode of operation in related this method Embodiment in be described in detail, explanation will be not set forth in detail herein.
Fig. 9 is a kind of block diagram of the control device of water heater according to an exemplary embodiment, which is applicable in In water heater arrangement.Device 900 can include following one or more assemblies:Processing component 901, memory 902, power supply module 903, multimedia component 904, input/output (I/O) interface 906, sensor component 907, and communication component 908.
The integrated operation of the usual control device 900 of processing component 901, such as operates phase with display, data communication and record Associated operation.Processing component 901 can carry out execute instruction including one or more processors 920, to complete above-mentioned method All or part of step.In addition, processing component 901 can include one or more modules, easy to processing component 901 and other Interaction between component.For example, processing component 901 can include multi-media module, to facilitate multimedia component 904 and treatment group Interaction between part 901.
Memory 902 is configured as storing various types of data to support the operation in device 900.These data are shown Example includes the instruction of any application program or method for being operated on device 900, etc..Memory 902 can be by any class The volatibility or non-volatile memory device or combinations thereof of type are realized, such as static RAM (SRAM), electricity Erasable Programmable Read Only Memory EPROM (EEPROM), Erasable Programmable Read Only Memory EPROM (EPROM), programmable read only memory (PROM), read-only storage (ROM), magnetic memory, flash memory, disk or CD.
Power supply module 903 provides electric power for the various assemblies of device 900.Power supply module 903 can include power management system System, one or more power supplys, and other components associated with generating, managing and distributing electric power for device 900.
Multimedia component 904 is included in the screen of one output interface of offer between described device 900 and user.One In a little embodiments, screen can include liquid crystal display (LCD) and touch panel (TP).If screen includes touch panel, screen Curtain may be implemented as touch-screen, to receive input signal from the user.Touch panel includes one or more touch sensings Device is to sense the gesture on touch, slip and touch panel.The touch sensor can not only sense touch or sliding action Border, but also detect and the duration and pressure associated with the touch or slide operation.
The interface 906 of I/O provides interface, above-mentioned peripheral interface module between processing component 901 and peripheral interface module Can be keyboard, click wheel, button etc..These buttons may include but be not limited to:Home button, volume button, start button and Locking press button.
Sensor component 907 includes one or more sensors, and the state for providing various aspects for device 900 is commented Estimate.For example, sensor component 907 can be temperature sensor, the temperature of water in water heater can be detected.
Communication component 908 is configured to facilitate the communication of wired or wireless way between device 900 and other equipment.Device 900 can access the wireless network based on communication standard, such as WiFi, 2G or 3G, or combinations thereof.
In the exemplary embodiment, device 900 can be believed by one or more application application-specific integrated circuit (ASIC), numeral Number processor (DSP), digital signal processing appts (DSPD), programmable logic device (PLD), field programmable gate array (FPGA), controller, microcontroller, microprocessor or other electronic components are realized, for performing the above method.
In the exemplary embodiment, a kind of non-transitorycomputer readable storage medium including instructing, example are additionally provided Such as include the memory 902 of instruction, above-metioned instruction can be performed to complete the above method by the processor 920 of device 900.For example, The non-transitorycomputer readable storage medium can be ROM, random access memory (RAM), CD-ROM, tape, floppy disk With optical data storage devices etc..
A kind of computer-readable recording medium is present embodiments provided, when the instruction in the storage medium is by device 900 Processor perform when realize following steps:
Before the water outlet of hot water pipeline of the water heater is opened, the water in hot water pipeline is transferred to spare pipe Road;
Control the water heater to begin to warm up, and control the water after the water heater heating to flow into the hot water pipeline.
Instruction in the storage medium can also realize following steps when being executed by processor:
The method further includes:
User is obtained to be accustomed to the water moment;
Before the water outlet of the hot water pipeline in the opening water heater, the water in hot water pipeline is transferred to spare Pipeline, including:
It is accustomed to, with before the water moment, the water in hot water pipeline being transferred to backup line in the user.
Instruction in the storage medium can also realize following steps when being executed by processor:
Before the water outlet of the hot water pipeline in the opening water heater, the water in hot water pipeline is transferred to spare Pipeline, including:
Detect the temperature of the water in the hot water pipeline;
When the temperature is less than or equal to preset temperature, the water in the hot water pipeline is transferred to backup line.
Instruction in the storage medium can also realize following steps when being executed by processor:
The method further includes:
When the hot water pipeline water outlet is closed, water the going out in hot water pipeline after the water heater heating is detected When entering amount and meeting preset condition, the water after the water heater is heated, which is pumped into the incubation cavity, to be cached;
After water in by hot water pipeline is transferred to backup line, the method further includes:
The water of caching in the incubation cavity is controlled to flow into the hot water pipeline.
Instruction in the storage medium can also realize following steps when being executed by processor:
Before the water outlet of the hot water pipeline in the opening water heater, the water in hot water pipeline is transferred to spare Pipeline, including:
Enabled instruction is received, the enabled instruction is used to notify user to begin to use hot water;
Water in the hot water pipeline is transferred to the backup line;
Open the water outlet of the hot water pipeline.
The present embodiment additionally provides a kind of control device of water heater, including:
Processor;
For storing the memory of processor-executable instruction;
Wherein, the processor is configured as:
Before the water outlet of hot water pipeline of the water heater is opened, the water in hot water pipeline is transferred to spare pipe Road;
Control the water heater to begin to warm up, and control the water after the water heater heating to flow into the hot water pipeline.
The processor can be additionally configured to:
The method further includes:
User is obtained to be accustomed to the water moment;
Before the water outlet of the hot water pipeline in the opening water heater, the water in hot water pipeline is transferred to spare Pipeline, including:
It is accustomed to, with before the water moment, the water in hot water pipeline being transferred to backup line in the user.
The processor can be additionally configured to:
Before the water outlet of the hot water pipeline in the opening water heater, the water in hot water pipeline is transferred to spare Pipeline, including:
Detect the temperature of the water in the hot water pipeline;
When the temperature is less than or equal to preset temperature, the water in the hot water pipeline is transferred to backup line.
The processor can be additionally configured to:
The method further includes:
When the hot water pipeline water outlet is closed, water the going out in hot water pipeline after the water heater heating is detected When entering amount and meeting preset condition, the water after the water heater is heated, which is pumped into the incubation cavity, to be cached;
After water in by hot water pipeline is transferred to backup line, the method further includes:
The water of caching in the incubation cavity is controlled to flow into the hot water pipeline.
The processor can be additionally configured to:
Before the water outlet of the hot water pipeline in the opening water heater, the water in hot water pipeline is transferred to spare Pipeline, including:
Enabled instruction is received, the enabled instruction is used to notify user to begin to use hot water;
Water in the hot water pipeline is transferred to the backup line;
Open the water outlet of the hot water pipeline.
Those skilled in the art will readily occur to the disclosure its after considering specification and putting into practice disclosure disclosed herein Its embodiment.This application is intended to cover any variations, uses, or adaptations of the disclosure, these modifications, purposes or Person's adaptive change follows the general principle of the disclosure and including the undocumented common knowledge in the art of the disclosure Or conventional techniques.Description and embodiments are considered only as exemplary, and the true scope and spirit of the disclosure are by following Claim is pointed out.
It should be appreciated that the present disclosure is not limited to the precise structures that have been described above and shown in the drawings, and And various modifications and changes may be made without departing from the scope thereof.The scope of the present disclosure is only limited by appended claim.

Claims (12)

  1. A kind of 1. control method of water heater, it is characterised in that including:
    Before the water outlet of hot water pipeline of the water heater is opened, the water in hot water pipeline is transferred to backup line;
    Control the water heater to begin to warm up, and control the water after the water heater heating to flow into the hot water pipeline.
  2. 2. according to the method described in claim 1, it is characterized in that, the method further includes:
    User is obtained to be accustomed to the water moment;
    Before the water outlet of the hot water pipeline in the opening water heater, the water in hot water pipeline is transferred to spare pipe Road, including:
    It is accustomed to, with before the water moment, the water in hot water pipeline being transferred to backup line in the user.
  3. 3. the according to the method described in claim 1, it is characterized in that, water outlet in the hot water pipeline for opening the water heater Before mouthful, the water in hot water pipeline is transferred to backup line, including:
    Detect the temperature of the water in the hot water pipeline;
    When the temperature is less than or equal to preset temperature, the water in the hot water pipeline is transferred to backup line.
  4. 4. according to the method described in claim 1, it is characterized in that, the method further includes:
    When the hot water pipeline water outlet is closed, discrepancy amount of the water after the water heater heating in hot water pipeline is detected When meeting preset condition, the water after the water heater is heated, which is pumped into the incubation cavity, to be cached;
    After water in by hot water pipeline is transferred to backup line, the method further includes:
    The water of caching in the incubation cavity is controlled to flow into the hot water pipeline.
  5. 5. the according to the method described in claim 1, it is characterized in that, water outlet in the hot water pipeline for opening the water heater Before mouthful, the water in hot water pipeline is transferred to backup line, including:
    Enabled instruction is received, the enabled instruction is used to notify user to begin to use hot water;
    Water in the hot water pipeline is transferred to the backup line;
    Open the water outlet of the hot water pipeline.
  6. A kind of 6. control device of water heater, it is characterised in that including:
    Shift module, for before the water outlet of hot water pipeline of the water heater is opened, the water in hot water pipeline to be shifted To backup line;
    First control module, for controlling the water heater to begin to warm up, and controls the water after the water heater heating to flow into institute State hot water pipeline.
  7. 7. device according to claim 6, it is characterised in that described device further includes:
    Acquisition module, is accustomed to the water moment for obtaining user;
    The shift module includes:
    First transfer submodule, for being accustomed to, with before the water moment, the water in hot water pipeline being transferred to spare in the user Pipeline.
  8. 8. device according to claim 6, it is characterised in that the shift module includes:
    Detection sub-module, for detecting the temperature of the water in the hot water pipeline;
    Second transfer submodule, for when the temperature is less than or equal to preset temperature, the water in the hot water pipeline to be shifted To backup line.
  9. 9. device according to claim 6, it is characterised in that described device further includes:
    Cache module, for when the hot water pipeline water outlet is closed, detecting the water after water heater heating in hot water When discrepancy amount in pipeline meets preset condition, the water after the water heater is heated, which is pumped into the incubation cavity, to be cached;
    Second control module, for controlling the water cached in the incubation cavity to flow into the hot water pipeline.
  10. 10. device according to claim 6, it is characterised in that the shift module includes:
    Receiving submodule, for receiving enabled instruction, the enabled instruction is used to notify user to begin to use hot water;
    3rd transfer submodule, for the water in the hot water pipeline to be transferred to the backup line;
    Submodule is opened, for opening the water outlet of the hot water pipeline.
  11. A kind of 11. control device of water heater, it is characterised in that including:
    Processor;
    For storing the memory of processor-executable instruction;
    Wherein, the processor is configured as:
    Before the water outlet of hot water pipeline of the water heater is opened, the water in hot water pipeline is transferred to backup line;
    Control the water heater to begin to warm up, and control the water after the water heater heating to flow into the hot water pipeline.
  12. 12. a kind of computer-readable recording medium, is stored with computer instruction, it is characterised in that the computer instruction is located Reason device realizes the step in any one of claim 1 to 5 the method when performing.
CN201711192135.2A 2017-11-24 2017-11-24 Control method and device of water heater Active CN107975945B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711192135.2A CN107975945B (en) 2017-11-24 2017-11-24 Control method and device of water heater

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711192135.2A CN107975945B (en) 2017-11-24 2017-11-24 Control method and device of water heater

Publications (2)

Publication Number Publication Date
CN107975945A true CN107975945A (en) 2018-05-01
CN107975945B CN107975945B (en) 2021-03-23

Family

ID=62011542

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711192135.2A Active CN107975945B (en) 2017-11-24 2017-11-24 Control method and device of water heater

Country Status (1)

Country Link
CN (1) CN107975945B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109339156A (en) * 2018-09-27 2019-02-15 深圳市磐石科技工程技术有限公司 Discharging device, intelligent water supply system and intelligent water supply method
CN115143646A (en) * 2022-06-16 2022-10-04 浙江科技学院 Intelligent hot water control device and control method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2006002477A1 (en) * 2004-07-05 2006-01-12 Arvo Poldmaa Water saving hot water system
CN104296387A (en) * 2013-07-19 2015-01-21 珠海格力电器股份有限公司 Water heater control method and system
CN104930692A (en) * 2015-06-29 2015-09-23 广东万和新电气股份有限公司 Gas water heater, control method thereof and waterway pipe network
CN105352192A (en) * 2015-11-06 2016-02-24 芜湖美的厨卫电器制造有限公司 Electric water heater and control method thereof
CN205481827U (en) * 2016-03-29 2016-08-17 覃伟帆 Small -size hot water buffer
CN205619546U (en) * 2016-03-26 2016-10-05 广东万家乐燃气具有限公司 Gas heater of area reservation function
CN106766216A (en) * 2016-11-11 2017-05-31 广东美的暖通设备有限公司 A kind of intelligent backwater control method, controller and control system
CN106813401A (en) * 2017-03-09 2017-06-09 芜湖美的厨卫电器制造有限公司 Water heater and its control method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2006002477A1 (en) * 2004-07-05 2006-01-12 Arvo Poldmaa Water saving hot water system
CN104296387A (en) * 2013-07-19 2015-01-21 珠海格力电器股份有限公司 Water heater control method and system
CN104930692A (en) * 2015-06-29 2015-09-23 广东万和新电气股份有限公司 Gas water heater, control method thereof and waterway pipe network
CN105352192A (en) * 2015-11-06 2016-02-24 芜湖美的厨卫电器制造有限公司 Electric water heater and control method thereof
CN205619546U (en) * 2016-03-26 2016-10-05 广东万家乐燃气具有限公司 Gas heater of area reservation function
CN205481827U (en) * 2016-03-29 2016-08-17 覃伟帆 Small -size hot water buffer
CN106766216A (en) * 2016-11-11 2017-05-31 广东美的暖通设备有限公司 A kind of intelligent backwater control method, controller and control system
CN106813401A (en) * 2017-03-09 2017-06-09 芜湖美的厨卫电器制造有限公司 Water heater and its control method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109339156A (en) * 2018-09-27 2019-02-15 深圳市磐石科技工程技术有限公司 Discharging device, intelligent water supply system and intelligent water supply method
CN115143646A (en) * 2022-06-16 2022-10-04 浙江科技学院 Intelligent hot water control device and control method
CN115143646B (en) * 2022-06-16 2023-06-27 浙江科技学院 Intelligent hot water control device and control method

Also Published As

Publication number Publication date
CN107975945B (en) 2021-03-23

Similar Documents

Publication Publication Date Title
CN103968552B (en) A kind of electric heater and its control method
CN107975945A (en) The control method and device of water heater
WO2016025802A1 (en) Collaborative energy management system
US20190249903A1 (en) Electronic Control System for Electric Water Heater
CN109282502B (en) Method for forecasting remaining bath time of water storage type water heater
CN102342752A (en) Drinking water device and drinking water temperature adjusting method
US9784472B2 (en) Managing hot water delivery
CN107166636A (en) Air conditioner control method and device
CN105867449B (en) Control the method and device of temperature
CN105673908A (en) Intelligent water-saving faucet based on neural network and single-chip microcomputer
CN110115003B (en) Control system for bathtub, controllable bathing equipment and computer implementation method
CN108954482A (en) A kind of control method, device and computer readable storage medium
CN104110836A (en) Water heater and control method thereof
KR101897703B1 (en) Water saving apparatus of the boiler using hot-water storage tank
CN114061152A (en) Water heater, preheating control method and device of water heater and computer readable storage medium
CN108151323A (en) Intelligence adjusts method, controller, device and the storage medium of water temperature
JP6045364B2 (en) Remote controller for hot water storage type water heater
JP2011220656A (en) System and method for supporting energy saving
JP2010230245A (en) Voice guidance device
CN203949356U (en) Water heater
CN110567163B (en) Water heater control method and device and water heater
CN104019556A (en) Water return control device, water system and water return control method
CN208170748U (en) Water heater
CN204187849U (en) Water heater
JP7194618B2 (en) water heater

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant